1
Spring 2023 (4th Semester)
Dr. Bakht Zamin
(bakht@cecos.edu.pk)
Department of Civil Engineering
CECOS University Peshawar
Lecture Outlines
❑ Transportation Planning – Introduction
❑ Basic Elements of Transportation Planning
❑ Transportation Planning Institutions
❑ Transportation Planning Organizations
❑ Travel Surveys and Travel Demand
❑ Travel Forecasting and Travel Forecasting Model
2
Transportation Planning
❑ Transportation Planning is the process of defining
future policies, goals, investments and designs to
fulfill the future needs and demands in most
effective and well organized way.
❑ Transportation planning is highly essential in
shaping cities, enabling economic activities,
promoting community interaction and enhancing
quality of life.
❑ It is also essential for sustainable development and
ensuring safe accessibility at various levels for all
individuals.
3
Transportation Planning
❑ The transportation planner begins by
❑ Defining the problem
❑ Gathering and analyzing data
❑ Evaluating various alternative solutions
❑ Transportation planning process also involve
❑ Forecast of future traffic
❑ Estimates of the impact of facility on land use
❑ The environment
❑ The community
❑ Cost – benefits analysis
4
Transportation Planning
❑ Among the factors that may justify a transportation
project are
❑ Improvements in traffic flow and safety
❑ Energy consumption
❑ Travel time
❑ Economic growth
❑ Accessibility
5
Transportation Planning
❑ Some transportation projects may have been
selected for reasons unrelated to specific benefits
❑ To stimulate employment in a particular region.
❑ To compete with other cities or statesfor prestige.
❑ To attract industry.
❑ To respond to pressures from a political constituency.
❑ To gain personnel benefits from a particular project.
❑ Whatever the reason for selecting or rejecting a
transportation project, a specific process led to the
conclusion to build or not to build.
6
Basic Elements of Transportation Planning
❑ The transportation planning process comprises
seven basic elements, which are interrelated and
not necessarily carried out sequentially.
❑ The information acquired in one phase of the
process may be helpful in some earlier or later
phase.
❑ So there is a continuity of effort that should
eventually result in a decision.
7
Basic Elements of Transportation Planning
❑ The elements of transportation planning are:
❑ Situation definition
❑ Problem situation
❑ Search for solutions
❑ Analysis of performance
❑ Evaluation of alternatives
❑ Choice of project
❑ Specification and construction.
8
Basic Elements of Transportation Planning
Situation Definition
❑ Understanding of situation that give rise to the
perceived need for a transportation improvement is
required
❑ In this phase, the present system is analyzed and its
characteristics are described
❑ Information about the surrounding area, its people
and their travel habits may be obtained
❑ Previous reports and studies that may be relevant to
the present situation are reviewed and summarized
9
Basic Elements of Transportation Planning
Problem Definition
❑ The purpose of this step is to describe the problem
in terms of objectives to be accomplished by the
project and to translate those objectives into
criteria that can be quantified.
❑ Objectives are statement of purpose, such as to
reduce traffic congestion, to improve safety, to
reduce noise etc.
10
Basic Elements of Transportation Planning
Problem Definition
❑ Criteria are the measure of effectiveness that can be
used to quantify the extent to which a proposed
transportation project will achieve the stated
objectives.
❑ For example, the objective “to reduce traffic
congestion” might use “travel time” as the measure
of the effectiveness.
❑ The characteristics of an acceptable system should
be identified and specific limitations and
requirements should be noted.
11
Basic Elements of Transportation Planning
Search Solution
❑ In this phase of planning process, consideration is
given to a number/variety of ideas, designs,
locations and system configurations that might
provide solutions to the problem.
❑ This is the brainstorming stage, in which many
options may be proposed for later testing and
evaluation.
12
Basic Elements of Transportation Planning
Search Solution
❑ Alternatives can be proposed by any group or
organization.
❑ This phase also includes preliminary feasibility
studies, which might narrow the range of choices.
❑ Some data gathering, filed testing and cost
estimation may be necessary at this stage to
determine the practicality and financial feasibility of
the alternatives being proposed
13
Basic Elements of Transportation Planning
Analysis of Performance
❑ The purpose of performance analysis is to estimate
how each of the proposed alternatives would
perform under present and future conditions.
❑ The criteria identified in the previous steps are
calculated for each transportation option.
❑ This step is a determination of the investment cost
of building the transportation project, as well as
annual costs for maintenance and operation.
14
Basic Elements of Transportation Planning
Analysis of Performance
❑ It also include the use of mathematical models for
estimating travel demands.
❑ The number of persons/vehicles that will use the
system is determined and are considered in design
process.
❑ Environmental effects of the transportation project
are also estimated.
15
Basic Elements of Transportation Planning
Evaluation of Alternatives
❑ The purpose of the evaluation phase is to
determine, how well each alternative will achieve
the objectives of the project as defined by the
criteria.
❑ The performance data produced in the analysis
phase are used to compute the benefits and costs
that will result if the project is selected.
❑ In cases where the results cannot be reduced to a
single monetary value, a weighted rating for each
alternative might be produced and compared with
other proposed projects.
16
Basic Elements of Transportation Planning
Choice of Project
❑ Project selection is made after considering all the
factors involved.
❑ In a simple situation, for example, where the
projects has been authorized and is in the design
phase, a single criteria might be used and the
chosen project might be the one with the lowest
cost.
❑ With a more complex project, many factors have to
be considered, and selection is based on how the
results are perceived by those involved in decision
making.
17
Basic Elements of Transportation Planning
Choice of Project
❑ If the project involves the community, it may be
necessary to hold additional public hearings.
❑ It is possible that none of the alternative will meet
the criteria and hence additional investigation will
be necessary.
18
Basic Elements of Transportation Planning
Specification and Construction
❑ This phase involves the physical location, geometric
dimensions and structural configurations of a
project.
❑ Design planes are produced that can be used by
contractors to estimate the construction cost of
building the project.
❑ When a construction firm is selected, these planes
will be the basis on which the project will be built.
19
Transportation Planning Organization
Policy Committee
22
Transportation Planning Organization
Policy Committee
❑ The policy committee is composed of elected or
appointed officials such as the director of public
works, who represent the governing bodies or
agencies that will be affected by the results.
❑ This committee makes the basic policy decisions
and acts as board of directors for the study.
❑ Committee members will decide the management
aspects of the study as well as key issues of a
financial or political nature.
23
Transportation Planning Organization
Technical Committee
24
Transportation Planning Organization
Technical Committee
❑ The technical committee is composed of the
engineering and planning staffs that are responsible
for carrying out works or evaluating the technical
aspects of the project prepared by consultants.
❑ This group will assure that the necessary
evaluations and cost comparisons for each project
alternative are complete and will supervise the
technical details of the entire process.
25
Transportation Planning Organization
Technical Committee
❑ Typically, the technical committee will include
❑ Highway and traffic engineers
❑ Specialists in land use planning
❑ Economists
❑ Environmental engineers
26
Transportation Planning Organization
Citizen Advisory Committee
27
Transportation Planning Organization
Citizen Advisory Committee
❑ The citizen advisory committee is composed of a
cross section of the community and may include
representatives from labor and business interested
citizens and members of community interest groups
❑ The committee’s functions are
❑ To express community goals and objectives
❑ To suggest alternatives
❑ To react to the proposed alternatives
28
Transportation Planning Organization
Citizen Advisory Committee
❑ Through this committee structure, an open dialogue
is facilitated among the policy makers, technical
staff and community.
❑ When a selection is made and recommendations
are produced by the study, they should be based on
the consensus of all interested parties.
29
Assignment #1
• Demonstrate the sustainable Transportation
System.
• Explain their salient Features.
• Give few examples of such system currently
operating in Pakistan with the technical
specification.
• SubmissionDate: 11th April, 2023
31
Quiz # 1
• Quiz no. 1 will held in Next Class.
• Topic: Lectures 1 & 2
32
Link, Node and Centroid
❑ A highway network consists of links, nodes and
centroids
❑ Link is a portion of the highway system that can be
described by its capacity, lane width and speed
❑ Node is the end point of the link and represents an
intersection or location, where a link changes
direction , capacity, width or speed
❑ Centroid is the location within a zone where trips
are considered to began and end
33
Travel Surveys
❑ Travel surveys are conducted to establish a
complete understanding of the travel patterns
within the study area
❑ For single projects (e.g. highway project), it may be
sufficient to use traffic counts on existing roads or
counting of passengers riding the present system
❑ To understand why people travel or where they
wish to go, Origin – Destination (O – D) survey data
can be useful
34
Travel Surveys
❑ The O – D survey asks questions about
❑ Where the trips begins and ends
❑ The purpose of the trip
❑ The time of the day
❑ The type of the vehicle involved
❑ The type of person making the trip
❑ The O – D survey may be completed by asking
questions the people while riding the bus or when
stopped at a roadside interview station
35
Travel Demand
❑ Travel demand is expressed as the number of
persons or vehicles per unit time that can be
expected to travel on a given segment of a
transportation system
❑ The factors that influence the demand for travelling
are
❑ The location and intensity of land use
❑ The socioeconomic characteristics of people
living in the area
❑ The extent, cost and quality of available
transportation services
36
Factors Influencing Travel Demand
❑ Land use characteristics are a primary determinant
of travel demand
❑ The amount of traffic generated by a parcel of land
depends on how the land is used
❑ For example
❑ Shopping centers
❑ Residential complexes
❑ Office buildings
37
Factors Influencing Travel Demand
❑ Socioeconomic characteristics of the people living
within the society also influence the demand for
transportation
❑ Life styles and values affect how people decide to
use their resources for transportation
❑ For example, a residential area consisting primarily
of high income workers will generate more trips per
person than a residential area populated primarily
by retirees
38
Factors Influencing Travel Demand
❑ Availability of transportation facilities and services
also affects the demand for travel
❑ Travelers are sensitive to the level of services
provided by alternative transportation modes
❑ Choosing mode of transportation depends on
attributes such as
❑ Travel time
❑ Cost
❑ Convenience
❑ Comfort
❑ Safety
39
Travel Forecasting
❑ Travel forecasting is the attempt of estimating the
number of vehicles or people that will use a specific
transportation facility in the future
❑ Travel forecasting begins with the collection of
current traffic data
❑ This traffic data is combined with the other known
data such as population, employment, travel cost
etc. to develop a traffic demand model for the
current situation
❑ Feeding it with the predicted data for population,
employment etc. results in the estimate of future
traffic
40
Travel Forecasting
❑ Travel forecasts are used for several key purposes in
transportation policy, planning and engineering to
calculate the capacity of infrastructure
❑ For example
❑ How many lanes a bridge should have
41
Four-Step Model For Travel Forecasting
❑ Travel forecasting follows the sequential four-step
model or urban transportation planning procedure
❑ The four step of the classical urban transportation
planning system model are:
❑ Trip generation
❑ Trip distribution
❑ Mode choice
❑ Route/ network assignment
42
Four-Step Model For Travel Forecasting
43
Four-Step Model For Travel Forecasting
Trip Generation – How many trips are generated
❑ Trip generation is the process of determining the
number of trips that will begin or end in each traffic
zone
❑ The number of trips produced by and attracted to
each zone depends on its
❑ Residential characteristics
❑ Employment characteristics
❑ Industrial characteristics
❑ For example, the more employment a zone has, the
more work trips it attracts
44
Four-Step Model For Travel Forecasting
Trip Distribution – Where do trips go
❑ Trip distribution is a process by which the trips
generated in one zone are allocated to other zones
in the study area
❑ Trips end are linked to create complete trips
❑ These trips may be within the same zone (internal-
internal) or between adjacent zones (internal-
external) with varying distance
45
Four-Step Model For Travel Forecasting
Mode Choice – What travel mode is used for each trip
❑ Mode choice predicts the choices that
individuals or groups make in selecting their
transportation modes
❑ An important objective is to predict the share
of trips attracted to public transportation
❑ Other factors considered for mode choice
include travel time, travel cost etc.,
46
Four-Step Model For Travel Forecasting
Route/Network Assignment – What is the route of
each trip
❑ The final step is to determine the routes travelers
choose to reach their destinations
❑ Route/Network assignment requires the following
❑ Number of trips that will be made from one zone to
another zone
❑ A description of highway routes between zones
❑ Travel time on each zone route segment
❑ External trips that were not considered in previous steps
47
Four-Step Model For Travel Forecasting
48

Más contenido relacionado

La actualidad más candente

Introduction to tranportation
Introduction to tranportationIntroduction to tranportation
Introduction to tranportationSatyamkumar Jha
 
Traffic engineering and traffic control devices final
Traffic engineering and traffic control devices finalTraffic engineering and traffic control devices final
Traffic engineering and traffic control devices finalLatif Hyder Wadho
 
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)Vijai Krishnan V
 
Traffic Flow Fundamentals
Traffic Flow FundamentalsTraffic Flow Fundamentals
Traffic Flow FundamentalsShaira Lucero
 
Highway capacity and level of service.pptx
Highway capacity and level of service.pptxHighway capacity and level of service.pptx
Highway capacity and level of service.pptxNaveenNavi148500
 
07 Speed, Travel Time & Delay Studies (Traffic Engineering هندسة المرور & Pro...
07 Speed, Travel Time & Delay Studies (Traffic Engineering هندسة المرور & Pro...07 Speed, Travel Time & Delay Studies (Traffic Engineering هندسة المرور & Pro...
07 Speed, Travel Time & Delay Studies (Traffic Engineering هندسة المرور & Pro...Hossam Shafiq I
 
Simulation of Traffic Flow - Density
Simulation of Traffic Flow - DensitySimulation of Traffic Flow - Density
Simulation of Traffic Flow - DensityAzdeen Najah
 
Level of Service(LOS) of a road with Calculation Method
Level of Service(LOS) of a road with Calculation MethodLevel of Service(LOS) of a road with Calculation Method
Level of Service(LOS) of a road with Calculation MethodMd. Abdul Kader
 
Transportation Engineering I
Transportation Engineering  ITransportation Engineering  I
Transportation Engineering IGAURAV. H .TANDON
 
428096463-EVALUATING-TRANSPORTATION-ALTERNATIVES-ppt-pptx.pptx
428096463-EVALUATING-TRANSPORTATION-ALTERNATIVES-ppt-pptx.pptx428096463-EVALUATING-TRANSPORTATION-ALTERNATIVES-ppt-pptx.pptx
428096463-EVALUATING-TRANSPORTATION-ALTERNATIVES-ppt-pptx.pptxShahidRahman37
 
Freeway & Highway LOS (Transportation Engineering)
Freeway & Highway LOS (Transportation Engineering)Freeway & Highway LOS (Transportation Engineering)
Freeway & Highway LOS (Transportation Engineering)Hossam Shafiq I
 
Transportation Engineering I
Transportation Engineering ITransportation Engineering I
Transportation Engineering IShradhesh Marve
 
Accident study (Traffic Engineering) | Jameel Academy
Accident study (Traffic Engineering) | Jameel AcademyAccident study (Traffic Engineering) | Jameel Academy
Accident study (Traffic Engineering) | Jameel AcademyJameel Academy
 
Chapter 2
Chapter 2Chapter 2
Chapter 2EWIT
 

La actualidad más candente (20)

Unit 3
Unit 3Unit 3
Unit 3
 
Introduction to tranportation
Introduction to tranportationIntroduction to tranportation
Introduction to tranportation
 
Traffic engineering and traffic control devices final
Traffic engineering and traffic control devices finalTraffic engineering and traffic control devices final
Traffic engineering and traffic control devices final
 
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
Capacity & Level of Service: Highways & Signalized Intersections (Indo-HCM)
 
Traffic Flow Fundamentals
Traffic Flow FundamentalsTraffic Flow Fundamentals
Traffic Flow Fundamentals
 
Highway capacity and level of service.pptx
Highway capacity and level of service.pptxHighway capacity and level of service.pptx
Highway capacity and level of service.pptx
 
07 Speed, Travel Time & Delay Studies (Traffic Engineering هندسة المرور & Pro...
07 Speed, Travel Time & Delay Studies (Traffic Engineering هندسة المرور & Pro...07 Speed, Travel Time & Delay Studies (Traffic Engineering هندسة المرور & Pro...
07 Speed, Travel Time & Delay Studies (Traffic Engineering هندسة المرور & Pro...
 
PAVEMENT DESIGN
PAVEMENT DESIGNPAVEMENT DESIGN
PAVEMENT DESIGN
 
Road Safety Auditing
Road Safety AuditingRoad Safety Auditing
Road Safety Auditing
 
Simulation of Traffic Flow - Density
Simulation of Traffic Flow - DensitySimulation of Traffic Flow - Density
Simulation of Traffic Flow - Density
 
Level of Service(LOS) of a road with Calculation Method
Level of Service(LOS) of a road with Calculation MethodLevel of Service(LOS) of a road with Calculation Method
Level of Service(LOS) of a road with Calculation Method
 
Design flexible and rigid pavements
Design flexible and rigid pavementsDesign flexible and rigid pavements
Design flexible and rigid pavements
 
Transportation Engineering I
Transportation Engineering  ITransportation Engineering  I
Transportation Engineering I
 
428096463-EVALUATING-TRANSPORTATION-ALTERNATIVES-ppt-pptx.pptx
428096463-EVALUATING-TRANSPORTATION-ALTERNATIVES-ppt-pptx.pptx428096463-EVALUATING-TRANSPORTATION-ALTERNATIVES-ppt-pptx.pptx
428096463-EVALUATING-TRANSPORTATION-ALTERNATIVES-ppt-pptx.pptx
 
Freeway & Highway LOS (Transportation Engineering)
Freeway & Highway LOS (Transportation Engineering)Freeway & Highway LOS (Transportation Engineering)
Freeway & Highway LOS (Transportation Engineering)
 
Transportation Engineering I
Transportation Engineering ITransportation Engineering I
Transportation Engineering I
 
Accident study (Traffic Engineering) | Jameel Academy
Accident study (Traffic Engineering) | Jameel AcademyAccident study (Traffic Engineering) | Jameel Academy
Accident study (Traffic Engineering) | Jameel Academy
 
Airport engineering
Airport engineering Airport engineering
Airport engineering
 
Classification of airport
Classification of airportClassification of airport
Classification of airport
 
Chapter 2
Chapter 2Chapter 2
Chapter 2
 

Similar a Transportation Lecture 2.pdf

Phases and principles of transportation planning
Phases and principles of transportation planningPhases and principles of transportation planning
Phases and principles of transportation planningMuhammadNomanAslam3
 
Oarc slides c02 assessment workshop
Oarc slides c02 assessment workshop  Oarc slides c02 assessment workshop
Oarc slides c02 assessment workshop pyoungkyova
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxssuserc1ed5e
 
43.-Transportation-Decision-Making—Overview-and-Process_23Sep2020 (2).pptx
43.-Transportation-Decision-Making—Overview-and-Process_23Sep2020 (2).pptx43.-Transportation-Decision-Making—Overview-and-Process_23Sep2020 (2).pptx
43.-Transportation-Decision-Making—Overview-and-Process_23Sep2020 (2).pptxAkramElsaied1
 
TRANSPORTATION PLANNING
TRANSPORTATION PLANNINGTRANSPORTATION PLANNING
TRANSPORTATION PLANNINGintan fatihah
 
Unlocking the Secrets of Road Improvement Planning Service.pdf
Unlocking the Secrets of Road Improvement Planning Service.pdfUnlocking the Secrets of Road Improvement Planning Service.pdf
Unlocking the Secrets of Road Improvement Planning Service.pdfmariaavery480
 
Role of transport economist
Role of transport economistRole of transport economist
Role of transport economistMegha Kashyap
 
MKAQ1063 W9 -Transit System Planning CRIed (4).pptx
MKAQ1063 W9 -Transit System Planning CRIed (4).pptxMKAQ1063 W9 -Transit System Planning CRIed (4).pptx
MKAQ1063 W9 -Transit System Planning CRIed (4).pptxNURSUHANABINTIBORHAN
 
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptxPUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptxkipkorirkoech5
 
Transport Technology Research Innovation for International Development (T-TRI...
Transport Technology Research Innovation for International Development (T-TRI...Transport Technology Research Innovation for International Development (T-TRI...
Transport Technology Research Innovation for International Development (T-TRI...KTN
 
Transportation Planning Implications of Automated Vehicles on Texas Highways
Transportation Planning Implications of Automated Vehicles on Texas Highways Transportation Planning Implications of Automated Vehicles on Texas Highways
Transportation Planning Implications of Automated Vehicles on Texas Highways Texas A&M Transportation Institute
 
Knowledge-based Expert System for Route Selection of Road Alignment
Knowledge-based Expert System for Route Selection of Road AlignmentKnowledge-based Expert System for Route Selection of Road Alignment
Knowledge-based Expert System for Route Selection of Road AlignmentUCSI University
 
A Review of MCDM in Transportation and Environmental Projects
A Review of MCDM in Transportation and Environmental ProjectsA Review of MCDM in Transportation and Environmental Projects
A Review of MCDM in Transportation and Environmental ProjectsBME
 
API CollegeSBM 1101 & 1102 &1201Project Fundamentals 1,.docx
API CollegeSBM 1101 & 1102 &1201Project Fundamentals 1,.docxAPI CollegeSBM 1101 & 1102 &1201Project Fundamentals 1,.docx
API CollegeSBM 1101 & 1102 &1201Project Fundamentals 1,.docxjustine1simpson78276
 
Sustainable transport planning
Sustainable transport planning Sustainable transport planning
Sustainable transport planning MOHIT PANCHAL
 
[2015 e-Government Program] Action Plan : Quito(Ecuador)
[2015 e-Government Program] Action Plan : Quito(Ecuador)[2015 e-Government Program] Action Plan : Quito(Ecuador)
[2015 e-Government Program] Action Plan : Quito(Ecuador)shrdcinfo
 
Day2 session3 multi-criteria-analysis
Day2 session3 multi-criteria-analysisDay2 session3 multi-criteria-analysis
Day2 session3 multi-criteria-analysisOECD Environment
 

Similar a Transportation Lecture 2.pdf (20)

Phases and principles of transportation planning
Phases and principles of transportation planningPhases and principles of transportation planning
Phases and principles of transportation planning
 
Oarc slides c02 assessment workshop
Oarc slides c02 assessment workshop  Oarc slides c02 assessment workshop
Oarc slides c02 assessment workshop
 
dr. cal
dr. caldr. cal
dr. cal
 
Sprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptxSprawled City; Lesson 7.pptx
Sprawled City; Lesson 7.pptx
 
43.-Transportation-Decision-Making—Overview-and-Process_23Sep2020 (2).pptx
43.-Transportation-Decision-Making—Overview-and-Process_23Sep2020 (2).pptx43.-Transportation-Decision-Making—Overview-and-Process_23Sep2020 (2).pptx
43.-Transportation-Decision-Making—Overview-and-Process_23Sep2020 (2).pptx
 
DESIGN PROJECT FOR PAVEMENT
DESIGN PROJECT FOR PAVEMENTDESIGN PROJECT FOR PAVEMENT
DESIGN PROJECT FOR PAVEMENT
 
TRANSPORTATION PLANNING
TRANSPORTATION PLANNINGTRANSPORTATION PLANNING
TRANSPORTATION PLANNING
 
Unlocking the Secrets of Road Improvement Planning Service.pdf
Unlocking the Secrets of Road Improvement Planning Service.pdfUnlocking the Secrets of Road Improvement Planning Service.pdf
Unlocking the Secrets of Road Improvement Planning Service.pdf
 
Lecture 5.pptx
Lecture 5.pptxLecture 5.pptx
Lecture 5.pptx
 
Role of transport economist
Role of transport economistRole of transport economist
Role of transport economist
 
MKAQ1063 W9 -Transit System Planning CRIed (4).pptx
MKAQ1063 W9 -Transit System Planning CRIed (4).pptxMKAQ1063 W9 -Transit System Planning CRIed (4).pptx
MKAQ1063 W9 -Transit System Planning CRIed (4).pptx
 
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptxPUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
PUBLIC PRIVATE PARTNERSHIP MANAGEMENT-Module.pptx
 
Transport Technology Research Innovation for International Development (T-TRI...
Transport Technology Research Innovation for International Development (T-TRI...Transport Technology Research Innovation for International Development (T-TRI...
Transport Technology Research Innovation for International Development (T-TRI...
 
Transportation Planning Implications of Automated Vehicles on Texas Highways
Transportation Planning Implications of Automated Vehicles on Texas Highways Transportation Planning Implications of Automated Vehicles on Texas Highways
Transportation Planning Implications of Automated Vehicles on Texas Highways
 
Knowledge-based Expert System for Route Selection of Road Alignment
Knowledge-based Expert System for Route Selection of Road AlignmentKnowledge-based Expert System for Route Selection of Road Alignment
Knowledge-based Expert System for Route Selection of Road Alignment
 
A Review of MCDM in Transportation and Environmental Projects
A Review of MCDM in Transportation and Environmental ProjectsA Review of MCDM in Transportation and Environmental Projects
A Review of MCDM in Transportation and Environmental Projects
 
API CollegeSBM 1101 & 1102 &1201Project Fundamentals 1,.docx
API CollegeSBM 1101 & 1102 &1201Project Fundamentals 1,.docxAPI CollegeSBM 1101 & 1102 &1201Project Fundamentals 1,.docx
API CollegeSBM 1101 & 1102 &1201Project Fundamentals 1,.docx
 
Sustainable transport planning
Sustainable transport planning Sustainable transport planning
Sustainable transport planning
 
[2015 e-Government Program] Action Plan : Quito(Ecuador)
[2015 e-Government Program] Action Plan : Quito(Ecuador)[2015 e-Government Program] Action Plan : Quito(Ecuador)
[2015 e-Government Program] Action Plan : Quito(Ecuador)
 
Day2 session3 multi-criteria-analysis
Day2 session3 multi-criteria-analysisDay2 session3 multi-criteria-analysis
Day2 session3 multi-criteria-analysis
 

Último

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 

Último (20)

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 

Transportation Lecture 2.pdf

  • 1. 1 Spring 2023 (4th Semester) Dr. Bakht Zamin (bakht@cecos.edu.pk) Department of Civil Engineering CECOS University Peshawar
  • 2. Lecture Outlines ❑ Transportation Planning – Introduction ❑ Basic Elements of Transportation Planning ❑ Transportation Planning Institutions ❑ Transportation Planning Organizations ❑ Travel Surveys and Travel Demand ❑ Travel Forecasting and Travel Forecasting Model 2
  • 3. Transportation Planning ❑ Transportation Planning is the process of defining future policies, goals, investments and designs to fulfill the future needs and demands in most effective and well organized way. ❑ Transportation planning is highly essential in shaping cities, enabling economic activities, promoting community interaction and enhancing quality of life. ❑ It is also essential for sustainable development and ensuring safe accessibility at various levels for all individuals. 3
  • 4. Transportation Planning ❑ The transportation planner begins by ❑ Defining the problem ❑ Gathering and analyzing data ❑ Evaluating various alternative solutions ❑ Transportation planning process also involve ❑ Forecast of future traffic ❑ Estimates of the impact of facility on land use ❑ The environment ❑ The community ❑ Cost – benefits analysis 4
  • 5. Transportation Planning ❑ Among the factors that may justify a transportation project are ❑ Improvements in traffic flow and safety ❑ Energy consumption ❑ Travel time ❑ Economic growth ❑ Accessibility 5
  • 6. Transportation Planning ❑ Some transportation projects may have been selected for reasons unrelated to specific benefits ❑ To stimulate employment in a particular region. ❑ To compete with other cities or statesfor prestige. ❑ To attract industry. ❑ To respond to pressures from a political constituency. ❑ To gain personnel benefits from a particular project. ❑ Whatever the reason for selecting or rejecting a transportation project, a specific process led to the conclusion to build or not to build. 6
  • 7. Basic Elements of Transportation Planning ❑ The transportation planning process comprises seven basic elements, which are interrelated and not necessarily carried out sequentially. ❑ The information acquired in one phase of the process may be helpful in some earlier or later phase. ❑ So there is a continuity of effort that should eventually result in a decision. 7
  • 8. Basic Elements of Transportation Planning ❑ The elements of transportation planning are: ❑ Situation definition ❑ Problem situation ❑ Search for solutions ❑ Analysis of performance ❑ Evaluation of alternatives ❑ Choice of project ❑ Specification and construction. 8
  • 9. Basic Elements of Transportation Planning Situation Definition ❑ Understanding of situation that give rise to the perceived need for a transportation improvement is required ❑ In this phase, the present system is analyzed and its characteristics are described ❑ Information about the surrounding area, its people and their travel habits may be obtained ❑ Previous reports and studies that may be relevant to the present situation are reviewed and summarized 9
  • 10. Basic Elements of Transportation Planning Problem Definition ❑ The purpose of this step is to describe the problem in terms of objectives to be accomplished by the project and to translate those objectives into criteria that can be quantified. ❑ Objectives are statement of purpose, such as to reduce traffic congestion, to improve safety, to reduce noise etc. 10
  • 11. Basic Elements of Transportation Planning Problem Definition ❑ Criteria are the measure of effectiveness that can be used to quantify the extent to which a proposed transportation project will achieve the stated objectives. ❑ For example, the objective “to reduce traffic congestion” might use “travel time” as the measure of the effectiveness. ❑ The characteristics of an acceptable system should be identified and specific limitations and requirements should be noted. 11
  • 12. Basic Elements of Transportation Planning Search Solution ❑ In this phase of planning process, consideration is given to a number/variety of ideas, designs, locations and system configurations that might provide solutions to the problem. ❑ This is the brainstorming stage, in which many options may be proposed for later testing and evaluation. 12
  • 13. Basic Elements of Transportation Planning Search Solution ❑ Alternatives can be proposed by any group or organization. ❑ This phase also includes preliminary feasibility studies, which might narrow the range of choices. ❑ Some data gathering, filed testing and cost estimation may be necessary at this stage to determine the practicality and financial feasibility of the alternatives being proposed 13
  • 14. Basic Elements of Transportation Planning Analysis of Performance ❑ The purpose of performance analysis is to estimate how each of the proposed alternatives would perform under present and future conditions. ❑ The criteria identified in the previous steps are calculated for each transportation option. ❑ This step is a determination of the investment cost of building the transportation project, as well as annual costs for maintenance and operation. 14
  • 15. Basic Elements of Transportation Planning Analysis of Performance ❑ It also include the use of mathematical models for estimating travel demands. ❑ The number of persons/vehicles that will use the system is determined and are considered in design process. ❑ Environmental effects of the transportation project are also estimated. 15
  • 16. Basic Elements of Transportation Planning Evaluation of Alternatives ❑ The purpose of the evaluation phase is to determine, how well each alternative will achieve the objectives of the project as defined by the criteria. ❑ The performance data produced in the analysis phase are used to compute the benefits and costs that will result if the project is selected. ❑ In cases where the results cannot be reduced to a single monetary value, a weighted rating for each alternative might be produced and compared with other proposed projects. 16
  • 17. Basic Elements of Transportation Planning Choice of Project ❑ Project selection is made after considering all the factors involved. ❑ In a simple situation, for example, where the projects has been authorized and is in the design phase, a single criteria might be used and the chosen project might be the one with the lowest cost. ❑ With a more complex project, many factors have to be considered, and selection is based on how the results are perceived by those involved in decision making. 17
  • 18. Basic Elements of Transportation Planning Choice of Project ❑ If the project involves the community, it may be necessary to hold additional public hearings. ❑ It is possible that none of the alternative will meet the criteria and hence additional investigation will be necessary. 18
  • 19. Basic Elements of Transportation Planning Specification and Construction ❑ This phase involves the physical location, geometric dimensions and structural configurations of a project. ❑ Design planes are produced that can be used by contractors to estimate the construction cost of building the project. ❑ When a construction firm is selected, these planes will be the basis on which the project will be built. 19
  • 21. Transportation Planning Organization Policy Committee ❑ The policy committee is composed of elected or appointed officials such as the director of public works, who represent the governing bodies or agencies that will be affected by the results. ❑ This committee makes the basic policy decisions and acts as board of directors for the study. ❑ Committee members will decide the management aspects of the study as well as key issues of a financial or political nature. 23
  • 23. Transportation Planning Organization Technical Committee ❑ The technical committee is composed of the engineering and planning staffs that are responsible for carrying out works or evaluating the technical aspects of the project prepared by consultants. ❑ This group will assure that the necessary evaluations and cost comparisons for each project alternative are complete and will supervise the technical details of the entire process. 25
  • 24. Transportation Planning Organization Technical Committee ❑ Typically, the technical committee will include ❑ Highway and traffic engineers ❑ Specialists in land use planning ❑ Economists ❑ Environmental engineers 26
  • 26. Transportation Planning Organization Citizen Advisory Committee ❑ The citizen advisory committee is composed of a cross section of the community and may include representatives from labor and business interested citizens and members of community interest groups ❑ The committee’s functions are ❑ To express community goals and objectives ❑ To suggest alternatives ❑ To react to the proposed alternatives 28
  • 27. Transportation Planning Organization Citizen Advisory Committee ❑ Through this committee structure, an open dialogue is facilitated among the policy makers, technical staff and community. ❑ When a selection is made and recommendations are produced by the study, they should be based on the consensus of all interested parties. 29
  • 28. Assignment #1 • Demonstrate the sustainable Transportation System. • Explain their salient Features. • Give few examples of such system currently operating in Pakistan with the technical specification. • SubmissionDate: 11th April, 2023 31
  • 29. Quiz # 1 • Quiz no. 1 will held in Next Class. • Topic: Lectures 1 & 2 32
  • 30. Link, Node and Centroid ❑ A highway network consists of links, nodes and centroids ❑ Link is a portion of the highway system that can be described by its capacity, lane width and speed ❑ Node is the end point of the link and represents an intersection or location, where a link changes direction , capacity, width or speed ❑ Centroid is the location within a zone where trips are considered to began and end 33
  • 31. Travel Surveys ❑ Travel surveys are conducted to establish a complete understanding of the travel patterns within the study area ❑ For single projects (e.g. highway project), it may be sufficient to use traffic counts on existing roads or counting of passengers riding the present system ❑ To understand why people travel or where they wish to go, Origin – Destination (O – D) survey data can be useful 34
  • 32. Travel Surveys ❑ The O – D survey asks questions about ❑ Where the trips begins and ends ❑ The purpose of the trip ❑ The time of the day ❑ The type of the vehicle involved ❑ The type of person making the trip ❑ The O – D survey may be completed by asking questions the people while riding the bus or when stopped at a roadside interview station 35
  • 33. Travel Demand ❑ Travel demand is expressed as the number of persons or vehicles per unit time that can be expected to travel on a given segment of a transportation system ❑ The factors that influence the demand for travelling are ❑ The location and intensity of land use ❑ The socioeconomic characteristics of people living in the area ❑ The extent, cost and quality of available transportation services 36
  • 34. Factors Influencing Travel Demand ❑ Land use characteristics are a primary determinant of travel demand ❑ The amount of traffic generated by a parcel of land depends on how the land is used ❑ For example ❑ Shopping centers ❑ Residential complexes ❑ Office buildings 37
  • 35. Factors Influencing Travel Demand ❑ Socioeconomic characteristics of the people living within the society also influence the demand for transportation ❑ Life styles and values affect how people decide to use their resources for transportation ❑ For example, a residential area consisting primarily of high income workers will generate more trips per person than a residential area populated primarily by retirees 38
  • 36. Factors Influencing Travel Demand ❑ Availability of transportation facilities and services also affects the demand for travel ❑ Travelers are sensitive to the level of services provided by alternative transportation modes ❑ Choosing mode of transportation depends on attributes such as ❑ Travel time ❑ Cost ❑ Convenience ❑ Comfort ❑ Safety 39
  • 37. Travel Forecasting ❑ Travel forecasting is the attempt of estimating the number of vehicles or people that will use a specific transportation facility in the future ❑ Travel forecasting begins with the collection of current traffic data ❑ This traffic data is combined with the other known data such as population, employment, travel cost etc. to develop a traffic demand model for the current situation ❑ Feeding it with the predicted data for population, employment etc. results in the estimate of future traffic 40
  • 38. Travel Forecasting ❑ Travel forecasts are used for several key purposes in transportation policy, planning and engineering to calculate the capacity of infrastructure ❑ For example ❑ How many lanes a bridge should have 41
  • 39. Four-Step Model For Travel Forecasting ❑ Travel forecasting follows the sequential four-step model or urban transportation planning procedure ❑ The four step of the classical urban transportation planning system model are: ❑ Trip generation ❑ Trip distribution ❑ Mode choice ❑ Route/ network assignment 42
  • 40. Four-Step Model For Travel Forecasting 43
  • 41. Four-Step Model For Travel Forecasting Trip Generation – How many trips are generated ❑ Trip generation is the process of determining the number of trips that will begin or end in each traffic zone ❑ The number of trips produced by and attracted to each zone depends on its ❑ Residential characteristics ❑ Employment characteristics ❑ Industrial characteristics ❑ For example, the more employment a zone has, the more work trips it attracts 44
  • 42. Four-Step Model For Travel Forecasting Trip Distribution – Where do trips go ❑ Trip distribution is a process by which the trips generated in one zone are allocated to other zones in the study area ❑ Trips end are linked to create complete trips ❑ These trips may be within the same zone (internal- internal) or between adjacent zones (internal- external) with varying distance 45
  • 43. Four-Step Model For Travel Forecasting Mode Choice – What travel mode is used for each trip ❑ Mode choice predicts the choices that individuals or groups make in selecting their transportation modes ❑ An important objective is to predict the share of trips attracted to public transportation ❑ Other factors considered for mode choice include travel time, travel cost etc., 46
  • 44. Four-Step Model For Travel Forecasting Route/Network Assignment – What is the route of each trip ❑ The final step is to determine the routes travelers choose to reach their destinations ❑ Route/Network assignment requires the following ❑ Number of trips that will be made from one zone to another zone ❑ A description of highway routes between zones ❑ Travel time on each zone route segment ❑ External trips that were not considered in previous steps 47
  • 45. Four-Step Model For Travel Forecasting 48