TOPICS
1. WHAT IS UL?
– UL Standards
– UL Files for PFC Flexible Circuits
2. UL Tests for Flexible Circuit (FPC) boards
3. Summary of UL – Recognised types for PFC
4. Examples of UL – Recognised designation
UNDERWRITERS LABORATORIES (UL)
3
UNDERWRITERS LABORATORIES (UL)
What is UL?
• UL stands for "Underwriters Laboratory“
• Independent and non-profit organization to tests electrical
components and equipment for potential hazards
• When something is UL - listed, that means that the UL has
tested the device, and it meets their requirements for safety
• UL has developed more than 1000 standards for safety
4
UNDERWRITERS LABORATORIES (UL)
• UL – recognition means products which have been tested and
approved by UL to use the UL recognition mark;
or whichever mark is registered with and approved by UL
• Necessary for consumer products in the US & Canada
• Optional elsewhere
5
UNDERWRITERS LABORATORIES (UL)
• UL Files for PFC Flexible Circuits
E217146 [with Thermal Shock], Standard
Component – Wiring, Printed – Flexible Material
Constructions
• UL Standards
UL 796 Standard for Printed Wiring Board
UL 796F Standard for Printed Wiring Board includes special
classification for flexible printed wiring
UL 94 Tests for Flammability of Plastic Materials for Parts in
Devices and Appliances
6
UNDERWRITERS LABORATORIES (UL)
• For UL 796F standard, 2 categories of the safety test
– Flammability
– Function
• Adhesion
• Bending / fatigue
• Current / voltage limit
7
UNDERWRITERS LABORATORIES (UL)
• Flammability Test
– UL 94 Standard
– These requirements cover tests for flammability of plastic
materials used for parts in devices and appliances.
– There are 3 grades of flammability rating:
1) Vertical Burning Test; V-0, V-1, or V-2
2) Thin Material Vertical Burning Test; VTM-0, VTM-1, or VTM-2
3) Horizontal Burning Test; HB
8
UNDERWRITERS LABORATORIES (UL)
• UL Tests for Flexible Printed Circuit Boards
Vertical flammability, 94V
– Test for flammability in which the test material is held vertically,
governed by flame rating classification
•94V-0
•94V-1
•94V-2
9
UNDERWRITERS LABORATORIES (UL)
10
UNDERWRITERS LABORATORIES (UL)
• UL Tests for Flexible Printed Circuit Boards
Vertical flammability, 94VTM
– Test for flammability for thin materials in which the test
material is held vertically, governed by flame rating classification
•94VTM-0
•94VTM-1
•94VTM-2
11
UNDERWRITERS LABORATORIES (UL)
12
UNDERWRITERS LABORATORIES (UL)
• UL Tests for Flexible Printed Circuit Boards
Horizontal flammability, 94HB
– Test for flammability in which the test material is held
horizontally governed by flame rating classification
13
UNDERWRITERS LABORATORIES (UL)
• Standard Vertical Flammability Rating
Flame Rating Classification
Criteria Condition 94V-0 94V-1 94V-2
After flame time for each individual
specimen t1 or t2
<10s <30s <30s
Total after flame time for any condition
set (t1 + t2 for the 5 specimens)
<50s <250s <250s
After flame + Afterglow time for each
individual specimen after the second
flame application (t2 + t3)
<30s <60s <60s
After flame or Afterglow of any specimen
up to the holding clamp
No
No No
Cotton indicator ignited by flaming
particles or drops
No No Yes
14
UNDERWRITERS LABORATORIES (UL)
• Vertical Flammability Rating – Thin Materials
Flame Rating Classification
Criteria Condition 94VTM-0 94VTM-1 94VTM-2
After flame time for each individual
specimen t1 or t2
<10s <30s <30s
Total after flame time for any condition
set (t1 + t2 for the 5 specimens)
<50s <250s <250s
After flame + Afterglow time for each
individual specimen after the second
flame application (t2 + t3)
<30s <60s <60s
After flame or Afterglow of any specimen
up to the holding clamp
No
No No
Cotton indicator ignited by flaming
particles or drops
No No Yes
15
UNDERWRITERS LABORATORIES (UL)
• Horizontal Flammability Rating
Flame rating classification – 94HB
Must meet the following criteria:
1 Materials with thickness range3.0 < t < 13 mm
Burning rate <40 mm/min over a
distance of 75 mm
2 Materials with thickness < 3.0 mm
Burning rate <75 mm/min over a
distance of 75 mm
3 Stop burning before flame covers a distance of 100 mm

Más contenido relacionado

La actualidad más candente

UNDERGROUND CABLES PRESENTATION
UNDERGROUND CABLES  PRESENTATIONUNDERGROUND CABLES  PRESENTATION
UNDERGROUND CABLES PRESENTATIONPANKAJ KUMAR
 
Fat procedure for lv switchboards
Fat procedure for lv switchboardsFat procedure for lv switchboards
Fat procedure for lv switchboardskhongai
 
Crimping Presentation
Crimping PresentationCrimping Presentation
Crimping PresentationFin1
 
Nondestructive testing
Nondestructive testingNondestructive testing
Nondestructive testingGulfam Hussain
 
Thermocouple by Engr. Imran Tanvir
Thermocouple by Engr. Imran TanvirThermocouple by Engr. Imran Tanvir
Thermocouple by Engr. Imran TanvirImran Tanvir Meo
 
Breakdown due to Internal Discharges and Surface Breakdown
Breakdown due to Internal Discharges and Surface BreakdownBreakdown due to Internal Discharges and Surface Breakdown
Breakdown due to Internal Discharges and Surface BreakdownAsim Raza
 
Basics of electrical control panel
Basics of electrical control panelBasics of electrical control panel
Basics of electrical control panelCHACKOCHEN MATHEW
 
Electrical Maintenance for Engineers and Technicians
Electrical Maintenance for Engineers and TechniciansElectrical Maintenance for Engineers and Technicians
Electrical Maintenance for Engineers and TechniciansLiving Online
 
Circuit Breakers for Low Voltage Applications
Circuit Breakers for Low Voltage ApplicationsCircuit Breakers for Low Voltage Applications
Circuit Breakers for Low Voltage ApplicationsIsham Rashik
 
Types of cables
Types of cables Types of cables
Types of cables Nisarg Amin
 
Transformer oil-specifications new
Transformer oil-specifications newTransformer oil-specifications new
Transformer oil-specifications newMolla Morshad
 
Japanese industrial standard
Japanese industrial standardJapanese industrial standard
Japanese industrial standardAlbert Candor
 
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...Jobin Abraham
 

La actualidad más candente (20)

UNDERGROUND CABLES PRESENTATION
UNDERGROUND CABLES  PRESENTATIONUNDERGROUND CABLES  PRESENTATION
UNDERGROUND CABLES PRESENTATION
 
Fat procedure for lv switchboards
Fat procedure for lv switchboardsFat procedure for lv switchboards
Fat procedure for lv switchboards
 
Earthing
EarthingEarthing
Earthing
 
Cable tray testing
Cable tray testingCable tray testing
Cable tray testing
 
Cable and laying
Cable and layingCable and laying
Cable and laying
 
Crimping Presentation
Crimping PresentationCrimping Presentation
Crimping Presentation
 
Nondestructive testing
Nondestructive testingNondestructive testing
Nondestructive testing
 
Thermocouple by Engr. Imran Tanvir
Thermocouple by Engr. Imran TanvirThermocouple by Engr. Imran Tanvir
Thermocouple by Engr. Imran Tanvir
 
Breakdown due to Internal Discharges and Surface Breakdown
Breakdown due to Internal Discharges and Surface BreakdownBreakdown due to Internal Discharges and Surface Breakdown
Breakdown due to Internal Discharges and Surface Breakdown
 
Basics of electrical control panel
Basics of electrical control panelBasics of electrical control panel
Basics of electrical control panel
 
Electrical Maintenance for Engineers and Technicians
Electrical Maintenance for Engineers and TechniciansElectrical Maintenance for Engineers and Technicians
Electrical Maintenance for Engineers and Technicians
 
Circuit Breakers for Low Voltage Applications
Circuit Breakers for Low Voltage ApplicationsCircuit Breakers for Low Voltage Applications
Circuit Breakers for Low Voltage Applications
 
Introduction to Arc Flash/Blast Electrical Hazards
Introduction to Arc Flash/Blast Electrical HazardsIntroduction to Arc Flash/Blast Electrical Hazards
Introduction to Arc Flash/Blast Electrical Hazards
 
Types of cables
Types of cables Types of cables
Types of cables
 
Acoustic Emission (AE) Testing
Acoustic Emission (AE) TestingAcoustic Emission (AE) Testing
Acoustic Emission (AE) Testing
 
Transformer oil-specifications new
Transformer oil-specifications newTransformer oil-specifications new
Transformer oil-specifications new
 
BUSBAR PROTECTION
BUSBAR PROTECTIONBUSBAR PROTECTION
BUSBAR PROTECTION
 
Japanese industrial standard
Japanese industrial standardJapanese industrial standard
Japanese industrial standard
 
Lightning arresters
Lightning arrestersLightning arresters
Lightning arresters
 
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
TESTING AND COMMISSIONING OF ELECTRICAL EQUIPMENTS. TESTING OF CURRENT TRANSF...
 

Similar a UL (Underwriters Laboratories)

App 125 Safety Agencies
App 125 Safety AgenciesApp 125 Safety Agencies
App 125 Safety Agenciesrencousa
 
Flammability Testing Of Plastics Jinish Doshi
Flammability Testing Of Plastics Jinish DoshiFlammability Testing Of Plastics Jinish Doshi
Flammability Testing Of Plastics Jinish DoshiJinish Doshi
 
Flammability Testing Of Plastics Jinish Doshi
Flammability Testing Of Plastics Jinish DoshiFlammability Testing Of Plastics Jinish Doshi
Flammability Testing Of Plastics Jinish DoshiJinish Doshi
 
Insulation solutions for electrical engineering - Selector guide
Insulation solutions for electrical engineering - Selector guideInsulation solutions for electrical engineering - Selector guide
Insulation solutions for electrical engineering - Selector guideHuntsman Advanced Materials Europe
 
2011 photovoltaic brochure_us_final
2011 photovoltaic brochure_us_final2011 photovoltaic brochure_us_final
2011 photovoltaic brochure_us_finalNiNa Ninita
 
OIL_GAS_PRESENT_TEI_KABALAS_DEC_2014
OIL_GAS_PRESENT_TEI_KABALAS_DEC_2014OIL_GAS_PRESENT_TEI_KABALAS_DEC_2014
OIL_GAS_PRESENT_TEI_KABALAS_DEC_2014George M. Mylonakis
 
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...Thorne & Derrick International
 
A Comparison of Contemporary Electrical Distribution Equipment Standards
A Comparison of Contemporary Electrical Distribution Equipment StandardsA Comparison of Contemporary Electrical Distribution Equipment Standards
A Comparison of Contemporary Electrical Distribution Equipment Standardsmichaeljmack
 
Discussing osha 1910 106 nfpa 30 and recent fire incidents of 2015 2016
Discussing osha 1910 106 nfpa 30 and recent fire incidents of 2015 2016Discussing osha 1910 106 nfpa 30 and recent fire incidents of 2015 2016
Discussing osha 1910 106 nfpa 30 and recent fire incidents of 2015 2016John Newquist
 
Fluke Electrical Safety Seminar Slides
Fluke Electrical Safety Seminar SlidesFluke Electrical Safety Seminar Slides
Fluke Electrical Safety Seminar SlidesTranscat
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersLiving Online
 
IEEE-PSES Presentation: Don't Get Burned By Plastics
IEEE-PSES Presentation:  Don't Get Burned By PlasticsIEEE-PSES Presentation:  Don't Get Burned By Plastics
IEEE-PSES Presentation: Don't Get Burned By Plasticsbbisenius
 
Apt 3rd Edition Presentation
Apt 3rd Edition PresentationApt 3rd Edition Presentation
Apt 3rd Edition Presentationvisak123
 

Similar a UL (Underwriters Laboratories) (20)

App 125 Safety Agencies
App 125 Safety AgenciesApp 125 Safety Agencies
App 125 Safety Agencies
 
Flammability Testing Of Plastics Jinish Doshi
Flammability Testing Of Plastics Jinish DoshiFlammability Testing Of Plastics Jinish Doshi
Flammability Testing Of Plastics Jinish Doshi
 
Flammability Testing Of Plastics Jinish Doshi
Flammability Testing Of Plastics Jinish DoshiFlammability Testing Of Plastics Jinish Doshi
Flammability Testing Of Plastics Jinish Doshi
 
DI Product Presentation Feb 2018
DI Product Presentation Feb 2018DI Product Presentation Feb 2018
DI Product Presentation Feb 2018
 
Lv cable is_694
Lv cable is_694Lv cable is_694
Lv cable is_694
 
Lv cable is_694
Lv cable is_694Lv cable is_694
Lv cable is_694
 
Insulation solutions for electrical engineering - Selector guide
Insulation solutions for electrical engineering - Selector guideInsulation solutions for electrical engineering - Selector guide
Insulation solutions for electrical engineering - Selector guide
 
2011 photovoltaic brochure_us_final
2011 photovoltaic brochure_us_final2011 photovoltaic brochure_us_final
2011 photovoltaic brochure_us_final
 
OIL_GAS_PRESENT_TEI_KABALAS_DEC_2014
OIL_GAS_PRESENT_TEI_KABALAS_DEC_2014OIL_GAS_PRESENT_TEI_KABALAS_DEC_2014
OIL_GAS_PRESENT_TEI_KABALAS_DEC_2014
 
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
Pfisterer Electrical Safety Equipment - Voltage Detectors, Phase Comparators,...
 
A Comparison of Contemporary Electrical Distribution Equipment Standards
A Comparison of Contemporary Electrical Distribution Equipment StandardsA Comparison of Contemporary Electrical Distribution Equipment Standards
A Comparison of Contemporary Electrical Distribution Equipment Standards
 
2013 design for compliance
2013   design for compliance2013   design for compliance
2013 design for compliance
 
Marine and Offshore Cables - Noskab Catalogue
Marine and Offshore Cables - Noskab CatalogueMarine and Offshore Cables - Noskab Catalogue
Marine and Offshore Cables - Noskab Catalogue
 
Discussing osha 1910 106 nfpa 30 and recent fire incidents of 2015 2016
Discussing osha 1910 106 nfpa 30 and recent fire incidents of 2015 2016Discussing osha 1910 106 nfpa 30 and recent fire incidents of 2015 2016
Discussing osha 1910 106 nfpa 30 and recent fire incidents of 2015 2016
 
Fluke Electrical Safety Seminar Slides
Fluke Electrical Safety Seminar SlidesFluke Electrical Safety Seminar Slides
Fluke Electrical Safety Seminar Slides
 
Megger regidez dielectrica oil test- OTS seminar
Megger   regidez dielectrica oil test- OTS seminarMegger   regidez dielectrica oil test- OTS seminar
Megger regidez dielectrica oil test- OTS seminar
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of Transformers
 
IEEE-PSES Presentation: Don't Get Burned By Plastics
IEEE-PSES Presentation:  Don't Get Burned By PlasticsIEEE-PSES Presentation:  Don't Get Burned By Plastics
IEEE-PSES Presentation: Don't Get Burned By Plastics
 
Apt 3rd Edition Presentation
Apt 3rd Edition PresentationApt 3rd Edition Presentation
Apt 3rd Edition Presentation
 
FIRE_Safety.pptx
FIRE_Safety.pptxFIRE_Safety.pptx
FIRE_Safety.pptx
 

Último

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 

Último (20)

Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 

UL (Underwriters Laboratories)

  • 2. 2 TOPICS 1. WHAT IS UL? – UL Standards – UL Files for PFC Flexible Circuits 2. UL Tests for Flexible Circuit (FPC) boards 3. Summary of UL – Recognised types for PFC 4. Examples of UL – Recognised designation UNDERWRITERS LABORATORIES (UL)
  • 3. 3 UNDERWRITERS LABORATORIES (UL) What is UL? • UL stands for "Underwriters Laboratory“ • Independent and non-profit organization to tests electrical components and equipment for potential hazards • When something is UL - listed, that means that the UL has tested the device, and it meets their requirements for safety • UL has developed more than 1000 standards for safety
  • 4. 4 UNDERWRITERS LABORATORIES (UL) • UL – recognition means products which have been tested and approved by UL to use the UL recognition mark; or whichever mark is registered with and approved by UL • Necessary for consumer products in the US & Canada • Optional elsewhere
  • 5. 5 UNDERWRITERS LABORATORIES (UL) • UL Files for PFC Flexible Circuits E217146 [with Thermal Shock], Standard Component – Wiring, Printed – Flexible Material Constructions • UL Standards UL 796 Standard for Printed Wiring Board UL 796F Standard for Printed Wiring Board includes special classification for flexible printed wiring UL 94 Tests for Flammability of Plastic Materials for Parts in Devices and Appliances
  • 6. 6 UNDERWRITERS LABORATORIES (UL) • For UL 796F standard, 2 categories of the safety test – Flammability – Function • Adhesion • Bending / fatigue • Current / voltage limit
  • 7. 7 UNDERWRITERS LABORATORIES (UL) • Flammability Test – UL 94 Standard – These requirements cover tests for flammability of plastic materials used for parts in devices and appliances. – There are 3 grades of flammability rating: 1) Vertical Burning Test; V-0, V-1, or V-2 2) Thin Material Vertical Burning Test; VTM-0, VTM-1, or VTM-2 3) Horizontal Burning Test; HB
  • 8. 8 UNDERWRITERS LABORATORIES (UL) • UL Tests for Flexible Printed Circuit Boards Vertical flammability, 94V – Test for flammability in which the test material is held vertically, governed by flame rating classification •94V-0 •94V-1 •94V-2
  • 10. 10 UNDERWRITERS LABORATORIES (UL) • UL Tests for Flexible Printed Circuit Boards Vertical flammability, 94VTM – Test for flammability for thin materials in which the test material is held vertically, governed by flame rating classification •94VTM-0 •94VTM-1 •94VTM-2
  • 12. 12 UNDERWRITERS LABORATORIES (UL) • UL Tests for Flexible Printed Circuit Boards Horizontal flammability, 94HB – Test for flammability in which the test material is held horizontally governed by flame rating classification
  • 13. 13 UNDERWRITERS LABORATORIES (UL) • Standard Vertical Flammability Rating Flame Rating Classification Criteria Condition 94V-0 94V-1 94V-2 After flame time for each individual specimen t1 or t2 <10s <30s <30s Total after flame time for any condition set (t1 + t2 for the 5 specimens) <50s <250s <250s After flame + Afterglow time for each individual specimen after the second flame application (t2 + t3) <30s <60s <60s After flame or Afterglow of any specimen up to the holding clamp No No No Cotton indicator ignited by flaming particles or drops No No Yes
  • 14. 14 UNDERWRITERS LABORATORIES (UL) • Vertical Flammability Rating – Thin Materials Flame Rating Classification Criteria Condition 94VTM-0 94VTM-1 94VTM-2 After flame time for each individual specimen t1 or t2 <10s <30s <30s Total after flame time for any condition set (t1 + t2 for the 5 specimens) <50s <250s <250s After flame + Afterglow time for each individual specimen after the second flame application (t2 + t3) <30s <60s <60s After flame or Afterglow of any specimen up to the holding clamp No No No Cotton indicator ignited by flaming particles or drops No No Yes
  • 15. 15 UNDERWRITERS LABORATORIES (UL) • Horizontal Flammability Rating Flame rating classification – 94HB Must meet the following criteria: 1 Materials with thickness range3.0 < t < 13 mm Burning rate <40 mm/min over a distance of 75 mm 2 Materials with thickness < 3.0 mm Burning rate <75 mm/min over a distance of 75 mm 3 Stop burning before flame covers a distance of 100 mm