Safety Operating Procedure
For
Tower Crane Operators

VITAL CORP. SDN. BHD.
Contents
Forward---------------------------------------------------------------1
Qualifications---------------------------------------------------------1
Permits ---------------------------------------------------------------1
Sample Permit-----------------------------------------------------2

Training---------------------------------------------------------------2
Personal Protective Equipment-----------------------------------3
General Conduct of Operators------------------------------------3
Table 2

Shift/Operator Inspection Checks------------------------3

Table 1

Standard Hand Signals for Controlling
Overhead and Gantry Cranes-------------------------5

Inspection-------------------------------------------------------------6
Maintenance----------------------------------------------------------6

VITAL CORP. SDN. BHD.
Safety Manual for Overhead Crane Operators
Forward
An overhead crane operator’s job is very important. It is a position of responsibility that
you must be authorized to hold. There are rules and regulations you must obey and
responsibilities you must accept.
For specific rules and regulations and your responsibilities when operating an overhead
crane in Michigan, see MIOSHA General Industry Safety Standard Part 18. Overhead
and Gantry Cranes.
This manual may be used as a tool in the overall training and authorization of a
prospective overhead crane operator.
Employers and employees need to be aware that all cranes are different and may have
specific operating, safety, inspection and maintenance requirements. It is essential that
you have the manufacturers operating manuals and are familiar with your particular
crane.

Qualifications
The minimum qualifications for an employee selected to operate a crane are as follows:
•
•
•
•
•

Have corrected vision that meets the same requirements as vision for a valid
Michigan driver’s license.
Have effective use of all 4 limbs.
Be of sufficient height to operate the controls and to have an unobstructed view
over the controls into the work area.
Have coordination between eyes, hands, and feet.
Be free of known convulsive disorders and episodes of unconsciousness.

The employee must also have the ability to understand signs, labels, and instructions.
The employee must be examined for these qualifications at least once every 3 years.

Permits
You must be trained and tested before you can operate an overhead crane. Upon passing
this test and meeting other operator requirements (including demonstrating proficiency in
running the crane) a permit will be issued to you. It is to be carried by you or be
available upon request.
1
Sample Permit
CRANE OPERATOR PERMIT
(Firm Name)

Operator’s Name
Operator’s Number
Is Authorized To Operate: (Insert Type of Crane(s) Authorized)
Restrictions: (Explanation of Restrictions)
Date Issued: (Month-Day-Year)
Date Expiring (Month-Day-Year)
By Issuing Authority: _______________________________________________
Title

Training
Training of all operators will include the following:
•
•
•
•
•
•
•
•
•
•
•

Capacities of equipment and attachments.
Purpose, use and limitation of controls.
How to make daily checks.
The energizing sequences, including pneumatic, hydraulic, and electrical
sequences.
Start-up and shutdown procedures.
Emergency shutdown procedures.
General operating procedures.
All basic signaling procedures, including hand, radio, or telephone signals, where
required.
Knowledge of MIOSHA Part 18. Overhead and Gantry Cranes, and other
applicable MIOSHA standards.
Practice in operating the assigned equipment through the mechanical functions
necessary to perform the required task.
Maximum rated capacity of the crane.

Training of all riggers will include the following:
• The requirements of MIOSHA Part 18. Overhead and Gantry Cranes.
• Knowledge of MIOSHA Part 49. Slings.
• Knowledge of MIOSHA Part 33. Personal Protective Equipment.
• Maximum capacity of the crane.
• Rigging procedures.
• Company rules and regulations.

2
Personal Protective Equipment
When your employer conducts a personal protective equipment hazard assessment (as
required in Part 33. Personal Protective Equipment), they should include overhead cranes
in their review.
An operator and any employee directing a lift must use the PPE required in the area. If
the top of the load is lifted to a height greater than 5 feet, then the load is considered an
overhead hazard and head protection needs to be worn.
When an employee is performing maintenance on an overhead or gantry crane, and a
standard barrier or platform is not provided, the employee must wear an approved safety
harness and lanyard, or a fall arrest device as prescribed in Construction Safety Standard,
Part 45. Fall Protection.

General Conduct of Operators
At the beginning of each shift during which a crane is used, a visual inspection must be
made in accordance with Table 2 below. A visual inspection is limited to that which can
be made from a catwalk or other safe observation point. Any defects must be reported to
a supervisor.
TABLE 2
Shift/Operator Inspection Checks
Inspection Item
Tagged Crane or Hoist
Control Devices
Brakes
Hook
Hook Latch
Wire Rope
Reeving
Limit Switches
Oil Leakage
Unusual Sounds
Warning and Safety Labels
Housekeeping and Lighting

Description of Inspection Check Points
Check that crane or hoist is not tagged with an out-of-order sign.
Test run that all motions agree with control device markings.
Check that all motions do not have excessive drift and that stopping distances are
normal.
Check for damage, cracks, nicks, gouges, deformations of the throat opening, wear on
saddle or load bearing point, and twist. Refer to the manual furnished by the original
manufacturer of the crane.
If a hook latch is required, check for proper operation.
Check for broken wires, broken strands, kinks, and any deformation or damage to the
rope structure.
Check that the wire rope is properly reeved and that rope parts are not twisted about
each other.
Check that the upper limit device stops lifting motion of the hoist load block before
striking any part of the hoist or crane.
Check for any sign of oil leakage on the crane and on the floor area beneath the crane.
Check for any unusual sounds from the crane or hoist mechanism while operating the
crane or hoist.
Check that warning and other safety labels are not missing and that they are legible.
Check area for accumulation of material, trip or slip hazards, and poor lighting.

3
A hoisting limit switch on a crane or hoisting device must not be used as an operating
control, unless the crane is also equipped with a backup limit switch.
A load must not be lowered below a point where less than 2 full wraps of wire rope
remain on the hoisting drum. If there is doubt concerning the safety of a crane or hoisting
means, the operator must immediately stop the crane, and report the condition creating
the doubt to the supervisor.
In the event of power failure, the operator must place all controllers in the “off” position.
When an operator leaves a crane unattended he or she must land any attached load, place
the controllers in the “off” position, and open the main switch. Before closing a main
switch the operator must make sure all controllers are in the “off” position. The main
switch does not need to be opened on a pendant-controlled crane if the crane is left
unattended for short periods.
An operator must only respond to signals from the employee directing the lift. Except for
an emergency stop signal, which must be obeyed when given from any employee. The
signals given to an operator must conform to table 1 below.

4
Table 1
Standard Hand Signals For Controlling Overhead
And Gantry Cranes

HOIST. With forearm vertical,
forefinger pointing up, move hand in
small horizontal circle

LOWER. With arm extended
downward, forefinger pointing down,
move hand in small horizontal circle.

BRIDGE TRAVEL. Arm extended
forward, hand open and slightly
raised, make pushing motion in
direction of travel.

TROLLEY TRAVEL. Palm up,
fingers closed, thumb pointing in
direction of motion, jerk hand
horizontally.

STOP. Arm extended, palm down,
hold position rigidly.

EMERGENCY STOP. Arm
extended, palm down, move hand
rapidly right and left.

MULTIPLE TROLLEYS. Hold up
one finger for block marked “1” and
two fingers for block marked “2”.
Regular signals follow.

MOVE SLOWLY. Use one hand to
give any motion signal and place
other hand motionless in front of
hand giving the motion signal. (Hoist
Slowly shown as an example.)

MAGNET IS DISCONNECTED.
Crane operator spreads both hands
apart – palms up.

An operator must not carry a load over another person.
A crane must not be used to make a side pull (except where it has been specifically
authorized by a qualified person after making specific determinations).
Compressed gases can only be lifted by a cradle or enclosed platform.
5
An employee cannot ride a hoisting device, such as a magnet, hook, ball, or load. The
only exception is a work platform that meets all the requirements in the Construction
Safety Standard Part 10. Lifting & Digging Equipment.
When attaching or moving a load, the operator, rigger, or hooker must make sure of all of
the following:
•
•
•
•
•
•
•

The hoisting rope or chain is free of kinks or twist and not wrapped around the
load.
The load is attached to the load block hook by means of a sling or other approved
device.
The sling and load will clear all obstacles or obstructions.
The load is balanced and secured before lifting the load more than a few inches.
Multiple lines are not twisted around each other.
The hook is brought over the load in a manner to prevent swinging.
There is no sudden acceleration or deceleration of the moving load.

Inspection
The inspection procedure for cranes in regular service is divided into 2 general
classifications:
•
•

Frequent inspections are done monthly to quarterly or at intervals of 100 hours of
use, whichever comes first.
Periodic inspections are done annually or at intervals of 500 hours of use,
whichever comes first.

The inspections cover topics outlined in the standard or manufacturers guidelines.

Maintenance
The employer must maintain a crane and its accessories in a condition that will not
endanger an operator or other employee.
A preventative maintenance program will be established and the program will be based
on the manufacturer’s recommendations and for the application as reviewed by a
qualified person.
Before adjustments or repairs are made on a crane, all of the following precautions must
be taken:
•
•

The crane will be moved to a location where it will cause the least interference
with other moving equipment on the track or rails and operations in the area.
Controllers will be placed in the “off” position.
6
•
•
•

The main switch will be placed in the “off” position or “open” position and
LOCKED OUT, except where power is necessary to adjust or service the crane.
A warning sign or “out of order” sign will be placed at the operator control
station.
Illumination of 15 footcandles intensity will be provided while maintenance is
performed on the crane.

If any other crane uses the same runway, then a protective device must be used to prevent
interference with the idle crane undergoing repairs. If a protective device is
impracticable, then a signal person must be placed at a visual vantage point to warn the
operator of the active crane when it reaches the limit of safe distance from the idle crane.
A crane that has been adjusted or repaired must not be returned to normal operation until
all guards have been replaced, locks removed by those who installed them, or their
supervisor, safety devices reactivated, and the maintenance equipment removed.

7
•
•
•

The main switch will be placed in the “off” position or “open” position and
LOCKED OUT, except where power is necessary to adjust or service the crane.
A warning sign or “out of order” sign will be placed at the operator control
station.
Illumination of 15 footcandles intensity will be provided while maintenance is
performed on the crane.

If any other crane uses the same runway, then a protective device must be used to prevent
interference with the idle crane undergoing repairs. If a protective device is
impracticable, then a signal person must be placed at a visual vantage point to warn the
operator of the active crane when it reaches the limit of safe distance from the idle crane.
A crane that has been adjusted or repaired must not be returned to normal operation until
all guards have been replaced, locks removed by those who installed them, or their
supervisor, safety devices reactivated, and the maintenance equipment removed.

7

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANESBs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
Bs 7121 2º INSPECTION, TESTING AND EXAMINATION-CRANES
 
Safe Slinging Practices Training by PE
Safe Slinging Practices Training by PESafe Slinging Practices Training by PE
Safe Slinging Practices Training by PE
 
Rigging and lifting
Rigging and liftingRigging and lifting
Rigging and lifting
 
TOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operationsTOOLBOX TALK | lifting & rigging operations
TOOLBOX TALK | lifting & rigging operations
 
Presentation of Rigger
Presentation of RiggerPresentation of Rigger
Presentation of Rigger
 
Mobile crane
Mobile craneMobile crane
Mobile crane
 
Lifting Sling Safety
Lifting Sling SafetyLifting Sling Safety
Lifting Sling Safety
 
10. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-210. lifting-plan-checklist-and-method-statement-2
10. lifting-plan-checklist-and-method-statement-2
 
Liftingproedure
LiftingproedureLiftingproedure
Liftingproedure
 
Overhead and gantry cranes safe operating procedures
Overhead and gantry cranes safe operating proceduresOverhead and gantry cranes safe operating procedures
Overhead and gantry cranes safe operating procedures
 
Below the hook
Below the hook Below the hook
Below the hook
 
Lifting & Rigging by NEIS
Lifting & Rigging by NEISLifting & Rigging by NEIS
Lifting & Rigging by NEIS
 
presentation on mobile cranes
presentation on mobile cranespresentation on mobile cranes
presentation on mobile cranes
 
Mobile crane
Mobile craneMobile crane
Mobile crane
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Hoisting and Rigging Safety
Hoisting and Rigging SafetyHoisting and Rigging Safety
Hoisting and Rigging Safety
 
Crane Rigging Safety by HF & C
Crane Rigging Safety by HF & CCrane Rigging Safety by HF & C
Crane Rigging Safety by HF & C
 
Rigging Safety Training by ATP
Rigging Safety Training by ATPRigging Safety Training by ATP
Rigging Safety Training by ATP
 
Basic riggingworkbook
Basic riggingworkbookBasic riggingworkbook
Basic riggingworkbook
 
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
Standard Operating Practices (SOPs) and Standard Maintenance Practices (SMPs)...
 

Destacado

Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
lukemoy13
 
Safe use of Mobile Cranes
Safe use of Mobile CranesSafe use of Mobile Cranes
Safe use of Mobile Cranes
Mihajlo Stupar
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
Sam Benzie
 
Primavera presentation
Primavera presentationPrimavera presentation
Primavera presentation
Nithin Dev
 

Destacado (20)

Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
 
Keselamatan crane
Keselamatan crane Keselamatan crane
Keselamatan crane
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
 
Lifting plan
Lifting planLifting plan
Lifting plan
 
Overhead Crane
Overhead CraneOverhead Crane
Overhead Crane
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Safe use of Mobile Cranes
Safe use of Mobile CranesSafe use of Mobile Cranes
Safe use of Mobile Cranes
 
China Coal Group railway maintenance tools
China Coal Group railway maintenance toolsChina Coal Group railway maintenance tools
China Coal Group railway maintenance tools
 
P.way
P.wayP.way
P.way
 
Standard hand signals for controlling crane operations Rigging Information, R...
Standard hand signals for controlling crane operations Rigging Information, R...Standard hand signals for controlling crane operations Rigging Information, R...
Standard hand signals for controlling crane operations Rigging Information, R...
 
studi kasus Perhitungan tower crane
studi kasus Perhitungan tower cranestudi kasus Perhitungan tower crane
studi kasus Perhitungan tower crane
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Safe Use of Tower Cranes Ahmed Assad
Safe Use of Tower Cranes Ahmed AssadSafe Use of Tower Cranes Ahmed Assad
Safe Use of Tower Cranes Ahmed Assad
 
Safety of Mobile Cranes in Construction
Safety of Mobile Cranes in ConstructionSafety of Mobile Cranes in Construction
Safety of Mobile Cranes in Construction
 
Calculation sheet crane
Calculation sheet craneCalculation sheet crane
Calculation sheet crane
 
Primavera presentation
Primavera presentationPrimavera presentation
Primavera presentation
 
installation and commissioning
installation and commissioninginstallation and commissioning
installation and commissioning
 
Sop overhead crane
Sop overhead craneSop overhead crane
Sop overhead crane
 
Crane
CraneCrane
Crane
 
114 site layout
114 site layout114 site layout
114 site layout
 

Similar a Crane operator safety procedure

Similar a Crane operator safety procedure (20)

Overhead-Cranes safety training.ppt
Overhead-Cranes safety training.pptOverhead-Cranes safety training.ppt
Overhead-Cranes safety training.ppt
 
1910.179 osha class
1910.179 osha class1910.179 osha class
1910.179 osha class
 
HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...HSE-BMS-011 Crane & Lifting Safety.ppt...
HSE-BMS-011 Crane & Lifting Safety.ppt...
 
Rigger safety .pdf
Rigger safety                        .pdfRigger safety                        .pdf
Rigger safety .pdf
 
Rigging Course .pdf
Rigging Course                       .pdfRigging Course                       .pdf
Rigging Course .pdf
 
Crane Operation - Lifting
Crane Operation -  LiftingCrane Operation -  Lifting
Crane Operation - Lifting
 
WINCH-SAFETY-TRAINING-ppt.pdf
WINCH-SAFETY-TRAINING-ppt.pdfWINCH-SAFETY-TRAINING-ppt.pdf
WINCH-SAFETY-TRAINING-ppt.pdf
 
Quality Control Operator Training &.pptx
Quality Control Operator Training &.pptxQuality Control Operator Training &.pptx
Quality Control Operator Training &.pptx
 
Overhead-Cranes.ppt
Overhead-Cranes.pptOverhead-Cranes.ppt
Overhead-Cranes.ppt
 
Overhead-Cranes.ppt
Overhead-Cranes.pptOverhead-Cranes.ppt
Overhead-Cranes.ppt
 
Overhead-Cranes (1).ppt
Overhead-Cranes (1).pptOverhead-Cranes (1).ppt
Overhead-Cranes (1).ppt
 
Overhead-Cranes.ppt
Overhead-Cranes.pptOverhead-Cranes.ppt
Overhead-Cranes.ppt
 
Aerial Lift Safety Training by ANSV
Aerial Lift Safety Training by ANSVAerial Lift Safety Training by ANSV
Aerial Lift Safety Training by ANSV
 
Overhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCAOverhead Crane Safety and Inspection Requirements by NPCA
Overhead Crane Safety and Inspection Requirements by NPCA
 
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industry
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industryCrane & Lifting Safety.ppt Crane lifting safety useful for construction industry
Crane & Lifting Safety.ppt Crane lifting safety useful for construction industry
 
Aerial Lift Safety
Aerial Lift SafetyAerial Lift Safety
Aerial Lift Safety
 
Crane Safety Tips for Construction Project..pdf
Crane Safety Tips for Construction Project..pdfCrane Safety Tips for Construction Project..pdf
Crane Safety Tips for Construction Project..pdf
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.ppt
 
overhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.pptoverhead_crane_operator_safety_manual.ppt
overhead_crane_operator_safety_manual.ppt
 
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh RajputCrane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
Crane | Crane Safety | Crane Safety Parts | Gaurav Singh Rajput
 

Último

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Último (20)

Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 

Crane operator safety procedure

  • 1. Safety Operating Procedure For Tower Crane Operators VITAL CORP. SDN. BHD.
  • 2. Contents Forward---------------------------------------------------------------1 Qualifications---------------------------------------------------------1 Permits ---------------------------------------------------------------1 Sample Permit-----------------------------------------------------2 Training---------------------------------------------------------------2 Personal Protective Equipment-----------------------------------3 General Conduct of Operators------------------------------------3 Table 2 Shift/Operator Inspection Checks------------------------3 Table 1 Standard Hand Signals for Controlling Overhead and Gantry Cranes-------------------------5 Inspection-------------------------------------------------------------6 Maintenance----------------------------------------------------------6 VITAL CORP. SDN. BHD.
  • 3. Safety Manual for Overhead Crane Operators Forward An overhead crane operator’s job is very important. It is a position of responsibility that you must be authorized to hold. There are rules and regulations you must obey and responsibilities you must accept. For specific rules and regulations and your responsibilities when operating an overhead crane in Michigan, see MIOSHA General Industry Safety Standard Part 18. Overhead and Gantry Cranes. This manual may be used as a tool in the overall training and authorization of a prospective overhead crane operator. Employers and employees need to be aware that all cranes are different and may have specific operating, safety, inspection and maintenance requirements. It is essential that you have the manufacturers operating manuals and are familiar with your particular crane. Qualifications The minimum qualifications for an employee selected to operate a crane are as follows: • • • • • Have corrected vision that meets the same requirements as vision for a valid Michigan driver’s license. Have effective use of all 4 limbs. Be of sufficient height to operate the controls and to have an unobstructed view over the controls into the work area. Have coordination between eyes, hands, and feet. Be free of known convulsive disorders and episodes of unconsciousness. The employee must also have the ability to understand signs, labels, and instructions. The employee must be examined for these qualifications at least once every 3 years. Permits You must be trained and tested before you can operate an overhead crane. Upon passing this test and meeting other operator requirements (including demonstrating proficiency in running the crane) a permit will be issued to you. It is to be carried by you or be available upon request. 1
  • 4. Sample Permit CRANE OPERATOR PERMIT (Firm Name) Operator’s Name Operator’s Number Is Authorized To Operate: (Insert Type of Crane(s) Authorized) Restrictions: (Explanation of Restrictions) Date Issued: (Month-Day-Year) Date Expiring (Month-Day-Year) By Issuing Authority: _______________________________________________ Title Training Training of all operators will include the following: • • • • • • • • • • • Capacities of equipment and attachments. Purpose, use and limitation of controls. How to make daily checks. The energizing sequences, including pneumatic, hydraulic, and electrical sequences. Start-up and shutdown procedures. Emergency shutdown procedures. General operating procedures. All basic signaling procedures, including hand, radio, or telephone signals, where required. Knowledge of MIOSHA Part 18. Overhead and Gantry Cranes, and other applicable MIOSHA standards. Practice in operating the assigned equipment through the mechanical functions necessary to perform the required task. Maximum rated capacity of the crane. Training of all riggers will include the following: • The requirements of MIOSHA Part 18. Overhead and Gantry Cranes. • Knowledge of MIOSHA Part 49. Slings. • Knowledge of MIOSHA Part 33. Personal Protective Equipment. • Maximum capacity of the crane. • Rigging procedures. • Company rules and regulations. 2
  • 5. Personal Protective Equipment When your employer conducts a personal protective equipment hazard assessment (as required in Part 33. Personal Protective Equipment), they should include overhead cranes in their review. An operator and any employee directing a lift must use the PPE required in the area. If the top of the load is lifted to a height greater than 5 feet, then the load is considered an overhead hazard and head protection needs to be worn. When an employee is performing maintenance on an overhead or gantry crane, and a standard barrier or platform is not provided, the employee must wear an approved safety harness and lanyard, or a fall arrest device as prescribed in Construction Safety Standard, Part 45. Fall Protection. General Conduct of Operators At the beginning of each shift during which a crane is used, a visual inspection must be made in accordance with Table 2 below. A visual inspection is limited to that which can be made from a catwalk or other safe observation point. Any defects must be reported to a supervisor. TABLE 2 Shift/Operator Inspection Checks Inspection Item Tagged Crane or Hoist Control Devices Brakes Hook Hook Latch Wire Rope Reeving Limit Switches Oil Leakage Unusual Sounds Warning and Safety Labels Housekeeping and Lighting Description of Inspection Check Points Check that crane or hoist is not tagged with an out-of-order sign. Test run that all motions agree with control device markings. Check that all motions do not have excessive drift and that stopping distances are normal. Check for damage, cracks, nicks, gouges, deformations of the throat opening, wear on saddle or load bearing point, and twist. Refer to the manual furnished by the original manufacturer of the crane. If a hook latch is required, check for proper operation. Check for broken wires, broken strands, kinks, and any deformation or damage to the rope structure. Check that the wire rope is properly reeved and that rope parts are not twisted about each other. Check that the upper limit device stops lifting motion of the hoist load block before striking any part of the hoist or crane. Check for any sign of oil leakage on the crane and on the floor area beneath the crane. Check for any unusual sounds from the crane or hoist mechanism while operating the crane or hoist. Check that warning and other safety labels are not missing and that they are legible. Check area for accumulation of material, trip or slip hazards, and poor lighting. 3
  • 6. A hoisting limit switch on a crane or hoisting device must not be used as an operating control, unless the crane is also equipped with a backup limit switch. A load must not be lowered below a point where less than 2 full wraps of wire rope remain on the hoisting drum. If there is doubt concerning the safety of a crane or hoisting means, the operator must immediately stop the crane, and report the condition creating the doubt to the supervisor. In the event of power failure, the operator must place all controllers in the “off” position. When an operator leaves a crane unattended he or she must land any attached load, place the controllers in the “off” position, and open the main switch. Before closing a main switch the operator must make sure all controllers are in the “off” position. The main switch does not need to be opened on a pendant-controlled crane if the crane is left unattended for short periods. An operator must only respond to signals from the employee directing the lift. Except for an emergency stop signal, which must be obeyed when given from any employee. The signals given to an operator must conform to table 1 below. 4
  • 7. Table 1 Standard Hand Signals For Controlling Overhead And Gantry Cranes HOIST. With forearm vertical, forefinger pointing up, move hand in small horizontal circle LOWER. With arm extended downward, forefinger pointing down, move hand in small horizontal circle. BRIDGE TRAVEL. Arm extended forward, hand open and slightly raised, make pushing motion in direction of travel. TROLLEY TRAVEL. Palm up, fingers closed, thumb pointing in direction of motion, jerk hand horizontally. STOP. Arm extended, palm down, hold position rigidly. EMERGENCY STOP. Arm extended, palm down, move hand rapidly right and left. MULTIPLE TROLLEYS. Hold up one finger for block marked “1” and two fingers for block marked “2”. Regular signals follow. MOVE SLOWLY. Use one hand to give any motion signal and place other hand motionless in front of hand giving the motion signal. (Hoist Slowly shown as an example.) MAGNET IS DISCONNECTED. Crane operator spreads both hands apart – palms up. An operator must not carry a load over another person. A crane must not be used to make a side pull (except where it has been specifically authorized by a qualified person after making specific determinations). Compressed gases can only be lifted by a cradle or enclosed platform. 5
  • 8. An employee cannot ride a hoisting device, such as a magnet, hook, ball, or load. The only exception is a work platform that meets all the requirements in the Construction Safety Standard Part 10. Lifting & Digging Equipment. When attaching or moving a load, the operator, rigger, or hooker must make sure of all of the following: • • • • • • • The hoisting rope or chain is free of kinks or twist and not wrapped around the load. The load is attached to the load block hook by means of a sling or other approved device. The sling and load will clear all obstacles or obstructions. The load is balanced and secured before lifting the load more than a few inches. Multiple lines are not twisted around each other. The hook is brought over the load in a manner to prevent swinging. There is no sudden acceleration or deceleration of the moving load. Inspection The inspection procedure for cranes in regular service is divided into 2 general classifications: • • Frequent inspections are done monthly to quarterly or at intervals of 100 hours of use, whichever comes first. Periodic inspections are done annually or at intervals of 500 hours of use, whichever comes first. The inspections cover topics outlined in the standard or manufacturers guidelines. Maintenance The employer must maintain a crane and its accessories in a condition that will not endanger an operator or other employee. A preventative maintenance program will be established and the program will be based on the manufacturer’s recommendations and for the application as reviewed by a qualified person. Before adjustments or repairs are made on a crane, all of the following precautions must be taken: • • The crane will be moved to a location where it will cause the least interference with other moving equipment on the track or rails and operations in the area. Controllers will be placed in the “off” position. 6
  • 9. • • • The main switch will be placed in the “off” position or “open” position and LOCKED OUT, except where power is necessary to adjust or service the crane. A warning sign or “out of order” sign will be placed at the operator control station. Illumination of 15 footcandles intensity will be provided while maintenance is performed on the crane. If any other crane uses the same runway, then a protective device must be used to prevent interference with the idle crane undergoing repairs. If a protective device is impracticable, then a signal person must be placed at a visual vantage point to warn the operator of the active crane when it reaches the limit of safe distance from the idle crane. A crane that has been adjusted or repaired must not be returned to normal operation until all guards have been replaced, locks removed by those who installed them, or their supervisor, safety devices reactivated, and the maintenance equipment removed. 7
  • 10. • • • The main switch will be placed in the “off” position or “open” position and LOCKED OUT, except where power is necessary to adjust or service the crane. A warning sign or “out of order” sign will be placed at the operator control station. Illumination of 15 footcandles intensity will be provided while maintenance is performed on the crane. If any other crane uses the same runway, then a protective device must be used to prevent interference with the idle crane undergoing repairs. If a protective device is impracticable, then a signal person must be placed at a visual vantage point to warn the operator of the active crane when it reaches the limit of safe distance from the idle crane. A crane that has been adjusted or repaired must not be returned to normal operation until all guards have been replaced, locks removed by those who installed them, or their supervisor, safety devices reactivated, and the maintenance equipment removed. 7