ALMM monitoring and evaluation
tools
<Event title, date,presenter's name>
EUNES IPA Project
Technical Assistance to enhance forecasting and evaluation capacity of the National Employment Service
Europeaid/128079/C/SER/RS
Monitoring - Definition
Monitoring aims:
to highlight strengths and weaknesses in implementation.
to enable responsible personnel to deal with problems, improve
performance, build on success, and adapt to changing circumstances.
to provide the mechanism by which relevant information is channeled to
the right people at the right time.
Monitoring
The types of information necessary
Programme inputs,
Progress against objectives and against the Implementation Plan.
Results of activities and outputs achieved.
Impact on the target group.
The way the programme is managed and style of work.
The means of gathering information
Site visits to local offices and projects;
Interviews with staff, project personnel and beneficiary groups;
Observation of project activities;
Analysis of activity reports, statistical reports and other documents;
Analysis of financial documents.
Performance Monitoring System- levels
Process monitoring
reviewing and planning work on a regular basis;
assessing whether activities are carried out as planned;
identifying and dealing with problems;
building on strengths: and
assessing whether the style of work is the best way to achieve the
programme objectives
Impact monitoring
progress towards objectives is measured continuously;
implementation is modified in response to changing circumstances without
losing sight of overall objectives and aims;
the need to change objectives (if necessary) can be identified;
the need for further research can be identified;
assumptions can be verified
Performance Monitoring System
..provides the basis for the kind of management information system which is essential
for programme operations, especially in situations where implementation is delegated
or decentralised to local
level.
Steps
establishing / confirming programme goals;
developing performance indicators corresponding to programme goals;
collection of data concerning the indicators;
analysis of the data;
appropriate presentation of information;
using the information findings to improve activities.
Performance Monitoring System
The Monitoring System for an ALMM-funded project- key
documents:
QUARTERLY MONITORING REPORT (covering staffing levels; activities engaged in
over the reporting period; achievements /products; seminars and events etc);
QUARTERLY FINANCIAL REPORT;
PARTICIPANT START AND COMPLETION DETAILS (broken down by gender, age,
target group, etc).
Monitoring of an ALMM would focus:
Number (broken down by gender, age, etc) from the target group(s) who
participated within a specified period;
The cost of the programme over the same period;
The completion rate;
 Qualifications obtained as a result of participation (if applicable);
Employment status (in the short run) immediately after completion.
Monitoring vs. Evaluation
Monitoring
assess the success or failure of the
programme
provides rapid information about the
programme
programmes are expected to monitor for
quality control and procedural purposes
in monitoring the effectiveness of the
ALMPs- secondary effects should be taken
into account
Evaluation
provides explanations
longer term process
Evaluation
 determins whether and why a programme is successful
 assessing implementation and outcomes from a ‘wider angle’ viewpoint
 can take place at all stages of the programme
 makes use of monitoring data
Programme Evaluation
 individual systematic studies
 assess how well project / programme has worked and what lessons can be
learned
 conducted by external experts
 a programme evaluation examines achievement of programme objectives in
the wider context
 based on the statistics collected OR address important questions of a more
qualitative nature
 evaluation as a learning process
Evaluation Objectives:
find out- asssess- recommend
To find out...
 whether the programme is making progress towards achieving its objectives?
 who has benefited from the intervention?
 what the impact has been on the beneficiaries?
 have there been changes to the target group due to external factors?
To asess..
 whether the impact, if there is one, is due to the programme, or to other
factors?
 whether the aims and objectives of the programme are still relevant, or
whether there is a better way of achieving them?
 whether the work is being carried out efficiently and what major problems and
constraints have arisen?
 whether the resources allocated where used efficiently and effectively?
 how changes in the needs of the target group effect future programmes?
Evaluation Objectives:
find out- asssess- recommend
to make recommendations about:
 how the programme could be improved;
 how the aims and objectives should be modified or revised;
 how the work can be monitored and evaluated in the future;
 how the work could be made more cost-effective
Programme Evaluation
partly statistical exercise
statistics do not
provide full assesment
good evaluation involves
evidence based interpretation
elements of qualitative analysis
Evaluation Elements: Outcomes and Process
Outcomes- what was achieved and with what results?
Impact evaluation process three steps:
What are the estimated impacts of the programme on the individual?
Are the impacts large enough to yield net social gains?
Is this the best outcome that could have been achieved for the money spent?
(effectiveness). Feasibility of replicating programme’s outcomes might also
arise under this heading.
Evaluation Elements: Outcomes and Process
Process- how the outputs were achieved, how the
programme was managed?
programme design and methodology;
programme management;
service delivery mechanisms;
the quality of the co-operation with partner organisations innovation (if any).
Relevance of Evaluation
The results of an evaluation exercise will:
 identify what worked well and what worked less well (outputs and processes);
 assist in the planning of current and future programmes ;
 help to build on success, develop good practice, and avoid repeating
mistakes;
 assist in the monitoring of the programme’s future phase;
 help to shape dissemination and mainstreaming strategy.
Qualitative analysis helps in judging the outcomes of the approach – i.e. the
learning and process 'successes' of a programme that are not necessarily
captured by Labour Market Information System (LMIS) statistics alone, but
require complementary feedback from beneficiaries, employers and other
stakeholders, using interviews, focus group sessions, questionnaires, etc.
Evaluating the multiple contexts of a project may also point to situations that
limit a project’s ability to achieve anticipated outcomes, or lead to the
realization that specific interventions and their intended outcomes may be
difficult to measure or to attribute to the project itself.
Evaluation: Who and How?
Evaluation - the ‘How’?
Four key issues for planning and undertaking an evaluation are:
Who should undertake the evaluation?
When should evaluation take place?
What should be evaluated?
How is an evaluation conducted?
Who Should Undertake the Evaluation?
self-evaluation – an evaluation exercise conducted by the programme
sponsor, or any other (partner) organisation involved; and
external evaluation – an evaluation undertaken by an individual or organisation
from outside the programme.
Self-Evaluation
 Most programmes will probably conduct
 important to ensure that is done properly
 skilled staff, independent from its management
 time and other resources
 available data
 understanding of research methods and data analysis
 ability to reflect on the progress of the programme against its stated
objectives
 Skills to interpret this information and report it in a clear and useful manner
are required
External Evaluation
 The external evaluator can offer expert services; the levels of expertise and
resources required for thorough evaluation are likely to be greater.
 Expert can often provide a more cost-effective solution than in case of self-
evaluation.
 Objective evaluation; the external evaluator may also elicit more honest
information from the staff and the beneficiaries of your programme.
 The perceived independence of the external evaluator can help to ensure that
other organisations take the results more seriously.
 They may also (depending on your programme) be able to undertake the
evaluation of the programme within a wider context. This may help you to
address evaluation questions relating to mainstreaming and multiplier effects.
Decision- Terms of Reference
When Should Evaluation Take Place?
Two intervals:
at an interim stage,
at the end of the approved period for the programme.
The monitoring data you collect are a key source of information for both interim
and final evaluations.
Interim evaluation
addresses whether the
programme:
has achieved its objectives by the
dates set out in the work plan; and
is on track to achieve its objectives
by the end of the programme.
•Final evaluation
•draw conclusions on the
design, implementation and degree of
success of your programme in the
light of your objectives and
indicators;
•inform funding bodies and other
stakeholders of your results, and the
actual and potential impact of your
programme;
•stimulate support for transfer and
mainstreaming of your innovation;
•form the basis of the final report and
other publications; and stimulate new
ideas for innovation.
Aims of Interm and Final Evaluation
How Is An Evaluation Conducted?
PLAN
ANALYSE
INDICATORS
ANALYSE
DATA
REPORT
Planning the evaluation- key points
 Focus of the evaluation. A clear, focused brief should go some way towards
ensuring that you get the information you need from the exercise;
 Programme objectives.
 Programme products.
 Programme processes: processes related to partnership arrangements and
decisionmaking, programme management and monitoring systems could be
evaluated.
 Subject, purpose and audience targeted.
Analyse the Performance indicators
Performance indicators:
 Output indicators – quantitative measures, based on your programme's key
targets and objectives
 Process indicators –quantitative or qualitative
When defining the indicators, consider whether they will provide Information
concerning:
 programme’s effectiveness in meeting your objectives;
 programme’s efficiency in meeting your objectives;
 relevance of your programme activities to the needs identified;
 impact of your innovation;
 impact of activity at different levels (individuals, groups, systems); and
 value added to the programme as a result of partnership activities.
Gather and analyse the data
Questions to ask are:
 Is the information already available?
 Do you need to establish a baseline? – i.e. do you need to have some
information in place at the start of your programme?
 What gaps are there in the data? What do you need to collect in addition to
 what exists?
 How will the information be gathered and recorded, and by whom?
 Are these procedures feasible?
Methods are used to gather the data:
 Record-keeping
 Observation of participants
 Self-administered questionnaire
 Individual personal interviews (face to face or by telephone)
 Group discussion/ focus groups
Reporting of the findings
An interim evaluation report should cover:
 programme background; (context, rationale, objectives);
 achievements to date and problems encountered;
 trends and issues; and
 action needed.
The final evaluation report needs to encompass:
 the background to the programme (context, rationale, objectives),
 how the evaluation exercise was undertaken, the methods used to gather
 and analyse the information; identifying problems encountered and how they
were addressed
 the results / findings emerging from the evaluation, supported by evidence;
lessons for this programme and others
 the final report should make recommendations and highlighting the main
lessons.
Dissemination
The evaluation will be of interest to a wide audience, including:
 beneficiary groups;
 local, regional and national social partner organisations;
 policy-makers and representatives from intermediary organisations (training
and employment, equal opportunities, information technology in training, etc)
Take into account:
 tailor the contents of your evaluation report to your audience;
 only include the information and evidence necessary to ‘tell the story’, and
 focus on key findings for making the case for recommendations.
 be transparent
 reference all external sources; and
 provide a summary, even if the report itself is quite brief.
Thank you for the attention!
<full contactdetails>
EUNES IPA Project
Technical Assistance to enhance forecasting and evaluation capacity of the National Employment Service
Europeaid/128079/C/SER/RS

Más contenido relacionado

La actualidad más candente

Project Monitoring and Evaluation (M and E Plan) Notes
Project Monitoring and Evaluation (M and E Plan) NotesProject Monitoring and Evaluation (M and E Plan) Notes
Project Monitoring and Evaluation (M and E Plan) Notes
Excellence Foundation for South Sudan
 
Developing-Monitoring-And-Evaluation-Framework-for-Budget-Work-Projects
Developing-Monitoring-And-Evaluation-Framework-for-Budget-Work-ProjectsDeveloping-Monitoring-And-Evaluation-Framework-for-Budget-Work-Projects
Developing-Monitoring-And-Evaluation-Framework-for-Budget-Work-Projects
NIDHI SEN
 
Monitoring and evaluation (2)
Monitoring and evaluation (2)Monitoring and evaluation (2)
Monitoring and evaluation (2)
Dr.RAJEEV KASHYAP
 
Project m&e & logframe
Project m&e & logframeProject m&e & logframe
Project m&e & logframe
Wesley Opaki
 

La actualidad más candente (20)

M&E Plan
M&E PlanM&E Plan
M&E Plan
 
TTIPEC: Monitoring and Evaluation (Session 2)
TTIPEC: Monitoring and Evaluation (Session 2)TTIPEC: Monitoring and Evaluation (Session 2)
TTIPEC: Monitoring and Evaluation (Session 2)
 
Project Monitoring and Evaluation (M and E Plan) Notes
Project Monitoring and Evaluation (M and E Plan) NotesProject Monitoring and Evaluation (M and E Plan) Notes
Project Monitoring and Evaluation (M and E Plan) Notes
 
Project Monitoring and Evaluation
Project Monitoring and Evaluation Project Monitoring and Evaluation
Project Monitoring and Evaluation
 
Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.
 
Developing-Monitoring-And-Evaluation-Framework-for-Budget-Work-Projects
Developing-Monitoring-And-Evaluation-Framework-for-Budget-Work-ProjectsDeveloping-Monitoring-And-Evaluation-Framework-for-Budget-Work-Projects
Developing-Monitoring-And-Evaluation-Framework-for-Budget-Work-Projects
 
Project M&E (unit 1-4)
Project M&E (unit 1-4)Project M&E (unit 1-4)
Project M&E (unit 1-4)
 
Monitoring and evaluation (2)
Monitoring and evaluation (2)Monitoring and evaluation (2)
Monitoring and evaluation (2)
 
Monitoring and evaluation (Part 1)
Monitoring and evaluation (Part 1)Monitoring and evaluation (Part 1)
Monitoring and evaluation (Part 1)
 
Importance of M&E
Importance of M&EImportance of M&E
Importance of M&E
 
Monitoring and evaluation
Monitoring and evaluationMonitoring and evaluation
Monitoring and evaluation
 
Monitoring and evaluation of Projects
Monitoring and evaluation of ProjectsMonitoring and evaluation of Projects
Monitoring and evaluation of Projects
 
Participatory Monitoring and Evaluation
Participatory Monitoring and EvaluationParticipatory Monitoring and Evaluation
Participatory Monitoring and Evaluation
 
Monitoring and evaluation
Monitoring and evaluationMonitoring and evaluation
Monitoring and evaluation
 
Monitoring and Evaluation
Monitoring and EvaluationMonitoring and Evaluation
Monitoring and Evaluation
 
Monitoring & Evalution ...... Orientation PPT
Monitoring & Evalution ...... Orientation PPT Monitoring & Evalution ...... Orientation PPT
Monitoring & Evalution ...... Orientation PPT
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 
Components of a monitoring and evaluation system
Components of a monitoring and evaluation system  Components of a monitoring and evaluation system
Components of a monitoring and evaluation system
 
Project m&e & logframe
Project m&e & logframeProject m&e & logframe
Project m&e & logframe
 
Monitoring and Evaluation of Plan
Monitoring and Evaluation of PlanMonitoring and Evaluation of Plan
Monitoring and Evaluation of Plan
 

Similar a Almm monitoring and evaluation tools draft[1]acm

Almm monitoring and evaluation tools draft[1]acm sir revised
Almm monitoring and evaluation tools draft[1]acm sir revisedAlmm monitoring and evaluation tools draft[1]acm sir revised
Almm monitoring and evaluation tools draft[1]acm sir revised
Alberto Mico
 
COURSEWORK.pdf
COURSEWORK.pdfCOURSEWORK.pdf
COURSEWORK.pdf
mohamedsaidomar6
 
Program Rationale and Logic for Post Monitoring
Program Rationale and Logic for Post MonitoringProgram Rationale and Logic for Post Monitoring
Program Rationale and Logic for Post Monitoring
Thabang Nare
 
A Good Program Can Improve Educational Outcomes.pdf
A Good Program Can Improve Educational Outcomes.pdfA Good Program Can Improve Educational Outcomes.pdf
A Good Program Can Improve Educational Outcomes.pdf
noblex1
 
Monitoring and Evaluation of Health Services
Monitoring and Evaluation of Health ServicesMonitoring and Evaluation of Health Services
Monitoring and Evaluation of Health Services
Nayyar Kazmi
 
Monitoring and Evaluation for development and governmental organizations.pdf
Monitoring and Evaluation for development and governmental organizations.pdfMonitoring and Evaluation for development and governmental organizations.pdf
Monitoring and Evaluation for development and governmental organizations.pdf
Guta Mengesha
 

Similar a Almm monitoring and evaluation tools draft[1]acm (20)

Almm monitoring and evaluation tools draft[1]acm sir revised
Almm monitoring and evaluation tools draft[1]acm sir revisedAlmm monitoring and evaluation tools draft[1]acm sir revised
Almm monitoring and evaluation tools draft[1]acm sir revised
 
Almm monitoring and evaluation tools draft[1]acm sir revised
Almm monitoring and evaluation tools draft[1]acm sir revisedAlmm monitoring and evaluation tools draft[1]acm sir revised
Almm monitoring and evaluation tools draft[1]acm sir revised
 
Monitoring process
Monitoring processMonitoring process
Monitoring process
 
A2011214171642 1
A2011214171642 1A2011214171642 1
A2011214171642 1
 
COURSEWORK.pdf
COURSEWORK.pdfCOURSEWORK.pdf
COURSEWORK.pdf
 
Program Rationale and Logic for Post Monitoring
Program Rationale and Logic for Post MonitoringProgram Rationale and Logic for Post Monitoring
Program Rationale and Logic for Post Monitoring
 
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT AT THE WORKPLACE S
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT  AT THE WORKPLACE SHOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT  AT THE WORKPLACE S
HOW TO CARRY OUT MONITORING AND EVALUATION OF PROJECT AT THE WORKPLACE S
 
M&amp;e notes unit 1(7)
M&amp;e notes unit 1(7)M&amp;e notes unit 1(7)
M&amp;e notes unit 1(7)
 
A Good Program Can Improve Educational Outcomes.pdf
A Good Program Can Improve Educational Outcomes.pdfA Good Program Can Improve Educational Outcomes.pdf
A Good Program Can Improve Educational Outcomes.pdf
 
PROJECTPROGRAM IMPLEMENTATION, MONITORING AND EVALUATION.pptx
PROJECTPROGRAM IMPLEMENTATION, MONITORING AND EVALUATION.pptxPROJECTPROGRAM IMPLEMENTATION, MONITORING AND EVALUATION.pptx
PROJECTPROGRAM IMPLEMENTATION, MONITORING AND EVALUATION.pptx
 
Report on overview monitoring and evaluation in Strategic Management_Report p...
Report on overview monitoring and evaluation in Strategic Management_Report p...Report on overview monitoring and evaluation in Strategic Management_Report p...
Report on overview monitoring and evaluation in Strategic Management_Report p...
 
Program Evaluation 1
Program Evaluation 1Program Evaluation 1
Program Evaluation 1
 
Day 1
Day 1Day 1
Day 1
 
Monitoring and Evaluation of Health Services
Monitoring and Evaluation of Health ServicesMonitoring and Evaluation of Health Services
Monitoring and Evaluation of Health Services
 
MPPC.ppt
MPPC.pptMPPC.ppt
MPPC.ppt
 
Monitoring and Evaluation Lesson 2.pptx
Monitoring and Evaluation Lesson 2.pptxMonitoring and Evaluation Lesson 2.pptx
Monitoring and Evaluation Lesson 2.pptx
 
Project monitoring and control &amp; planning for monitoring
Project monitoring and control &amp; planning for monitoringProject monitoring and control &amp; planning for monitoring
Project monitoring and control &amp; planning for monitoring
 
COMMUNITY EVALUATION 2023.pptx
COMMUNITY  EVALUATION 2023.pptxCOMMUNITY  EVALUATION 2023.pptx
COMMUNITY EVALUATION 2023.pptx
 
Ngo’s project management
Ngo’s project managementNgo’s project management
Ngo’s project management
 
Monitoring and Evaluation for development and governmental organizations.pdf
Monitoring and Evaluation for development and governmental organizations.pdfMonitoring and Evaluation for development and governmental organizations.pdf
Monitoring and Evaluation for development and governmental organizations.pdf
 

Más de Alberto Mico

5 supported employement for pwd
5 supported employement for pwd5 supported employement for pwd
5 supported employement for pwd
Alberto Mico
 
4 ap & job integration adaptation pwd
4 ap & job integration adaptation pwd4 ap & job integration adaptation pwd
4 ap & job integration adaptation pwd
Alberto Mico
 
2.1 ap lm pwd typical structure content ppp
2.1 ap lm pwd typical structure content ppp2.1 ap lm pwd typical structure content ppp
2.1 ap lm pwd typical structure content ppp
Alberto Mico
 
Work injury presentation
Work injury presentationWork injury presentation
Work injury presentation
Alberto Mico
 
Spanish mutual funds osh wi
Spanish mutual funds osh wiSpanish mutual funds osh wi
Spanish mutual funds osh wi
Alberto Mico
 
Job integration disabled persons en cn
Job integration disabled persons en cnJob integration disabled persons en cn
Job integration disabled persons en cn
Alberto Mico
 
Risk evaluation presentation power point ukr
Risk evaluation presentation power point ukrRisk evaluation presentation power point ukr
Risk evaluation presentation power point ukr
Alberto Mico
 
Cost benefit ohs prevention ukrainia ukr[1]
Cost benefit ohs prevention ukrainia ukr[1]Cost benefit ohs prevention ukrainia ukr[1]
Cost benefit ohs prevention ukrainia ukr[1]
Alberto Mico
 
Campaigns ohs promotion methodology ukr
Campaigns ohs promotion methodology ukrCampaigns ohs promotion methodology ukr
Campaigns ohs promotion methodology ukr
Alberto Mico
 
Risk evaluation presentation power point
Risk evaluation presentation power pointRisk evaluation presentation power point
Risk evaluation presentation power point
Alberto Mico
 
European network for workplace health promotion presentation
European network for workplace health promotion presentationEuropean network for workplace health promotion presentation
European network for workplace health promotion presentation
Alberto Mico
 
Eu osha strategy ohs 2002 2006
Eu osha strategy ohs 2002 2006Eu osha strategy ohs 2002 2006
Eu osha strategy ohs 2002 2006
Alberto Mico
 
Campaigns ohs promotion methodology
Campaigns ohs promotion methodologyCampaigns ohs promotion methodology
Campaigns ohs promotion methodology
Alberto Mico
 
Kick off meeting turkey presentation4
Kick off meeting turkey presentation4Kick off meeting turkey presentation4
Kick off meeting turkey presentation4
Alberto Mico
 
Annex a2 kick off meeting presentation iskur 2006 (240106) en
Annex a2 kick off meeting presentation iskur 2006 (240106) enAnnex a2 kick off meeting presentation iskur 2006 (240106) en
Annex a2 kick off meeting presentation iskur 2006 (240106) en
Alberto Mico
 
Annex a kick off meeting presentation iskur 2006 (240106) tr
Annex a kick off meeting presentation iskur 2006 (240106) trAnnex a kick off meeting presentation iskur 2006 (240106) tr
Annex a kick off meeting presentation iskur 2006 (240106) tr
Alberto Mico
 

Más de Alberto Mico (20)

1 acm cv EU EN 2021.doc
1 acm cv EU EN 2021.doc1 acm cv EU EN 2021.doc
1 acm cv EU EN 2021.doc
 
7.1 m&e[1]acm
7.1 m&e[1]acm7.1 m&e[1]acm
7.1 m&e[1]acm
 
6.1 csr[1]
6.1 csr[1]6.1 csr[1]
6.1 csr[1]
 
5 supported employement for pwd
5 supported employement for pwd5 supported employement for pwd
5 supported employement for pwd
 
4 ap & job integration adaptation pwd
4 ap & job integration adaptation pwd4 ap & job integration adaptation pwd
4 ap & job integration adaptation pwd
 
2.1 ap lm pwd typical structure content ppp
2.1 ap lm pwd typical structure content ppp2.1 ap lm pwd typical structure content ppp
2.1 ap lm pwd typical structure content ppp
 
Work injury presentation
Work injury presentationWork injury presentation
Work injury presentation
 
Spanish mutual funds osh wi
Spanish mutual funds osh wiSpanish mutual funds osh wi
Spanish mutual funds osh wi
 
Job integration disabled persons en cn
Job integration disabled persons en cnJob integration disabled persons en cn
Job integration disabled persons en cn
 
Risk evaluation presentation power point ukr
Risk evaluation presentation power point ukrRisk evaluation presentation power point ukr
Risk evaluation presentation power point ukr
 
Cost benefit ohs prevention ukrainia ukr[1]
Cost benefit ohs prevention ukrainia ukr[1]Cost benefit ohs prevention ukrainia ukr[1]
Cost benefit ohs prevention ukrainia ukr[1]
 
Campaigns ohs promotion methodology ukr
Campaigns ohs promotion methodology ukrCampaigns ohs promotion methodology ukr
Campaigns ohs promotion methodology ukr
 
Risk evaluation presentation power point
Risk evaluation presentation power pointRisk evaluation presentation power point
Risk evaluation presentation power point
 
European network for workplace health promotion presentation
European network for workplace health promotion presentationEuropean network for workplace health promotion presentation
European network for workplace health promotion presentation
 
Eu osha strategy ohs 2002 2006
Eu osha strategy ohs 2002 2006Eu osha strategy ohs 2002 2006
Eu osha strategy ohs 2002 2006
 
Campaigns ohs promotion methodology
Campaigns ohs promotion methodologyCampaigns ohs promotion methodology
Campaigns ohs promotion methodology
 
Kick off meeting turkey presentation4
Kick off meeting turkey presentation4Kick off meeting turkey presentation4
Kick off meeting turkey presentation4
 
Annex a2 kick off meeting presentation iskur 2006 (240106) en
Annex a2 kick off meeting presentation iskur 2006 (240106) enAnnex a2 kick off meeting presentation iskur 2006 (240106) en
Annex a2 kick off meeting presentation iskur 2006 (240106) en
 
Annex a kick off meeting presentation iskur 2006 (240106) tr
Annex a kick off meeting presentation iskur 2006 (240106) trAnnex a kick off meeting presentation iskur 2006 (240106) tr
Annex a kick off meeting presentation iskur 2006 (240106) tr
 
7.1 m&e acm hrv
7.1 m&e acm hrv7.1 m&e acm hrv
7.1 m&e acm hrv
 

Último

EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Enterprise Knowledge
 

Último (20)

The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 

Almm monitoring and evaluation tools draft[1]acm

  • 1. ALMM monitoring and evaluation tools <Event title, date,presenter's name> EUNES IPA Project Technical Assistance to enhance forecasting and evaluation capacity of the National Employment Service Europeaid/128079/C/SER/RS
  • 2. Monitoring - Definition Monitoring aims: to highlight strengths and weaknesses in implementation. to enable responsible personnel to deal with problems, improve performance, build on success, and adapt to changing circumstances. to provide the mechanism by which relevant information is channeled to the right people at the right time.
  • 3. Monitoring The types of information necessary Programme inputs, Progress against objectives and against the Implementation Plan. Results of activities and outputs achieved. Impact on the target group. The way the programme is managed and style of work. The means of gathering information Site visits to local offices and projects; Interviews with staff, project personnel and beneficiary groups; Observation of project activities; Analysis of activity reports, statistical reports and other documents; Analysis of financial documents.
  • 4. Performance Monitoring System- levels Process monitoring reviewing and planning work on a regular basis; assessing whether activities are carried out as planned; identifying and dealing with problems; building on strengths: and assessing whether the style of work is the best way to achieve the programme objectives Impact monitoring progress towards objectives is measured continuously; implementation is modified in response to changing circumstances without losing sight of overall objectives and aims; the need to change objectives (if necessary) can be identified; the need for further research can be identified; assumptions can be verified
  • 5. Performance Monitoring System ..provides the basis for the kind of management information system which is essential for programme operations, especially in situations where implementation is delegated or decentralised to local level. Steps establishing / confirming programme goals; developing performance indicators corresponding to programme goals; collection of data concerning the indicators; analysis of the data; appropriate presentation of information; using the information findings to improve activities.
  • 6. Performance Monitoring System The Monitoring System for an ALMM-funded project- key documents: QUARTERLY MONITORING REPORT (covering staffing levels; activities engaged in over the reporting period; achievements /products; seminars and events etc); QUARTERLY FINANCIAL REPORT; PARTICIPANT START AND COMPLETION DETAILS (broken down by gender, age, target group, etc). Monitoring of an ALMM would focus: Number (broken down by gender, age, etc) from the target group(s) who participated within a specified period; The cost of the programme over the same period; The completion rate;  Qualifications obtained as a result of participation (if applicable); Employment status (in the short run) immediately after completion.
  • 7. Monitoring vs. Evaluation Monitoring assess the success or failure of the programme provides rapid information about the programme programmes are expected to monitor for quality control and procedural purposes in monitoring the effectiveness of the ALMPs- secondary effects should be taken into account Evaluation provides explanations longer term process
  • 8. Evaluation  determins whether and why a programme is successful  assessing implementation and outcomes from a ‘wider angle’ viewpoint  can take place at all stages of the programme  makes use of monitoring data
  • 9. Programme Evaluation  individual systematic studies  assess how well project / programme has worked and what lessons can be learned  conducted by external experts  a programme evaluation examines achievement of programme objectives in the wider context  based on the statistics collected OR address important questions of a more qualitative nature  evaluation as a learning process
  • 10. Evaluation Objectives: find out- asssess- recommend To find out...  whether the programme is making progress towards achieving its objectives?  who has benefited from the intervention?  what the impact has been on the beneficiaries?  have there been changes to the target group due to external factors? To asess..  whether the impact, if there is one, is due to the programme, or to other factors?  whether the aims and objectives of the programme are still relevant, or whether there is a better way of achieving them?  whether the work is being carried out efficiently and what major problems and constraints have arisen?  whether the resources allocated where used efficiently and effectively?  how changes in the needs of the target group effect future programmes?
  • 11. Evaluation Objectives: find out- asssess- recommend to make recommendations about:  how the programme could be improved;  how the aims and objectives should be modified or revised;  how the work can be monitored and evaluated in the future;  how the work could be made more cost-effective
  • 12. Programme Evaluation partly statistical exercise statistics do not provide full assesment good evaluation involves evidence based interpretation elements of qualitative analysis
  • 13. Evaluation Elements: Outcomes and Process Outcomes- what was achieved and with what results? Impact evaluation process three steps: What are the estimated impacts of the programme on the individual? Are the impacts large enough to yield net social gains? Is this the best outcome that could have been achieved for the money spent? (effectiveness). Feasibility of replicating programme’s outcomes might also arise under this heading.
  • 14. Evaluation Elements: Outcomes and Process Process- how the outputs were achieved, how the programme was managed? programme design and methodology; programme management; service delivery mechanisms; the quality of the co-operation with partner organisations innovation (if any).
  • 15. Relevance of Evaluation The results of an evaluation exercise will:  identify what worked well and what worked less well (outputs and processes);  assist in the planning of current and future programmes ;  help to build on success, develop good practice, and avoid repeating mistakes;  assist in the monitoring of the programme’s future phase;  help to shape dissemination and mainstreaming strategy. Qualitative analysis helps in judging the outcomes of the approach – i.e. the learning and process 'successes' of a programme that are not necessarily captured by Labour Market Information System (LMIS) statistics alone, but require complementary feedback from beneficiaries, employers and other stakeholders, using interviews, focus group sessions, questionnaires, etc. Evaluating the multiple contexts of a project may also point to situations that limit a project’s ability to achieve anticipated outcomes, or lead to the realization that specific interventions and their intended outcomes may be difficult to measure or to attribute to the project itself.
  • 16. Evaluation: Who and How? Evaluation - the ‘How’? Four key issues for planning and undertaking an evaluation are: Who should undertake the evaluation? When should evaluation take place? What should be evaluated? How is an evaluation conducted? Who Should Undertake the Evaluation? self-evaluation – an evaluation exercise conducted by the programme sponsor, or any other (partner) organisation involved; and external evaluation – an evaluation undertaken by an individual or organisation from outside the programme.
  • 17. Self-Evaluation  Most programmes will probably conduct  important to ensure that is done properly  skilled staff, independent from its management  time and other resources  available data  understanding of research methods and data analysis  ability to reflect on the progress of the programme against its stated objectives  Skills to interpret this information and report it in a clear and useful manner are required
  • 18. External Evaluation  The external evaluator can offer expert services; the levels of expertise and resources required for thorough evaluation are likely to be greater.  Expert can often provide a more cost-effective solution than in case of self- evaluation.  Objective evaluation; the external evaluator may also elicit more honest information from the staff and the beneficiaries of your programme.  The perceived independence of the external evaluator can help to ensure that other organisations take the results more seriously.  They may also (depending on your programme) be able to undertake the evaluation of the programme within a wider context. This may help you to address evaluation questions relating to mainstreaming and multiplier effects. Decision- Terms of Reference
  • 19. When Should Evaluation Take Place? Two intervals: at an interim stage, at the end of the approved period for the programme. The monitoring data you collect are a key source of information for both interim and final evaluations.
  • 20. Interim evaluation addresses whether the programme: has achieved its objectives by the dates set out in the work plan; and is on track to achieve its objectives by the end of the programme. •Final evaluation •draw conclusions on the design, implementation and degree of success of your programme in the light of your objectives and indicators; •inform funding bodies and other stakeholders of your results, and the actual and potential impact of your programme; •stimulate support for transfer and mainstreaming of your innovation; •form the basis of the final report and other publications; and stimulate new ideas for innovation. Aims of Interm and Final Evaluation
  • 21. How Is An Evaluation Conducted? PLAN ANALYSE INDICATORS ANALYSE DATA REPORT
  • 22. Planning the evaluation- key points  Focus of the evaluation. A clear, focused brief should go some way towards ensuring that you get the information you need from the exercise;  Programme objectives.  Programme products.  Programme processes: processes related to partnership arrangements and decisionmaking, programme management and monitoring systems could be evaluated.  Subject, purpose and audience targeted.
  • 23. Analyse the Performance indicators Performance indicators:  Output indicators – quantitative measures, based on your programme's key targets and objectives  Process indicators –quantitative or qualitative When defining the indicators, consider whether they will provide Information concerning:  programme’s effectiveness in meeting your objectives;  programme’s efficiency in meeting your objectives;  relevance of your programme activities to the needs identified;  impact of your innovation;  impact of activity at different levels (individuals, groups, systems); and  value added to the programme as a result of partnership activities.
  • 24. Gather and analyse the data Questions to ask are:  Is the information already available?  Do you need to establish a baseline? – i.e. do you need to have some information in place at the start of your programme?  What gaps are there in the data? What do you need to collect in addition to  what exists?  How will the information be gathered and recorded, and by whom?  Are these procedures feasible? Methods are used to gather the data:  Record-keeping  Observation of participants  Self-administered questionnaire  Individual personal interviews (face to face or by telephone)  Group discussion/ focus groups
  • 25. Reporting of the findings An interim evaluation report should cover:  programme background; (context, rationale, objectives);  achievements to date and problems encountered;  trends and issues; and  action needed. The final evaluation report needs to encompass:  the background to the programme (context, rationale, objectives),  how the evaluation exercise was undertaken, the methods used to gather  and analyse the information; identifying problems encountered and how they were addressed  the results / findings emerging from the evaluation, supported by evidence; lessons for this programme and others  the final report should make recommendations and highlighting the main lessons.
  • 26. Dissemination The evaluation will be of interest to a wide audience, including:  beneficiary groups;  local, regional and national social partner organisations;  policy-makers and representatives from intermediary organisations (training and employment, equal opportunities, information technology in training, etc) Take into account:  tailor the contents of your evaluation report to your audience;  only include the information and evidence necessary to ‘tell the story’, and  focus on key findings for making the case for recommendations.  be transparent  reference all external sources; and  provide a summary, even if the report itself is quite brief.
  • 27. Thank you for the attention! <full contactdetails> EUNES IPA Project Technical Assistance to enhance forecasting and evaluation capacity of the National Employment Service Europeaid/128079/C/SER/RS