SlideShare una empresa de Scribd logo
1 de 10
Cleanout and Test Tee Fig. No. 4505 The Boss Tee A Contractor Friendly Product from Jay R. Smith Mfg. Co.
The Boss Tee - Cleanout and Test Tee Fig. No. 4505 Hydrostatic Testing The Boss Tee, Fig. 4505 The Boss Tee Advantages The Boss Tee Testing Procedures Introduction Technical Information 1 2 4 5 6 7 Hydrostatic Testing Issues 3
[object Object],Introduction ,[object Object],[object Object],[object Object],Main Concerns 1 ►   Contractor Safety ►  The Mold Liability - due to water spilling inside the chase ►  Reliability of testing
[object Object],Hydrostatic Testing ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],2 Usual Steps
[object Object],Hydrostatic Testing Issues ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Common Problems 3
[object Object],[object Object],The Boss Tee, Fig. No. 4505 ►  Internal threading  – allows the stack to be closed  off by installing a raised hex head plug (by others). ►   Test port  – allows the filling and draining of the piping system.  Application How it works 4 Test Port with Raised Head Plug (Regularly Furnished) Countersunk Taper Thread Bronze Plug (Regularly Furnished) Fig. No. 4505Y, No- Hub Model Cleanout and Test Tee
The Boss Tee, Technical Information Regularly Furnished 5 Duco cast iron cleanout tee with internal threading, ½” NPT test port with raised head plug and countersunk taper thread bronze plug.   ►  Hub & Spigot and No-Hub outlets. ►  Internal Threading for Test Plug use. ►  ½” NPT Test Port with Raised Head Plug. ►  Spherical opening for better hand access. ►  Available in 3”, 4” and 6” pipe sizes. Features
The Boss Tee Testing Procedures 6 Note:  The Boss Tee can be used to test the piping system in the customary manner by installing a plug into the internal threading and filling the piping from the top. ►  Remove cleanout plug  at face of tee. ►   Thread a raised hex head plug  (by others) into the internal threading. ►   Remove plug from test port.   ►   Thread ½” NPT nipple with boiler drain valve into the port . Pressure gauge may be installed before the boiler drain valve. ►   Connect water hose  to the boiler drain valve and water supply to fill piping. Boiler drain valve  must  be in the open position. ►   When piping is full of water  - shut off the water supply and close the boiler drain valve. ►  When testing is complete -  disconnect the water hose from the water supply and place in stack, floor drain or other acceptable drainage point and open boiler drain valve to drain piping. ►  When piping is completely drained -  reverse steps to install the cleanout plug.
The Boss Tee Advantages ►  SAFETY  – contractor not required to remove inflatable plug from inside of stack with 5 -15 psi pressure just upstream of the plug. ►   REDUCES THE CHANCE OF MOLD  – due to water spilling inside the chase.   ►   CONTROLLED TESTING   ENVIRONMENT  – provides contractor with effective means of controlling the filling and draining of piping system.   ►  RELIABILITY  – better testing results because of reliable closure of the stack. ►  TIME & MATERIAL SAVINGS  – eliminates the inflatable plug in the vertical stack and the time to get it to seal properly.   ►  EFFICIENT  – test up to 3 floors at a time. The inspector can use the gauge to verify pressure in the line. ►   LARGER, SPHERICAL OPENING  in the fitting allows for easy hand access for line testing/inspection/cleaning. ►   CLEANOUT TEE REMAINS IN THE STACK  after testing to be used for future maintenance and testing. 7 The Boss Tee, Cleanout and Test Tee - Another Contractor Friendly Product from Jay R. Smith Mfg. Co.
Cleanout and Test Tee Fig. No. 4505 The Boss Tee A Contractor Friendly Product from Jay R. Smith Mfg. Co. Bottom line....when THE BOSS TEE is on the job,  there're no drips, no runs, no errors!

Más contenido relacionado

Más de Morris Group International

Potter Roemer Fire Pro Nozzle/Monitor Presentation
Potter Roemer Fire Pro Nozzle/Monitor PresentationPotter Roemer Fire Pro Nozzle/Monitor Presentation
Potter Roemer Fire Pro Nozzle/Monitor PresentationMorris Group International
 
Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.
Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.
Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.Morris Group International
 
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof DrainsJay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof DrainsMorris Group International
 
Ultracept Presentation by Jay R. Smith Mfg. Co.
Ultracept Presentation by Jay R. Smith Mfg. Co.Ultracept Presentation by Jay R. Smith Mfg. Co.
Ultracept Presentation by Jay R. Smith Mfg. Co.Morris Group International
 
Extreme Water Savings - The Next Frontier in Drainage and Plumbing Systems
Extreme Water Savings - The Next Frontier in Drainage and Plumbing SystemsExtreme Water Savings - The Next Frontier in Drainage and Plumbing Systems
Extreme Water Savings - The Next Frontier in Drainage and Plumbing SystemsMorris Group International
 
Vacuum Plumbing Systems - Future Frontiers for Plumbing Design
Vacuum Plumbing Systems - Future Frontiers for Plumbing DesignVacuum Plumbing Systems - Future Frontiers for Plumbing Design
Vacuum Plumbing Systems - Future Frontiers for Plumbing DesignMorris Group International
 
Grease+Gard Retrofit Skimmer and Grease Recovery Device Overview
Grease+Gard Retrofit Skimmer and Grease Recovery Device OverviewGrease+Gard Retrofit Skimmer and Grease Recovery Device Overview
Grease+Gard Retrofit Skimmer and Grease Recovery Device OverviewMorris Group International
 
The High Velocity Hurricane Zone Roof Drainage Requirements
The High Velocity Hurricane Zone Roof Drainage Requirements The High Velocity Hurricane Zone Roof Drainage Requirements
The High Velocity Hurricane Zone Roof Drainage Requirements Morris Group International
 
Murdock Mfg. Potable Sanitary Hydrants & Drinking Fountains
Murdock Mfg. Potable Sanitary Hydrants & Drinking FountainsMurdock Mfg. Potable Sanitary Hydrants & Drinking Fountains
Murdock Mfg. Potable Sanitary Hydrants & Drinking FountainsMorris Group International
 
Vacuum Plumbing and a Sustainable Future by AcornVac
Vacuum Plumbing and a Sustainable Future by AcornVacVacuum Plumbing and a Sustainable Future by AcornVac
Vacuum Plumbing and a Sustainable Future by AcornVacMorris Group International
 

Más de Morris Group International (20)

Potter Roemer Fire Pro Nozzle/Monitor Presentation
Potter Roemer Fire Pro Nozzle/Monitor PresentationPotter Roemer Fire Pro Nozzle/Monitor Presentation
Potter Roemer Fire Pro Nozzle/Monitor Presentation
 
Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.
Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.
Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.
 
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof DrainsJay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
Jay R. Smith Mfg. Co. Full-bore Siphonic Roof Drains
 
Whitehall BestCare Presentation
Whitehall BestCare PresentationWhitehall BestCare Presentation
Whitehall BestCare Presentation
 
Ultracept Presentation by Jay R. Smith Mfg. Co.
Ultracept Presentation by Jay R. Smith Mfg. Co.Ultracept Presentation by Jay R. Smith Mfg. Co.
Ultracept Presentation by Jay R. Smith Mfg. Co.
 
Extreme Water Savings - The Next Frontier in Drainage and Plumbing Systems
Extreme Water Savings - The Next Frontier in Drainage and Plumbing SystemsExtreme Water Savings - The Next Frontier in Drainage and Plumbing Systems
Extreme Water Savings - The Next Frontier in Drainage and Plumbing Systems
 
Vacuum Plumbing Systems - Future Frontiers for Plumbing Design
Vacuum Plumbing Systems - Future Frontiers for Plumbing DesignVacuum Plumbing Systems - Future Frontiers for Plumbing Design
Vacuum Plumbing Systems - Future Frontiers for Plumbing Design
 
Jay R. Smith Mfg. Co. Grease Gard II
Jay R. Smith Mfg. Co. Grease Gard IIJay R. Smith Mfg. Co. Grease Gard II
Jay R. Smith Mfg. Co. Grease Gard II
 
AcornVac Presents "Vacuum Plumbing 101"
AcornVac Presents "Vacuum Plumbing 101"AcornVac Presents "Vacuum Plumbing 101"
AcornVac Presents "Vacuum Plumbing 101"
 
Morris Group International at a Glance
Morris Group International at a GlanceMorris Group International at a Glance
Morris Group International at a Glance
 
Grease+Gard Retrofit Skimmer and Grease Recovery Device Overview
Grease+Gard Retrofit Skimmer and Grease Recovery Device OverviewGrease+Gard Retrofit Skimmer and Grease Recovery Device Overview
Grease+Gard Retrofit Skimmer and Grease Recovery Device Overview
 
Acorn Water Coolers & Drinking Fountains
Acorn Water Coolers & Drinking FountainsAcorn Water Coolers & Drinking Fountains
Acorn Water Coolers & Drinking Fountains
 
The High Velocity Hurricane Zone Roof Drainage Requirements
The High Velocity Hurricane Zone Roof Drainage Requirements The High Velocity Hurricane Zone Roof Drainage Requirements
The High Velocity Hurricane Zone Roof Drainage Requirements
 
Jay R. Smith Mfg. Co. Product Line Overview
Jay R. Smith Mfg. Co. Product Line OverviewJay R. Smith Mfg. Co. Product Line Overview
Jay R. Smith Mfg. Co. Product Line Overview
 
Grease Myths & Facts by PDI
Grease Myths & Facts by PDIGrease Myths & Facts by PDI
Grease Myths & Facts by PDI
 
Murdock Mfg. Potable Sanitary Hydrants & Drinking Fountains
Murdock Mfg. Potable Sanitary Hydrants & Drinking FountainsMurdock Mfg. Potable Sanitary Hydrants & Drinking Fountains
Murdock Mfg. Potable Sanitary Hydrants & Drinking Fountains
 
Murdock Mfg Building Installation
Murdock Mfg Building InstallationMurdock Mfg Building Installation
Murdock Mfg Building Installation
 
Morris Group International Company Profile
Morris Group International Company ProfileMorris Group International Company Profile
Morris Group International Company Profile
 
Vacuum Plumbing and a Sustainable Future by AcornVac
Vacuum Plumbing and a Sustainable Future by AcornVacVacuum Plumbing and a Sustainable Future by AcornVac
Vacuum Plumbing and a Sustainable Future by AcornVac
 
Morris Group International Overview
Morris Group International OverviewMorris Group International Overview
Morris Group International Overview
 

Último

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesShubhangi Sonawane
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 

Último (20)

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 

The Boss Tee, Cleanout and Test Tee Overview by Jay R. Smith Mfg. Co.

  • 1. Cleanout and Test Tee Fig. No. 4505 The Boss Tee A Contractor Friendly Product from Jay R. Smith Mfg. Co.
  • 2. The Boss Tee - Cleanout and Test Tee Fig. No. 4505 Hydrostatic Testing The Boss Tee, Fig. 4505 The Boss Tee Advantages The Boss Tee Testing Procedures Introduction Technical Information 1 2 4 5 6 7 Hydrostatic Testing Issues 3
  • 3.
  • 4.
  • 5.
  • 6.
  • 7. The Boss Tee, Technical Information Regularly Furnished 5 Duco cast iron cleanout tee with internal threading, ½” NPT test port with raised head plug and countersunk taper thread bronze plug. ► Hub & Spigot and No-Hub outlets. ► Internal Threading for Test Plug use. ► ½” NPT Test Port with Raised Head Plug. ► Spherical opening for better hand access. ► Available in 3”, 4” and 6” pipe sizes. Features
  • 8. The Boss Tee Testing Procedures 6 Note: The Boss Tee can be used to test the piping system in the customary manner by installing a plug into the internal threading and filling the piping from the top. ► Remove cleanout plug at face of tee. ► Thread a raised hex head plug (by others) into the internal threading. ► Remove plug from test port. ► Thread ½” NPT nipple with boiler drain valve into the port . Pressure gauge may be installed before the boiler drain valve. ► Connect water hose to the boiler drain valve and water supply to fill piping. Boiler drain valve must be in the open position. ► When piping is full of water - shut off the water supply and close the boiler drain valve. ► When testing is complete - disconnect the water hose from the water supply and place in stack, floor drain or other acceptable drainage point and open boiler drain valve to drain piping. ► When piping is completely drained - reverse steps to install the cleanout plug.
  • 9. The Boss Tee Advantages ► SAFETY – contractor not required to remove inflatable plug from inside of stack with 5 -15 psi pressure just upstream of the plug. ► REDUCES THE CHANCE OF MOLD – due to water spilling inside the chase. ► CONTROLLED TESTING ENVIRONMENT – provides contractor with effective means of controlling the filling and draining of piping system. ► RELIABILITY – better testing results because of reliable closure of the stack. ► TIME & MATERIAL SAVINGS – eliminates the inflatable plug in the vertical stack and the time to get it to seal properly. ► EFFICIENT – test up to 3 floors at a time. The inspector can use the gauge to verify pressure in the line. ► LARGER, SPHERICAL OPENING in the fitting allows for easy hand access for line testing/inspection/cleaning. ► CLEANOUT TEE REMAINS IN THE STACK after testing to be used for future maintenance and testing. 7 The Boss Tee, Cleanout and Test Tee - Another Contractor Friendly Product from Jay R. Smith Mfg. Co.
  • 10. Cleanout and Test Tee Fig. No. 4505 The Boss Tee A Contractor Friendly Product from Jay R. Smith Mfg. Co. Bottom line....when THE BOSS TEE is on the job, there're no drips, no runs, no errors!