SALIENT FEATURES

Installed Capacity                      :    4x60 MW
Type of Power Station                   :    Underground Run-of-River
Commissioning Year                      : 1975
Water Conductor System                  : HRT
Water Outlet                            :    Collection Gallery
Design Head                             : 110 m
Design Discharge                        : 200 m³/s
Turbine Type                            : Francis
Turbine Output                          : 84000 HP
Generator Type                          : Umbrella
Generator Output                        :    63 MVA
Main Transformer                        : 69 MVA, 11/230 kV, star/delta, Z=13.7%
Switchyard                              :    220 kV
Design Energy                           :    750 MU

                                             Generator Rating

BHEL BHOPAL 1971

KVA              : 63000/69300

KW                 : 56700/62370

V/G                  : 11000

C/N                  : 3310

RPM                  : 250

PF                 : 0.9

Type                 : ADV254/95

Specification        : BS2613-1957

Excitation           : 207 V   1060 A

Voltage Range : (+)(-)10%

Connection           : Star type

Governor             : Electro Hydraulic Type
Servo motor is used in Hydro power plant for controlling
of governor Hydraulic system to maintain frequency.


The annual generation from the HEP in the last five years is as follows:




             Year                2006-07    2007-08     2008-09     2009-10   2010-11
        Generation(MU)            756.17     755.08     837.68       587.89   795.69
The Plant Availability of the HEP for the last five years is as follows:




             Year                  2006-07    2007-08     2008-09      2009-10     2010-11
        Generation(MU)              73.68      71.92       76.57           76.24    84.18




RMU Status of HEPs

Más contenido relacionado

La actualidad más candente

5.energy audit of pumps
5.energy audit of pumps5.energy audit of pumps
5.energy audit of pumps
Padmadhar PD
 
HYDRAULIC CYLINDER REPAIR project JUNE 2013 ppt
HYDRAULIC CYLINDER REPAIR project JUNE 2013  pptHYDRAULIC CYLINDER REPAIR project JUNE 2013  ppt
HYDRAULIC CYLINDER REPAIR project JUNE 2013 ppt
Marcial Jr Militante
 
Babic components of hydraulic & pneumatic systems
Babic components of hydraulic & pneumatic systemsBabic components of hydraulic & pneumatic systems
Babic components of hydraulic & pneumatic systems
wakurets_21
 
Energy efficiency in pumps and fans ppt
Energy efficiency in pumps and fans pptEnergy efficiency in pumps and fans ppt
Energy efficiency in pumps and fans ppt
D.Pawan Kumar
 

La actualidad más candente (20)

5.energy audit of pumps
5.energy audit of pumps5.energy audit of pumps
5.energy audit of pumps
 
Hydrostatic transmission
Hydrostatic transmissionHydrostatic transmission
Hydrostatic transmission
 
Hydrostatic transmissions
Hydrostatic transmissionsHydrostatic transmissions
Hydrostatic transmissions
 
Actuators in hydraulic system
Actuators in hydraulic systemActuators in hydraulic system
Actuators in hydraulic system
 
Hydraulic Pumps, Motors and Actuators
Hydraulic Pumps, Motors and ActuatorsHydraulic Pumps, Motors and Actuators
Hydraulic Pumps, Motors and Actuators
 
Piston pumps
Piston pumpsPiston pumps
Piston pumps
 
Jay Vaghela (OHP)
Jay Vaghela (OHP)Jay Vaghela (OHP)
Jay Vaghela (OHP)
 
1 hydraulic actuators cylinders
1 hydraulic actuators cylinders1 hydraulic actuators cylinders
1 hydraulic actuators cylinders
 
Module 2 Hydraulic Actuators and Motors
Module 2 Hydraulic Actuators and MotorsModule 2 Hydraulic Actuators and Motors
Module 2 Hydraulic Actuators and Motors
 
3.1 turbine and governing
3.1 turbine and governing3.1 turbine and governing
3.1 turbine and governing
 
HYDRAULIC CYLINDER REPAIR project JUNE 2013 ppt
HYDRAULIC CYLINDER REPAIR project JUNE 2013  pptHYDRAULIC CYLINDER REPAIR project JUNE 2013  ppt
HYDRAULIC CYLINDER REPAIR project JUNE 2013 ppt
 
Pump pipeline
Pump pipelinePump pipeline
Pump pipeline
 
Hydraulic Pumps & Motors
Hydraulic Pumps & MotorsHydraulic Pumps & Motors
Hydraulic Pumps & Motors
 
Babic components of hydraulic & pneumatic systems
Babic components of hydraulic & pneumatic systemsBabic components of hydraulic & pneumatic systems
Babic components of hydraulic & pneumatic systems
 
adasdad
adasdadadasdad
adasdad
 
Hydraulic systems
Hydraulic  systemsHydraulic  systems
Hydraulic systems
 
10. pump
10. pump10. pump
10. pump
 
Hydraulics and Pneumatics - Hydraulic Pumps
Hydraulics and Pneumatics - Hydraulic Pumps Hydraulics and Pneumatics - Hydraulic Pumps
Hydraulics and Pneumatics - Hydraulic Pumps
 
Energy efficiency in pumps and fans ppt
Energy efficiency in pumps and fans pptEnergy efficiency in pumps and fans ppt
Energy efficiency in pumps and fans ppt
 
Hydrostatic Continuous Variable Power Transmission Drive for Two wheelers usi...
Hydrostatic Continuous Variable Power Transmission Drive for Two wheelers usi...Hydrostatic Continuous Variable Power Transmission Drive for Two wheelers usi...
Hydrostatic Continuous Variable Power Transmission Drive for Two wheelers usi...
 

Similar a Salient features

[0] final - report hydroelectric power plant
[0] final - report hydroelectric power plant[0] final - report hydroelectric power plant
[0] final - report hydroelectric power plant
U.E.T Lahore Pakistan
 
Middle marshyangdi hydro power plant
Middle marshyangdi hydro power plantMiddle marshyangdi hydro power plant
Middle marshyangdi hydro power plant
Bhavin Pradhan
 
speed breaker power
speed breaker powerspeed breaker power
speed breaker power
Samir9064
 
Eng silovie transformatori
Eng silovie transformatoriEng silovie transformatori
Eng silovie transformatori
KamalKhan822
 

Similar a Salient features (20)

Sunshine welding generator 50 hz
Sunshine welding generator 50 hzSunshine welding generator 50 hz
Sunshine welding generator 50 hz
 
lift ppt
lift pptlift ppt
lift ppt
 
ENSCO-DS-7
ENSCO-DS-7ENSCO-DS-7
ENSCO-DS-7
 
[0] final - report hydroelectric power plant
[0] final - report hydroelectric power plant[0] final - report hydroelectric power plant
[0] final - report hydroelectric power plant
 
Middle marshyangdi hydro power plant
Middle marshyangdi hydro power plantMiddle marshyangdi hydro power plant
Middle marshyangdi hydro power plant
 
Hydro POWER PLANT
Hydro POWER PLANTHydro POWER PLANT
Hydro POWER PLANT
 
Indian railways
Indian railwaysIndian railways
Indian railways
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
 
Industrial Training Presentation
Industrial Training PresentationIndustrial Training Presentation
Industrial Training Presentation
 
Speed breaker power
Speed breaker powerSpeed breaker power
Speed breaker power
 
speed breaker power
speed breaker powerspeed breaker power
speed breaker power
 
Design turbo generator
Design turbo generatorDesign turbo generator
Design turbo generator
 
Power transformer manufacturing process and testing
Power transformer manufacturing process and testingPower transformer manufacturing process and testing
Power transformer manufacturing process and testing
 
PROPOSAL
PROPOSALPROPOSAL
PROPOSAL
 
Eng silovie transformatori
Eng silovie transformatoriEng silovie transformatori
Eng silovie transformatori
 
Sm1800
Sm1800Sm1800
Sm1800
 
Auxilia for Commercial Vessels
Auxilia for Commercial VesselsAuxilia for Commercial Vessels
Auxilia for Commercial Vessels
 
SPIE presentation
SPIE presentation SPIE presentation
SPIE presentation
 
Hydro Electric project
Hydro Electric projectHydro Electric project
Hydro Electric project
 
DVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPTDVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPT
 

Más de IIT Roorkee (7)

Advanced control techniques for the brushless permanent magnet ac motor by po...
Advanced control techniques for the brushless permanent magnet ac motor by po...Advanced control techniques for the brushless permanent magnet ac motor by po...
Advanced control techniques for the brushless permanent magnet ac motor by po...
 
Uttaranchal map
Uttaranchal mapUttaranchal map
Uttaranchal map
 
GAte 2012
GAte 2012GAte 2012
GAte 2012
 
artificail neural network application
artificail neural network applicationartificail neural network application
artificail neural network application
 
Uttaranchal jal vidyut nigam limited
Uttaranchal jal vidyut nigam limitedUttaranchal jal vidyut nigam limited
Uttaranchal jal vidyut nigam limited
 
Power factor improvement of an induction motor
Power factor improvement of an induction motorPower factor improvement of an induction motor
Power factor improvement of an induction motor
 
Harshit agarwal
Harshit agarwalHarshit agarwal
Harshit agarwal
 

Último

Último (20)

How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 

Salient features

  • 1. SALIENT FEATURES Installed Capacity : 4x60 MW Type of Power Station : Underground Run-of-River Commissioning Year : 1975 Water Conductor System : HRT Water Outlet : Collection Gallery Design Head : 110 m Design Discharge : 200 m³/s Turbine Type : Francis Turbine Output : 84000 HP Generator Type : Umbrella Generator Output : 63 MVA Main Transformer : 69 MVA, 11/230 kV, star/delta, Z=13.7% Switchyard : 220 kV Design Energy : 750 MU Generator Rating BHEL BHOPAL 1971 KVA : 63000/69300 KW : 56700/62370 V/G : 11000 C/N : 3310 RPM : 250 PF : 0.9 Type : ADV254/95 Specification : BS2613-1957 Excitation : 207 V 1060 A Voltage Range : (+)(-)10% Connection : Star type Governor : Electro Hydraulic Type
  • 2. Servo motor is used in Hydro power plant for controlling of governor Hydraulic system to maintain frequency. The annual generation from the HEP in the last five years is as follows: Year 2006-07 2007-08 2008-09 2009-10 2010-11 Generation(MU) 756.17 755.08 837.68 587.89 795.69
  • 3. The Plant Availability of the HEP for the last five years is as follows: Year 2006-07 2007-08 2008-09 2009-10 2010-11 Generation(MU) 73.68 71.92 76.57 76.24 84.18 RMU Status of HEPs