Introduction to PERT charts

       When planning projects of any nature, activities must be planned, documented

and mapped accordingly to reduce losses and costs resulting from poor planning. In

estimating the time required for a project, critical path scheduling is commonly used.

One of the most popular critical path scheduling techniques is PERT charts.

       A Program Evaluation and Review Technique (PERT) chart is a method to

visually represent a project. PERT charts are effective tools in showing activities and

their relationships with other activities. PERT charts have two major components, arrows

and nodes. Activities, called nodes, are connected by arrows with their previous and

following activities.

       Once the activities are plotted and connected, a project manager can then

determine the critical path. The critical path of a project can be defined as the sequence

of activities that are essential to the completion of the project, and the duration of the

project is affected by changing the duration of any of the activities on the critical path.



How to use PERT Charts

       The first step in developing a PERT chart is to identify the activities that are

needed to complete a project. A project group may be needed to discuss which activities

are necessary for project completion.

       The second step is to determine the time requirements needed for each activity of

the project. There are two widely accepted methods of assessing time requirements for

an activity. The first is through an expert. An expert could be anyone who works with

the activity in question, and he/she gives their best judgment as to how long the activity
will take based on their best judgment. The other method is based on calculations. Once

again, people in the field assess their opinions of how long the activity will last. Instead

of taking only one opinion, the calculation comes from adding the optimistic activity

completion time, plus four times the realistic activity completion time, plus the

pessimistic activity completion time, all divided by six to arrive at the estimated activity

completion time.

                                   ET = ( O + 4R + P ) /6

        The next step is to physically construct the PERT chart. This can be done easily

through software such as Microsoft Project. The sequence of activities are mapped out

by determining precedence relationships and inter-relationships among activities.

        The final step is to determine the critical path for the project. The critical path is

represented by the set of sequentially connected activities that take the least amount of

time from start to finish. A delay in an activity on the critical path results in a delay of

the overall project. Those activities not on the critical path can be delayed to a certain

extent. These activities have slack time.

        Calculating slack time is a sub-step of critical path determination. To calculate

slack time, first determine the earliest and latest expected completion times for each

activity. To find the earliest completion time, take the expected time for each preceding

activity, starting from left to right, and sum those times. The latest completion time is the

latest time an activity can be completed without delaying the project. The latest

completion time for each activity can be found by taking the finish time at the last

activity, and working from right to left, and subtracting the estimated time from each

activity.
Activities on the critical path always have a slack time of zero. Activities that are

not on the critical path have a slack time equal to the late finish time minus the early

finish time. Slack time is the amount of time that activity can be late without affecting

the completion time of the entire project.



PERT CHART EXAMPLE

       PERT charts and the critical path method can be used in virtually all types of

businesses. This simple example illustrates how PERT charts and critical path

scheduling can assist a manufacturing firm.

       Joe’s Widget Company is in the business of producing widgets. Each widget

consists of two parts, the upper and lower section of the widget. Both sections are then

produced separately. The upper section is then painted to various colors while the lower

section is stamped with Joe’s seal of approval for widget quality. Finally, both sections

are taken to final assembly where they are then packaged and shipped to customers. The

accompanying PERT chart shows all of the following steps:

   1. Upper sub-assembly production

   2. Lower sub-assembly production

   3. Stamping of lower section

   4. Painting of upper section

   5. Final assembly

   Each of the preceding steps are labeled in the accompanying chart accordingly, with

the estimated amount of time (in days) required to produce a batch at each step. Those

steps with a shaded border are on the critical path.
Need More Information concerning PERT charts?

   The following sources were used for this report and may be consulted for additional

information concerning PERT charts, critical path scheduling and other activity network

diagrams.

   1. Hoffer, Jeffrey A. Modern Systems Analysis & Design. Reading, Massachusetts;
      Addison, Wesley, Longman Inc. 1999.

   2. Anupindi, Ravi, Sunil Chopra, Sudhakar D. Deshmukh, Jan Van Mieghem, and
      Eitan Zemel. Managing Business Process Flows. Upper Saddle, NJ; Prentice-
      Hall, 1999

   3. Foster, Thomas. Managing Quality: An Integrative Approach. Upper Saddle
      River, NJ; Prentice-Hall, 2001.

   4. Mizuno, Shigeru. Management for Quality Improvement: The Seven New QC
      Tools. Cambridge, MA; Productivity Press, 1979.

Más contenido relacionado

La actualidad más candente

Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path Analysis
simu_mihai
 
Critical Path Analysis Notes
Critical Path Analysis NotesCritical Path Analysis Notes
Critical Path Analysis Notes
mattbentley34
 

La actualidad más candente (20)

Seminar on pert
Seminar on pertSeminar on pert
Seminar on pert
 
Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path Analysis
 
Programme evaluation & review technique (pert)
Programme evaluation & review technique (pert)Programme evaluation & review technique (pert)
Programme evaluation & review technique (pert)
 
PERT & Gantt Chart
PERT & Gantt Chart PERT & Gantt Chart
PERT & Gantt Chart
 
Pert 182
Pert 182Pert 182
Pert 182
 
Project management Using Pert
Project management Using PertProject management Using Pert
Project management Using Pert
 
Programme evaluation and review technique &Gantt Chart
Programme evaluation and review technique &Gantt ChartProgramme evaluation and review technique &Gantt Chart
Programme evaluation and review technique &Gantt Chart
 
Pert and its applications
Pert and its applicationsPert and its applications
Pert and its applications
 
Project management techniques
Project management techniquesProject management techniques
Project management techniques
 
Gantt PERT and CPM
Gantt PERT and CPMGantt PERT and CPM
Gantt PERT and CPM
 
Scheduling
SchedulingScheduling
Scheduling
 
OR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULINGOR PERT CPM AND JOB SCHEDULING
OR PERT CPM AND JOB SCHEDULING
 
Project Management Through Gantt & Pert Chart
Project Management Through Gantt & Pert ChartProject Management Through Gantt & Pert Chart
Project Management Through Gantt & Pert Chart
 
PERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingPERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursing
 
Gantt pert
Gantt pertGantt pert
Gantt pert
 
Gantt
GanttGantt
Gantt
 
CPM/PERT and Gantt charts
CPM/PERT and Gantt chartsCPM/PERT and Gantt charts
CPM/PERT and Gantt charts
 
Critical Path Analysis Notes
Critical Path Analysis NotesCritical Path Analysis Notes
Critical Path Analysis Notes
 
“Application of the Program Evaluation Review and Technique
“Application of the Program Evaluation Review and Technique“Application of the Program Evaluation Review and Technique
“Application of the Program Evaluation Review and Technique
 
Project management technique PERT & CPM
Project management technique PERT & CPMProject management technique PERT & CPM
Project management technique PERT & CPM
 

Similar a Pert

Control techniques
Control techniquesControl techniques
Control techniques
Adnan Shakir
 
(PROGRAM EVALUATION AND REVIE TECHNIQUE)
(PROGRAM EVALUATION AND REVIE TECHNIQUE)(PROGRAM EVALUATION AND REVIE TECHNIQUE)
(PROGRAM EVALUATION AND REVIE TECHNIQUE)
hannahpepino1
 
Critical path method & pert
Critical path method & pertCritical path method & pert
Critical path method & pert
Bhim Upadhyaya
 

Similar a Pert (20)

Critical path
Critical pathCritical path
Critical path
 
Programme Evaluation and Review Technique
Programme Evaluation and Review TechniqueProgramme Evaluation and Review Technique
Programme Evaluation and Review Technique
 
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
 
Control techniques
Control techniquesControl techniques
Control techniques
 
PERT-CPM : PROJECT MANAGEMENT TOOLS
PERT-CPM : PROJECT MANAGEMENT TOOLSPERT-CPM : PROJECT MANAGEMENT TOOLS
PERT-CPM : PROJECT MANAGEMENT TOOLS
 
Pert and gantt chart
Pert and gantt chartPert and gantt chart
Pert and gantt chart
 
Ii. pert cpm
Ii. pert cpmIi. pert cpm
Ii. pert cpm
 
(PROGRAM EVALUATION AND REVIE TECHNIQUE)
(PROGRAM EVALUATION AND REVIE TECHNIQUE)(PROGRAM EVALUATION AND REVIE TECHNIQUE)
(PROGRAM EVALUATION AND REVIE TECHNIQUE)
 
Lecture 6
Lecture 6Lecture 6
Lecture 6
 
PertGanttchart
PertGanttchartPertGanttchart
PertGanttchart
 
Project Duration Estimation
Project Duration EstimationProject Duration Estimation
Project Duration Estimation
 
Critical path method & pert
Critical path method & pertCritical path method & pert
Critical path method & pert
 
Sad lecture 4
Sad lecture 4Sad lecture 4
Sad lecture 4
 
Program_Evaluation_and_Review_Technique.pptx
Program_Evaluation_and_Review_Technique.pptxProgram_Evaluation_and_Review_Technique.pptx
Program_Evaluation_and_Review_Technique.pptx
 
pert/cpm
pert/cpmpert/cpm
pert/cpm
 
Project Time Management
Project Time ManagementProject Time Management
Project Time Management
 
Chapter 3
Chapter 3Chapter 3
Chapter 3
 
9a. SEPM LECTURE # 06 - PERT (1).pptx
9a.    SEPM LECTURE # 06 - PERT (1).pptx9a.    SEPM LECTURE # 06 - PERT (1).pptx
9a. SEPM LECTURE # 06 - PERT (1).pptx
 
or-pert
or-pertor-pert
or-pert
 
Advanced project management mod 4
Advanced project management mod 4Advanced project management mod 4
Advanced project management mod 4
 

Más de ahmad bassiouny (20)

Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Work Study
Work StudyWork Study
Work Study
 
Motion And Time Study
Motion And Time StudyMotion And Time Study
Motion And Time Study
 
Motion Study
Motion StudyMotion Study
Motion Study
 
The Christmas Story
The Christmas StoryThe Christmas Story
The Christmas Story
 
Turkey Photos
Turkey PhotosTurkey Photos
Turkey Photos
 
Mission Bo Kv3
Mission Bo Kv3Mission Bo Kv3
Mission Bo Kv3
 
Miramar
MiramarMiramar
Miramar
 
Mom
MomMom
Mom
 
Linearization
LinearizationLinearization
Linearization
 
Kblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean ManufacturingKblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean Manufacturing
 
How To Survive
How To SurviveHow To Survive
How To Survive
 
Dad
DadDad
Dad
 
Ancient Hieroglyphics
Ancient HieroglyphicsAncient Hieroglyphics
Ancient Hieroglyphics
 
Dubai In 2009
Dubai In 2009Dubai In 2009
Dubai In 2009
 
DesignPeopleSystem
DesignPeopleSystemDesignPeopleSystem
DesignPeopleSystem
 
Organizational Behavior
Organizational BehaviorOrganizational Behavior
Organizational Behavior
 
Work Study Workshop
Work Study WorkshopWork Study Workshop
Work Study Workshop
 
Workstudy
WorkstudyWorkstudy
Workstudy
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
 

Último

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Último (20)

Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 

Pert

  • 1. Introduction to PERT charts When planning projects of any nature, activities must be planned, documented and mapped accordingly to reduce losses and costs resulting from poor planning. In estimating the time required for a project, critical path scheduling is commonly used. One of the most popular critical path scheduling techniques is PERT charts. A Program Evaluation and Review Technique (PERT) chart is a method to visually represent a project. PERT charts are effective tools in showing activities and their relationships with other activities. PERT charts have two major components, arrows and nodes. Activities, called nodes, are connected by arrows with their previous and following activities. Once the activities are plotted and connected, a project manager can then determine the critical path. The critical path of a project can be defined as the sequence of activities that are essential to the completion of the project, and the duration of the project is affected by changing the duration of any of the activities on the critical path. How to use PERT Charts The first step in developing a PERT chart is to identify the activities that are needed to complete a project. A project group may be needed to discuss which activities are necessary for project completion. The second step is to determine the time requirements needed for each activity of the project. There are two widely accepted methods of assessing time requirements for an activity. The first is through an expert. An expert could be anyone who works with the activity in question, and he/she gives their best judgment as to how long the activity
  • 2. will take based on their best judgment. The other method is based on calculations. Once again, people in the field assess their opinions of how long the activity will last. Instead of taking only one opinion, the calculation comes from adding the optimistic activity completion time, plus four times the realistic activity completion time, plus the pessimistic activity completion time, all divided by six to arrive at the estimated activity completion time. ET = ( O + 4R + P ) /6 The next step is to physically construct the PERT chart. This can be done easily through software such as Microsoft Project. The sequence of activities are mapped out by determining precedence relationships and inter-relationships among activities. The final step is to determine the critical path for the project. The critical path is represented by the set of sequentially connected activities that take the least amount of time from start to finish. A delay in an activity on the critical path results in a delay of the overall project. Those activities not on the critical path can be delayed to a certain extent. These activities have slack time. Calculating slack time is a sub-step of critical path determination. To calculate slack time, first determine the earliest and latest expected completion times for each activity. To find the earliest completion time, take the expected time for each preceding activity, starting from left to right, and sum those times. The latest completion time is the latest time an activity can be completed without delaying the project. The latest completion time for each activity can be found by taking the finish time at the last activity, and working from right to left, and subtracting the estimated time from each activity.
  • 3. Activities on the critical path always have a slack time of zero. Activities that are not on the critical path have a slack time equal to the late finish time minus the early finish time. Slack time is the amount of time that activity can be late without affecting the completion time of the entire project. PERT CHART EXAMPLE PERT charts and the critical path method can be used in virtually all types of businesses. This simple example illustrates how PERT charts and critical path scheduling can assist a manufacturing firm. Joe’s Widget Company is in the business of producing widgets. Each widget consists of two parts, the upper and lower section of the widget. Both sections are then produced separately. The upper section is then painted to various colors while the lower section is stamped with Joe’s seal of approval for widget quality. Finally, both sections are taken to final assembly where they are then packaged and shipped to customers. The accompanying PERT chart shows all of the following steps: 1. Upper sub-assembly production 2. Lower sub-assembly production 3. Stamping of lower section 4. Painting of upper section 5. Final assembly Each of the preceding steps are labeled in the accompanying chart accordingly, with the estimated amount of time (in days) required to produce a batch at each step. Those steps with a shaded border are on the critical path.
  • 4. Need More Information concerning PERT charts? The following sources were used for this report and may be consulted for additional information concerning PERT charts, critical path scheduling and other activity network diagrams. 1. Hoffer, Jeffrey A. Modern Systems Analysis & Design. Reading, Massachusetts; Addison, Wesley, Longman Inc. 1999. 2. Anupindi, Ravi, Sunil Chopra, Sudhakar D. Deshmukh, Jan Van Mieghem, and Eitan Zemel. Managing Business Process Flows. Upper Saddle, NJ; Prentice- Hall, 1999 3. Foster, Thomas. Managing Quality: An Integrative Approach. Upper Saddle River, NJ; Prentice-Hall, 2001. 4. Mizuno, Shigeru. Management for Quality Improvement: The Seven New QC Tools. Cambridge, MA; Productivity Press, 1979.