Human efforts used for conversion of materials
into finished products or doing various jobs in
the business are known as labour.
Payment made towards the labour is
called labour cost. Labour cost is the significant
element of the total cost of production.
LABOUR
Labour is the most perishable commodity
and as such should be effectively utilized
immediately.
Therefore, efficient and
effective utilization of labour is an
important need of the modern business.
T
Y
P
ES
O
F
L
A
B
O
U
R
Labour
Direct
Labour
Indirect
Labour
2.INDIRECT LABOUR:-
Indirect labour is that labour which is not directly engaged in the
production of goods and services but which indirectly helps the direct
labour engaged in production. Such as … watchman, foreman, gardener,
cleaners, etc.
1.DIRECT LABOUR:-
Direct labour is the labour which is directly engaged in the
production of goods and services. Such as … worker on machine,
shoemaker making shoes, etc.
LABOURCOST
“Labour Cost, representing the human contribution to
production, is an important cost factor which requires
constant control, measurement and analysis.”
MATZ, CURRY & FRANK
The Manager’s Thought
LABOUR COST IS..
Prime cost of
concern for
the HRD
Important part
of production
process
Decides price
of product
CONTROL OVER LABOUR COST
Labour cost control aims at the control of the labour cost per
unit of the production. Control of labour cost is an important
objective of management. For labour cost control, following
factors kept into mind…..
1. Appointment & selection of employees
2. Labour records
3. Control over production methods
4. Control over arrival & departure time of the employees
5. Labour cost analysis
6. Determination & payment of wages
LABOUR COST CONTROL DEPARTMENT
1. Personnel Department
The main function of the personnel department are
recruitment and selection of workers, providing them
training and placing them to the jobs they are best fitted.
2. Engineering Department
This department maintains control over the
production method and working condition
for each job, department or process.
3. Time-Keeping Department
Time keeping means recording the arrival
and departure time of each worker. Time
record is divided into two parts :-
1. Time Keeping
2. Time Booking
4. Pay roll department
The payroll department is responsible for making payment
of wages or salary to each employee. It maintains all the
functions related to the wages and salaries of the
employees.
5. Cost Accounting Department
The cost accounting department is responsible
for the collection and classification of all
labour cost with the time cards , job cards ,
labour cost of various jobs , work orders , etc.
LABOUR TURNOVER
Labour turnover denotes the percentage change in labour force of an
organization. High percentage of labour turnover denotes that labour
is not stable.
Labour turnover ratio is calculated by the following
formula :-
LTR= Replaced worker x 100
Total no. Of workers
CAUSES OF LABOUR TURNOVER
1.Personal
Cause
• Death
• Ill health
• Dislike for the job
• Marriage of women
workers
• Retirement
• Family problem
2.Unavoidable
Cause
• Due to
insubordination
• Due to lack of
attention to duty
• Due to immoral
character
• Due to accidents
3.Avoidable
Causes
• Lack of job security
• Lack of proper
training facilities
• Lack of promotion
opportunities
• Lack of medical
facilities
Measurement Of Labour Turnover
1. Separation method :-
L.T. = No. of employees left during a period x 100
Avg. No. of employees during a period
2. Replacement method :-
L.T. = No. of workers replaced during a period x 100
Avg. No. of workers during a period
3. Flux method :-
L.T. = No. of separations + No. of additions x 100
Avg. No. of employees during a period
METHODS OF WAGES PAYMENT
Continued….
1. Time wage rate system :--
In this system the workers are paid on the basis of
time spent in the factory irrespective of the amount of
work done.
The total earnings are calculated as……….
( TOTAL EARNINGS = Hours Worked x Rate Per Hour )
Continued….
2. Piece wage rate system :--
In this system , workers are paid on the basis of work
done irrespective of time taken by the worker.
Total earnings is calculated as……..
( TOTAL EARNINGS = No. of units x Rate per unit )
Continued….
3. Incentive wage rate system :--
In incentive wage rate system each worker gets , not only
wages at normal rate but also receives bonus or premium for his
efficiency. This system induces the worker to produce more and
earn more.
There are two types of incentives plans as follows :-
Continued….
3.1. Individual Bonus Plans :--
1. Halsey Premium Plan
2. Halsey Weir Plan
3. Rowan Premium Plan
4. Taylor’s Differential Piece Rate Plan
5. Gantt Bonus Plan
6. Emerson’s Efficiency Plan
7. Merrick’s Multiple Piece Rate Plan
8. Bedeaux Point Premium Plan
9. Barth Variable Sharing Plan
CONTINUED….
3.1.1. Halsey premium plan:--
• The worker is paid a %(30% to 90% but usually 50%) of
the time saved over the standard rate per piece.
• Standard time is fixed for each job/operation
• If the labour completes at standard time or more he is
given the standard price.
• If time saved- wages given for actual hours saved as a
bonus.
Total Earnings = (Hours Worked x Rate Per Hour) +
% (Time Saved x Rate Per Hour)
Continued….
3.1.2. Halsey weir plan :--
It is calculated as Halsey Premium Plan , the only difference
is that the rate of premium or bonus is only 30% in place of
50%.
Total Earnings = (Hours Worked x Rate Per Hour) +
30% (Time Saved x Rate Per Hour)
Continued….
3.1.3. Rowan premium plan :--
• Wages are paid on time bases.
• If worker takes standard time or more time he is paid for
the actual time taken.
• If worker takes less than the standard time , then he is paid
a bonus.
Total Earnings =(Hours Worked x Rate Per Hour) + {(Time
Saved/Time Allowed) x Hours Worked x Rate Per Hour}
Continued….
3.1.4. Taylor’s differential piece rate system :--
This system was introduced by F. W. Taylor. The main features of
this incentive plan are as follows:
1)Day wages are not guaranteed, i.e. it does not assure any
minimum amount of wages to workers.
2)A standard time for each job is set very carefully after time
and motion studies.
3)Two piece rates are set for each job- the lower rate and the
higher rate.
–The lower piece rate is payable where a worker takes a
longer time than the standard time to complete the work.
–Higher rate is payable when a worker completes the work
within the standard time.
Continued….
3.1.5. Gantt task bonus plan :--
OUTPUT PAYMENT
- Output below standard
- Standard output
- Output above standard
- Guaranteed time rate
- Time wages+a bonus of
20% normal time wages
- Higher piece rate
Continued….
3.1.6. Emerson’s efficiency bonus plan:--
Under this plan,
 Below 66.67% efficiency – no bonus , only guaranteed time rate
wages paid
 From 66.67% to 100%efficiency – rate of bonus increased gradually
 At 100% rate of bonus is 20% of normal wage rate
 Above 100% -- 1% of increase in bonus for 1% increased in efficiency
Total Earnings =(Hours Worked x Rate Per Hour) +
{(EBP/100) x Hours Worked x Rate Per Hour}
Continued….
3.1.7. Merrick’s multiple piece rate plan :--
Level of efficiency Piece rate
Up to 83%
83% to 100%
Above 100%
Ordinary piece rate
110% of piece rate
120% of piece rate
Continued….
3.1.8. Bedeaux point premium plan :--
Under this plan, Standard time is divided into Standard
minutes. Each minute of standard time is called Bedeaux
point or B's. B's are indicated on each job ticket. Time
wages are paid until 100% efficiency is reached. Bonus is
paid on the basis of number of Bedeaux Points saved.
Bonus at 75% of wages of Bedeaux saved is paid to the
worker and 25% is paid to the foreman.
Total Earnings =(Hours Worked x Rate Per Hour) + 75%
{(Bedeaux point saved/60) x Rate Per Hour}
Continued….
3.1.9. Barth variable sharing plan:--
In this plan guarantee of daily wages is not given to any
worker. Total of earning of a worker is calculated as
follows :--
Total Earnings = √(standard time x actual time
taken) x hourly rate
3.2. Group Bonus Plans
1. Priestiman’s Production Bonus Plan
2. Scanlon Plan
3. Towne Plan
4. Profit Sharing And Co-partnership Schemes
Continued….
3.2. 1. Priestiman’s Production Bonus Plan:--
A standard performance in terms of output or point is fixed
by this scheme. The workers as a whole, becomes entitled
to bonus, if by producing output above the standard output
, or by securing points more than the standard points, they
can be account for better performance. On the basis of the
ratio of excess performance to standard performance,
bonus is paid according to this scheme. Obviously, time
wage is guaranteed under this scheme.
Bonus = (Increase in production/ standard
production) x 100
Continued….
3.2.2. SCANLON PLAN:--
Under this plan , bonus is paid at a constant proportion of the
added value of output to the workers who are responsible for
the increase in value.
3.2.3. TOWNE PLAN:--
The main objective of this plan is to encourage the foreman and
workers to reduce the cost. A standard labour cost per unit is
fixed for a particular period and if actual labour cost is less than
the standard labour cost, 50% 0f the total saving in labour is
divided among the workers and foreman in ratios of their
wages.
Continued….
3.2.4. Profit Sharing And Co-partnership Schemes:--
The purpose of introducing these schemes is to strengthen
the loyalty of employees to the firm. Workers can be given
their share of profits in the form of cash or shares in the
company. If a part of profit is paid in cash , it is known as
profit sharing and if a part of profit is paid ion the form of
shares , it is known as co-partnership.
labour cost control

Más contenido relacionado

La actualidad más candente

Differentiate between cost sheet, cost statement and
Differentiate between cost sheet, cost statement andDifferentiate between cost sheet, cost statement and
Differentiate between cost sheet, cost statement andlmondal810
 
Cost Accounting
Cost AccountingCost Accounting
Cost Accountingashu1983
 
Methods of remuneration
Methods of remunerationMethods of remuneration
Methods of remuneration9975346659
 
Ppt on Cost accounting and its classifications
Ppt on Cost accounting and its classifications Ppt on Cost accounting and its classifications
Ppt on Cost accounting and its classifications Susheel Tiwari
 
Absorption Costing Concept
Absorption Costing ConceptAbsorption Costing Concept
Absorption Costing ConceptBimarsh Giri
 
Management accounting
Management accountingManagement accounting
Management accountingRaj vardhan
 
Cost control and reduction
Cost control and reductionCost control and reduction
Cost control and reductionShri Theja
 
Standard costing presentation
Standard costing presentationStandard costing presentation
Standard costing presentationJay Singh
 
Objectives of cost accounting
Objectives of cost accountingObjectives of cost accounting
Objectives of cost accountingUday Teke
 
Operations and Services Costing
Operations and Services Costing Operations and Services Costing
Operations and Services Costing Shreyansh Kejriwal
 

La actualidad más candente (20)

Differentiate between cost sheet, cost statement and
Differentiate between cost sheet, cost statement andDifferentiate between cost sheet, cost statement and
Differentiate between cost sheet, cost statement and
 
Cost Accounting
Cost AccountingCost Accounting
Cost Accounting
 
Methods of remuneration
Methods of remunerationMethods of remuneration
Methods of remuneration
 
Contract costing
Contract costingContract costing
Contract costing
 
Chapter 05 Overhead Costs
Chapter 05   Overhead CostsChapter 05   Overhead Costs
Chapter 05 Overhead Costs
 
Budgetry control
Budgetry controlBudgetry control
Budgetry control
 
Budgetary control
Budgetary control Budgetary control
Budgetary control
 
Cost accounting
Cost accountingCost accounting
Cost accounting
 
Ppt on Cost accounting and its classifications
Ppt on Cost accounting and its classifications Ppt on Cost accounting and its classifications
Ppt on Cost accounting and its classifications
 
Absorption Costing Concept
Absorption Costing ConceptAbsorption Costing Concept
Absorption Costing Concept
 
Elements of cost and cost sheet
Elements of cost and cost sheetElements of cost and cost sheet
Elements of cost and cost sheet
 
Marginal costing
Marginal costingMarginal costing
Marginal costing
 
Overheads
OverheadsOverheads
Overheads
 
Management accounting
Management accountingManagement accounting
Management accounting
 
Cost control and reduction
Cost control and reductionCost control and reduction
Cost control and reduction
 
Overheads
OverheadsOverheads
Overheads
 
Standard costing presentation
Standard costing presentationStandard costing presentation
Standard costing presentation
 
Objectives of cost accounting
Objectives of cost accountingObjectives of cost accounting
Objectives of cost accounting
 
Operations and Services Costing
Operations and Services Costing Operations and Services Costing
Operations and Services Costing
 
Contract Costing
Contract CostingContract Costing
Contract Costing
 

Similar a labour cost control

Similar a labour cost control (20)

ACCOUNTANCY LABOR LAWS
ACCOUNTANCY LABOR LAWSACCOUNTANCY LABOR LAWS
ACCOUNTANCY LABOR LAWS
 
COMPENSATION1.ppt
COMPENSATION1.pptCOMPENSATION1.ppt
COMPENSATION1.ppt
 
Incentives plans in compensation
 Incentives plans in compensation Incentives plans in compensation
Incentives plans in compensation
 
Labour Cost Accounting.pptx
Labour Cost Accounting.pptxLabour Cost Accounting.pptx
Labour Cost Accounting.pptx
 
Labour cost accounting
Labour cost accountingLabour cost accounting
Labour cost accounting
 
UNIT 3.pptx
UNIT 3.pptxUNIT 3.pptx
UNIT 3.pptx
 
Incentive 120311235821-phpapp01
Incentive 120311235821-phpapp01Incentive 120311235821-phpapp01
Incentive 120311235821-phpapp01
 
Wages and salary
Wages and salaryWages and salary
Wages and salary
 
Basic system of wages
Basic system of wagesBasic system of wages
Basic system of wages
 
Wage payments methods
Wage payments methodsWage payments methods
Wage payments methods
 
cost accounting.UNIT 3.pptx
cost accounting.UNIT 3.pptxcost accounting.UNIT 3.pptx
cost accounting.UNIT 3.pptx
 
labour_costing (1).pptx
labour_costing (1).pptxlabour_costing (1).pptx
labour_costing (1).pptx
 
3. incentives & benifits
3. incentives & benifits3. incentives & benifits
3. incentives & benifits
 
Chapter 3 acc165
Chapter 3 acc165Chapter 3 acc165
Chapter 3 acc165
 
Incentives
IncentivesIncentives
Incentives
 
Incentive plans
Incentive plansIncentive plans
Incentive plans
 
CA NOTES ON COST AND MANAGEMENT ACCOUNTING
CA NOTES ON COST AND MANAGEMENT ACCOUNTINGCA NOTES ON COST AND MANAGEMENT ACCOUNTING
CA NOTES ON COST AND MANAGEMENT ACCOUNTING
 
COA B2.pptx
COA B2.pptxCOA B2.pptx
COA B2.pptx
 
Chapter 04 Labour Costs
Chapter 04   Labour CostsChapter 04   Labour Costs
Chapter 04 Labour Costs
 
U4 cm-lect1-to-lect9
U4 cm-lect1-to-lect9U4 cm-lect1-to-lect9
U4 cm-lect1-to-lect9
 

Más de Ajit Kumar

Training development and its objectives
Training development and its objectivesTraining development and its objectives
Training development and its objectivesAjit Kumar
 
Swot analysis ppt
Swot analysis pptSwot analysis ppt
Swot analysis pptAjit Kumar
 
Risk management
Risk managementRisk management
Risk managementAjit Kumar
 
Challenging role of women in india
Challenging role of women in indiaChallenging role of women in india
Challenging role of women in indiaAjit Kumar
 
Introduction to marketing
Introduction to marketingIntroduction to marketing
Introduction to marketingAjit Kumar
 
Introduction about insurance
Introduction about insuranceIntroduction about insurance
Introduction about insuranceAjit Kumar
 
Market segmentation final ppt
Market segmentation final pptMarket segmentation final ppt
Market segmentation final pptAjit Kumar
 
Indian legal-system and sources of law
Indian legal-system and sources of lawIndian legal-system and sources of law
Indian legal-system and sources of lawAjit Kumar
 
Indian contract act,1872
Indian contract act,1872Indian contract act,1872
Indian contract act,1872Ajit Kumar
 
Indeminity and guarantee
Indeminity and guaranteeIndeminity and guarantee
Indeminity and guaranteeAjit Kumar
 
Discharge of the contract
Discharge of the contractDischarge of the contract
Discharge of the contractAjit Kumar
 
Contract of agency
Contract of agencyContract of agency
Contract of agencyAjit Kumar
 
Sales of goods act,1930
Sales of goods act,1930Sales of goods act,1930
Sales of goods act,1930Ajit Kumar
 
Quasi contract
Quasi contractQuasi contract
Quasi contractAjit Kumar
 
Partnership act,1932
Partnership act,1932Partnership act,1932
Partnership act,1932Ajit Kumar
 
Negotiable instruments act1881
Negotiable instruments act1881Negotiable instruments act1881
Negotiable instruments act1881Ajit Kumar
 
Consumer protection act,1986
Consumer protection act,1986Consumer protection act,1986
Consumer protection act,1986Ajit Kumar
 
Breach of contract law
Breach of contract lawBreach of contract law
Breach of contract lawAjit Kumar
 

Más de Ajit Kumar (20)

Training development and its objectives
Training development and its objectivesTraining development and its objectives
Training development and its objectives
 
Swot analysis ppt
Swot analysis pptSwot analysis ppt
Swot analysis ppt
 
Selection
SelectionSelection
Selection
 
Risk management
Risk managementRisk management
Risk management
 
Challenging role of women in india
Challenging role of women in indiaChallenging role of women in india
Challenging role of women in india
 
Introduction to marketing
Introduction to marketingIntroduction to marketing
Introduction to marketing
 
Introduction about insurance
Introduction about insuranceIntroduction about insurance
Introduction about insurance
 
E learning
E learningE learning
E learning
 
Market segmentation final ppt
Market segmentation final pptMarket segmentation final ppt
Market segmentation final ppt
 
Indian legal-system and sources of law
Indian legal-system and sources of lawIndian legal-system and sources of law
Indian legal-system and sources of law
 
Indian contract act,1872
Indian contract act,1872Indian contract act,1872
Indian contract act,1872
 
Indeminity and guarantee
Indeminity and guaranteeIndeminity and guarantee
Indeminity and guarantee
 
Discharge of the contract
Discharge of the contractDischarge of the contract
Discharge of the contract
 
Contract of agency
Contract of agencyContract of agency
Contract of agency
 
Sales of goods act,1930
Sales of goods act,1930Sales of goods act,1930
Sales of goods act,1930
 
Quasi contract
Quasi contractQuasi contract
Quasi contract
 
Partnership act,1932
Partnership act,1932Partnership act,1932
Partnership act,1932
 
Negotiable instruments act1881
Negotiable instruments act1881Negotiable instruments act1881
Negotiable instruments act1881
 
Consumer protection act,1986
Consumer protection act,1986Consumer protection act,1986
Consumer protection act,1986
 
Breach of contract law
Breach of contract lawBreach of contract law
Breach of contract law
 

Último

TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the ClassroomPooky Knightsmith
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxcallscotland1987
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxAmanpreet Kaur
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 

Último (20)

TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 

labour cost control

  • 2. I N T R O D U C TI O N Human efforts used for conversion of materials into finished products or doing various jobs in the business are known as labour. Payment made towards the labour is called labour cost. Labour cost is the significant element of the total cost of production.
  • 3. LABOUR Labour is the most perishable commodity and as such should be effectively utilized immediately. Therefore, efficient and effective utilization of labour is an important need of the modern business.
  • 5. 2.INDIRECT LABOUR:- Indirect labour is that labour which is not directly engaged in the production of goods and services but which indirectly helps the direct labour engaged in production. Such as … watchman, foreman, gardener, cleaners, etc. 1.DIRECT LABOUR:- Direct labour is the labour which is directly engaged in the production of goods and services. Such as … worker on machine, shoemaker making shoes, etc.
  • 6. LABOURCOST “Labour Cost, representing the human contribution to production, is an important cost factor which requires constant control, measurement and analysis.” MATZ, CURRY & FRANK
  • 7. The Manager’s Thought LABOUR COST IS.. Prime cost of concern for the HRD Important part of production process Decides price of product
  • 8. CONTROL OVER LABOUR COST Labour cost control aims at the control of the labour cost per unit of the production. Control of labour cost is an important objective of management. For labour cost control, following factors kept into mind….. 1. Appointment & selection of employees 2. Labour records 3. Control over production methods 4. Control over arrival & departure time of the employees 5. Labour cost analysis 6. Determination & payment of wages
  • 9. LABOUR COST CONTROL DEPARTMENT
  • 10. 1. Personnel Department The main function of the personnel department are recruitment and selection of workers, providing them training and placing them to the jobs they are best fitted.
  • 11. 2. Engineering Department This department maintains control over the production method and working condition for each job, department or process.
  • 12. 3. Time-Keeping Department Time keeping means recording the arrival and departure time of each worker. Time record is divided into two parts :- 1. Time Keeping 2. Time Booking
  • 13. 4. Pay roll department The payroll department is responsible for making payment of wages or salary to each employee. It maintains all the functions related to the wages and salaries of the employees.
  • 14. 5. Cost Accounting Department The cost accounting department is responsible for the collection and classification of all labour cost with the time cards , job cards , labour cost of various jobs , work orders , etc.
  • 15. LABOUR TURNOVER Labour turnover denotes the percentage change in labour force of an organization. High percentage of labour turnover denotes that labour is not stable. Labour turnover ratio is calculated by the following formula :- LTR= Replaced worker x 100 Total no. Of workers
  • 16. CAUSES OF LABOUR TURNOVER 1.Personal Cause • Death • Ill health • Dislike for the job • Marriage of women workers • Retirement • Family problem 2.Unavoidable Cause • Due to insubordination • Due to lack of attention to duty • Due to immoral character • Due to accidents 3.Avoidable Causes • Lack of job security • Lack of proper training facilities • Lack of promotion opportunities • Lack of medical facilities
  • 17. Measurement Of Labour Turnover 1. Separation method :- L.T. = No. of employees left during a period x 100 Avg. No. of employees during a period 2. Replacement method :- L.T. = No. of workers replaced during a period x 100 Avg. No. of workers during a period 3. Flux method :- L.T. = No. of separations + No. of additions x 100 Avg. No. of employees during a period
  • 18. METHODS OF WAGES PAYMENT
  • 19. Continued…. 1. Time wage rate system :-- In this system the workers are paid on the basis of time spent in the factory irrespective of the amount of work done. The total earnings are calculated as………. ( TOTAL EARNINGS = Hours Worked x Rate Per Hour )
  • 20. Continued…. 2. Piece wage rate system :-- In this system , workers are paid on the basis of work done irrespective of time taken by the worker. Total earnings is calculated as…….. ( TOTAL EARNINGS = No. of units x Rate per unit )
  • 21. Continued…. 3. Incentive wage rate system :-- In incentive wage rate system each worker gets , not only wages at normal rate but also receives bonus or premium for his efficiency. This system induces the worker to produce more and earn more. There are two types of incentives plans as follows :-
  • 22. Continued…. 3.1. Individual Bonus Plans :-- 1. Halsey Premium Plan 2. Halsey Weir Plan 3. Rowan Premium Plan 4. Taylor’s Differential Piece Rate Plan 5. Gantt Bonus Plan 6. Emerson’s Efficiency Plan 7. Merrick’s Multiple Piece Rate Plan 8. Bedeaux Point Premium Plan 9. Barth Variable Sharing Plan
  • 23. CONTINUED…. 3.1.1. Halsey premium plan:-- • The worker is paid a %(30% to 90% but usually 50%) of the time saved over the standard rate per piece. • Standard time is fixed for each job/operation • If the labour completes at standard time or more he is given the standard price. • If time saved- wages given for actual hours saved as a bonus. Total Earnings = (Hours Worked x Rate Per Hour) + % (Time Saved x Rate Per Hour)
  • 24. Continued…. 3.1.2. Halsey weir plan :-- It is calculated as Halsey Premium Plan , the only difference is that the rate of premium or bonus is only 30% in place of 50%. Total Earnings = (Hours Worked x Rate Per Hour) + 30% (Time Saved x Rate Per Hour)
  • 25. Continued…. 3.1.3. Rowan premium plan :-- • Wages are paid on time bases. • If worker takes standard time or more time he is paid for the actual time taken. • If worker takes less than the standard time , then he is paid a bonus. Total Earnings =(Hours Worked x Rate Per Hour) + {(Time Saved/Time Allowed) x Hours Worked x Rate Per Hour}
  • 26. Continued…. 3.1.4. Taylor’s differential piece rate system :-- This system was introduced by F. W. Taylor. The main features of this incentive plan are as follows: 1)Day wages are not guaranteed, i.e. it does not assure any minimum amount of wages to workers. 2)A standard time for each job is set very carefully after time and motion studies. 3)Two piece rates are set for each job- the lower rate and the higher rate. –The lower piece rate is payable where a worker takes a longer time than the standard time to complete the work. –Higher rate is payable when a worker completes the work within the standard time.
  • 27. Continued…. 3.1.5. Gantt task bonus plan :-- OUTPUT PAYMENT - Output below standard - Standard output - Output above standard - Guaranteed time rate - Time wages+a bonus of 20% normal time wages - Higher piece rate
  • 28. Continued…. 3.1.6. Emerson’s efficiency bonus plan:-- Under this plan,  Below 66.67% efficiency – no bonus , only guaranteed time rate wages paid  From 66.67% to 100%efficiency – rate of bonus increased gradually  At 100% rate of bonus is 20% of normal wage rate  Above 100% -- 1% of increase in bonus for 1% increased in efficiency Total Earnings =(Hours Worked x Rate Per Hour) + {(EBP/100) x Hours Worked x Rate Per Hour}
  • 29. Continued…. 3.1.7. Merrick’s multiple piece rate plan :-- Level of efficiency Piece rate Up to 83% 83% to 100% Above 100% Ordinary piece rate 110% of piece rate 120% of piece rate
  • 30. Continued…. 3.1.8. Bedeaux point premium plan :-- Under this plan, Standard time is divided into Standard minutes. Each minute of standard time is called Bedeaux point or B's. B's are indicated on each job ticket. Time wages are paid until 100% efficiency is reached. Bonus is paid on the basis of number of Bedeaux Points saved. Bonus at 75% of wages of Bedeaux saved is paid to the worker and 25% is paid to the foreman. Total Earnings =(Hours Worked x Rate Per Hour) + 75% {(Bedeaux point saved/60) x Rate Per Hour}
  • 31. Continued…. 3.1.9. Barth variable sharing plan:-- In this plan guarantee of daily wages is not given to any worker. Total of earning of a worker is calculated as follows :-- Total Earnings = √(standard time x actual time taken) x hourly rate
  • 32. 3.2. Group Bonus Plans 1. Priestiman’s Production Bonus Plan 2. Scanlon Plan 3. Towne Plan 4. Profit Sharing And Co-partnership Schemes
  • 33. Continued…. 3.2. 1. Priestiman’s Production Bonus Plan:-- A standard performance in terms of output or point is fixed by this scheme. The workers as a whole, becomes entitled to bonus, if by producing output above the standard output , or by securing points more than the standard points, they can be account for better performance. On the basis of the ratio of excess performance to standard performance, bonus is paid according to this scheme. Obviously, time wage is guaranteed under this scheme. Bonus = (Increase in production/ standard production) x 100
  • 34. Continued…. 3.2.2. SCANLON PLAN:-- Under this plan , bonus is paid at a constant proportion of the added value of output to the workers who are responsible for the increase in value. 3.2.3. TOWNE PLAN:-- The main objective of this plan is to encourage the foreman and workers to reduce the cost. A standard labour cost per unit is fixed for a particular period and if actual labour cost is less than the standard labour cost, 50% 0f the total saving in labour is divided among the workers and foreman in ratios of their wages.
  • 35. Continued…. 3.2.4. Profit Sharing And Co-partnership Schemes:-- The purpose of introducing these schemes is to strengthen the loyalty of employees to the firm. Workers can be given their share of profits in the form of cash or shares in the company. If a part of profit is paid in cash , it is known as profit sharing and if a part of profit is paid ion the form of shares , it is known as co-partnership.