2. TTaabbllee ooff CCoonntteennttss
Definitions
Applications of Directional Drilling
Deflection Tools
Mud Motors
Types of Well Profile
3. DDeeffiinniittiioonnss
Directional drilling is the process of directing the
wellbore along some trajectory to a predetermined
target.
Deviation control is the process of keeping the
wellbore contained within some prescribed limits
relative to inclination, horizontal excursion from the
vertical, or both.
4. AApppplliiccaattiioonnss
History
Interests in controlled directional drilling began about
1929 after new and later accurate means of measuring
hole angle was introduced during the development of
Seminole, Oklahoma field.
In the early 1930’s the first controlled directional well
was drilled in Huntington Beach, California.
Controlled directional drilling was initially used in
California for unethical purposes, that is, to
intentionally cross property lines.
5. In 1933, during the development of the Signal Hill field
in Long Beach, California, several wells were drilled
under the Sunnyside Cemetery from locations across
the streets surrounding the cemetery.
In 1934, it was used to kill a wild well, Madeley No.1,
near Conroe, Texas.
14. Other applications include:
To reach multiple targets
Horizontal drilling
To reach thin reservoirs (using horizontal and
multilateral drilling)
To avoid gas or water coning problems
15. DDeefflleeccttiioonn TToooollss
The wellbore can be deflected from its current
position using any of the following:
Whipstocks
Jetting bit
Bent subs with downhole motors
16. WWhhiippssttoocckkss
Advantages
•It provides a controlled hole
curvature
at the onset
•Can be run at any depth in any kind
of
rock and very useful in hard rock
Dwihseardev oatnhteargs efail
•It is necessary to drill the pilot hole
and then trip out to change the
smaller bit to one of the wellbore
diameter.
17.
18. JJeettttiinngg bbiitt
Advantages
•Several attempts can be made to initiate deflection
without
pulling out of hole
•A full gauge hole can be drilled from the beginning
Disadvantage
•The technique is limited to soft-medium formations
•Severe dog-legs can occur if the jetting is not carefully
controlled
•On smaller rigs there may not be enough pump capacity to
wash away the formation
19.
20. BBeenntt ssuubbss wwiitthh ddoowwnnhhoollee mmoottoorrss
The bent sub is run directly above the motor and its pin is
offset at an angle of 1 – 3 degrees.
Deflection of the wellbore occurs when drilling is carried
out with no surface rotation to the drillstring.
The drill bit is forced to follow the curve of the bent sub.
The degree of curvature depends largely on the bent sub
offset angle and the OD of the motor.
When the required angles (inclination and/or azimuth)
are obtained, this BHA is tripped out to be replaced with a
rotary assembly.
21.
22. SStteeeerraabbllee mmoottoorrss
The motor is designed with an in-built bent housing
below the motor section; usually the connecting rod
housing.
The bent housing angle is usually 0.25 – 1.5 degrees.
The use of steerable motors with the correct drill bit and
BHA reduces the number of round trips required to
produce the desired inclination/azimuth.
It can be used in either :
Oriented mode (sliding)
Rotary mode
23. Oriented (Sliding) mode
•The drillstring remains
stationary (rotary table or
top-drive is locked) while the
drill bit is rotated by the
motor.
•The course of the well is
only changed when drilling
in sliding mode as the drill
bit will now follow the
curvature of the motor bent
housing.
Rotary mode
•Steerable motor becomes
“locked” with respect to
trajectory and the hole
direction and inclination are
maintained while drilling.
26. TTuurrbbiinnee mmoottoorr
The turbine motor consists of:
A multistage blade-type rotor and stator sections. The
number of rotor/stator sections can vary from 25 to 50.
A thrust bearing section and a drive shaft.
The rotor blades are connected to the drive shaft and
are rotated by mud pumped under high pressure.
The stator deflects the mud onto the rotor blades.
Rotation of the rotor is transmitted to the drive shaft
and drill bit.
29. Power section
The PDM consists of a helical steel rotor fitted inside a
spirally-shaped elastomer moulded stator.
Mud flowing under pressure fills the cavities between
the dissimilar shapes of the rotor and stator and under
the pressure of mud, the rotor is displaced and begins
to rotate.
The rotor actually moves in an elliptical shape. This
eccentric movement is converted to true circular
motion by a universal joint assembly.
30.
31. By-pass valve
This valve allows the drilling fluid to by-pass the mud
motor allowing the drillstring to fill during tripping in
and drain when making a connection or pulling out of
hole.
The valve operates by a spring which holds a piston in
the upper position.
In this position, ports in the by-pass valve are open
allowing mud to flow in or out of the drillstring.
At 30% of recommended flow rate, the piston is forced
down, closing the ports and directing flow through the
mud motor.
32.
33. Universal Joint:
A Connecting Rod assembly is attached to the lower
end of the rotor.
It transmits the torque and rotational speed from the
rotor to the drive shaft and bit.
Universal joints convert the eccentric motion of the
rotor into concentric motion at the drive shaft.
Bearing and Drive Shaft Assembly
The drive shaft is a rigidly-constructed hollow steel
component.
It is supported within the bearing housing by radial
and axial thrust bearings
34. TTyyppeess ooff WWeellll PPrrooffiillee
Type I
Build and Hold
Type 2
Build, Hold and Drop.
Returns to vertical after dropping – S-shape.
Does not return to vertical after dropping – Modified S-shape.
Type 3
Continuous Build
35. KOP
TYPE I TYPE II TYPE III
BUILD & HOLD BUILD – HOLD & DROP CONTINUOUS BUILD
36. TTyyppee II –– bbuuiilldd aanndd hhoolldd
Information needed:
Surface co-ordinates
Target co-ordinates
TVD of target
TVD to KOP
Build-up rate
37.
38.
39.
40. TTyyppee IIII –– bbuuiilldd,, hhoolldd aanndd ddrroopp
Information needed:
Surface co-ordinates
Target co-ordinates
TVD of target
TVD to KOP
TVD at end of drop-off
(usually end of
well)
Build-up rate
Drop-off rate
Final angle of
inclination through
target.
Because Type II have 2 curves,
2 radii need to be calculated
and compared with the total
departure, D3.
These quantities are then
used to calculate the
maximum possible
inclination angle at end of
build-up curve.
42. TTyyppee IIIIII –– ccoonnttiinnuuoouuss bbuuiilldd
Used for salt dome
drilling.
For planning appraisal
wells.
Information needed:
Surface co-ordinates
Target co-ordinates
One parameter
from:
Maximum
inclination angle
TVD to KOP
Build-up rate
43. Design a directional well with the following
restrictions:
• Total horizontal departure = 4,500 ft
• True vertical depth (TVD) = 12,500 ft
• Depth to kickoff point (KOP) = 2,500 ft
• Rate of build of hole angle = 1.5 deg/100 ft
• Profile type: Type I well (build and hold)
44. (i) What is the maximum hole angle
required.
(ii)What is the total measured
depth (MD)?
q
46. 46
ù
ú úû
é
2tan D D x (D D ) 2(r r )x
é
- - + - - +
2 2
ù
2 tan 10,000 4,500 10,000 2(3,820)4,500
ê êë
- + -
-
=
2(3,820) 4,500
-1
26.3 qmax =
ú ú
û
ê ê
ë
+ -
q = -
1 2 4
1 2 4
2
4 1
2
1 4 1 4
max 2(r r ) x
47. 47
MMeeaassuurreedd DDeepptthh ooff
WWeellll
xBuild = r1(1 - cos q
)
3,820(1- cos 26.3 )
395 ft
=
=
xHold 4,500 395
= -
4,105 ft
=
L sin 4,105
Hold
q =
Hold
L 9,265 ft
=