MANJUNG
3 x 700 MW Thermal Power Plant
           Malaysia




                           Power Turbo-Systems
                           Plants
General Presentation




                           In July 1999, a consortium including
                           Alstom Power and Peremba was
                           awarded by TENAGA NASIONAL
                           BERHARD JANAMANJUNG (TNBJ)
                           for the supply of 3 x 700 MW units
                           for the Manjung thermal power plant.

                           Alstom Power was responsible for the
                           design and supply of the civil works
                           of the power block, the equipment,
                           the erection, the commissioning, the
                           training of the operation and
                           maintenance team, the test run and
                           performance guarantee tests.

                           Peremba was responsible for the
                           civil works of the auxiliary buildings,
                           the electrical and control equipment.

                           The coal yard equipment was
                           designed and supplied by Koch.

                           The power station also features
                           an ALSTOM seawater flue gas
                           desulphurisation (FGD) process plant
                           which utilises the natural properties
                           of seawater to absorb the sulphur
                           dioxide from the flue gas.




                       2
Layout
12
                                           1
                                                                             The Manjung power plant is located
                                               Turbine hall
                                           2   Boiler                        on a reclaimed island, about 10 km
                                 7         3   Electrostatic precipitators   south of the nearest town Lumut, and
                                           4   Stack
                                                                             approximately 288 km north of
                                           5   Electrical building
                                           6   Transformer areas             Kuala Lumpur.
                                           7   Switchyard
                                           8   Water treatment plant
                                                                             The power blocks of the 3 units are
                     1                     9   Pumping station
                                          10   Cool yard                     identical. Their relative position in
                                          11   Fuel oil storage tanks        line allows the simultaneous
         3       2
                                          12   Main entrance                 construction of the 3 units.
     4
                     1

         3       2       6                                                   Although compact, the design of the
                     1                                                       power block leaves sufficient
10                       5           11                                      equipment laydown space for the
         3       2                                                           maintenance and main overhaul
                                                                             programme of the O & M contractors.
                                                                             The circulating water for the open
                                                                             cooling water circuit is taken from
             8                                                               the sea.
                             9
                                                                             The high voltage outgoing lines are
                                                                             connected to the 500 kV switchyard
                                                                             substation.




                                               3
Plant Description - Main Components



                                                    Boiler

                                                    The boilers of the three units are
                                                    drum type and controlled circulation
                                                    tangential firing. They are equipped
                                                    with economiser, superheater,
                                                    reheater and low NOx burners.
                                                    The boilers are designed to burn
                                                    imported international coals as main
                                                    fuel on base load. Light fuel oil
                                                    being used on ignition and for
                                                    sustaining the flame at low load.




   Steam generator parameters
Life steam flow ................ 2390 t/h
Life steam pressure .......... 175 bars abs.
Life steam temperature ..... 539°C
Feedwater temperature ..... 277°C
Fuel ................................ Coal
Ignition fuel ..................... Light oil




                                                4
Turbine

The turbine generator sets have a
rated output corresponding to a
nominal net power of 700 MW and
have a rotating speed of 3000 rpm.
The turbine is of axial flow design
with all turbine and generator rotors
directly coupled in tandem.
The turbine consists of a high pressure
(HP) turbine, an intermediate pressure
(IP) turbine and two double flow low
pressure (LP) turbines.                                                               Steam parameters
                                                                                 at HP turbine throttle :
Standard proven turbine auxilliary                                               Pressure ........................ 175 bar
systems are used wherever possible                                               Temperature ................. 540 °C
and the STG arrangement follows a
                                                                                 at IP cylinder inlet :
simple, practical pre-engineered
layout.                                                                          Pressure ........................ 38 bar
                                                                                 Temperature ................. 540 °C
                                                                                 at LP cylinder inlet :
Generator                                                                        Pressure ........................ 3 bar
                                                                                 Temperature .................. 240 °C
The generator is a two-pole
hydrogen and water cooled machine                                                       Generator parameters
of the “Gigatop” type.                    The stator winding and the terminals
                                                                                 Nominal rating ............... 943 MVA
The rotor winding and the stator          are directly water cooled.
                                                                                 Power factor ................... 0.85
core are hydrogen cooled.                 The machine is fitted with the seal
                                                                                 Voltage .......................... 23 kV
                                          oil, gas cooling and stator water
                                                                                 Frequency ....................... 50 Hz
                                          cooling systems.
                                                                                 Short circuit ratio ............. 0.51
                                          Its excitation is provided by a
                                                                                 Efficiency ........................ 98.9 %
                                          static excitation connected to the
                                                                                 H2 pressure .................... 4 bar gauge
                                          slip ring unit.
                                                                                 Excitation ....................... Static




                                                          5
Mechanical Equipment


                                                                               Circulating water pumps

                                                                               The circulating water system takes
                                                                               cooling water from the sea to the
                                                                               three condensers by means of six
                                                                               50 % duty concrete volute type main
                                                                               cooling water pumps.

                                                                               Feedwater heating plant

                                                                               The feedwater heating plant includes
                                                                               four LP heaters arranged in series, with
                                                                               LP1 & 2 located in the condenser neck,
                                                                               one feedwater tank equipped with a
                                                                               deaerator and three HP heaters. All
                                                                               the feedwater heating equipment is
                                                                               installed horizontally.

                                                                               Feedwater pumps

Steam water loop                                                               The feedwater pump system is
                                                                               composed of 3 x 50 % feedwater
                        Condenser main characteristics                         motor-pump sets, each including :
                   Circulating water temperature ...... 32 °C                  · a booster pump,
                   Condenser pressure .................... 85 mbar             · a main pump,
                                                                               · a variable speed hydraulic coupling,
                         Condensate extraction pumps
                                                                               · a drive motor.
                   Total manometric head ................ 235 mWG
                   Flow rate ................................... 2042 m3/h
                                                                               Condensate extraction pumps
                   Speed ....................................... 1480 rpm
                                                                               The condensate water is drawn from
                                                                               the condenser hotwell by two 100 %
                                                                               motor-pump sets. Each pump is of the
                                                                               multistage, vertical type with barrel.

                                                                               Condenser

                                                                               The condenser is of the single pass,
                                                                               surface type, comprising four titanium
                                                                               tube bundles. Each tube bundle has
                                                                               its own inlet and outlet water box such
                                                                               that the condenser can be considered
                                                                               as two half-condensers of two bundles
                                                                               in parallel. The condenser neck is
                                                                               connected to the LP turbine exhaust
                                                                               box by a suitable flexible bellow.


                                                                             HP heaters

                                                   6
Electrical Distribution - Control and Instrumentation


Electrical equipment                     Instrumentation and control                The analogue control system mainly
                                                                                    includes a load controller for the boiler
The electricity produced by the          Three units share one common main          and feedwater plant, control and
generator is transferred to the 500 kV   control room. The unit control mode        monitoring system for the turbine,
grid via a main three-phase core type    of the main systems (boiler, turbine,      excitation control system for the generator
transformer. Isolated phase busbars      generator and feedwater plant) is          and an energy metering system.
ensure the connection between the        centralised.
generator and the main transformer
as well as the tap connection to the     The centralised logic control equipment
unit transformers.                       is using ABB control equipment. This is
                                         fully programmable electronic equipment.
In normal operation, the 11 kV
network is supplied by the unit          The decentralised control equipment
three-phase transformers from the        is operated using microprocessors
generator 23 kV busbars.                 and is of the programmable logic
                                         controller (PLC) type.
Electricity is supplied to the unit
auxiliaries at different AC voltages :
· High voltage (11 kV) to the main
  motors,
· Medium voltage (3.3 kV) to the
  medium motors,
· Low voltage (415 V) to the small
  motors,
· Low voltage (240 V) to lighting and
  small power.

Four emergency diesel generators
automatically supply the essential
auxiliaries upon complete loss of
AC voltage.

Each 220, 110 and 24 V DC system
provides a secure power supply for
the control and protection of the
power plant.



                                            Electrical single line diagram




                                                               7
Tel. + 33 (0) 1 41 49 20 00 - Fax +33 (0) 1 41 49 24 85 - www.power.alstom.com
ALSTOM Power Centrales - 2, quai Michelet/4, avenue André Malraux - 92309 Levallois-Perret Cedex (France)
                                                                                                              c-
                                                                                                            “ O ALSTOM - 2000. ALSTOM, the logo ALSTOM and their frameworks are trademarks and service trademark applications of ALSTOM. The other names mentioned, registered or not, are the property of their respective companies.
                                                                                                            PWER / BPROB / MJGTPP03 / eng / PPB / 06.03 / FR / 4474 - 389 191 982 RCS Paris - Creation by Big Bang Communication - Printed in France - Illustration : ALSTOM Power - All information is given for indication purpose only and is subject to change without notice.

Más contenido relacionado

La actualidad más candente

Kubota v2203 m-bg diesel engine service repair manual
Kubota v2203 m-bg diesel engine service repair manualKubota v2203 m-bg diesel engine service repair manual
Kubota v2203 m-bg diesel engine service repair manualfjskekfsemmwe
 
ACO-1 Airport Familiarization
ACO-1 Airport Familiarization ACO-1 Airport Familiarization
ACO-1 Airport Familiarization Brock Jester
 
Internship Report on Cogeneration
Internship Report on Cogeneration Internship Report on Cogeneration
Internship Report on Cogeneration Mohan Patil
 
Gasturbinecourse 130129063149-phpapp02
Gasturbinecourse 130129063149-phpapp02Gasturbinecourse 130129063149-phpapp02
Gasturbinecourse 130129063149-phpapp02Naimat Khan
 
Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)Jigyasa Singh
 
Thermodynamic Chapter 5 Air Standard Cycle
Thermodynamic Chapter 5 Air Standard CycleThermodynamic Chapter 5 Air Standard Cycle
Thermodynamic Chapter 5 Air Standard CycleMuhammad Surahman
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boilerAshvani Shukla
 
Refrigeration system 2
Refrigeration system 2Refrigeration system 2
Refrigeration system 2Yuri Melliza
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsSHIVAJI CHOUDHURY
 
Comparison of Bombardier Q400 & ATR 72
Comparison of Bombardier Q400 &  ATR 72Comparison of Bombardier Q400 &  ATR 72
Comparison of Bombardier Q400 & ATR 72Sumathi Samuel
 
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdfA BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdfKhalidAyaz3
 
ENERGY CONSERVATION BACK PRESSURE TURBINE
ENERGY CONSERVATION BACK PRESSURE TURBINEENERGY CONSERVATION BACK PRESSURE TURBINE
ENERGY CONSERVATION BACK PRESSURE TURBINERAVI PAL SINGH
 
Basics of Gas Turbine Power Plant
Basics of Gas Turbine Power PlantBasics of Gas Turbine Power Plant
Basics of Gas Turbine Power PlantS.Vijaya Bhaskar
 
Combustion and dry low nox 2.6 dln system
Combustion and dry low nox 2.6 dln systemCombustion and dry low nox 2.6 dln system
Combustion and dry low nox 2.6 dln systemFaisal Nadeem
 

La actualidad más candente (20)

Kubota v2203 m-bg diesel engine service repair manual
Kubota v2203 m-bg diesel engine service repair manualKubota v2203 m-bg diesel engine service repair manual
Kubota v2203 m-bg diesel engine service repair manual
 
ACO-1 Airport Familiarization
ACO-1 Airport Familiarization ACO-1 Airport Familiarization
ACO-1 Airport Familiarization
 
Internship Report on Cogeneration
Internship Report on Cogeneration Internship Report on Cogeneration
Internship Report on Cogeneration
 
Gasturbinecourse 130129063149-phpapp02
Gasturbinecourse 130129063149-phpapp02Gasturbinecourse 130129063149-phpapp02
Gasturbinecourse 130129063149-phpapp02
 
Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)
 
CFBC Boiler vs Pulverized Fired Boiler
CFBC Boiler vs Pulverized Fired BoilerCFBC Boiler vs Pulverized Fired Boiler
CFBC Boiler vs Pulverized Fired Boiler
 
Hplpbp
HplpbpHplpbp
Hplpbp
 
Thermodynamic Chapter 5 Air Standard Cycle
Thermodynamic Chapter 5 Air Standard CycleThermodynamic Chapter 5 Air Standard Cycle
Thermodynamic Chapter 5 Air Standard Cycle
 
Iocl cdu
Iocl cduIocl cdu
Iocl cdu
 
660 mw supercritical boiler
660 mw supercritical boiler660 mw supercritical boiler
660 mw supercritical boiler
 
Refrigeration system 2
Refrigeration system 2Refrigeration system 2
Refrigeration system 2
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plants
 
Comparison of Bombardier Q400 & ATR 72
Comparison of Bombardier Q400 &  ATR 72Comparison of Bombardier Q400 &  ATR 72
Comparison of Bombardier Q400 & ATR 72
 
Cmc philosophy
Cmc philosophyCmc philosophy
Cmc philosophy
 
Cogeneration power plant
Cogeneration power plantCogeneration power plant
Cogeneration power plant
 
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdfA BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf
A BOOK ON BASIC CONCEPT OF MODERN combined cycle POWER PLANTS.pdf
 
ENERGY CONSERVATION BACK PRESSURE TURBINE
ENERGY CONSERVATION BACK PRESSURE TURBINEENERGY CONSERVATION BACK PRESSURE TURBINE
ENERGY CONSERVATION BACK PRESSURE TURBINE
 
Basics of Gas Turbine Power Plant
Basics of Gas Turbine Power PlantBasics of Gas Turbine Power Plant
Basics of Gas Turbine Power Plant
 
Combustion and dry low nox 2.6 dln system
Combustion and dry low nox 2.6 dln systemCombustion and dry low nox 2.6 dln system
Combustion and dry low nox 2.6 dln system
 
172 Preflight Checklist
172 Preflight Checklist172 Preflight Checklist
172 Preflight Checklist
 

Similar a Janamanjung

Nuclear power plant kakarapar
Nuclear power plant kakaraparNuclear power plant kakarapar
Nuclear power plant kakaraparnaitik997
 
Types of generation plant
Types of generation plantTypes of generation plant
Types of generation plant중구 장
 
Durgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationDurgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationSaumyadip Moitra
 
Vogtle 3&4 - Cleaner Energy Means Clean Air
Vogtle 3&4 - Cleaner Energy Means Clean AirVogtle 3&4 - Cleaner Energy Means Clean Air
Vogtle 3&4 - Cleaner Energy Means Clean Airandrewbouldin
 
Study of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportStudy of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportsushi roy
 
DPL Vocational Training Report
DPL Vocational Training ReportDPL Vocational Training Report
DPL Vocational Training ReportShivendra Bhushan
 
Talwandi sabo power plant (t
Talwandi sabo power plant (tTalwandi sabo power plant (t
Talwandi sabo power plant (t21403515
 
power plant ppt
power plant pptpower plant ppt
power plant ppt21403515
 
training report on Mejia Thermal Power Station
training report on Mejia Thermal Power Stationtraining report on Mejia Thermal Power Station
training report on Mejia Thermal Power Stationsagnikchoudhury
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plantAbhinaw kapoor
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plantAbhinaw kapoor
 
LAKHRA power generation company limited(LPGCL)
LAKHRA power generation company limited(LPGCL)LAKHRA power generation company limited(LPGCL)
LAKHRA power generation company limited(LPGCL)MUHAMMAD AZMAT ULLAH BAIG
 
Vacon energy efficient Ro-Pax vessels
Vacon energy efficient Ro-Pax vesselsVacon energy efficient Ro-Pax vessels
Vacon energy efficient Ro-Pax vesselsVacon Plc
 

Similar a Janamanjung (20)

Nuclear power plant kakarapar
Nuclear power plant kakaraparNuclear power plant kakarapar
Nuclear power plant kakarapar
 
Manjung Brochure
Manjung BrochureManjung Brochure
Manjung Brochure
 
Types of generation plant
Types of generation plantTypes of generation plant
Types of generation plant
 
Durgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationDurgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentation
 
Vogtle 3&4 - Cleaner Energy Means Clean Air
Vogtle 3&4 - Cleaner Energy Means Clean AirVogtle 3&4 - Cleaner Energy Means Clean Air
Vogtle 3&4 - Cleaner Energy Means Clean Air
 
Study of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportStudy of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant report
 
DPL Vocational Training Report
DPL Vocational Training ReportDPL Vocational Training Report
DPL Vocational Training Report
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Talwandi sabo power plant (t
Talwandi sabo power plant (tTalwandi sabo power plant (t
Talwandi sabo power plant (t
 
power plant ppt
power plant pptpower plant ppt
power plant ppt
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
training report on Mejia Thermal Power Station
training report on Mejia Thermal Power Stationtraining report on Mejia Thermal Power Station
training report on Mejia Thermal Power Station
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plant
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plant
 
Electrical Power generation
Electrical Power generationElectrical Power generation
Electrical Power generation
 
Siemens1000 Mw
Siemens1000 MwSiemens1000 Mw
Siemens1000 Mw
 
LAKHRA power generation company limited(LPGCL)
LAKHRA power generation company limited(LPGCL)LAKHRA power generation company limited(LPGCL)
LAKHRA power generation company limited(LPGCL)
 
Niket
NiketNiket
Niket
 
Vacon energy efficient Ro-Pax vessels
Vacon energy efficient Ro-Pax vesselsVacon energy efficient Ro-Pax vessels
Vacon energy efficient Ro-Pax vessels
 

Último

ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProduct Anonymous
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Principled Technologies
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024The Digital Insurer
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 

Último (20)

ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 

Janamanjung

  • 1. MANJUNG 3 x 700 MW Thermal Power Plant Malaysia Power Turbo-Systems Plants
  • 2. General Presentation In July 1999, a consortium including Alstom Power and Peremba was awarded by TENAGA NASIONAL BERHARD JANAMANJUNG (TNBJ) for the supply of 3 x 700 MW units for the Manjung thermal power plant. Alstom Power was responsible for the design and supply of the civil works of the power block, the equipment, the erection, the commissioning, the training of the operation and maintenance team, the test run and performance guarantee tests. Peremba was responsible for the civil works of the auxiliary buildings, the electrical and control equipment. The coal yard equipment was designed and supplied by Koch. The power station also features an ALSTOM seawater flue gas desulphurisation (FGD) process plant which utilises the natural properties of seawater to absorb the sulphur dioxide from the flue gas. 2
  • 3. Layout 12 1 The Manjung power plant is located Turbine hall 2 Boiler on a reclaimed island, about 10 km 7 3 Electrostatic precipitators south of the nearest town Lumut, and 4 Stack approximately 288 km north of 5 Electrical building 6 Transformer areas Kuala Lumpur. 7 Switchyard 8 Water treatment plant The power blocks of the 3 units are 1 9 Pumping station 10 Cool yard identical. Their relative position in 11 Fuel oil storage tanks line allows the simultaneous 3 2 12 Main entrance construction of the 3 units. 4 1 3 2 6 Although compact, the design of the 1 power block leaves sufficient 10 5 11 equipment laydown space for the 3 2 maintenance and main overhaul programme of the O & M contractors. The circulating water for the open cooling water circuit is taken from 8 the sea. 9 The high voltage outgoing lines are connected to the 500 kV switchyard substation. 3
  • 4. Plant Description - Main Components Boiler The boilers of the three units are drum type and controlled circulation tangential firing. They are equipped with economiser, superheater, reheater and low NOx burners. The boilers are designed to burn imported international coals as main fuel on base load. Light fuel oil being used on ignition and for sustaining the flame at low load. Steam generator parameters Life steam flow ................ 2390 t/h Life steam pressure .......... 175 bars abs. Life steam temperature ..... 539°C Feedwater temperature ..... 277°C Fuel ................................ Coal Ignition fuel ..................... Light oil 4
  • 5. Turbine The turbine generator sets have a rated output corresponding to a nominal net power of 700 MW and have a rotating speed of 3000 rpm. The turbine is of axial flow design with all turbine and generator rotors directly coupled in tandem. The turbine consists of a high pressure (HP) turbine, an intermediate pressure (IP) turbine and two double flow low pressure (LP) turbines. Steam parameters at HP turbine throttle : Standard proven turbine auxilliary Pressure ........................ 175 bar systems are used wherever possible Temperature ................. 540 °C and the STG arrangement follows a at IP cylinder inlet : simple, practical pre-engineered layout. Pressure ........................ 38 bar Temperature ................. 540 °C at LP cylinder inlet : Generator Pressure ........................ 3 bar Temperature .................. 240 °C The generator is a two-pole hydrogen and water cooled machine Generator parameters of the “Gigatop” type. The stator winding and the terminals Nominal rating ............... 943 MVA The rotor winding and the stator are directly water cooled. Power factor ................... 0.85 core are hydrogen cooled. The machine is fitted with the seal Voltage .......................... 23 kV oil, gas cooling and stator water Frequency ....................... 50 Hz cooling systems. Short circuit ratio ............. 0.51 Its excitation is provided by a Efficiency ........................ 98.9 % static excitation connected to the H2 pressure .................... 4 bar gauge slip ring unit. Excitation ....................... Static 5
  • 6. Mechanical Equipment Circulating water pumps The circulating water system takes cooling water from the sea to the three condensers by means of six 50 % duty concrete volute type main cooling water pumps. Feedwater heating plant The feedwater heating plant includes four LP heaters arranged in series, with LP1 & 2 located in the condenser neck, one feedwater tank equipped with a deaerator and three HP heaters. All the feedwater heating equipment is installed horizontally. Feedwater pumps Steam water loop The feedwater pump system is composed of 3 x 50 % feedwater Condenser main characteristics motor-pump sets, each including : Circulating water temperature ...... 32 °C · a booster pump, Condenser pressure .................... 85 mbar · a main pump, · a variable speed hydraulic coupling, Condensate extraction pumps · a drive motor. Total manometric head ................ 235 mWG Flow rate ................................... 2042 m3/h Condensate extraction pumps Speed ....................................... 1480 rpm The condensate water is drawn from the condenser hotwell by two 100 % motor-pump sets. Each pump is of the multistage, vertical type with barrel. Condenser The condenser is of the single pass, surface type, comprising four titanium tube bundles. Each tube bundle has its own inlet and outlet water box such that the condenser can be considered as two half-condensers of two bundles in parallel. The condenser neck is connected to the LP turbine exhaust box by a suitable flexible bellow. HP heaters 6
  • 7. Electrical Distribution - Control and Instrumentation Electrical equipment Instrumentation and control The analogue control system mainly includes a load controller for the boiler The electricity produced by the Three units share one common main and feedwater plant, control and generator is transferred to the 500 kV control room. The unit control mode monitoring system for the turbine, grid via a main three-phase core type of the main systems (boiler, turbine, excitation control system for the generator transformer. Isolated phase busbars generator and feedwater plant) is and an energy metering system. ensure the connection between the centralised. generator and the main transformer as well as the tap connection to the The centralised logic control equipment unit transformers. is using ABB control equipment. This is fully programmable electronic equipment. In normal operation, the 11 kV network is supplied by the unit The decentralised control equipment three-phase transformers from the is operated using microprocessors generator 23 kV busbars. and is of the programmable logic controller (PLC) type. Electricity is supplied to the unit auxiliaries at different AC voltages : · High voltage (11 kV) to the main motors, · Medium voltage (3.3 kV) to the medium motors, · Low voltage (415 V) to the small motors, · Low voltage (240 V) to lighting and small power. Four emergency diesel generators automatically supply the essential auxiliaries upon complete loss of AC voltage. Each 220, 110 and 24 V DC system provides a secure power supply for the control and protection of the power plant. Electrical single line diagram 7
  • 8. Tel. + 33 (0) 1 41 49 20 00 - Fax +33 (0) 1 41 49 24 85 - www.power.alstom.com ALSTOM Power Centrales - 2, quai Michelet/4, avenue André Malraux - 92309 Levallois-Perret Cedex (France) c- “ O ALSTOM - 2000. ALSTOM, the logo ALSTOM and their frameworks are trademarks and service trademark applications of ALSTOM. The other names mentioned, registered or not, are the property of their respective companies. PWER / BPROB / MJGTPP03 / eng / PPB / 06.03 / FR / 4474 - 389 191 982 RCS Paris - Creation by Big Bang Communication - Printed in France - Illustration : ALSTOM Power - All information is given for indication purpose only and is subject to change without notice.