Drilling Engineering 1 Course (2nd Ed.)
1. Introduction
2. Personnel at Rig Site
3. Rotary Drilling System
2 drilling goals
to build the well according to its purpose and in a
safe manner
(i.e, avoiding personal injuries
and avoiding technical problems)

to complete it with minimum cost
Thereto the overall costs of the well during its lifetime in
conjunction with the field development aspects shall be
minimized.

Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

4
Parameters
The overall cost minimization, or optimization, may
influence
the location from where the well is drilled,
(e.g., an extended reach onshore or above reservoir offshore),

the drilling technology applied,
(e.g., conventional or slim–hole drilling, overbalanced or
underbalanced, vertical or horizontal, etc),

and which evaluation procedures are run to gather
subsurface information to optimize future wells.

Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

5
drilling technologies
To build a hole, different drilling technologies have been invented:
 Percussion drilling
 Cable drilling
 Drillstring

“Pennsylvanian drilling”

• With mud
Quick percussion drilling
• Without mud “Canadian drilling”

 Rotating drilling

(Will be discussed exclusively)

 Full cross-section drilling
• Surface driven
o Rotary bit
o Rotary nozzle
• Subsurface driven
o Turbine drilling
o Positive displacement motor drilling
o Electro motor drilling

 Annular drilling

 Diamond coring
 Shot drilling

Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

6
drilling technologies (Cont.)
Special techniques
Abrasive jet drilling
Cavitating jet drilling
Electric arc and plasma
drilling
Electric beam drilling
Electric disintegration
drilling
Explosive drilling
Flame jet drilling
Implosion drilling

Spring14 H. AlamiNia

Laser drilling
REAM drilling
Replaceable cutterhead
drilling
Rocket exhaust drilling
Spark drilling
Subterrene drilling
Terra drilling
Thermal-mechanical
drilling
Thermocorer drilling

Drilling Engineering 1 Course (2nd Ed.)

7
Rig Classification
Rotary
Drilling Rigs

Land

Mobile

Jackknife

Marine

Bottom
Supported

Conventional

Portable
Mast

Platform

Self
Contained

Jack-Up

Spring14 H. AlamiNia

Floating

Tendered

Drill Ship

Semi
Submersible

Caisson
Vessel

Barge

Tension Leg

Submersible

Drilling Engineering 1 Course (2nd Ed.)

8
Land: Mobile Rigs

Jackknife rig

Spring14 H. AlamiNia

Portable mast

Drilling Engineering 1 Course (2nd Ed.)

9
Marine:
Bottom Supported Platform rigs

Self Contained

Spring14 H. AlamiNia

Tendered

Drilling Engineering 1 Course (2nd Ed.)

10
Marine:
Other Bottom Supported rigs

A cantilever rig on a barge

A Jack–Up rig

Spring14 H. AlamiNia

A submersible platform

Drilling Engineering 1 Course (2nd Ed.)

11
Marine: Floating rigs
A drill–ship

Semi–
submersible
vessel

Caisson vessel
(also called
sparbuoy) and
Diagram of a
spar–buoy

A tension–
leg platform

Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

12
Personnels
People directly involved in drilling a well are
employed either by
the operating company,
the drilling contractor,
or one of the service and supply companies

The operating company is the owner of the
lease/block and principal user of the services
provided by the drilling contractor and the different
service companies.

Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

14
Tasks
Since drilling contractors are companies that
perform the actual drilling of the well, their main
job is to drill a hole to the depth/location and
specifications set by the operator.
Along with hiring a drilling contractor, the operator
usually employs various service and supply
companies to perform
logging,
cementing,
or any other special operations, including maintaining
the drilling fluid in its planed condition.
Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

15
drilling crews
Most drilling crews consist of
a tool pusher,
a driller,
a derrickman,
a mud logger,
and two or three rotary helpers
(also called floormen or roughnecks).

Along with this basic crew configuration the
operator sends usually a representative, called
company man to the rig.

For offshore operations the crews usually consist of
many more employees.
Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

16
crew requirements
Tool Pusher:

 supervises all drilling operations and is the leading man of the drilling
contractor on location.

Company Man:

 The company man is in direct charge of all company’s activities on the
rig site.
 He is responsible for the drilling strategy as well as the supplies and
services in need. His decisions directly effect the progress of the well.

Driller:
 The driller operates the drilling machinery on the rig floor and is the
overall supervisor of all floormen.
 He reports directly to the tool pusher and is the person who is most
closely involved in the drilling process.
 He operates, from his position at the control console, the rig floor
brakes, switches, levers, and all other related controls that influence the
drilling parameters.
 In case of a kick he is the first person to take action by moving the bit
off bottom and closing the BOP.
Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

17
crew requirements (Cont.)
Derrick Man:

 The derrickman works on the so–called monkeyboard, a small platform
up in the derrick, usually about 90 ft above the rotary table.

 When a connection is made or during tripping operations he is handling and
guiding the upper end of the pipe.
 During drilling operations the derrickman is responsible for maintaining and
repairing the pumps and other equipment as well as keeping tabs on the drilling
fluid.

Floormen:
 During tripping, the rotary helpers are responsible for handling the
lower end of the drill pipe as well as operating tongs and wrenches to
make or break up a connection.
 During other times, they also maintain equipment, keep it clean, do
painting and in general help where ever help is needed.

Mud Engineer, Mud Logger:

 The service company who provides the mud almost always sends a mud
engineer and a mud logger to the rig site. They are constantly
responsible for logging what is happening in the hole as well as
maintaining the proper mud conditions.

Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

18
Well Classifications
According to a wells final depth, it can be classified
into:
Shallow well: < 2000m
Conventional well: 2 000m – 3500m
Deep well: 3500m – 5000m
Ultra deep well: > 5 000m

With the help of advanced technologies in
MWD/LWD and extended reach drilling techniques,
horizontal departures of more than10000m are
possible today.
Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

19
Typical rig components

Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

22
rig systems
For all rigs, the depth of the planned well
determines basic rig requirements. The most
important rig systems are:
Power system,
Hoisting system,
Drilling fluid circulation system,
Rotary system,
Derrick and substructure,
Well control system,
Well monitoring system

Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

23
drilling process
In rotary drilling, the rock is destroyed by the action
of rotation and axial force applied to a drilling bit.
The drilling bit is located at the end of a drill string
which is composed of drill pipes (also called joints
or singles), drill collars, and other specialized drilling
tools.
Drill collars are thick walled tubes responsible for
applying the axial force at the bit.
Rotation at the bit is usually obtained by rotating the
whole drill string from the surface.

Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

24
A simplified drillstring
The lower portion of the drill
string, composed of
drill collars
and specialized drilling tools,

are called bottom hole
assembly (BHA).

Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

25
drilling process (Cont.)
A large variety of bit models and designs are available
in industry. The choice of

the right bit, based on the characteristics of the formations to
be drilled,
and the right parameters (weight on bit and rotary speed)

are the two most basic problems the drilling engineer
faces during drilling planning and drilling operation.
The cuttings are lifted to the surface by the drilling
fluid.
At the surface, the cuttings are separated from the
drilling fluid by several solid removal equipment.
Drilling mud is picked up by the system of pumps and
pumped again down the hole.
Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

26
connection
As drilling
progresses, new
joints are added
to the top of the
drill string
increasing its
length, in an
operation called
connection.
A pipe slips is
used to transfer
the weight of
the drillstring
from the hook to
the master
bushing.
Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

27
round trip
As the bit gets dull, a round trip is performed to
bring the dull bit to the surface and replace it by a
new one.
A round trip is performed also to change the BHA.
The drillstring is also removed to run a casing
string. The operation is done by removing stands of
two (“doubles”), three (“thribbles”) or even four
(“fourbles”) joints connected, and stacking them
upright in the rig.

Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

28
Removing one stand of drillstring

Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

29
wiper trip
Sometimes the drillstring is not completely run out
of the hole.
It is just lifted up to the top of the open-hole
section and then lowered back again while
continuously circulating with drilling mud.
Such a trip, called wiper trip,
is carried out to clean the hole from remaining cuttings
that may have settled along the open–hole section.

Spring14 H. AlamiNia

Drilling Engineering 1 Course (2nd Ed.)

30
1. Jorge H.B. Sampaio Jr. “Drilling Engineering
Fundamentals.” Master of Petroleum
Engineering. Curtin University of Technology,
2007. Chapter 1 and 2
1. Power System
2. Hoisting System:
A. Introduction
B. The Block & Tackle
a.

Mechanical advantage and Efficiency
Q922+de1+l02 v1

Más contenido relacionado

La actualidad más candente

Power System
Power SystemPower System
Power SystemAFATous
 
Q922+de2+l07 v1
Q922+de2+l07 v1Q922+de2+l07 v1
Q922+de2+l07 v1AFATous
 
Gravel Pack Systems-R1-Feb.12.2014
Gravel Pack Systems-R1-Feb.12.2014Gravel Pack Systems-R1-Feb.12.2014
Gravel Pack Systems-R1-Feb.12.2014Mahbod Kian
 
Problems during Drilling a Well
Problems during Drilling a WellProblems during Drilling a Well
Problems during Drilling a WellFarida Ismayilova
 
Basic Hydraulic Fracturing
Basic Hydraulic FracturingBasic Hydraulic Fracturing
Basic Hydraulic FracturingJames Craig
 
Directional drilling
Directional drillingDirectional drilling
Directional drillingamrhaggag
 
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERWELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERAndi Anriansyah
 
Well control
Well controlWell control
Well controlSaba Saif
 
Q922+de2+l08 v1
Q922+de2+l08 v1Q922+de2+l08 v1
Q922+de2+l08 v1AFATous
 
Q921 re1 lec4 v1
Q921 re1 lec4 v1Q921 re1 lec4 v1
Q921 re1 lec4 v1AFATous
 
Q922+de2+l10 v1
Q922+de2+l10 v1Q922+de2+l10 v1
Q922+de2+l10 v1AFATous
 
Q921 de1 lec 4 v1
Q921 de1 lec 4 v1Q921 de1 lec 4 v1
Q921 de1 lec 4 v1AFATous
 
Rig types and components
Rig types and componentsRig types and components
Rig types and componentsMarwan Elaraby
 
Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and componentsChoong KW
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentationamrhaggag
 

La actualidad más candente (20)

Power System
Power SystemPower System
Power System
 
Water Base Muds
Water Base MudsWater Base Muds
Water Base Muds
 
Q922+de2+l07 v1
Q922+de2+l07 v1Q922+de2+l07 v1
Q922+de2+l07 v1
 
Gravel Pack Systems-R1-Feb.12.2014
Gravel Pack Systems-R1-Feb.12.2014Gravel Pack Systems-R1-Feb.12.2014
Gravel Pack Systems-R1-Feb.12.2014
 
Sand control
Sand controlSand control
Sand control
 
Problems during Drilling a Well
Problems during Drilling a WellProblems during Drilling a Well
Problems during Drilling a Well
 
Basic Hydraulic Fracturing
Basic Hydraulic FracturingBasic Hydraulic Fracturing
Basic Hydraulic Fracturing
 
Directional drilling
Directional drillingDirectional drilling
Directional drilling
 
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVERWELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
WELL COMPLETION, WELL INTERVENTION/ STIMULATION, AND WORKOVER
 
Well control
Well controlWell control
Well control
 
Q922+de2+l08 v1
Q922+de2+l08 v1Q922+de2+l08 v1
Q922+de2+l08 v1
 
Q921 re1 lec4 v1
Q921 re1 lec4 v1Q921 re1 lec4 v1
Q921 re1 lec4 v1
 
Q922+de2+l10 v1
Q922+de2+l10 v1Q922+de2+l10 v1
Q922+de2+l10 v1
 
Q921 de1 lec 4 v1
Q921 de1 lec 4 v1Q921 de1 lec 4 v1
Q921 de1 lec 4 v1
 
Rig types and components
Rig types and componentsRig types and components
Rig types and components
 
Type of rig
Type of rigType of rig
Type of rig
 
Well Control
Well ControlWell Control
Well Control
 
Drilling operation and components
Drilling operation and componentsDrilling operation and components
Drilling operation and components
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentation
 
rig types and its components
rig types and its componentsrig types and its components
rig types and its components
 

Destacado

GEOTHERMAL INDONESIA 2014
GEOTHERMAL INDONESIA 2014GEOTHERMAL INDONESIA 2014
GEOTHERMAL INDONESIA 2014Dinno Kurniawan
 
89176662 04-teknik-pemboran
89176662 04-teknik-pemboran89176662 04-teknik-pemboran
89176662 04-teknik-pemboranrramdan383
 
Lumpur Pengeboran (Drilling Fluid)
Lumpur Pengeboran (Drilling Fluid)Lumpur Pengeboran (Drilling Fluid)
Lumpur Pengeboran (Drilling Fluid)Rais Gunawan
 
1 hoisting system
1 hoisting system1 hoisting system
1 hoisting systemfianxxx
 
Dasar dasar reservoir-engineering
Dasar dasar reservoir-engineeringDasar dasar reservoir-engineering
Dasar dasar reservoir-engineeringRandy MC
 
01. drilling rig sistem tenaga power system ok
01. drilling rig sistem tenaga  power system ok01. drilling rig sistem tenaga  power system ok
01. drilling rig sistem tenaga power system okrusihan
 
Peralatan Produksi Lepas Pantai (Offshore Production Facility)
Peralatan Produksi Lepas Pantai (Offshore Production Facility)Peralatan Produksi Lepas Pantai (Offshore Production Facility)
Peralatan Produksi Lepas Pantai (Offshore Production Facility)Muhammad Febriyan Firdaus
 
Drilling engineering
Drilling engineeringDrilling engineering
Drilling engineeringSteffones K
 
Teknik Produksi Migas - Teknik Reservoir dan Cadangan Migas
Teknik Produksi Migas  - Teknik Reservoir dan Cadangan MigasTeknik Produksi Migas  - Teknik Reservoir dan Cadangan Migas
Teknik Produksi Migas - Teknik Reservoir dan Cadangan MigaslombkTBK
 
Buku pintar migas indonesia
Buku pintar migas indonesiaBuku pintar migas indonesia
Buku pintar migas indonesiaAsep Imam
 
Magazine advertisement Auestionnaire advert three analysis
Magazine advertisement Auestionnaire   advert three analysisMagazine advertisement Auestionnaire   advert three analysis
Magazine advertisement Auestionnaire advert three analysisChrisAshwell
 
Q921 rfp lec10 v1
Q921 rfp lec10 v1Q921 rfp lec10 v1
Q921 rfp lec10 v1AFATous
 
JavaScript入門勉強会ー第二章
JavaScript入門勉強会ー第二章JavaScript入門勉強会ー第二章
JavaScript入門勉強会ー第二章mactkg
 
جزوه کمک درسی مهندسی حفاری یک
جزوه کمک درسی مهندسی حفاری یکجزوه کمک درسی مهندسی حفاری یک
جزوه کمک درسی مهندسی حفاری یکAFATous
 
An intervview with Cambodian monk
An intervview with Cambodian monkAn intervview with Cambodian monk
An intervview with Cambodian monkguest3e66a9
 
Power point
Power pointPower point
Power pointsdavis27
 
Q922+rfp+l04 v1
Q922+rfp+l04 v1Q922+rfp+l04 v1
Q922+rfp+l04 v1AFATous
 
Wwwwwwwwwwwwwwwwwwwwwwwwwwwwwww
WwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwWwwwwwwwwwwwwwwwwwwwwwwwwwwwwww
WwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwJoão Filho
 

Destacado (20)

GEOTHERMAL INDONESIA 2014
GEOTHERMAL INDONESIA 2014GEOTHERMAL INDONESIA 2014
GEOTHERMAL INDONESIA 2014
 
89176662 04-teknik-pemboran
89176662 04-teknik-pemboran89176662 04-teknik-pemboran
89176662 04-teknik-pemboran
 
Lumpur Pengeboran (Drilling Fluid)
Lumpur Pengeboran (Drilling Fluid)Lumpur Pengeboran (Drilling Fluid)
Lumpur Pengeboran (Drilling Fluid)
 
1 hoisting system
1 hoisting system1 hoisting system
1 hoisting system
 
Dasar dasar reservoir-engineering
Dasar dasar reservoir-engineeringDasar dasar reservoir-engineering
Dasar dasar reservoir-engineering
 
01. drilling rig sistem tenaga power system ok
01. drilling rig sistem tenaga  power system ok01. drilling rig sistem tenaga  power system ok
01. drilling rig sistem tenaga power system ok
 
Peralatan Produksi Lepas Pantai (Offshore Production Facility)
Peralatan Produksi Lepas Pantai (Offshore Production Facility)Peralatan Produksi Lepas Pantai (Offshore Production Facility)
Peralatan Produksi Lepas Pantai (Offshore Production Facility)
 
Drilling engineering
Drilling engineeringDrilling engineering
Drilling engineering
 
Teknik Produksi Migas - Teknik Reservoir dan Cadangan Migas
Teknik Produksi Migas  - Teknik Reservoir dan Cadangan MigasTeknik Produksi Migas  - Teknik Reservoir dan Cadangan Migas
Teknik Produksi Migas - Teknik Reservoir dan Cadangan Migas
 
Buku pintar migas indonesia
Buku pintar migas indonesiaBuku pintar migas indonesia
Buku pintar migas indonesia
 
Magazine advertisement Auestionnaire advert three analysis
Magazine advertisement Auestionnaire   advert three analysisMagazine advertisement Auestionnaire   advert three analysis
Magazine advertisement Auestionnaire advert three analysis
 
Filling the Funnel
Filling the FunnelFilling the Funnel
Filling the Funnel
 
Q921 rfp lec10 v1
Q921 rfp lec10 v1Q921 rfp lec10 v1
Q921 rfp lec10 v1
 
JavaScript入門勉強会ー第二章
JavaScript入門勉強会ー第二章JavaScript入門勉強会ー第二章
JavaScript入門勉強会ー第二章
 
جزوه کمک درسی مهندسی حفاری یک
جزوه کمک درسی مهندسی حفاری یکجزوه کمک درسی مهندسی حفاری یک
جزوه کمک درسی مهندسی حفاری یک
 
An intervview with Cambodian monk
An intervview with Cambodian monkAn intervview with Cambodian monk
An intervview with Cambodian monk
 
Tour session 2
Tour session 2Tour session 2
Tour session 2
 
Power point
Power pointPower point
Power point
 
Q922+rfp+l04 v1
Q922+rfp+l04 v1Q922+rfp+l04 v1
Q922+rfp+l04 v1
 
Wwwwwwwwwwwwwwwwwwwwwwwwwwwwwww
WwwwwwwwwwwwwwwwwwwwwwwwwwwwwwwWwwwwwwwwwwwwwwwwwwwwwwwwwwwwww
Wwwwwwwwwwwwwwwwwwwwwwwwwwwwwww
 

Similar a Q922+de1+l02 v1

Q921 de1 lec 2 v1
Q921 de1 lec 2 v1Q921 de1 lec 2 v1
Q921 de1 lec 2 v1AFATous
 
Rotary Drilling System: Introduction
Rotary Drilling System:IntroductionRotary Drilling System:Introduction
Rotary Drilling System: IntroductionAFATous
 
Q922+de1+l06 v1
Q922+de1+l06 v1Q922+de1+l06 v1
Q922+de1+l06 v1AFATous
 
Well Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsWell Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsAFATous
 
Q922+de1+l08 v1
Q922+de1+l08 v1Q922+de1+l08 v1
Q922+de1+l08 v1AFATous
 
Q921 de1 lec 6 v1
Q921 de1 lec 6 v1Q921 de1 lec 6 v1
Q921 de1 lec 6 v1AFATous
 
Q921 de1 lec 6 v1
Q921 de1 lec 6 v1Q921 de1 lec 6 v1
Q921 de1 lec 6 v1AFATous
 
Q922+de1+l04 v1
Q922+de1+l04 v1Q922+de1+l04 v1
Q922+de1+l04 v1AFATous
 
Q922+de2+l06 v1
Q922+de2+l06 v1Q922+de2+l06 v1
Q922+de2+l06 v1AFATous
 
A poster presentation on raise boring machine
A poster presentation on raise boring machineA poster presentation on raise boring machine
A poster presentation on raise boring machineMd. Shahadot Hossain
 
Chapter-1 Introduction to Construction Equipments (1).pptx
Chapter-1 Introduction to Construction Equipments (1).pptxChapter-1 Introduction to Construction Equipments (1).pptx
Chapter-1 Introduction to Construction Equipments (1).pptxMubarekTeshome1
 
Q921 de2 lec6 uc v1
Q921 de2 lec6 uc v1Q921 de2 lec6 uc v1
Q921 de2 lec6 uc v1AFATous
 
Q921 de2 lec6 uc v1
Q921 de2 lec6 uc v1Q921 de2 lec6 uc v1
Q921 de2 lec6 uc v1AFATous
 
Conventional shaft sinking by manual means
Conventional shaft sinking by manual meansConventional shaft sinking by manual means
Conventional shaft sinking by manual meansSafdar Ali
 
Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringSahl Buhary
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync
 

Similar a Q922+de1+l02 v1 (20)

Q921 de1 lec 2 v1
Q921 de1 lec 2 v1Q921 de1 lec 2 v1
Q921 de1 lec 2 v1
 
Rotary Drilling System: Introduction
Rotary Drilling System:IntroductionRotary Drilling System:Introduction
Rotary Drilling System: Introduction
 
Q922+de1+l06 v1
Q922+de1+l06 v1Q922+de1+l06 v1
Q922+de1+l06 v1
 
Well Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsWell Control and Well Monitoring Systems
Well Control and Well Monitoring Systems
 
Q922+de1+l08 v1
Q922+de1+l08 v1Q922+de1+l08 v1
Q922+de1+l08 v1
 
Q921 de1 lec 6 v1
Q921 de1 lec 6 v1Q921 de1 lec 6 v1
Q921 de1 lec 6 v1
 
Q921 de1 lec 6 v1
Q921 de1 lec 6 v1Q921 de1 lec 6 v1
Q921 de1 lec 6 v1
 
Q922+de1+l04 v1
Q922+de1+l04 v1Q922+de1+l04 v1
Q922+de1+l04 v1
 
Drilling engineering zaidi
Drilling engineering zaidiDrilling engineering zaidi
Drilling engineering zaidi
 
Tunneling (2).ppt
Tunneling (2).pptTunneling (2).ppt
Tunneling (2).ppt
 
Q922+de2+l06 v1
Q922+de2+l06 v1Q922+de2+l06 v1
Q922+de2+l06 v1
 
A poster presentation on raise boring machine
A poster presentation on raise boring machineA poster presentation on raise boring machine
A poster presentation on raise boring machine
 
Chapter-1 Introduction to Construction Equipments (1).pptx
Chapter-1 Introduction to Construction Equipments (1).pptxChapter-1 Introduction to Construction Equipments (1).pptx
Chapter-1 Introduction to Construction Equipments (1).pptx
 
Q921 de2 lec6 uc v1
Q921 de2 lec6 uc v1Q921 de2 lec6 uc v1
Q921 de2 lec6 uc v1
 
Q921 de2 lec6 uc v1
Q921 de2 lec6 uc v1Q921 de2 lec6 uc v1
Q921 de2 lec6 uc v1
 
OSHA Trenching and Excavation Requirements
OSHA Trenching and Excavation Requirements OSHA Trenching and Excavation Requirements
OSHA Trenching and Excavation Requirements
 
Conventional shaft sinking by manual means
Conventional shaft sinking by manual meansConventional shaft sinking by manual means
Conventional shaft sinking by manual means
 
Machineries and Maintenance Question Patterns for Mining students
Machineries and Maintenance Question Patterns for Mining studentsMachineries and Maintenance Question Patterns for Mining students
Machineries and Maintenance Question Patterns for Mining students
 
Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil Engineering
 
PetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling OptimisationPetroSync - Deepwater Drilling Optimisation
PetroSync - Deepwater Drilling Optimisation
 

Más de AFATous

جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس نمودارگیری از چاه، ویرایش ششم جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس نمودارگیری از چاه، ویرایش ششم AFATous
 
جزوه درس مهندسی حفاری دو، ویرایش ششم
جزوه درس مهندسی حفاری دو، ویرایش ششم جزوه درس مهندسی حفاری دو، ویرایش ششم
جزوه درس مهندسی حفاری دو، ویرایش ششم AFATous
 
جزوه درس مهندسی بهره برداری دو، ویرایش دوم
جزوه درس مهندسی بهره برداری دو، ویرایش دومجزوه درس مهندسی بهره برداری دو، ویرایش دوم
جزوه درس مهندسی بهره برداری دو، ویرایش دومAFATous
 
جزوه درس مهندسی حفاری یک،ویرایش ششم
جزوه درس مهندسی حفاری یک،ویرایش ششمجزوه درس مهندسی حفاری یک،ویرایش ششم
جزوه درس مهندسی حفاری یک،ویرایش ششمAFATous
 
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دومجزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دومAFATous
 
Q933+log reference fa lec
Q933+log reference fa lecQ933+log reference fa lec
Q933+log reference fa lecAFATous
 
Q933+log reference fa lec 4x1
Q933+log reference fa lec 4x1Q933+log reference fa lec 4x1
Q933+log reference fa lec 4x1AFATous
 
Q933+po2 reference fa lec
Q933+po2 reference fa lecQ933+po2 reference fa lec
Q933+po2 reference fa lecAFATous
 
Q933+po2 reference fa lec 4x1
Q933+po2 reference fa lec 4x1Q933+po2 reference fa lec 4x1
Q933+po2 reference fa lec 4x1AFATous
 
Q933+de2 reference fa lec 4x1
Q933+de2 reference fa lec 4x1Q933+de2 reference fa lec 4x1
Q933+de2 reference fa lec 4x1AFATous
 
Q933+de2 reference fa lec
Q933+de2 reference fa lecQ933+de2 reference fa lec
Q933+de2 reference fa lecAFATous
 
Q933+de1 reference fa lec 4x1
Q933+de1 reference fa lec 4x1Q933+de1 reference fa lec 4x1
Q933+de1 reference fa lec 4x1AFATous
 
Q933+de1 reference fa lec
Q933+de1 reference fa lecQ933+de1 reference fa lec
Q933+de1 reference fa lecAFATous
 
Q932+log reference fa lec 4 x1
Q932+log reference fa lec 4 x1Q932+log reference fa lec 4 x1
Q932+log reference fa lec 4 x1AFATous
 
Q932+stm reference fa lec 4x1
Q932+stm reference fa lec 4x1Q932+stm reference fa lec 4x1
Q932+stm reference fa lec 4x1AFATous
 
Q932+rrl reference fa lec
Q932+rrl reference fa lecQ932+rrl reference fa lec
Q932+rrl reference fa lecAFATous
 
Q932+stm reference fa lec
Q932+stm reference fa lecQ932+stm reference fa lec
Q932+stm reference fa lecAFATous
 
Q932+rrl reference fa lec 4x1
Q932+rrl reference fa lec 4x1Q932+rrl reference fa lec 4x1
Q932+rrl reference fa lec 4x1AFATous
 
Q932+sgo reference fa lec 4x1
Q932+sgo reference fa lec 4x1Q932+sgo reference fa lec 4x1
Q932+sgo reference fa lec 4x1AFATous
 
Q932+sgo reference fa lec
Q932+sgo reference fa lecQ932+sgo reference fa lec
Q932+sgo reference fa lecAFATous
 

Más de AFATous (20)

جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس نمودارگیری از چاه، ویرایش ششم جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس نمودارگیری از چاه، ویرایش ششم
 
جزوه درس مهندسی حفاری دو، ویرایش ششم
جزوه درس مهندسی حفاری دو، ویرایش ششم جزوه درس مهندسی حفاری دو، ویرایش ششم
جزوه درس مهندسی حفاری دو، ویرایش ششم
 
جزوه درس مهندسی بهره برداری دو، ویرایش دوم
جزوه درس مهندسی بهره برداری دو، ویرایش دومجزوه درس مهندسی بهره برداری دو، ویرایش دوم
جزوه درس مهندسی بهره برداری دو، ویرایش دوم
 
جزوه درس مهندسی حفاری یک،ویرایش ششم
جزوه درس مهندسی حفاری یک،ویرایش ششمجزوه درس مهندسی حفاری یک،ویرایش ششم
جزوه درس مهندسی حفاری یک،ویرایش ششم
 
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دومجزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
 
Q933+log reference fa lec
Q933+log reference fa lecQ933+log reference fa lec
Q933+log reference fa lec
 
Q933+log reference fa lec 4x1
Q933+log reference fa lec 4x1Q933+log reference fa lec 4x1
Q933+log reference fa lec 4x1
 
Q933+po2 reference fa lec
Q933+po2 reference fa lecQ933+po2 reference fa lec
Q933+po2 reference fa lec
 
Q933+po2 reference fa lec 4x1
Q933+po2 reference fa lec 4x1Q933+po2 reference fa lec 4x1
Q933+po2 reference fa lec 4x1
 
Q933+de2 reference fa lec 4x1
Q933+de2 reference fa lec 4x1Q933+de2 reference fa lec 4x1
Q933+de2 reference fa lec 4x1
 
Q933+de2 reference fa lec
Q933+de2 reference fa lecQ933+de2 reference fa lec
Q933+de2 reference fa lec
 
Q933+de1 reference fa lec 4x1
Q933+de1 reference fa lec 4x1Q933+de1 reference fa lec 4x1
Q933+de1 reference fa lec 4x1
 
Q933+de1 reference fa lec
Q933+de1 reference fa lecQ933+de1 reference fa lec
Q933+de1 reference fa lec
 
Q932+log reference fa lec 4 x1
Q932+log reference fa lec 4 x1Q932+log reference fa lec 4 x1
Q932+log reference fa lec 4 x1
 
Q932+stm reference fa lec 4x1
Q932+stm reference fa lec 4x1Q932+stm reference fa lec 4x1
Q932+stm reference fa lec 4x1
 
Q932+rrl reference fa lec
Q932+rrl reference fa lecQ932+rrl reference fa lec
Q932+rrl reference fa lec
 
Q932+stm reference fa lec
Q932+stm reference fa lecQ932+stm reference fa lec
Q932+stm reference fa lec
 
Q932+rrl reference fa lec 4x1
Q932+rrl reference fa lec 4x1Q932+rrl reference fa lec 4x1
Q932+rrl reference fa lec 4x1
 
Q932+sgo reference fa lec 4x1
Q932+sgo reference fa lec 4x1Q932+sgo reference fa lec 4x1
Q932+sgo reference fa lec 4x1
 
Q932+sgo reference fa lec
Q932+sgo reference fa lecQ932+sgo reference fa lec
Q932+sgo reference fa lec
 

Último

Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 

Último (20)

Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 

Q922+de1+l02 v1

  • 1. Drilling Engineering 1 Course (2nd Ed.)
  • 2. 1. Introduction 2. Personnel at Rig Site 3. Rotary Drilling System
  • 3.
  • 4. 2 drilling goals to build the well according to its purpose and in a safe manner (i.e, avoiding personal injuries and avoiding technical problems) to complete it with minimum cost Thereto the overall costs of the well during its lifetime in conjunction with the field development aspects shall be minimized. Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 4
  • 5. Parameters The overall cost minimization, or optimization, may influence the location from where the well is drilled, (e.g., an extended reach onshore or above reservoir offshore), the drilling technology applied, (e.g., conventional or slim–hole drilling, overbalanced or underbalanced, vertical or horizontal, etc), and which evaluation procedures are run to gather subsurface information to optimize future wells. Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 5
  • 6. drilling technologies To build a hole, different drilling technologies have been invented:  Percussion drilling  Cable drilling  Drillstring “Pennsylvanian drilling” • With mud Quick percussion drilling • Without mud “Canadian drilling”  Rotating drilling (Will be discussed exclusively)  Full cross-section drilling • Surface driven o Rotary bit o Rotary nozzle • Subsurface driven o Turbine drilling o Positive displacement motor drilling o Electro motor drilling  Annular drilling  Diamond coring  Shot drilling Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 6
  • 7. drilling technologies (Cont.) Special techniques Abrasive jet drilling Cavitating jet drilling Electric arc and plasma drilling Electric beam drilling Electric disintegration drilling Explosive drilling Flame jet drilling Implosion drilling Spring14 H. AlamiNia Laser drilling REAM drilling Replaceable cutterhead drilling Rocket exhaust drilling Spark drilling Subterrene drilling Terra drilling Thermal-mechanical drilling Thermocorer drilling Drilling Engineering 1 Course (2nd Ed.) 7
  • 8. Rig Classification Rotary Drilling Rigs Land Mobile Jackknife Marine Bottom Supported Conventional Portable Mast Platform Self Contained Jack-Up Spring14 H. AlamiNia Floating Tendered Drill Ship Semi Submersible Caisson Vessel Barge Tension Leg Submersible Drilling Engineering 1 Course (2nd Ed.) 8
  • 9. Land: Mobile Rigs Jackknife rig Spring14 H. AlamiNia Portable mast Drilling Engineering 1 Course (2nd Ed.) 9
  • 10. Marine: Bottom Supported Platform rigs Self Contained Spring14 H. AlamiNia Tendered Drilling Engineering 1 Course (2nd Ed.) 10
  • 11. Marine: Other Bottom Supported rigs A cantilever rig on a barge A Jack–Up rig Spring14 H. AlamiNia A submersible platform Drilling Engineering 1 Course (2nd Ed.) 11
  • 12. Marine: Floating rigs A drill–ship Semi– submersible vessel Caisson vessel (also called sparbuoy) and Diagram of a spar–buoy A tension– leg platform Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 12
  • 13.
  • 14. Personnels People directly involved in drilling a well are employed either by the operating company, the drilling contractor, or one of the service and supply companies The operating company is the owner of the lease/block and principal user of the services provided by the drilling contractor and the different service companies. Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 14
  • 15. Tasks Since drilling contractors are companies that perform the actual drilling of the well, their main job is to drill a hole to the depth/location and specifications set by the operator. Along with hiring a drilling contractor, the operator usually employs various service and supply companies to perform logging, cementing, or any other special operations, including maintaining the drilling fluid in its planed condition. Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 15
  • 16. drilling crews Most drilling crews consist of a tool pusher, a driller, a derrickman, a mud logger, and two or three rotary helpers (also called floormen or roughnecks). Along with this basic crew configuration the operator sends usually a representative, called company man to the rig. For offshore operations the crews usually consist of many more employees. Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 16
  • 17. crew requirements Tool Pusher:  supervises all drilling operations and is the leading man of the drilling contractor on location. Company Man:  The company man is in direct charge of all company’s activities on the rig site.  He is responsible for the drilling strategy as well as the supplies and services in need. His decisions directly effect the progress of the well. Driller:  The driller operates the drilling machinery on the rig floor and is the overall supervisor of all floormen.  He reports directly to the tool pusher and is the person who is most closely involved in the drilling process.  He operates, from his position at the control console, the rig floor brakes, switches, levers, and all other related controls that influence the drilling parameters.  In case of a kick he is the first person to take action by moving the bit off bottom and closing the BOP. Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 17
  • 18. crew requirements (Cont.) Derrick Man:  The derrickman works on the so–called monkeyboard, a small platform up in the derrick, usually about 90 ft above the rotary table.  When a connection is made or during tripping operations he is handling and guiding the upper end of the pipe.  During drilling operations the derrickman is responsible for maintaining and repairing the pumps and other equipment as well as keeping tabs on the drilling fluid. Floormen:  During tripping, the rotary helpers are responsible for handling the lower end of the drill pipe as well as operating tongs and wrenches to make or break up a connection.  During other times, they also maintain equipment, keep it clean, do painting and in general help where ever help is needed. Mud Engineer, Mud Logger:  The service company who provides the mud almost always sends a mud engineer and a mud logger to the rig site. They are constantly responsible for logging what is happening in the hole as well as maintaining the proper mud conditions. Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 18
  • 19. Well Classifications According to a wells final depth, it can be classified into: Shallow well: < 2000m Conventional well: 2 000m – 3500m Deep well: 3500m – 5000m Ultra deep well: > 5 000m With the help of advanced technologies in MWD/LWD and extended reach drilling techniques, horizontal departures of more than10000m are possible today. Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 19
  • 20.
  • 21.
  • 22. Typical rig components Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 22
  • 23. rig systems For all rigs, the depth of the planned well determines basic rig requirements. The most important rig systems are: Power system, Hoisting system, Drilling fluid circulation system, Rotary system, Derrick and substructure, Well control system, Well monitoring system Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 23
  • 24. drilling process In rotary drilling, the rock is destroyed by the action of rotation and axial force applied to a drilling bit. The drilling bit is located at the end of a drill string which is composed of drill pipes (also called joints or singles), drill collars, and other specialized drilling tools. Drill collars are thick walled tubes responsible for applying the axial force at the bit. Rotation at the bit is usually obtained by rotating the whole drill string from the surface. Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 24
  • 25. A simplified drillstring The lower portion of the drill string, composed of drill collars and specialized drilling tools, are called bottom hole assembly (BHA). Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 25
  • 26. drilling process (Cont.) A large variety of bit models and designs are available in industry. The choice of the right bit, based on the characteristics of the formations to be drilled, and the right parameters (weight on bit and rotary speed) are the two most basic problems the drilling engineer faces during drilling planning and drilling operation. The cuttings are lifted to the surface by the drilling fluid. At the surface, the cuttings are separated from the drilling fluid by several solid removal equipment. Drilling mud is picked up by the system of pumps and pumped again down the hole. Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 26
  • 27. connection As drilling progresses, new joints are added to the top of the drill string increasing its length, in an operation called connection. A pipe slips is used to transfer the weight of the drillstring from the hook to the master bushing. Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 27
  • 28. round trip As the bit gets dull, a round trip is performed to bring the dull bit to the surface and replace it by a new one. A round trip is performed also to change the BHA. The drillstring is also removed to run a casing string. The operation is done by removing stands of two (“doubles”), three (“thribbles”) or even four (“fourbles”) joints connected, and stacking them upright in the rig. Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 28
  • 29. Removing one stand of drillstring Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 29
  • 30. wiper trip Sometimes the drillstring is not completely run out of the hole. It is just lifted up to the top of the open-hole section and then lowered back again while continuously circulating with drilling mud. Such a trip, called wiper trip, is carried out to clean the hole from remaining cuttings that may have settled along the open–hole section. Spring14 H. AlamiNia Drilling Engineering 1 Course (2nd Ed.) 30
  • 31. 1. Jorge H.B. Sampaio Jr. “Drilling Engineering Fundamentals.” Master of Petroleum Engineering. Curtin University of Technology, 2007. Chapter 1 and 2
  • 32. 1. Power System 2. Hoisting System: A. Introduction B. The Block & Tackle a. Mechanical advantage and Efficiency