This document provides an overview of Lloyd's Register Rail, Hyde Group, and their joint capabilities. Some key points:
- Lloyd's Register Rail and Hyde Group have a global engineering presence with over 200 offices and over 2,000 employees.
- They provide a full scope of engineering services including design, analysis, manufacturing, tooling, and project management.
- Specific capabilities mentioned include structural analysis, systems integration, composite and metallic structures, stress analysis, and manufacturing engineering.
- Previous projects highlighted include work for AgustaWestland, Airbus, Bombardier, and the A400M.
- The document discusses the companies' processes, approvals, and strategies for working with
2. Contents Lloyd’s Register and Hyde Group – Overview Lloyd’s Register Rail – Overview LR Rail T&RS - Capabilities Previous Projects This project
3. Providing a total scope of supply Providing extensive engineering expertise Delivering engineering integrity with competence and authority Investing in R&D to meet market challenges Access into low-cost overseas supply-chain Having a balance sheet to support new investments and sustain ongoing, long term, operations Operating to a clear and continually updated corporate strategy based upon known industry & client objectives
15. Established in 1990 as a first teir engineering services supplier to major OEMs
16. HGEL have proven capability to take major engineering projects from Feasibility Studies, right through to Design for Manufacture and Manufacturing support
17.
18. UK forms hub for global rail business with over 150 consultants
153. We also offer Non-conformance management (product support, MRB)
154. With the Hyde Group Tooling and Manufacturing divisions, we can offer full Design, build & tooling turn key solutions.Structures/Systems Design Stress Analysis Manufacturing Data Configuration Management Production Planning Tool Design Tool Planning Tool Manufacture NC Programming Production Prove Out Detail Component Manufacture Component Assembly/Installation FAI and On Going Inspection Non Conformance Management From Initial Concepts Through to Serial Production
159. Applied new manufacturing and technological advancements. Moved from a riveted sheet metal design to monolithic machining solution – minimised number of parts and the production costs.
160. Following initial scheming the work was transferred off-site for full Design and analysis, including design and routing of all systems
202. Portal Request RFI/RFP Internal Distribution and Technical review Technical and Commercial response produced Resource defined Location and work share defined Low cost option reviewed Contact MAP defined for organisation per task Final draft and contracts established Engineering Check Approval Delivery Task Execution
203. Mission Policy Statement ‘’At Hyde Group Engineering Ltd we aim to manage strategic and tactical Engineering Design work packages both Structural and Systems, in addition we provide strategic product support management services. We aim to achieve this by empowering our employees, suppliers and customers to be the best they can be. By gaining the respect and trust of our customers, suppliers and partner vendors Hyde Group Engineering Ltd will increase in value. ‘’
204. HGEL are active in partnership agreements built around a mission charter, this is a prime tool in company integration. The “team” recognise they are entering into a relationship where mutual success depends on operating in the spirit of a mission charter and also the importance to the customer of the objectives of all contracts. The “team” therefore seek to conduct all their business in a spirit of respect and mutual co-operation to ensure objectives are met and have laid out in this document the means by which they intend to ensure that this is achieved. Partnership Agreement Extended Enterprise HGEL Bristol SUPPLY CHAIN MISSION CHARTER PARTNERSHIP AGREEMENT HGEL Manchester CUSTOMER HGEL Chester HGEL Chorley
205.
206. Teams will be formed with key skills from all of our departments.
207. For Turn key projects the team would be selected from the Engineering, Manufacturing, Quality and Management teams. ISO 9001 Systems Integration/ packaging Quality Engineering Customer Approvals Composite and Metallic Structures Customer Requirements Configuration Management Tooling Manufacturing Management Components and Assembly Programme Management Business and Technical Management Protective Treatments
217. 15 Specialists, Including Six Sigma, Weights Engineers, Configuration Management, Manufacturing Engineers, Materials and Processes
218. All Supported by the Expected Management, IT, Business Excellence and Administration Functions and Infrastructure39 Engineering Support 14 Programme Managers 15 Specialists 148 Structures Design Engineers 29 Manufacture Support Engineers 106 Stress Engineers 69 Systems Design Engineers
219.
220. Hyde Group do not design or manufacture any in house product for sale, therefore have a developed a robust and viable means of supporting client briefs, and delivering Manufacturing Engineering based solutions
231. 1st Phase Onsite Engineers to become conversant with Design Standards and Design Disposition. Establish development plans for Design /Stress process & approvals Engagement Strategy IPT & Product Development Offload Infrastructure Proven Process Cost saving to OEM Introduce an offload infrastructure Developed with Lloyds HGEL and OEM. Design deployment gates and plan. Quarterly reviews diarised and Establish savings opportunities and Continuous improvement Supplier- dependant skill requirement Introduce controls /KPI’s & Deliver improvements and cost Reductions.
232. Key Design Competencies Experience Design engineers/key skills with topical experience. Structural & Systems Design HGEL have worked with Joint Venture Partners & 2nd tier suppliers for a number of years to developStrengths/ & mitigate Weaknesses Extended Enterprise - Capability Six sigma- QA Philosophies Six sigma directs our goals of improvements to focus our client and revenue impacting issues. Kaizen Working Environment Seeking to improve with an in-exhaustible focus on delivering value back to the customer. Corrective Action Processes Key Project management skills Key investment of project management.
233.
234. HGEL shall work under the guidance and Project management control of Lloyds highly experienced personnel
235. All contractual and delivery matters shall be handled between HGEL & Lloyds with a guarantee of zero risk to the client relating to this engagement.Lloyds Register Technology Level HGEL
236.
237. All suppliers have proven aerospace capability, with experienced and skilled workforce.
238. HGEL are highly flexible in the use of external suppliers and will develop partnerships in support of offset requirements.
239. HGEL currently place 200k hours per annum of work to suppliers outside of the UK