This document outlines various infrastructure projects that have been completed or are ongoing in Alegria, Leyte. These include roadworks, water systems, buildings like gymnasiums, classrooms and a municipal building. Funding sources include the municipal development fund, congressional funds, and support from organizations like World Vision, DA and IFAD. The total cost of projects outlined is over 50 million pesos.
1. Brgy. Julio Ouano Project Cost: 1,700,000.00 Source of Fund: 20% Development Fund
2. CONCRETE LINE CANAL Brgy. JULIO OUANO Project Cost: 411,000.00 Source of Fund: 20% Development Fund
3. PUBLIC COMFORT ROOMS OUTSIDE OF CR Project Cost: 180,000.00 Source of Fund: 20% Development Fund INSIDE OF CR
4. Street lights Installation at the National Highway from Brgy. Gamutonto Brgy. San Pedro Project Cost: 350,000.00 Source Of fund: 20% Development Fund
5. TB Room Project Cost: 35,000.00 Source of Fund 20% Development Fund Birthing Clinic Project Cost: 80,000.00 Source of Fund: 20% Development Fund
7. CRISIS INTERVENTION AND LIVELIHOOD TRAINING CENTER Project Cost: 500,000.00 Source of Funds: SNPIDA World Vision Australia Rev. Fr. Nick officiates the blessing of 4 units sewing machine for Alegria Livelihood Center
12. Poblacion to Danao Road Bgry. Poblacion Fish Port Project Cost: 5,100,000.00 Source of Funds: DA / LGU-Alegria
13.
14. Pongtud Potable Water System Level II Project Cost: 3,883,310.80 Source of Fund: IFAD-NMCIREMP/ LGU Alegria
15. Alipao Potable Water System Level II Project Cost: 1,500,000.00 Source of Fund: IFAD-NMCIREMP/ LGU Alegria
16.
17.
18.
19.
20.
21. Newly completed Classroom Bldng. w/ Built in Comfort Room in Brgy. Budlingin Project Cost: 1,800,000.00 Source of Fund: Kalahi- Kalayaan through the Engineering Batallion of the Phil. Army