Turner Construction Company
In 1983, turner led building contractors in the value of
contracts booked
Construction services
Turner operated as
General Contractor:
a Contractor plans to
deliver (and built a
portion of) a finished
product to an owner
(customer)
Construction manager:
A CM acted as the owner’s
agent and adviser, providing
preconstruction services
and monitoring the firms
that actually built the
project.
Contracts were:
• Lump-sum: an owner’s architect completed plans and specifications and then
contractors bid on the project; the contractors competed primarly on price, and their
incentive was to meet specifications at minimal cost because their remunerations was
the lump-sum price minus their final cost of materials and construction.
• Negotiated: contractor and owner worked together from the planning stage,
negotiating specifications, cost estimates, a guaranteed maximum price, and the
contractor’s fee.
Construction services
Turner perfomed most of its work through negotiated fee contracts where it
acted as both General Contractor and Construction Manager
• Planned and scheduled the project;
• Procured materials;
• Marshaled the different personnel required;
• Awared and supervised subcontracts;
• Assumed responsability for on-time completion at a guaranteed
maximum price;
‘’Our business is a combination of consulting and underwriting: we buy risk and sell
predictability’’
‘’ We manage all the project’s details for the owner and, because we’re involved early,
we can guarantee a price earlier than the lump-sum bidder. Thus, the owner can
begin arranging financing earlier and construction (and occupancy) can begin sooner.
TIME IS MONEY IN CONSTRUCTION’’
Turner’s senior
vice president
Major Markets and buyers
Commercial
Turner Public
Hotel/residential
Health care
Commercial:
Real estate developer
Corporation building a new heardquarters
Health care: Total hospital construction expenditures were expected to
continue increasing ( due to financing through municipal bond offerings)
The Selling Process
Winning a contract involved several activities:
1. To locate prospects and create awareness of Turner’s capabilities in that building
category; ( in hospital construction, potential building was public knoledge and
presentations at hospital associations were a common means of maintaining
awareness of Turner’s services; in commercial construction, contacts with
developers and architects are crucial)
2. To meet with the decision makers (architect or owner); at this meeting, the
territory’s business development manager sought information about both the
specifications and the people involved in a project
3. To send a proposal and references
4. A 30- to 45-minute presentation to a board or development committee; this
presentation also covered preconstruction services such as cost estimates and
scheduling
5. Ivolved pricing, where lump-sum versus a negotiated fee contract was often a key
issue
The Project Selection
Selecting a project meant judging future demand and potential opportunity costs:
1. Type of contract : lump-sum or negotiated
2. The job’s size: bigger can be better, but large projects take years and carry risks
concerning the availability and perfomance of subs during that time
3. The owner: some developers will chisel away your margin, and some existing
relationships take precedence over the other criteria mentioned
4. Required staffing
5. The level of business in the territory: often determines whether we commit to
pursuing a job
6. Whether it’s a client we want to get to know
Project Management
Complexity of projects
(purchasing, scheduling, fabrication, inventory control, shipping, coordinating of subcontractors)
Project executive = key Turner person during construction Scarcest resource
Territory manager had spent several years as project executive
Local knowledge is
fundamental
Most projects required changes during construction lead by
Fast changes in technology (Hospitals) Changes in owners mind
Key words: Executive manager have to manage the owner proprerly with daily meetings
«There are networks at each phase»
Organization
Until 1973
Home office
Branch office 1 Branch office 2 Branch office 3
Home office in charge for executive selling and for estimating/purchasing for large projects
Starting from 1973 we had a reorganization of the Organization Chart…
Turner Corp.
Construction
company
Northest region
New York (1902), Boston (1910), Philadelphia (1920), Pittsburgh (1975)
Southeast region
Washimgton, D.C.(1978), Miami 1980
Central region
Chicago (1948), Cincinnati (1955), Cleveland (1965), Columbus (1965), Houston (1972), Detroit (1975)
Western region
Los Angeles (1964), Denver (1976), San Francisco (1972), Seattle (1978
Subsidiaries International industries
Organization
Turner corporate organization, 1984
Organization
Cost and project
control
Terrotory operations
manager
Safety
Equal employment
opportunity
Special project
division
scheduling
Project executives
Financing
Purchasing
Estimating
Business
development
Territory general
manager
Project managementPreconstruction support
Turner Territory Organization
Organization
Turner Typical Project Staffing
Project Executive
Project engineer
Assistant engineer
Project
superintendent
Assistant superintendent
Project accountantCost engineer
Estimating
Purchasing
Organization
Organization
Territory GMs had been with Turner for 20 to 25 years with experience in estimating,
purchasing and project management
GMs reported to regional VPs who reported to Kupfer
GMs and VPs were measured on annual sales and earning goals
Recent developments
Kupfer became executive VP in May 1983, previously he held the position of
International Industries’ president and senior VP for eastern region.
He was responsible for corporate marketing and sale, contract administration, and
strategic planning
Two long-term development setted by him:
 Product specialization
 National accounts
Product specialization
Hospital market:
Turner had lost share in recent years to a new company (Park).
Park is considered a «hospital construction specialist», it operate from corporate offices
Ability to bring national resources to a hospital project
«The core of precostruction service’s Parks is software that provides a fancy checklist of
cost and design estimates»
Park’s presentations are very professional
Product specialization
Similar competition in correctional and high-tech industrial market
In response to this competition Turner established in 1983 a «Management Consulting
Service, M.C.S.» to standardize service among territories
Some GMs welcomed these groups, wile others considered their involment redundant.
What do you thing about this new function at the corporate level of Turner?
National accounts
Various factors had increased the national scope of construction work
Nationwide expansion of large regional developers and major architectural firms
National insurance companies beginning to assume development as well as financing
tasks in JV with developers
Large retailers and manufacturers had expanded into national companies.
IN 1978, Turner estabilished a National Account Program (N.A.P.)
Objectives: develop a network for early detection of new business opportunities
In 1984, corporate management was disappointed with this program
National firms are not pursued aggressively or proactively
In your mind, why the N.A.P. is not working well?
National accounts
Recommendations concerning N.A.P.
•Granting a territory some percentage of the operating fee if it performed “work of
substance” in generating a project for another territory
•Placing one or two senior managers as full-time NAP rappresentative at the
corporate level
•Developing Turner’s product-specific capabilities beyond the MCS stage by
establishing national groups for hospitals and correctional facilities.
Today’s Decisions
Commercial building project in territory A
Turner had not previously worked with this owner but it had worked with DA
(Design Associates) for 30 years.
All key staff available in territory…
(not really it the three previous proposal were successful)
Project’s starting date suggested a tight schedule
Hospital Facility Group
Turner had not built an hospital in territory A in the last decade and had not worked
with HFG
Kupfer believed the hospital market would be increasingly important and that the
commercial-building market, while currently strong, was vulnerable to overcapacity
in the near future.
Today’s Decisions
Call from business development manager of Territory B
He reported a possible contract of renovation ($50 million) for Goodnight Hotels
national chain
A senior VP of Goodnight Hotels request a uniform standard of service and fees
through the United States
Turner construction

Más contenido relacionado

La actualidad más candente

Tweeter Electronics: Marketing Case Analysis
Tweeter Electronics: Marketing Case AnalysisTweeter Electronics: Marketing Case Analysis
Tweeter Electronics: Marketing Case AnalysisDipak Senapati
 
The Walt Disney Company and Pixar Inc.: To Acquire or Not to Acquire
The Walt Disney Company and Pixar Inc.: To Acquire or Not to AcquireThe Walt Disney Company and Pixar Inc.: To Acquire or Not to Acquire
The Walt Disney Company and Pixar Inc.: To Acquire or Not to AcquireEric Moon
 
Summary chunnel tunnel project management
Summary chunnel tunnel project managementSummary chunnel tunnel project management
Summary chunnel tunnel project managementNilesh Dhotre
 
Quantity Surveying & Cost Planning
Quantity Surveying & Cost PlanningQuantity Surveying & Cost Planning
Quantity Surveying & Cost PlanningGalala University
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkDaniel Ross
 
Project on construction of 3 block house report
Project on construction of 3 block house reportProject on construction of 3 block house report
Project on construction of 3 block house reportHagi Sahib
 
Paseo caribe case study analysis
Paseo caribe case study analysis Paseo caribe case study analysis
Paseo caribe case study analysis Yamna Rashid
 
Risk and uncertainty in construction projects
Risk and uncertainty in construction projectsRisk and uncertainty in construction projects
Risk and uncertainty in construction projectsSameer Nawab
 
Rob Parson At Morgan Stanley
Rob Parson At Morgan StanleyRob Parson At Morgan Stanley
Rob Parson At Morgan StanleyPIYUSH KUMAR
 
Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Hamza Waheed
 
McKinsey & Company: Managing Knowledge and Learning
McKinsey & Company:  Managing Knowledge and LearningMcKinsey & Company:  Managing Knowledge and Learning
McKinsey & Company: Managing Knowledge and LearningDisha Ghoshal
 
Indian Paint Industry
 Indian Paint Industry Indian Paint Industry
Indian Paint IndustryAkash Agarwal
 
Trust-Pro-Contracting-company-profile
Trust-Pro-Contracting-company-profileTrust-Pro-Contracting-company-profile
Trust-Pro-Contracting-company-profileManar Farid Koutrach
 
Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar Saket Bansal
 
PP2 Assignment: Group
PP2 Assignment: GroupPP2 Assignment: Group
PP2 Assignment: GroupFarah Sham
 
Silvio Napoli at Schindler India-HBS Case Study
Silvio Napoli at Schindler India-HBS Case StudySilvio Napoli at Schindler India-HBS Case Study
Silvio Napoli at Schindler India-HBS Case StudyRawad Mroueh
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesMANTHAN CHAUHAN
 

La actualidad más candente (20)

EPC Business Model
EPC Business ModelEPC Business Model
EPC Business Model
 
Tweeter Electronics: Marketing Case Analysis
Tweeter Electronics: Marketing Case AnalysisTweeter Electronics: Marketing Case Analysis
Tweeter Electronics: Marketing Case Analysis
 
The Walt Disney Company and Pixar Inc.: To Acquire or Not to Acquire
The Walt Disney Company and Pixar Inc.: To Acquire or Not to AcquireThe Walt Disney Company and Pixar Inc.: To Acquire or Not to Acquire
The Walt Disney Company and Pixar Inc.: To Acquire or Not to Acquire
 
Epc contractor
Epc contractorEpc contractor
Epc contractor
 
Summary chunnel tunnel project management
Summary chunnel tunnel project managementSummary chunnel tunnel project management
Summary chunnel tunnel project management
 
Quantity Surveying & Cost Planning
Quantity Surveying & Cost PlanningQuantity Surveying & Cost Planning
Quantity Surveying & Cost Planning
 
Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
 
Australia – Japan Cable
Australia – Japan CableAustralia – Japan Cable
Australia – Japan Cable
 
Project on construction of 3 block house report
Project on construction of 3 block house reportProject on construction of 3 block house report
Project on construction of 3 block house report
 
Paseo caribe case study analysis
Paseo caribe case study analysis Paseo caribe case study analysis
Paseo caribe case study analysis
 
Risk and uncertainty in construction projects
Risk and uncertainty in construction projectsRisk and uncertainty in construction projects
Risk and uncertainty in construction projects
 
Rob Parson At Morgan Stanley
Rob Parson At Morgan StanleyRob Parson At Morgan Stanley
Rob Parson At Morgan Stanley
 
Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)Construction report (boq, wbs, reports, evm)
Construction report (boq, wbs, reports, evm)
 
McKinsey & Company: Managing Knowledge and Learning
McKinsey & Company:  Managing Knowledge and LearningMcKinsey & Company:  Managing Knowledge and Learning
McKinsey & Company: Managing Knowledge and Learning
 
Indian Paint Industry
 Indian Paint Industry Indian Paint Industry
Indian Paint Industry
 
Trust-Pro-Contracting-company-profile
Trust-Pro-Contracting-company-profileTrust-Pro-Contracting-company-profile
Trust-Pro-Contracting-company-profile
 
Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar Procurement Contract Types | PMP | iZenBridge - Webinar
Procurement Contract Types | PMP | iZenBridge - Webinar
 
PP2 Assignment: Group
PP2 Assignment: GroupPP2 Assignment: Group
PP2 Assignment: Group
 
Silvio Napoli at Schindler India-HBS Case Study
Silvio Napoli at Schindler India-HBS Case StudySilvio Napoli at Schindler India-HBS Case Study
Silvio Napoli at Schindler India-HBS Case Study
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission Lines
 

Similar a Turner construction

2. Organization of the Architect‘s office.pptx
2. Organization of the Architect‘s office.pptx2. Organization of the Architect‘s office.pptx
2. Organization of the Architect‘s office.pptxMussemaAbdurazak
 
The tomorrow company power point by aung thu
The tomorrow company power point by aung thuThe tomorrow company power point by aung thu
The tomorrow company power point by aung thuSAIFULLAH MAHMUD
 
Ian blacker
Ian blackerIan blacker
Ian blackerbexbd
 
The Analysis Of Business Strategy and Objectives Of SONY
The Analysis Of Business Strategy and Objectives Of SONYThe Analysis Of Business Strategy and Objectives Of SONY
The Analysis Of Business Strategy and Objectives Of SONYAmelia Jones
 
DEV1111 Principal Engineer Job Desc
DEV1111 Principal Engineer Job DescDEV1111 Principal Engineer Job Desc
DEV1111 Principal Engineer Job DescRichard Childs
 
Marion Hummer - Resume 2016
Marion Hummer - Resume 2016Marion Hummer - Resume 2016
Marion Hummer - Resume 2016Marion Hummer
 
Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016Redsun Communication
 
R&M Property Group Ltd brochure - 2018
R&M Property Group Ltd  brochure - 2018R&M Property Group Ltd  brochure - 2018
R&M Property Group Ltd brochure - 2018Thomas McKenna
 
Marketing mix for project marketing .pptx
Marketing mix for project marketing .pptxMarketing mix for project marketing .pptx
Marketing mix for project marketing .pptxAbdiqadirOsman
 
Real Estate Matters Co. Introduction For Pdf Q2 2012
Real Estate Matters  Co. Introduction  For Pdf Q2 2012Real Estate Matters  Co. Introduction  For Pdf Q2 2012
Real Estate Matters Co. Introduction For Pdf Q2 2012TonyDoar
 
Group 1 presentation intro to cpm
Group 1 presentation intro to cpmGroup 1 presentation intro to cpm
Group 1 presentation intro to cpmKaila Turla
 
Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916George Wilkinson
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryAkshika Mahanama
 
LISC MetroEdge suggestions (2012)
LISC MetroEdge suggestions (2012)LISC MetroEdge suggestions (2012)
LISC MetroEdge suggestions (2012)dcrummey
 
CRM -Construction Industry and Construction Projects.pptx
CRM -Construction Industry and Construction Projects.pptxCRM -Construction Industry and Construction Projects.pptx
CRM -Construction Industry and Construction Projects.pptxPrasadKadam82
 
15-02-10 Bosenko Resume
15-02-10 Bosenko Resume15-02-10 Bosenko Resume
15-02-10 Bosenko ResumeDaysman
 

Similar a Turner construction (20)

2. Organization of the Architect‘s office.pptx
2. Organization of the Architect‘s office.pptx2. Organization of the Architect‘s office.pptx
2. Organization of the Architect‘s office.pptx
 
The tomorrow company power point by aung thu
The tomorrow company power point by aung thuThe tomorrow company power point by aung thu
The tomorrow company power point by aung thu
 
Ian blacker
Ian blackerIan blacker
Ian blacker
 
The Analysis Of Business Strategy and Objectives Of SONY
The Analysis Of Business Strategy and Objectives Of SONYThe Analysis Of Business Strategy and Objectives Of SONY
The Analysis Of Business Strategy and Objectives Of SONY
 
DEV1111 Principal Engineer Job Desc
DEV1111 Principal Engineer Job DescDEV1111 Principal Engineer Job Desc
DEV1111 Principal Engineer Job Desc
 
Adding value to public procurement
Adding value to public procurementAdding value to public procurement
Adding value to public procurement
 
Methodology
MethodologyMethodology
Methodology
 
Marion Hummer - Resume 2016
Marion Hummer - Resume 2016Marion Hummer - Resume 2016
Marion Hummer - Resume 2016
 
professional practic
professional practicprofessional practic
professional practic
 
Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016
 
R&M Property Group Ltd brochure - 2018
R&M Property Group Ltd  brochure - 2018R&M Property Group Ltd  brochure - 2018
R&M Property Group Ltd brochure - 2018
 
Marketing mix for project marketing .pptx
Marketing mix for project marketing .pptxMarketing mix for project marketing .pptx
Marketing mix for project marketing .pptx
 
Real Estate Matters Co. Introduction For Pdf Q2 2012
Real Estate Matters  Co. Introduction  For Pdf Q2 2012Real Estate Matters  Co. Introduction  For Pdf Q2 2012
Real Estate Matters Co. Introduction For Pdf Q2 2012
 
Group 1 presentation intro to cpm
Group 1 presentation intro to cpmGroup 1 presentation intro to cpm
Group 1 presentation intro to cpm
 
Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 
LISC MetroEdge suggestions (2012)
LISC MetroEdge suggestions (2012)LISC MetroEdge suggestions (2012)
LISC MetroEdge suggestions (2012)
 
CRM -Construction Industry and Construction Projects.pptx
CRM -Construction Industry and Construction Projects.pptxCRM -Construction Industry and Construction Projects.pptx
CRM -Construction Industry and Construction Projects.pptx
 
15-02-10 Bosenko Resume
15-02-10 Bosenko Resume15-02-10 Bosenko Resume
15-02-10 Bosenko Resume
 
Robert Bazewicz
Robert BazewiczRobert Bazewicz
Robert Bazewicz
 

Más de Alessandro Rinaldi

HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTHOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTAlessandro Rinaldi
 
Arabtec - Porter’s Five Forces
Arabtec - Porter’s Five Forces Arabtec - Porter’s Five Forces
Arabtec - Porter’s Five Forces Alessandro Rinaldi
 
ECONOMIC FOUNDATIONS OF BUSINESS AND MANAGEMENT "Activist fiscal policy in US"
ECONOMIC FOUNDATIONS OF BUSINESS AND MANAGEMENT "Activist fiscal policy in US"ECONOMIC FOUNDATIONS OF BUSINESS AND MANAGEMENT "Activist fiscal policy in US"
ECONOMIC FOUNDATIONS OF BUSINESS AND MANAGEMENT "Activist fiscal policy in US"Alessandro Rinaldi
 
Modellazione di un sistema di Picking
Modellazione di un sistema di PickingModellazione di un sistema di Picking
Modellazione di un sistema di PickingAlessandro Rinaldi
 
Dimensionamento di un sistema di movimentazione e stoccaggio dei materiali
Dimensionamento di un sistema di movimentazione e stoccaggio dei materialiDimensionamento di un sistema di movimentazione e stoccaggio dei materiali
Dimensionamento di un sistema di movimentazione e stoccaggio dei materialiAlessandro Rinaldi
 

Más de Alessandro Rinaldi (7)

HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENTHOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
HOW TO ESTABLISH AN EFFECTIVE CHANGE MANAGEMENT
 
Arabtec - Porter’s Five Forces
Arabtec - Porter’s Five Forces Arabtec - Porter’s Five Forces
Arabtec - Porter’s Five Forces
 
ECONOMIC FOUNDATIONS OF BUSINESS AND MANAGEMENT "Activist fiscal policy in US"
ECONOMIC FOUNDATIONS OF BUSINESS AND MANAGEMENT "Activist fiscal policy in US"ECONOMIC FOUNDATIONS OF BUSINESS AND MANAGEMENT "Activist fiscal policy in US"
ECONOMIC FOUNDATIONS OF BUSINESS AND MANAGEMENT "Activist fiscal policy in US"
 
Ncc construction DK, Strategy
Ncc construction DK, StrategyNcc construction DK, Strategy
Ncc construction DK, Strategy
 
Home energy audit
Home energy auditHome energy audit
Home energy audit
 
Modellazione di un sistema di Picking
Modellazione di un sistema di PickingModellazione di un sistema di Picking
Modellazione di un sistema di Picking
 
Dimensionamento di un sistema di movimentazione e stoccaggio dei materiali
Dimensionamento di un sistema di movimentazione e stoccaggio dei materialiDimensionamento di un sistema di movimentazione e stoccaggio dei materiali
Dimensionamento di un sistema di movimentazione e stoccaggio dei materiali
 

Último

CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyHafizMuhammadAbdulla5
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 

Último (20)

CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biography
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
LoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner CircleLoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner Circle
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 

Turner construction

  • 1. Turner Construction Company Arrigo Gaetano Rinaldi Alessandro Organizational Design
  • 2. Turner Construction Company In 1983, turner led building contractors in the value of contracts booked
  • 3. Construction services Turner operated as General Contractor: a Contractor plans to deliver (and built a portion of) a finished product to an owner (customer) Construction manager: A CM acted as the owner’s agent and adviser, providing preconstruction services and monitoring the firms that actually built the project. Contracts were: • Lump-sum: an owner’s architect completed plans and specifications and then contractors bid on the project; the contractors competed primarly on price, and their incentive was to meet specifications at minimal cost because their remunerations was the lump-sum price minus their final cost of materials and construction. • Negotiated: contractor and owner worked together from the planning stage, negotiating specifications, cost estimates, a guaranteed maximum price, and the contractor’s fee.
  • 4. Construction services Turner perfomed most of its work through negotiated fee contracts where it acted as both General Contractor and Construction Manager • Planned and scheduled the project; • Procured materials; • Marshaled the different personnel required; • Awared and supervised subcontracts; • Assumed responsability for on-time completion at a guaranteed maximum price; ‘’Our business is a combination of consulting and underwriting: we buy risk and sell predictability’’ ‘’ We manage all the project’s details for the owner and, because we’re involved early, we can guarantee a price earlier than the lump-sum bidder. Thus, the owner can begin arranging financing earlier and construction (and occupancy) can begin sooner. TIME IS MONEY IN CONSTRUCTION’’ Turner’s senior vice president
  • 5. Major Markets and buyers Commercial Turner Public Hotel/residential Health care Commercial: Real estate developer Corporation building a new heardquarters Health care: Total hospital construction expenditures were expected to continue increasing ( due to financing through municipal bond offerings)
  • 6. The Selling Process Winning a contract involved several activities: 1. To locate prospects and create awareness of Turner’s capabilities in that building category; ( in hospital construction, potential building was public knoledge and presentations at hospital associations were a common means of maintaining awareness of Turner’s services; in commercial construction, contacts with developers and architects are crucial) 2. To meet with the decision makers (architect or owner); at this meeting, the territory’s business development manager sought information about both the specifications and the people involved in a project 3. To send a proposal and references 4. A 30- to 45-minute presentation to a board or development committee; this presentation also covered preconstruction services such as cost estimates and scheduling 5. Ivolved pricing, where lump-sum versus a negotiated fee contract was often a key issue
  • 7. The Project Selection Selecting a project meant judging future demand and potential opportunity costs: 1. Type of contract : lump-sum or negotiated 2. The job’s size: bigger can be better, but large projects take years and carry risks concerning the availability and perfomance of subs during that time 3. The owner: some developers will chisel away your margin, and some existing relationships take precedence over the other criteria mentioned 4. Required staffing 5. The level of business in the territory: often determines whether we commit to pursuing a job 6. Whether it’s a client we want to get to know
  • 8. Project Management Complexity of projects (purchasing, scheduling, fabrication, inventory control, shipping, coordinating of subcontractors) Project executive = key Turner person during construction Scarcest resource Territory manager had spent several years as project executive Local knowledge is fundamental Most projects required changes during construction lead by Fast changes in technology (Hospitals) Changes in owners mind Key words: Executive manager have to manage the owner proprerly with daily meetings «There are networks at each phase»
  • 9. Organization Until 1973 Home office Branch office 1 Branch office 2 Branch office 3 Home office in charge for executive selling and for estimating/purchasing for large projects Starting from 1973 we had a reorganization of the Organization Chart…
  • 10. Turner Corp. Construction company Northest region New York (1902), Boston (1910), Philadelphia (1920), Pittsburgh (1975) Southeast region Washimgton, D.C.(1978), Miami 1980 Central region Chicago (1948), Cincinnati (1955), Cleveland (1965), Columbus (1965), Houston (1972), Detroit (1975) Western region Los Angeles (1964), Denver (1976), San Francisco (1972), Seattle (1978 Subsidiaries International industries Organization Turner corporate organization, 1984
  • 11. Organization Cost and project control Terrotory operations manager Safety Equal employment opportunity Special project division scheduling Project executives Financing Purchasing Estimating Business development Territory general manager Project managementPreconstruction support Turner Territory Organization
  • 12. Organization Turner Typical Project Staffing Project Executive Project engineer Assistant engineer Project superintendent Assistant superintendent Project accountantCost engineer Estimating Purchasing
  • 14. Organization Territory GMs had been with Turner for 20 to 25 years with experience in estimating, purchasing and project management GMs reported to regional VPs who reported to Kupfer GMs and VPs were measured on annual sales and earning goals
  • 15. Recent developments Kupfer became executive VP in May 1983, previously he held the position of International Industries’ president and senior VP for eastern region. He was responsible for corporate marketing and sale, contract administration, and strategic planning Two long-term development setted by him:  Product specialization  National accounts
  • 16. Product specialization Hospital market: Turner had lost share in recent years to a new company (Park). Park is considered a «hospital construction specialist», it operate from corporate offices Ability to bring national resources to a hospital project «The core of precostruction service’s Parks is software that provides a fancy checklist of cost and design estimates» Park’s presentations are very professional
  • 17. Product specialization Similar competition in correctional and high-tech industrial market In response to this competition Turner established in 1983 a «Management Consulting Service, M.C.S.» to standardize service among territories Some GMs welcomed these groups, wile others considered their involment redundant. What do you thing about this new function at the corporate level of Turner?
  • 18. National accounts Various factors had increased the national scope of construction work Nationwide expansion of large regional developers and major architectural firms National insurance companies beginning to assume development as well as financing tasks in JV with developers Large retailers and manufacturers had expanded into national companies. IN 1978, Turner estabilished a National Account Program (N.A.P.) Objectives: develop a network for early detection of new business opportunities In 1984, corporate management was disappointed with this program National firms are not pursued aggressively or proactively In your mind, why the N.A.P. is not working well?
  • 19. National accounts Recommendations concerning N.A.P. •Granting a territory some percentage of the operating fee if it performed “work of substance” in generating a project for another territory •Placing one or two senior managers as full-time NAP rappresentative at the corporate level •Developing Turner’s product-specific capabilities beyond the MCS stage by establishing national groups for hospitals and correctional facilities.
  • 20. Today’s Decisions Commercial building project in territory A Turner had not previously worked with this owner but it had worked with DA (Design Associates) for 30 years. All key staff available in territory… (not really it the three previous proposal were successful) Project’s starting date suggested a tight schedule Hospital Facility Group Turner had not built an hospital in territory A in the last decade and had not worked with HFG Kupfer believed the hospital market would be increasingly important and that the commercial-building market, while currently strong, was vulnerable to overcapacity in the near future.
  • 21. Today’s Decisions Call from business development manager of Territory B He reported a possible contract of renovation ($50 million) for Goodnight Hotels national chain A senior VP of Goodnight Hotels request a uniform standard of service and fees through the United States