Lecture 3 - Excavation
Objectives:-
1. To learn the excavation work, backfill and
removal of surplus soil.
2. To relate the excavation works as per
clauses in SMM2
3. To determine the various clauses applied
to the excavation works.
Outcomes:-
1. Able to differentiate the different clauses
used
2. Able to write down the dimensions clearly.
A single storey house with pad
footings.
Foundation (Footing)
Ground level
Resistance from the soil.
Loading from the house
So to construct a house what do
we need?
 1. A foundation, in this case this a a pad
footing.
 2. So we need to determine first the type
of foundation designed by the engineer.
 3. Each type of foundation may not involve
the same type of excavation activities.
 4. Each activity may use different types of
machineries or method of excavation.
Clause D.12.6. Excavation pit
for footing
Section of footing Plan of footing
Footing
Stump
Excavation depth
Plan dimension
a
b
A three-storey building with pile
foundation Clause D.12.8 page 18
Ground level
Pile cap
R.C. pile
Stump
Hard strata
Excavating for pile caps and
trenches for ground beams
Ground beams
Stump
Pile cap
R.C. pile
Summary of excavation work:-
 1. To measure excavation work we must
first determine the type of excavation
work.
 2. With the type of excavation determined
find out which clause to be used.
 3. Using the clause now you could
determine next the dimensions of
excavation.
Disposal of excavated material
Clause D17 to D22 page 19 & 20
On site
Off site
Boundary of construction site
Filling Clause D.23 to D.34 page 20
& 21
Filling material
Column stump
RC footing
Classification of filling material
Clause D.23
 1. Materials arising
from the excavation
 The material that is
suitable for filling.
2. Materials that is to be treated
or selected
 1. Material to be
filtered and to be
separated from those
unsuitable material
like rubbish, timber
and stones.
 2. It involves more
time, labour and of
course more
expensive.
Sieve
Treated material
3. Material obtained off-site
 1. Material from the
excavated site is not
suitable.
 2. Material for backfill
to be purchased from
other sources, like
imported earth,
Exercise no. 1- Measure the excavation
work to the footings (F1)
Plan of a brick wall ( 3 nos.)
How to write down the answer?
 First find out the type of foundation from
the drawing.
 Then search for the relevant clause in
SMM2.
 Then find out the unit of measurement.
 Also find out any other conditions
necessary.
How to write down the answer?
To do that we need to know what type of work involved.
So we need more information about this structure
The structure
THE ELEVATION
With these two additional diagrams we can now
understand the structure and know the construction
method.
So how many items we need to
measure?
Find out the excavation depth first.
Description
 1. What type of activity?
 Excavate pit for brick wall foundation.
 2. From what level?
 From ground level.
 3. To what depth?
 Need to find out, and classify according to
clause D.10
 4. Anything else?
 Check clauseD.12.6 again.
Description
 Lets put it all together:-
Excavate pit for brick wall
foundation commencing from
ground levels with depth not
exceeding 2.00m. ( 3 nos.)
Write this in your taking off paper
 Excavate pit for brick
wall foundation
commencing from
ground levels with
depth not exceeding
2.00m. ( 3 nos.)
First write down the description
How to write down the answer?
Depth of excavation:
1125
50
1175
Length of foundation:
Width of foundation:
Then you need to provide side cast or
workings
Description
Your answer
Side cast/working
 Excavate pit for brick
wall foundation
commencing from
ground levels with
depth not exceeding
2.00m. ( 1 no.)
L
W
D
m3
3/
Measure the excavation work again
based on the following:-
 1. Another brick wall with foundation F2 (5
nos.) with the same layout but the depth
(d) is now 3.05m.
 2. Write down your answer similar to the
earlier exercise in the same piece of
paper.
Exercise no. 2- measure the F1
again based on this information.
Is that all?
 No, you still need to remove the soil you
have excavated.
 So you need to write description again for
the removal of surplus soil.
 1st. Remove what?
 Answer: Surplus soil.
 2nd. To where?
 Answer: Away from site or off site(clause
D.19)
 3rd. Unit?
 M3 Clause D.19
Your answer
Removing surplus
excavated soil off site
including disposal to
contractor’s own tip.
Answer similar to excavation work for
foundation

Más contenido relacionado

La actualidad más candente

M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof coveringEst
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantityhlksd
 
Top down construction
Top down constructionTop down construction
Top down constructionAmulya Kansal
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMAnep Botak
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildingsSimarpreet Singh
 
Construction technology assignment 1
Construction technology assignment 1Construction technology assignment 1
Construction technology assignment 1Doreen Yeo
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in MalaysiaDayat Mohamad
 
Building Construction
Building ConstructionBuilding Construction
Building ConstructionWilden How
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System마 이환
 
Tutor site clearance
Tutor site clearance Tutor site clearance
Tutor site clearance Luke D'Arcy
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achahAisyah Asyikin
 
Design of mat and combined footing
Design of mat and combined footingDesign of mat and combined footing
Design of mat and combined footingMd Faiz Ali
 
Introduction to Blockwork
Introduction to BlockworkIntroduction to Blockwork
Introduction to BlockworkSteve Jarvis
 
Element site preparation new
Element site preparation newElement site preparation new
Element site preparation newaizat76
 

La actualidad más candente (20)

M3 EG BQ for timber roof covering
M3 EG BQ for timber roof  coveringM3 EG BQ for timber roof  covering
M3 EG BQ for timber roof covering
 
Site preparation works
Site preparation worksSite preparation works
Site preparation works
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Top down construction
Top down constructionTop down construction
Top down construction
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
 
Earthwork support
Earthwork supportEarthwork support
Earthwork support
 
Specifications of buildings
Specifications of buildingsSpecifications of buildings
Specifications of buildings
 
Construction technology assignment 1
Construction technology assignment 1Construction technology assignment 1
Construction technology assignment 1
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
Soil investigation
Soil investigationSoil investigation
Soil investigation
 
Building Construction
Building ConstructionBuilding Construction
Building Construction
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
 
Diaphragm Wall
 Diaphragm Wall Diaphragm Wall
Diaphragm Wall
 
Tutor site clearance
Tutor site clearance Tutor site clearance
Tutor site clearance
 
bs:copbs101
bs:copbs101bs:copbs101
bs:copbs101
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achah
 
Design of mat and combined footing
Design of mat and combined footingDesign of mat and combined footing
Design of mat and combined footing
 
Introduction to Blockwork
Introduction to BlockworkIntroduction to Blockwork
Introduction to Blockwork
 
Element site preparation new
Element site preparation newElement site preparation new
Element site preparation new
 

Destacado

Specifications of excavation and foundation
Specifications of excavation and foundationSpecifications of excavation and foundation
Specifications of excavation and foundationPrabhat chhirolya
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second editionBt Lee
 
Excavation work
Excavation workExcavation work
Excavation workAmit Kumar
 
Excavation & Trenching Safety
Excavation & Trenching Safety Excavation & Trenching Safety
Excavation & Trenching Safety Reliance
 
Quantity surveyor (ici+itd)
Quantity surveyor (ici+itd)Quantity surveyor (ici+itd)
Quantity surveyor (ici+itd)ALISON TANG
 
Backfilling 2014a-Lecture4
Backfilling 2014a-Lecture4Backfilling 2014a-Lecture4
Backfilling 2014a-Lecture4Anne Allan
 
How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?Duc Tran Xuan
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of QuantitiesNatalie Reid
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantitiesBt Lee
 
Concrete2014a-Lecture6
Concrete2014a-Lecture6Concrete2014a-Lecture6
Concrete2014a-Lecture6Anne Allan
 

Destacado (20)

Specifications of excavation and foundation
Specifications of excavation and foundationSpecifications of excavation and foundation
Specifications of excavation and foundation
 
Smm2 second edition
Smm2 second editionSmm2 second edition
Smm2 second edition
 
Excavations ppt
Excavations pptExcavations ppt
Excavations ppt
 
Excavation work
Excavation workExcavation work
Excavation work
 
Excavation & Trenching Safety
Excavation & Trenching Safety Excavation & Trenching Safety
Excavation & Trenching Safety
 
EXCAVATIONS
EXCAVATIONSEXCAVATIONS
EXCAVATIONS
 
Deep excavation
Deep excavationDeep excavation
Deep excavation
 
ACH 122 Lecture 04a (Excavation & Foundations P1)
ACH 122 Lecture 04a (Excavation & Foundations P1)ACH 122 Lecture 04a (Excavation & Foundations P1)
ACH 122 Lecture 04a (Excavation & Foundations P1)
 
Quantity surveyor (ici+itd)
Quantity surveyor (ici+itd)Quantity surveyor (ici+itd)
Quantity surveyor (ici+itd)
 
Backfilling 2014a-Lecture4
Backfilling 2014a-Lecture4Backfilling 2014a-Lecture4
Backfilling 2014a-Lecture4
 
How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
Earthwork
EarthworkEarthwork
Earthwork
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
OSHA Trenching and Excavation Requirements
OSHA Trenching and Excavation Requirements OSHA Trenching and Excavation Requirements
OSHA Trenching and Excavation Requirements
 
Concrete2014a-Lecture6
Concrete2014a-Lecture6Concrete2014a-Lecture6
Concrete2014a-Lecture6
 
Excavation
ExcavationExcavation
Excavation
 
Site report 1
Site report 1Site report 1
Site report 1
 
Bt 1: Excavation
Bt 1: ExcavationBt 1: Excavation
Bt 1: Excavation
 
How to pour concrete
How to pour concreteHow to pour concrete
How to pour concrete
 

Similar a Excavation 2014a-Lecture3

Concrete 2014a-Lecture7
Concrete 2014a-Lecture7Concrete 2014a-Lecture7
Concrete 2014a-Lecture7Anne Allan
 
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-AghaBasics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-AghaHossam Shafiq II
 
Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line methodmalang1214
 
Trapezium Rule Practical Substructure And Excavation Presentation1
Trapezium Rule Practical  Substructure And Excavation Presentation1Trapezium Rule Practical  Substructure And Excavation Presentation1
Trapezium Rule Practical Substructure And Excavation Presentation1Daniel Ross
 
Excavation and filling - Execution, QC & Equipment 101
Excavation and filling - Execution, QC & Equipment 101Excavation and filling - Execution, QC & Equipment 101
Excavation and filling - Execution, QC & Equipment 101SHAZEBALIKHAN1
 
Lec- 3.ppt domabd gerhjddj gedawquun bhajk
Lec- 3.ppt domabd gerhjddj gedawquun bhajkLec- 3.ppt domabd gerhjddj gedawquun bhajk
Lec- 3.ppt domabd gerhjddj gedawquun bhajk2cd
 
Construction considerations of Earthen Dams
Construction considerations of Earthen DamsConstruction considerations of Earthen Dams
Construction considerations of Earthen DamsUday kumar Devalla
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Parham Farhadpoor
 
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdfRaj Bakhtani
 
An over view of the high rise buildings
An over view of the high rise buildingsAn over view of the high rise buildings
An over view of the high rise buildingshlksd
 
Construction Materials site visit report
Construction Materials site visit report Construction Materials site visit report
Construction Materials site visit report Batoul Alshamali
 
(S) Week 3 - Preliminary Works.pptx
(S) Week 3  - Preliminary Works.pptx(S) Week 3  - Preliminary Works.pptx
(S) Week 3 - Preliminary Works.pptxKIMLIANGSIM
 
Site report
Site reportSite report
Site reportHuiYik
 
Lecture_all.pdf
Lecture_all.pdfLecture_all.pdf
Lecture_all.pdfRanadita
 

Similar a Excavation 2014a-Lecture3 (20)

Concrete 2014a-Lecture7
Concrete 2014a-Lecture7Concrete 2014a-Lecture7
Concrete 2014a-Lecture7
 
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-AghaBasics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
 
Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line method
 
Module_3.pdf.pdf
Module_3.pdf.pdfModule_3.pdf.pdf
Module_3.pdf.pdf
 
Trapezium Rule Practical Substructure And Excavation Presentation1
Trapezium Rule Practical  Substructure And Excavation Presentation1Trapezium Rule Practical  Substructure And Excavation Presentation1
Trapezium Rule Practical Substructure And Excavation Presentation1
 
Excavation and filling - Execution, QC & Equipment 101
Excavation and filling - Execution, QC & Equipment 101Excavation and filling - Execution, QC & Equipment 101
Excavation and filling - Execution, QC & Equipment 101
 
Lec- 3.ppt domabd gerhjddj gedawquun bhajk
Lec- 3.ppt domabd gerhjddj gedawquun bhajkLec- 3.ppt domabd gerhjddj gedawquun bhajk
Lec- 3.ppt domabd gerhjddj gedawquun bhajk
 
Construction considerations of Earthen Dams
Construction considerations of Earthen DamsConstruction considerations of Earthen Dams
Construction considerations of Earthen Dams
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1
 
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
 
FE 2 Marks and 16 Marks
FE 2 Marks and 16 MarksFE 2 Marks and 16 Marks
FE 2 Marks and 16 Marks
 
An over view of the high rise buildings
An over view of the high rise buildingsAn over view of the high rise buildings
An over view of the high rise buildings
 
Foundation
FoundationFoundation
Foundation
 
Sheet pile presentation
Sheet pile presentationSheet pile presentation
Sheet pile presentation
 
Construction Materials site visit report
Construction Materials site visit report Construction Materials site visit report
Construction Materials site visit report
 
(S) Week 3 - Preliminary Works.pptx
(S) Week 3  - Preliminary Works.pptx(S) Week 3  - Preliminary Works.pptx
(S) Week 3 - Preliminary Works.pptx
 
Site report
Site reportSite report
Site report
 
1200 13
1200 131200 13
1200 13
 
Lecture_all.pdf
Lecture_all.pdfLecture_all.pdf
Lecture_all.pdf
 
Phase of Building
Phase of BuildingPhase of Building
Phase of Building
 

Último

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 

Último (20)

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 

Excavation 2014a-Lecture3

  • 1. Lecture 3 - Excavation Objectives:- 1. To learn the excavation work, backfill and removal of surplus soil. 2. To relate the excavation works as per clauses in SMM2 3. To determine the various clauses applied to the excavation works. Outcomes:- 1. Able to differentiate the different clauses used 2. Able to write down the dimensions clearly.
  • 2. A single storey house with pad footings. Foundation (Footing) Ground level Resistance from the soil. Loading from the house
  • 3. So to construct a house what do we need?  1. A foundation, in this case this a a pad footing.  2. So we need to determine first the type of foundation designed by the engineer.  3. Each type of foundation may not involve the same type of excavation activities.  4. Each activity may use different types of machineries or method of excavation.
  • 4. Clause D.12.6. Excavation pit for footing Section of footing Plan of footing Footing Stump Excavation depth Plan dimension a b
  • 5. A three-storey building with pile foundation Clause D.12.8 page 18 Ground level Pile cap R.C. pile Stump Hard strata
  • 6. Excavating for pile caps and trenches for ground beams Ground beams Stump Pile cap R.C. pile
  • 7. Summary of excavation work:-  1. To measure excavation work we must first determine the type of excavation work.  2. With the type of excavation determined find out which clause to be used.  3. Using the clause now you could determine next the dimensions of excavation.
  • 8. Disposal of excavated material Clause D17 to D22 page 19 & 20 On site Off site Boundary of construction site
  • 9. Filling Clause D.23 to D.34 page 20 & 21 Filling material Column stump RC footing
  • 10. Classification of filling material Clause D.23  1. Materials arising from the excavation  The material that is suitable for filling.
  • 11. 2. Materials that is to be treated or selected  1. Material to be filtered and to be separated from those unsuitable material like rubbish, timber and stones.  2. It involves more time, labour and of course more expensive. Sieve Treated material
  • 12. 3. Material obtained off-site  1. Material from the excavated site is not suitable.  2. Material for backfill to be purchased from other sources, like imported earth,
  • 13. Exercise no. 1- Measure the excavation work to the footings (F1) Plan of a brick wall ( 3 nos.)
  • 14. How to write down the answer?  First find out the type of foundation from the drawing.  Then search for the relevant clause in SMM2.  Then find out the unit of measurement.  Also find out any other conditions necessary.
  • 15. How to write down the answer? To do that we need to know what type of work involved. So we need more information about this structure
  • 16. The structure THE ELEVATION With these two additional diagrams we can now understand the structure and know the construction method.
  • 17. So how many items we need to measure?
  • 18. Find out the excavation depth first.
  • 19. Description  1. What type of activity?  Excavate pit for brick wall foundation.  2. From what level?  From ground level.  3. To what depth?  Need to find out, and classify according to clause D.10  4. Anything else?  Check clauseD.12.6 again.
  • 20. Description  Lets put it all together:- Excavate pit for brick wall foundation commencing from ground levels with depth not exceeding 2.00m. ( 3 nos.)
  • 21. Write this in your taking off paper  Excavate pit for brick wall foundation commencing from ground levels with depth not exceeding 2.00m. ( 3 nos.) First write down the description
  • 22. How to write down the answer? Depth of excavation: 1125 50 1175 Length of foundation: Width of foundation: Then you need to provide side cast or workings Description
  • 23. Your answer Side cast/working  Excavate pit for brick wall foundation commencing from ground levels with depth not exceeding 2.00m. ( 1 no.) L W D m3 3/
  • 24. Measure the excavation work again based on the following:-  1. Another brick wall with foundation F2 (5 nos.) with the same layout but the depth (d) is now 3.05m.  2. Write down your answer similar to the earlier exercise in the same piece of paper.
  • 25. Exercise no. 2- measure the F1 again based on this information.
  • 26. Is that all?  No, you still need to remove the soil you have excavated.  So you need to write description again for the removal of surplus soil.  1st. Remove what?  Answer: Surplus soil.  2nd. To where?  Answer: Away from site or off site(clause D.19)  3rd. Unit?  M3 Clause D.19
  • 27. Your answer Removing surplus excavated soil off site including disposal to contractor’s own tip. Answer similar to excavation work for foundation