SCR-7 GROUND FLOOR PLAN
DCS RACK ROOM LAYOUT
PANEL ARRANGEMENT
(SCR7)
DN
50 PBA 002A
BATTERY BANK -1
50 PBA 002B
BATTERY BANK -2
BATTERY ROOM 2
CONTROL ROOM
OFFICE
50-PIV-001A
AC UPS-1
50-PIV-001B
AC UPS-2
UPS ROOM 2
CONFERENCE
TABLE
22 23 30 27
29
28
03
19
20
21
18
31
16
15
14
13
12
11
10
9 8 7 6 5 4 3 2 1
32
24 25 26
HVAC ROOM
HVAC
CONTROL
PANEL
4509
6490
7000
18000
B
B
F
F
F F F F F
F
F
F
F F F F F F F F F
F
F
F F
F
F
F
F
F
F
F
3000 4008 14000
20998
DRAWING LIMIT
DRAWING LIMIT
DRAWING
LIMIT
CL CM CN CO CP CQ
2695
845
450
F
F
F
F
C1
C2
C3
C4
EL. +100.750 ACCESS FLOOR
T.O.F (H:600,TYP.)
30/04/2021
CONVERTED/DRAWN BY:
DESCRIPTIONS
DRAWING NO. REV. DATE
MRCSB
CHKD
DSSB
CHKD
DRAWN
APPD
CHKD
APPD
APPD
DSSB
SCALE :
DATE :
N.T.S
DHIA
MRCSB
VENDOR:
CLIENT TITLE:
NIK
LKS
DIALOG SYSTEMS SDN. BHD.
F1
CAD FILE NAME:
SUBJECT
-
AREA:
LOCATION:
SHT.NO.
DRAWING NO. REV.NO.
PROJECT:
PROVISION OF EPIC OF DCS UPGRADE
PROJECT AT COGEN
8002395-411
MALAYSIAN REFINING
COMPANY SDN BHD
TEL:03-7717 1111
No. 15, Jalan PJU 7/5, Mutiara Damansara,
Selangor, MALAYSIA.
47810 Petaling Jaya,
Dialog Tower
P-EDMS NO:
RESET-EXE-HES-5A-INC-DWG-3002
J
I
H
G
F
E
D
C
B
A
7 7
6
5
4
3
2
1
6
5
4
3
2
1
J
I
H
G
F
E
D
C
B
A m m m m m m m
1 /100 1 /150 1 /200 1 /250 1 /300 1 /400 1 /500
0 1 2 3 4 5 6 7 8 9 10 0 5 10 15 0 5 0 5 0 0 0
10 15 20 10 15 20 25 10 20 30 10 20 30 40 10 20 30 40 50
F1 30/04/2021 DHIA NIK LKS
8002395-411 AS BUILT DIALOG
04
16
17
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
2705 800 1700 800 1700 800
1700
800 1700 800
1700
800 1700 800 1700
800 2397
600
4604 4593 4604 4593 4604
22997
CQ CR CS CT CU CV
DRAWING LIMIT 3050 500
3550
INSTRUMENT WALL OPENING
H425xW3050
2450
500
2949
INSTRUMENT WALL OPENING
H425xW3050
DRAWING
LIMIT
4501
6496
7000
18000
C4
C3
C2
C1
BAY
No. 1
DN
15
8
9
10
11
12
13
14
600
RACK ROOM
EL. +100.750 ACCESS FLOOR
T.O.F (H:600,TYP.)
18
DCS M/C (BOP)
9
10
11
12
13
14
15
DN
10
11
12
13
14
15
16
8
9
10
11
12
13
14
8
9
10
11
12
13
14
8
9
10
11
12
13
14
8
9
10
11
12
13
14
8
9
10
11
12
13
14
15
1
1
1
1
1
13
13
13
13
13
DRAWING LIMIT
SCR-7 GROUND FLOOR PLAN
BAY
No. 2
BAY
No. 3
BAY
No. 4
BAY
No. 5
BAY
No. 6
BAY
No. 7
BAY
No. 7
BAY
No. 7
2341
5996
2105
898
6400
DCS RACK ROOM LAYOUT
PANEL ARRANGEMENT
(SCR7)
05
30/04/2021
CONVERTED/DRAWN BY:
DESCRIPTIONS
DRAWING NO. REV. DATE
MRCSB
CHKD
DSSB
CHKD
DRAWN
APPD
CHKD
APPD
APPD
DSSB
SCALE :
DATE :
N.T.S
DHIA
MRCSB
VENDOR:
CLIENT TITLE:
NIK
LKS
DIALOG SYSTEMS SDN. BHD.
F1
CAD FILE NAME:
SUBJECT
-
AREA:
LOCATION:
SHT.NO.
DRAWING NO. REV.NO.
PROJECT:
PROVISION OF EPIC OF DCS UPGRADE
PROJECT AT COGEN
8002395-411
MALAYSIAN REFINING
COMPANY SDN BHD
TEL:03-7717 1111
No. 15, Jalan PJU 7/5, Mutiara Damansara,
Selangor, MALAYSIA.
47810 Petaling Jaya,
Dialog Tower
P-EDMS NO:
RESET-EXE-HES-5A-INC-DWG-3002
J
I
H
G
F
E
D
C
B
A
7 7
6
5
4
3
2
1
6
5
4
3
2
1
J
I
H
G
F
E
D
C
B
A m m m m m m m
1 /100 1 /150 1 /200 1 /250 1 /300 1 /400 1 /500
0 1 2 3 4 5 6 7 8 9 10 0 5 10 15 0 5 0 5 0 0 0
10 15 20 10 15 20 25 10 20 30 10 20 30 40 10 20 30 40 50
F1 30/04/2021 DHIA NIK LKS
8002395-411 AS BUILT DIALOG
SYSTEM GTG1
MARSHALLING GTG1
SYSTEM GTG2
MARSHALLING GTG2
SYSTEM GTG3
MARSHALLING GTG3
SYSTEM GTG4
MARSHALLING GTG4
SYSTEM GTG5
MARSHALLING GTG5
SYSTEM BOP
MARSHALLING BOP
SYSTEM STG
MARSHALLING STG
SYSTEM U53 MARSHALLING U53
NO. DESCRIPTION
EQUIPMENT
NO
SIZE
WxDxH(mm)
REMARKS
1 MMS SYSTEM 1 7-SYS1-101
2 STG HMI STG-OS-3
3 GTG HMI GTG-HMI-3
4 SGS/BMS ENGINEERING WORK STATION SGS EMS
5 DCS ENGINEERING WORK STATION P4STN03TC
6 ALARM DISPLAY PANEL SCR7-ADP-ESPC-001
7 ALARM DISPLAY PANEL
8 STG HMI STG-OWS-1
9 GTG HMI GTG-OWS-1
10 DCS HMI P4STN01
11 DCS HMI P4STN0OTC
12 APC APC
13 STG HMI STG-OWS-2
14 GTG HMI GTG-OWS-2
15 DCS HMI DCS-OWS
16 ENMC HMI ENMCS-CS
17 - -
18 HIGH SENSITIVITY SMOKE DETC. PANEL 7-HSSDP-001
19 7-HSSDP-002
20 7-HSSDP-003
21 7-HSSDP-004
22 LINEAR DETECTION PANEL 7-LDP-001
23 7-LDP-002
24 7-LDP-003
25 7-LDP-004
26
GAS DETECTION PANEL FOR
FLAMMABLE & H2S
7-GDP-002
27 GAS DETECTION PANEL FOR SF6 SS50 7-GDP-001
28 SUB FIRE ALARM PANEL 7-SFAP-001
29 MMC PANEL -
30 MODULE CONTROL BOX 7-MCB-003
31 GTG PRINTER 7-PRT-001
32 HRSG STEAM INDICATOR 7-HRSG-001
800x800x720
650x800x720
WALL MOUNTED
WALL MOUNTED
WALL MOUNTED
(59U-750A)
1600x800x720
800x800x720
-
200x200x300
250x250x300
580x800x1805
845x450x2000
650x400x200
800x800x720
350x350x400
CONTROL ROOM EQUIPMENT LIST
NO. DESCRIPTION
EQUIPMENT
NO
SIZE
WxDxH(mm)
REMARKS
PUBLIC ADDRESS 7-PA-001
SPARE CABINET SPARE
EXPERION DCS SERVER 7-EXP-001
POWER DISTRIBUTION BOARD 7-PDB-001
MACHINE MONITORING HUB 7-MMSH-001
EARTHING CABINET 7-EC-001
NETWORK 7-LAN-001
MAIN DISTR. FRAME C200 (BoP) 7-MDF-001
C200 CONTROLLER (BoP) 7-C200-001
SAFEGUARDNG SYSTEM (STG/BoP) 7-SGS-001
MAIN DISTR. FRAME SGS (STG/BoP) 7-MDF-002
MAIN DISTR. FRAME C200 (STG) 7-MDF-501
C200 CONTROLLER (STG) 7-C200-501
C200 CONTROLLER (UNIT 53) 7-C200-002
SYSTEM 1, OPC & GTG SERVER CABINET 7-GTG-SVR
EXPERION SERVER CABINET 7-EXP-002
DCS MARSHALLING CABINET 7-MDF-004
SPARE CABINET SPARE
ENMCS PANEL ENMCS
AVR 50-PVR-501
SYNCHRONIZING AND MEAS GENERATOR 50-PSY-501
ELECT. PROTECTION OF GENERATOR 50-PGP-501
STG PC CUBICAL 7-TCC4-501
STG OPEN LOOP CONTROLLER 7-TCC3-501
STG PROTECTION 7-TCC2-504
800x800x2100
810x810x2100
600x600x2100
800x800x2000
800x800x2000
800x800x2000
RACK ROOM EQUIPMENT LIST
NO. DESCRIPTION
EQUIPMENT
NO
SIZE
WxDxH(mm)
REMARKS
GTG MARSHALLING PANEL 7-MP-X01
GTG LOW LEVEL I/O SECTION 7-LIOS-X01
GTG TURBINE CONTROL PANEL (MARK VI) 7-TCP-X01
GTG HIGH LEVEL I/O SECTION 7-HIOS-X01
GTG MARSHALLING PANEL 7-MP-X02
GTG AUXILIARY CONTROL PANEL 7-ACP-X01
GTG POWER DISTRIBUTION 7-PD-X01
SPARE CABINET SPARE
ELECT. PROTECTION OF GENERATOR 50-PGP-X01
AVR 50-PVR-X01
SAFEGUARDING SYSTEM/BMS (TRAIN 1-5) 7-SGS/BMS-X01
MAIN DISTR. FRAME SGS/BMS (TRAIN 1-5) 7-MDF-X02
MAIN DISTR. FRAME C200 (TRAIN 1-5) 7-MDF-X01
C200 CONTROLLER (TRAIN 1-5) 7-C200-X01
GTG TURBINE CONTROL PANEL 7-TCP1-701
GTG AUXILARY CONTROL PANEL
GENERATOR PROTECTION &
CONTROL PANEL
50-PVR-701
GENERATOR EXCITATION PANEL
50-PGP-701
SGS MARSHALLING CABINET 7-MDF-703
7-MDF-704
7-MDF-705
SGS SYSTEM CABINET 7-SGS-701
DCS MARSHALLING CABINET 7-MDF-701
1000x800x2300
BY MECH.
BY MECH.
BY MECH.
800x800x2100
4035x1009x2420
810x810x2100
1620x810x2100
RACK ROOM EQUIPMENT LIST
DCS SYSTEM CABINET 7-C300-701
MACHINE MONITORING SYSTEM 7-MMS-701
POWER DISTRIBUTION PANEL 7-PDB-002 UPS 110V AC
NORMAL 240V AC
800x800x2300
1000x800x2300
800x800x2300
1600x800x2200
800x600x2100
NO. DESCRIPTION
EQUIPMENT
NO
SIZE
WxDxH(mm) REMARKS
UPS ROOM 2 EQUIPMENT LIST
NO. DESCRIPTION
EQUIPMENT
NO
SIZE
WxDxH(mm)
REMARKS
BATTERY ROOM EQUIPMENT LIST
1 AC UPS-1 PANEL 50-PIV-001A
2 AC UPS-2 PANEL 50-PIV-001B
3 110V AC DISTRIBUTION BOARD 50-PIV-002 WALL MOUNTED
800x3000x1900
-
1 AC BATTERY RANK BANK 50-PBA-002A
2
600x600x2100
HIGH SENSITIVITY SMOKE DETC. PANEL
HIGH SENSITIVITY SMOKE DETC. PANEL
HIGH SENSITIVITY SMOKE DETC. PANEL
LINEAR DETECTION PANEL
LINEAR DETECTION PANEL
LINEAR DETECTION PANEL
SCR7-ADP-ESPC-002
650x400x200
250x250x300
250x250x300
250x250x300
250x250x300
200x200x300
200x200x300
200x200x300
1600x800x720
1600x800x720
1600x800x720
650x800x720
1600x800x720
1600x800x720
WALL MOUNTED
WALL MOUNTED
WALL MOUNTED
WALL MOUNTED
WALL MOUNTED
WALL MOUNTED
WALL MOUNTED
WALL MOUNTED
*BAY - 1
*BAY - 2
*BAY - 7
*BAY - 3 - 6
800x3000x1900
AC BATTERY RANK BANK 50-PBA-002B
930x4500x1895
930x4500x1895
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
STG PROTECTION 7-TCC2-503 800x800x2000
STG PROTECTION 7-TCC2-502 800x800x2000
STG PROTECTION 7-TCC2-501 800x800x2000
STG PROTECTION 7-TCC1-503 800x800x2000
STG PROTECTION 7-TCC1-502 800x800x2000
7-MDF-003 800x800x2000
STG OPEN LOOP CONTROLLER 7-TCC3-502 800x800x2000
STG OPEN LOOP CONTROLLER 7-TCC3-503 800x800x2000
800x800x2200
800x800x2200
800x800x2200
600x600x2100
800x800x2100
800x800x2100
800x800x2100
800x800x2100
800x800x2100
800x800x2100
800x800x2100
800x800x2100
800x800x2100
800x800x2100
800x800x2100
800x800x2100
800x800x2100
800x800x2100
600x600x2100
PUBLIC ADDRESS 7-PA-001 1000x800x2300
1000x800x2300
1000x800x2300
800x800x2300
800x800x2100
800x800x2100
800x800x2100
7-TCP2-701
7-TCP3-701
7-PDP-701
7-ACP-701
GTG TURBINE CONTROL PANEL
GTG TURBINE CONTROL PANEL
GTG POWER DISTRIBUTION PANEL
SGS MARSHALLING CABINET
SGS MARSHALLING CABINET
810x810x2100
810x810x2100
810x810x2100
810x810x2100
SGS SYSTEM CABINET 7-SGS-702 810x810x2100
810x810x2100
810x810x2100
810x810x2100
810x810x2100
810x810x2100
810x810x2100
DCS MARSHALLING CABINET 7-MDF-701
POWER DISTRIBUTION PANEL 7-PDB-003
DCS RACK ROOM LAYOUT
EQUIPMENT LIST
(SCR7)
30/04/2021
CONVERTED/DRAWN BY:
DESCRIPTIONS
DRAWING NO. REV. DATE
MRCSB
CHKD
DSSB
CHKD
DRAWN
APPD
CHKD
APPD
APPD
DSSB
SCALE :
DATE :
N.T.S
DHIA
MRCSB
VENDOR:
CLIENT TITLE:
NIK
LKS
DIALOG SYSTEMS SDN. BHD.
F1
CAD FILE NAME:
SUBJECT
-
AREA:
LOCATION:
SHT.NO.
DRAWING NO. REV.NO.
PROJECT:
PROVISION OF EPIC OF DCS UPGRADE
PROJECT AT COGEN
8002395-411
MALAYSIAN REFINING
COMPANY SDN BHD
TEL:03-7717 1111
No. 15, Jalan PJU 7/5, Mutiara Damansara,
Selangor, MALAYSIA.
47810 Petaling Jaya,
Dialog Tower
P-EDMS NO:
RESET-EXE-HES-5A-INC-DWG-3002
J
I
H
G
F
E
D
C
B
A
7 7
6
5
4
3
2
1
6
5
4
3
2
1
J
I
H
G
F
E
D
C
B
A m m m m m m m
1 /100 1 /150 1 /200 1 /250 1 /300 1 /400 1 /500
0 1 2 3 4 5 6 7 8 9 10 0 5 10 15 0 5 0 5 0 0 0
10 15 20 10 15 20 25 10 20 30 10 20 30 40 10 20 30 40 50
F1 30/04/2021 DHIA NIK LKS
8002395-411 AS BUILT DIALOG
06
MAIN DISTR. FRAME C200 (U53)

Más contenido relacionado

Similar a Cogen Rack Room Layout.pdf

Lcl users manual electrical drawings
Lcl users manual electrical drawingsLcl users manual electrical drawings
Lcl users manual electrical drawings
bibimisael
 
Ananth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_Sample
Ananth K.Samy
 
hp_compaq_515_516_615_inventec_volna_amd-uma_rev_ax1_sch.pdf
hp_compaq_515_516_615_inventec_volna_amd-uma_rev_ax1_sch.pdfhp_compaq_515_516_615_inventec_volna_amd-uma_rev_ax1_sch.pdf
hp_compaq_515_516_615_inventec_volna_amd-uma_rev_ax1_sch.pdf
jovanasaricbgd
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
Sunit Dhingra
 
Quanta bd1 r3b_schematics_da0wj1mb6f0
Quanta bd1 r3b_schematics_da0wj1mb6f0Quanta bd1 r3b_schematics_da0wj1mb6f0
Quanta bd1 r3b_schematics_da0wj1mb6f0
DATACORP
 
PLC Control Panel for HVACR System
PLC Control Panel for HVACR SystemPLC Control Panel for HVACR System
PLC Control Panel for HVACR System
Muhammad Sarfraz
 
RTG19_CircuitDiagram_REVB (2).pdf
RTG19_CircuitDiagram_REVB (2).pdfRTG19_CircuitDiagram_REVB (2).pdf
RTG19_CircuitDiagram_REVB (2).pdf
JrMerlinCabato2
 

Similar a Cogen Rack Room Layout.pdf (20)

Lcl users manual electrical drawings
Lcl users manual electrical drawingsLcl users manual electrical drawings
Lcl users manual electrical drawings
 
Ananth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_Sample
 
SynergieCAD-V93K-CTH-Configuration_MAR16
SynergieCAD-V93K-CTH-Configuration_MAR16SynergieCAD-V93K-CTH-Configuration_MAR16
SynergieCAD-V93K-CTH-Configuration_MAR16
 
Foo
FooFoo
Foo
 
Visio arquitectura dcs petrocedeño
Visio arquitectura dcs petrocedeñoVisio arquitectura dcs petrocedeño
Visio arquitectura dcs petrocedeño
 
DCS Infra Structure
DCS Infra StructureDCS Infra Structure
DCS Infra Structure
 
Sld for pmcc
Sld for pmccSld for pmcc
Sld for pmcc
 
CE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptxCE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptx
 
dc2026c1-sch.pdf
dc2026c1-sch.pdfdc2026c1-sch.pdf
dc2026c1-sch.pdf
 
PSC Stock of Miscellaneous Products (2).pdf
PSC Stock of Miscellaneous Products (2).pdfPSC Stock of Miscellaneous Products (2).pdf
PSC Stock of Miscellaneous Products (2).pdf
 
hp_compaq_515_516_615_inventec_volna_amd-uma_rev_ax1_sch.pdf
hp_compaq_515_516_615_inventec_volna_amd-uma_rev_ax1_sch.pdfhp_compaq_515_516_615_inventec_volna_amd-uma_rev_ax1_sch.pdf
hp_compaq_515_516_615_inventec_volna_amd-uma_rev_ax1_sch.pdf
 
BOOST110.pdf
BOOST110.pdfBOOST110.pdf
BOOST110.pdf
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
 
Quanta bd1 r3b_schematics_da0wj1mb6f0
Quanta bd1 r3b_schematics_da0wj1mb6f0Quanta bd1 r3b_schematics_da0wj1mb6f0
Quanta bd1 r3b_schematics_da0wj1mb6f0
 
Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020
 
Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020Semiconductor equipment spare parts in usa may 20th 2020
Semiconductor equipment spare parts in usa may 20th 2020
 
precast driven pile 450x450-350x350
precast driven pile 450x450-350x350precast driven pile 450x450-350x350
precast driven pile 450x450-350x350
 
SEIMENS CRP.pdf
SEIMENS CRP.pdfSEIMENS CRP.pdf
SEIMENS CRP.pdf
 
PLC Control Panel for HVACR System
PLC Control Panel for HVACR SystemPLC Control Panel for HVACR System
PLC Control Panel for HVACR System
 
RTG19_CircuitDiagram_REVB (2).pdf
RTG19_CircuitDiagram_REVB (2).pdfRTG19_CircuitDiagram_REVB (2).pdf
RTG19_CircuitDiagram_REVB (2).pdf
 

Último

scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Último (20)

scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

Cogen Rack Room Layout.pdf

  • 1. SCR-7 GROUND FLOOR PLAN DCS RACK ROOM LAYOUT PANEL ARRANGEMENT (SCR7) DN 50 PBA 002A BATTERY BANK -1 50 PBA 002B BATTERY BANK -2 BATTERY ROOM 2 CONTROL ROOM OFFICE 50-PIV-001A AC UPS-1 50-PIV-001B AC UPS-2 UPS ROOM 2 CONFERENCE TABLE 22 23 30 27 29 28 03 19 20 21 18 31 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 32 24 25 26 HVAC ROOM HVAC CONTROL PANEL 4509 6490 7000 18000 B B F F F F F F F F F F F F F F F F F F F F F F F F F F F F F F 3000 4008 14000 20998 DRAWING LIMIT DRAWING LIMIT DRAWING LIMIT CL CM CN CO CP CQ 2695 845 450 F F F F C1 C2 C3 C4 EL. +100.750 ACCESS FLOOR T.O.F (H:600,TYP.) 30/04/2021 CONVERTED/DRAWN BY: DESCRIPTIONS DRAWING NO. REV. DATE MRCSB CHKD DSSB CHKD DRAWN APPD CHKD APPD APPD DSSB SCALE : DATE : N.T.S DHIA MRCSB VENDOR: CLIENT TITLE: NIK LKS DIALOG SYSTEMS SDN. BHD. F1 CAD FILE NAME: SUBJECT - AREA: LOCATION: SHT.NO. DRAWING NO. REV.NO. PROJECT: PROVISION OF EPIC OF DCS UPGRADE PROJECT AT COGEN 8002395-411 MALAYSIAN REFINING COMPANY SDN BHD TEL:03-7717 1111 No. 15, Jalan PJU 7/5, Mutiara Damansara, Selangor, MALAYSIA. 47810 Petaling Jaya, Dialog Tower P-EDMS NO: RESET-EXE-HES-5A-INC-DWG-3002 J I H G F E D C B A 7 7 6 5 4 3 2 1 6 5 4 3 2 1 J I H G F E D C B A m m m m m m m 1 /100 1 /150 1 /200 1 /250 1 /300 1 /400 1 /500 0 1 2 3 4 5 6 7 8 9 10 0 5 10 15 0 5 0 5 0 0 0 10 15 20 10 15 20 25 10 20 30 10 20 30 40 10 20 30 40 50 F1 30/04/2021 DHIA NIK LKS 8002395-411 AS BUILT DIALOG 04
  • 2. 16 17 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 2705 800 1700 800 1700 800 1700 800 1700 800 1700 800 1700 800 1700 800 2397 600 4604 4593 4604 4593 4604 22997 CQ CR CS CT CU CV DRAWING LIMIT 3050 500 3550 INSTRUMENT WALL OPENING H425xW3050 2450 500 2949 INSTRUMENT WALL OPENING H425xW3050 DRAWING LIMIT 4501 6496 7000 18000 C4 C3 C2 C1 BAY No. 1 DN 15 8 9 10 11 12 13 14 600 RACK ROOM EL. +100.750 ACCESS FLOOR T.O.F (H:600,TYP.) 18 DCS M/C (BOP) 9 10 11 12 13 14 15 DN 10 11 12 13 14 15 16 8 9 10 11 12 13 14 8 9 10 11 12 13 14 8 9 10 11 12 13 14 8 9 10 11 12 13 14 8 9 10 11 12 13 14 15 1 1 1 1 1 13 13 13 13 13 DRAWING LIMIT SCR-7 GROUND FLOOR PLAN BAY No. 2 BAY No. 3 BAY No. 4 BAY No. 5 BAY No. 6 BAY No. 7 BAY No. 7 BAY No. 7 2341 5996 2105 898 6400 DCS RACK ROOM LAYOUT PANEL ARRANGEMENT (SCR7) 05 30/04/2021 CONVERTED/DRAWN BY: DESCRIPTIONS DRAWING NO. REV. DATE MRCSB CHKD DSSB CHKD DRAWN APPD CHKD APPD APPD DSSB SCALE : DATE : N.T.S DHIA MRCSB VENDOR: CLIENT TITLE: NIK LKS DIALOG SYSTEMS SDN. BHD. F1 CAD FILE NAME: SUBJECT - AREA: LOCATION: SHT.NO. DRAWING NO. REV.NO. PROJECT: PROVISION OF EPIC OF DCS UPGRADE PROJECT AT COGEN 8002395-411 MALAYSIAN REFINING COMPANY SDN BHD TEL:03-7717 1111 No. 15, Jalan PJU 7/5, Mutiara Damansara, Selangor, MALAYSIA. 47810 Petaling Jaya, Dialog Tower P-EDMS NO: RESET-EXE-HES-5A-INC-DWG-3002 J I H G F E D C B A 7 7 6 5 4 3 2 1 6 5 4 3 2 1 J I H G F E D C B A m m m m m m m 1 /100 1 /150 1 /200 1 /250 1 /300 1 /400 1 /500 0 1 2 3 4 5 6 7 8 9 10 0 5 10 15 0 5 0 5 0 0 0 10 15 20 10 15 20 25 10 20 30 10 20 30 40 10 20 30 40 50 F1 30/04/2021 DHIA NIK LKS 8002395-411 AS BUILT DIALOG SYSTEM GTG1 MARSHALLING GTG1 SYSTEM GTG2 MARSHALLING GTG2 SYSTEM GTG3 MARSHALLING GTG3 SYSTEM GTG4 MARSHALLING GTG4 SYSTEM GTG5 MARSHALLING GTG5 SYSTEM BOP MARSHALLING BOP SYSTEM STG MARSHALLING STG SYSTEM U53 MARSHALLING U53
  • 3. NO. DESCRIPTION EQUIPMENT NO SIZE WxDxH(mm) REMARKS 1 MMS SYSTEM 1 7-SYS1-101 2 STG HMI STG-OS-3 3 GTG HMI GTG-HMI-3 4 SGS/BMS ENGINEERING WORK STATION SGS EMS 5 DCS ENGINEERING WORK STATION P4STN03TC 6 ALARM DISPLAY PANEL SCR7-ADP-ESPC-001 7 ALARM DISPLAY PANEL 8 STG HMI STG-OWS-1 9 GTG HMI GTG-OWS-1 10 DCS HMI P4STN01 11 DCS HMI P4STN0OTC 12 APC APC 13 STG HMI STG-OWS-2 14 GTG HMI GTG-OWS-2 15 DCS HMI DCS-OWS 16 ENMC HMI ENMCS-CS 17 - - 18 HIGH SENSITIVITY SMOKE DETC. PANEL 7-HSSDP-001 19 7-HSSDP-002 20 7-HSSDP-003 21 7-HSSDP-004 22 LINEAR DETECTION PANEL 7-LDP-001 23 7-LDP-002 24 7-LDP-003 25 7-LDP-004 26 GAS DETECTION PANEL FOR FLAMMABLE & H2S 7-GDP-002 27 GAS DETECTION PANEL FOR SF6 SS50 7-GDP-001 28 SUB FIRE ALARM PANEL 7-SFAP-001 29 MMC PANEL - 30 MODULE CONTROL BOX 7-MCB-003 31 GTG PRINTER 7-PRT-001 32 HRSG STEAM INDICATOR 7-HRSG-001 800x800x720 650x800x720 WALL MOUNTED WALL MOUNTED WALL MOUNTED (59U-750A) 1600x800x720 800x800x720 - 200x200x300 250x250x300 580x800x1805 845x450x2000 650x400x200 800x800x720 350x350x400 CONTROL ROOM EQUIPMENT LIST NO. DESCRIPTION EQUIPMENT NO SIZE WxDxH(mm) REMARKS PUBLIC ADDRESS 7-PA-001 SPARE CABINET SPARE EXPERION DCS SERVER 7-EXP-001 POWER DISTRIBUTION BOARD 7-PDB-001 MACHINE MONITORING HUB 7-MMSH-001 EARTHING CABINET 7-EC-001 NETWORK 7-LAN-001 MAIN DISTR. FRAME C200 (BoP) 7-MDF-001 C200 CONTROLLER (BoP) 7-C200-001 SAFEGUARDNG SYSTEM (STG/BoP) 7-SGS-001 MAIN DISTR. FRAME SGS (STG/BoP) 7-MDF-002 MAIN DISTR. FRAME C200 (STG) 7-MDF-501 C200 CONTROLLER (STG) 7-C200-501 C200 CONTROLLER (UNIT 53) 7-C200-002 SYSTEM 1, OPC & GTG SERVER CABINET 7-GTG-SVR EXPERION SERVER CABINET 7-EXP-002 DCS MARSHALLING CABINET 7-MDF-004 SPARE CABINET SPARE ENMCS PANEL ENMCS AVR 50-PVR-501 SYNCHRONIZING AND MEAS GENERATOR 50-PSY-501 ELECT. PROTECTION OF GENERATOR 50-PGP-501 STG PC CUBICAL 7-TCC4-501 STG OPEN LOOP CONTROLLER 7-TCC3-501 STG PROTECTION 7-TCC2-504 800x800x2100 810x810x2100 600x600x2100 800x800x2000 800x800x2000 800x800x2000 RACK ROOM EQUIPMENT LIST NO. DESCRIPTION EQUIPMENT NO SIZE WxDxH(mm) REMARKS GTG MARSHALLING PANEL 7-MP-X01 GTG LOW LEVEL I/O SECTION 7-LIOS-X01 GTG TURBINE CONTROL PANEL (MARK VI) 7-TCP-X01 GTG HIGH LEVEL I/O SECTION 7-HIOS-X01 GTG MARSHALLING PANEL 7-MP-X02 GTG AUXILIARY CONTROL PANEL 7-ACP-X01 GTG POWER DISTRIBUTION 7-PD-X01 SPARE CABINET SPARE ELECT. PROTECTION OF GENERATOR 50-PGP-X01 AVR 50-PVR-X01 SAFEGUARDING SYSTEM/BMS (TRAIN 1-5) 7-SGS/BMS-X01 MAIN DISTR. FRAME SGS/BMS (TRAIN 1-5) 7-MDF-X02 MAIN DISTR. FRAME C200 (TRAIN 1-5) 7-MDF-X01 C200 CONTROLLER (TRAIN 1-5) 7-C200-X01 GTG TURBINE CONTROL PANEL 7-TCP1-701 GTG AUXILARY CONTROL PANEL GENERATOR PROTECTION & CONTROL PANEL 50-PVR-701 GENERATOR EXCITATION PANEL 50-PGP-701 SGS MARSHALLING CABINET 7-MDF-703 7-MDF-704 7-MDF-705 SGS SYSTEM CABINET 7-SGS-701 DCS MARSHALLING CABINET 7-MDF-701 1000x800x2300 BY MECH. BY MECH. BY MECH. 800x800x2100 4035x1009x2420 810x810x2100 1620x810x2100 RACK ROOM EQUIPMENT LIST DCS SYSTEM CABINET 7-C300-701 MACHINE MONITORING SYSTEM 7-MMS-701 POWER DISTRIBUTION PANEL 7-PDB-002 UPS 110V AC NORMAL 240V AC 800x800x2300 1000x800x2300 800x800x2300 1600x800x2200 800x600x2100 NO. DESCRIPTION EQUIPMENT NO SIZE WxDxH(mm) REMARKS UPS ROOM 2 EQUIPMENT LIST NO. DESCRIPTION EQUIPMENT NO SIZE WxDxH(mm) REMARKS BATTERY ROOM EQUIPMENT LIST 1 AC UPS-1 PANEL 50-PIV-001A 2 AC UPS-2 PANEL 50-PIV-001B 3 110V AC DISTRIBUTION BOARD 50-PIV-002 WALL MOUNTED 800x3000x1900 - 1 AC BATTERY RANK BANK 50-PBA-002A 2 600x600x2100 HIGH SENSITIVITY SMOKE DETC. PANEL HIGH SENSITIVITY SMOKE DETC. PANEL HIGH SENSITIVITY SMOKE DETC. PANEL LINEAR DETECTION PANEL LINEAR DETECTION PANEL LINEAR DETECTION PANEL SCR7-ADP-ESPC-002 650x400x200 250x250x300 250x250x300 250x250x300 250x250x300 200x200x300 200x200x300 200x200x300 1600x800x720 1600x800x720 1600x800x720 650x800x720 1600x800x720 1600x800x720 WALL MOUNTED WALL MOUNTED WALL MOUNTED WALL MOUNTED WALL MOUNTED WALL MOUNTED WALL MOUNTED WALL MOUNTED *BAY - 1 *BAY - 2 *BAY - 7 *BAY - 3 - 6 800x3000x1900 AC BATTERY RANK BANK 50-PBA-002B 930x4500x1895 930x4500x1895 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 STG PROTECTION 7-TCC2-503 800x800x2000 STG PROTECTION 7-TCC2-502 800x800x2000 STG PROTECTION 7-TCC2-501 800x800x2000 STG PROTECTION 7-TCC1-503 800x800x2000 STG PROTECTION 7-TCC1-502 800x800x2000 7-MDF-003 800x800x2000 STG OPEN LOOP CONTROLLER 7-TCC3-502 800x800x2000 STG OPEN LOOP CONTROLLER 7-TCC3-503 800x800x2000 800x800x2200 800x800x2200 800x800x2200 600x600x2100 800x800x2100 800x800x2100 800x800x2100 800x800x2100 800x800x2100 800x800x2100 800x800x2100 800x800x2100 800x800x2100 800x800x2100 800x800x2100 800x800x2100 800x800x2100 800x800x2100 600x600x2100 PUBLIC ADDRESS 7-PA-001 1000x800x2300 1000x800x2300 1000x800x2300 800x800x2300 800x800x2100 800x800x2100 800x800x2100 7-TCP2-701 7-TCP3-701 7-PDP-701 7-ACP-701 GTG TURBINE CONTROL PANEL GTG TURBINE CONTROL PANEL GTG POWER DISTRIBUTION PANEL SGS MARSHALLING CABINET SGS MARSHALLING CABINET 810x810x2100 810x810x2100 810x810x2100 810x810x2100 SGS SYSTEM CABINET 7-SGS-702 810x810x2100 810x810x2100 810x810x2100 810x810x2100 810x810x2100 810x810x2100 810x810x2100 DCS MARSHALLING CABINET 7-MDF-701 POWER DISTRIBUTION PANEL 7-PDB-003 DCS RACK ROOM LAYOUT EQUIPMENT LIST (SCR7) 30/04/2021 CONVERTED/DRAWN BY: DESCRIPTIONS DRAWING NO. REV. DATE MRCSB CHKD DSSB CHKD DRAWN APPD CHKD APPD APPD DSSB SCALE : DATE : N.T.S DHIA MRCSB VENDOR: CLIENT TITLE: NIK LKS DIALOG SYSTEMS SDN. BHD. F1 CAD FILE NAME: SUBJECT - AREA: LOCATION: SHT.NO. DRAWING NO. REV.NO. PROJECT: PROVISION OF EPIC OF DCS UPGRADE PROJECT AT COGEN 8002395-411 MALAYSIAN REFINING COMPANY SDN BHD TEL:03-7717 1111 No. 15, Jalan PJU 7/5, Mutiara Damansara, Selangor, MALAYSIA. 47810 Petaling Jaya, Dialog Tower P-EDMS NO: RESET-EXE-HES-5A-INC-DWG-3002 J I H G F E D C B A 7 7 6 5 4 3 2 1 6 5 4 3 2 1 J I H G F E D C B A m m m m m m m 1 /100 1 /150 1 /200 1 /250 1 /300 1 /400 1 /500 0 1 2 3 4 5 6 7 8 9 10 0 5 10 15 0 5 0 5 0 0 0 10 15 20 10 15 20 25 10 20 30 10 20 30 40 10 20 30 40 50 F1 30/04/2021 DHIA NIK LKS 8002395-411 AS BUILT DIALOG 06 MAIN DISTR. FRAME C200 (U53)