1. Introduction
2. Power plant layout
3. Main and Auxiliary Equipments
4. Thermal power plants in Rajasthan
5. References
INTRODUCTION
A Thermal Power Plant converts the heat energy of coal into
electrical energy. Coal is burnt in a boiler which converts
water into steam. The expansion of steam in turbine produces
mechanical power which drives the alternator coupled to the
turbine.Thermal Power Plants contribute maximum to the
generation of Power for any country . Thermal Power Plants
constitute 75.43% of the total installed captive and non-captive
power generation in India . In thermal generating stations coal,
oil, natural gas etc. are employed as primary sources of energy.
GENERAL LAYOUT OF THERMAL
POWER STATION
Diagram of a typical coal-fired thermal
power station
1. Cooling tower 10. Steam Control valve 19. Superheater
2. Cooling water pump 11. High pressure steam turbine 20. Forced draught (draft) fan
3. transmission line (3-phase) 12. Deaerator 21. Reheater
4. Step-up transformer (3-phase) 13. Feed water heater 22. Combustion air intake
5. Electrical generator (3-phase)14. Coal conveyor 23. Economiser
6. Low pressure steam turbine 15. Coal hopper 24. Air preheater
7. Condensate pump 16. Coal pulveriser 25. Precipitator
8. Surface condenser 17. Boiler steam drum 26. Induced draught (draft) fan
9. Intermediate pressure steam 
turbine
18. Bottom ash hopper 27. Flue gas stack
Diagram of a typical coal-fired
thermal power station
MAIN AND AUXILIARY
EQUIPMENTS
1. Coal handling plant
2. Pulverizing plant
3. Draft fans
4. Boiler
5. Ash handling plant
6. Turbine
7. Condenser
8. Cooling towers and ponds
9. Feed water heater
10. Economiser
11. Superheater and Reheater
12. Air preheater
COAL HANDLING PLANT
•The function of coal handling plant is automatic feeding of coal to the
boiler furnace.
• A thermal power plant burns enormous amounts of coal.
•A 200MW plant may require around 2000 tons of coal daily
PULVERISING PLANT
In modern thermal power plant , coal is
pulverised i.e. ground to dust like size and
carried to the furnace in a stream of hot air.
Pulverising is a means of exposing a large
surface area to the action of oxygen and
consequently helping combustion.
Pulverising mills are further classified as:
1.Contact mill
2.Ball mill
3.Impact mill
DRAFT SYSTEM
• The circulation of air is
caused by a difference in
pressure, known as Draft.
• Draft is a differential
pressure b/w atmosphere
and inside the boiler.
• It is necessary to cause the
flow of gases through boiler
setting
• It may be –
1. Natural draft
2. Mechanical draft
BOILER
BOILER
• A boiler or steam generator is a closed vessel in which water
under pressure, is converted into steam.
• It is one of the major components of a thermal power plant
• Always designed to absorb maximum amount of heat released in
the process of combustion
Boilers are of two types-
1.Fire tube boiler
2.Water tube boiler
SUPERHEATER AND REHEATER
Most of the modern boilers are having super heater and reheater arrangement.
Superheater :
Superheater is a component of a steam-generating unit in which steam, after it
has left the boiler drum, is heated above its saturation temperature. The
amount of superheat added to the steam is influenced by the location,
arrangement, and amount of super heater surface installed, as well as the rating
of the boiler. The super heater may consist of one or more stages of tube banks
arranged to effectively transfer heat from the products of combustion. Super
heaters are classified as convection , radiant or combination of these.
Reheater : Some of the heat of superheated steam is used to rotate the 
turbine  where  it  loses  some  of  its  energy.  Reheater  is  also steam  boiler 
component  in  which  heat  is  added  to  this  intermediate-pressure  steam, 
which  has  given  up  some  of  its  energy  in  expansion  through  the  high-
pressure  turbine.  The  steam  after  reheating  is  used  to rotate  the  second 
steam  turbine  where  the  heat  is  converted  to  mechanical  energy.  This 
mechanical  energy  is  used  to  run  the  alternator,  which  is  coupled  to 
turbine , there by generating electrical energy.
TURBINE
TURBINE – FULL VIEW
STEAM TURBINE
A steam turbine converts heat energy of steam into mechanical
energy and drives the generator. It uses the principle that steam
when issuing from a small opening attains a high velocity. This
velocity attained during expansion depends on the initial and
final heat content of the steam. This difference b/w initial and
final heat content repesents the heat energy converted into
kinetic energy.
These are of two types :-
Impulse turbine
Reaction turbine
ASH HANDLING PLANT
The percentage of ash in coal varies from 5% in good quality coal to
about 40% in poor quality coal
Power plants generally use poor quality of coal , thus amount of ash
produced by it is pretty large
A modern 2000MW plant produces about 5000 tons of ash daily
The stations use some conveyor arrangement to carry ash to dump
sites directly or for carrying and loading it to trucks and wagons which
transport it to the site of disposal
CONDENSER
Steam after rotating steam turbine comes to condenser. Condenser refers
here to the shell and tube heat exchanger (or surface condenser) installed at
the outlet of every steam turbine in Thermal power stations of utility
companies generally.
These condensers are heat exchangers which convert steam from its
gaseous to its liquid state, also known as phase transition.
In so doing, the latent heat of steam is given out inside the condenser.
Where water is in short supply an air cooled condenser is often used.
An air cooled condenser is however significantly more expensive and
cannot achieve as low a steam turbine backpressure (and therefore less
efficient) as a surface condenser.
The purpose is to condense the outlet (or exhaust) steam from steam turbine
to obtain maximum efficiency and also to get the condensed steam in the
form of pure water, otherwise known as condensate, back to steam
generator or (boiler) as boiler feed water.
COOLING TOWERS AND PONDS
o A condenser needs huge quantity of water to condense the steam .
o Typically a 2000MW plant needs about 1500MGallon of water.
oMost plants use a closed cooling system where warm water coming from
condenser is cooled and reused
oSmall plants use spray ponds and medium and large plants use cooling towers.
oCooling tower is a steel or concrete hyperbolic structure having a reservoir at the
base for storage of cooled water
oHeight of the cooling tower may be 150 m or so and diameter at the base is 150 m
FEED WATER HEATER
Advantages of heating water before feeding back to the boiler:-
a)Feed water heating improves overall plant efficiency.
b)The dissolved oxygen and carbon dioxide which would
otherwise cause boiler corrosion are removed in feed water
heater
c)Thermal stresses due to cold water entering the boiler drum
are avoided.
d)Quantity of steam produced by the boiler is increased.
e)Some other impurities carried by the steam and condensate,
due to corrosion of boiler and condenser are precipitated
outside the boiler.
ECONOMISER
Flue gases coming out of the boiler carry lot of heat. An
economiser extracts a part of this heat from flue gases
and uses it for heating feed water. This use of
economiser results in saving coal consumption and
higher boiler efficiency
ECONOMIZER
AIR PREHEATER
After flue gases leave economiser, some further heat
can be extracted from them and used to heat
incoming heat. Cooling of flue gases by 20 degree
centigrade increases the plant efficiency by 1%.
Air preheaters may be of three types
Plate type
Tubular type
Regenerative type
INSTALLED CAPACITY ( 01-04-2014)
SL.No. Power Station
Installed
Capacity
(MW)
M P SHARE
(MW)
1 Amarkantak II (2x120 MW)  240 240
 2 Amarkantak Extn (210 MW)  210 210
3 Satpura II (200+210 MW)  410 410
4 Satpura III (2x210 MW)  420 420
5 Satpura IV (2x250 MW)  500 500
REFERENCES
Generation of electrical power- B.R.GUPTA
www.google.com
www.slideshare.com

Más contenido relacionado

La actualidad más candente

INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
ADITYA ARYAN
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP
Amit Bansal
 

La actualidad más candente (20)

INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
 
Power Plant Familiarization
Power Plant FamiliarizationPower Plant Familiarization
Power Plant Familiarization
 
Industrial training report of thermal power plant
Industrial training report of thermal power plantIndustrial training report of thermal power plant
Industrial training report of thermal power plant
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
 
STEAM POWER PLANT
STEAM POWER PLANTSTEAM POWER PLANT
STEAM POWER PLANT
 
Thermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit HingeThermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit Hinge
 
Thermal power plant ppt
Thermal power plant pptThermal power plant ppt
Thermal power plant ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Training report on thermal power plant
Training report on thermal power plantTraining report on thermal power plant
Training report on thermal power plant
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
An Overview of Thermal Power Plant
An Overview of Thermal Power PlantAn Overview of Thermal Power Plant
An Overview of Thermal Power Plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
 
Steam Power Plants
Steam Power PlantsSteam Power Plants
Steam Power Plants
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 

Similar a SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT

Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02
arvind singh rathore
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
foxycrow
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01
arvind singh rathore
 

Similar a SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT (20)

Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Bandel training
Bandel trainingBandel training
Bandel training
 
Thermal Power Plant (Bathinda) PPT
Thermal Power Plant (Bathinda) PPTThermal Power Plant (Bathinda) PPT
Thermal Power Plant (Bathinda) PPT
 
Overview of Thermal Power Plants
Overview of Thermal Power PlantsOverview of Thermal Power Plants
Overview of Thermal Power Plants
 
Industrial training at NTPC Shaktinagar
Industrial training at NTPC ShaktinagarIndustrial training at NTPC Shaktinagar
Industrial training at NTPC Shaktinagar
 
Coal Base Thermal Power Plant
Coal Base Thermal Power PlantCoal Base Thermal Power Plant
Coal Base Thermal Power Plant
 
coal based thermal power plant
coal based thermal power plantcoal based thermal power plant
coal based thermal power plant
 
coal based thermal power plant
coal based thermal power plantcoal based thermal power plant
coal based thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
2013edusat lecture on steam plant(2)
2013edusat lecture on steam  plant(2)2013edusat lecture on steam  plant(2)
2013edusat lecture on steam plant(2)
 
Mtps ppt
Mtps pptMtps ppt
Mtps ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
lecture on steam plant
 lecture on steam  plant lecture on steam  plant
lecture on steam plant
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01
 
Thermal power point
Thermal power pointThermal power point
Thermal power point
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 

Último

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 

SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT

  • 1. VIVEKANANDA INSTITUTE OF TECHNOLOGY-(EAST) JAIPUR THERMAL POWER PLANT Submitted by:- Guided by:- AMIT GUPTA PAWAN SHARMA MECHANICAL ENGINEERING II YEAR (IV SEM)
  • 2. CONTENTS 1. Introduction 2. Power plant layout 3. Main and Auxiliary Equipments 4. Thermal power plants in Rajasthan 5. References
  • 3. INTRODUCTION A Thermal Power Plant converts the heat energy of coal into electrical energy. Coal is burnt in a boiler which converts water into steam. The expansion of steam in turbine produces mechanical power which drives the alternator coupled to the turbine.Thermal Power Plants contribute maximum to the generation of Power for any country . Thermal Power Plants constitute 75.43% of the total installed captive and non-captive power generation in India . In thermal generating stations coal, oil, natural gas etc. are employed as primary sources of energy.
  • 4. GENERAL LAYOUT OF THERMAL POWER STATION
  • 5. Diagram of a typical coal-fired thermal power station
  • 6. 1. Cooling tower 10. Steam Control valve 19. Superheater 2. Cooling water pump 11. High pressure steam turbine 20. Forced draught (draft) fan 3. transmission line (3-phase) 12. Deaerator 21. Reheater 4. Step-up transformer (3-phase) 13. Feed water heater 22. Combustion air intake 5. Electrical generator (3-phase)14. Coal conveyor 23. Economiser 6. Low pressure steam turbine 15. Coal hopper 24. Air preheater 7. Condensate pump 16. Coal pulveriser 25. Precipitator 8. Surface condenser 17. Boiler steam drum 26. Induced draught (draft) fan 9. Intermediate pressure steam  turbine 18. Bottom ash hopper 27. Flue gas stack Diagram of a typical coal-fired thermal power station
  • 7. MAIN AND AUXILIARY EQUIPMENTS 1. Coal handling plant 2. Pulverizing plant 3. Draft fans 4. Boiler 5. Ash handling plant 6. Turbine 7. Condenser 8. Cooling towers and ponds 9. Feed water heater 10. Economiser 11. Superheater and Reheater 12. Air preheater
  • 8. COAL HANDLING PLANT •The function of coal handling plant is automatic feeding of coal to the boiler furnace. • A thermal power plant burns enormous amounts of coal. •A 200MW plant may require around 2000 tons of coal daily
  • 9. PULVERISING PLANT In modern thermal power plant , coal is pulverised i.e. ground to dust like size and carried to the furnace in a stream of hot air. Pulverising is a means of exposing a large surface area to the action of oxygen and consequently helping combustion. Pulverising mills are further classified as: 1.Contact mill 2.Ball mill 3.Impact mill
  • 10. DRAFT SYSTEM • The circulation of air is caused by a difference in pressure, known as Draft. • Draft is a differential pressure b/w atmosphere and inside the boiler. • It is necessary to cause the flow of gases through boiler setting • It may be – 1. Natural draft 2. Mechanical draft
  • 12. BOILER • A boiler or steam generator is a closed vessel in which water under pressure, is converted into steam. • It is one of the major components of a thermal power plant • Always designed to absorb maximum amount of heat released in the process of combustion Boilers are of two types- 1.Fire tube boiler 2.Water tube boiler
  • 13. SUPERHEATER AND REHEATER Most of the modern boilers are having super heater and reheater arrangement. Superheater : Superheater is a component of a steam-generating unit in which steam, after it has left the boiler drum, is heated above its saturation temperature. The amount of superheat added to the steam is influenced by the location, arrangement, and amount of super heater surface installed, as well as the rating of the boiler. The super heater may consist of one or more stages of tube banks arranged to effectively transfer heat from the products of combustion. Super heaters are classified as convection , radiant or combination of these.
  • 14. Reheater : Some of the heat of superheated steam is used to rotate the  turbine  where  it  loses  some  of  its  energy.  Reheater  is  also steam  boiler  component  in  which  heat  is  added  to  this  intermediate-pressure  steam,  which  has  given  up  some  of  its  energy  in  expansion  through  the  high- pressure  turbine.  The  steam  after  reheating  is  used  to rotate  the  second  steam  turbine  where  the  heat  is  converted  to  mechanical  energy.  This  mechanical  energy  is  used  to  run  the  alternator,  which  is  coupled  to  turbine , there by generating electrical energy.
  • 17. STEAM TURBINE A steam turbine converts heat energy of steam into mechanical energy and drives the generator. It uses the principle that steam when issuing from a small opening attains a high velocity. This velocity attained during expansion depends on the initial and final heat content of the steam. This difference b/w initial and final heat content repesents the heat energy converted into kinetic energy. These are of two types :- Impulse turbine Reaction turbine
  • 18. ASH HANDLING PLANT The percentage of ash in coal varies from 5% in good quality coal to about 40% in poor quality coal Power plants generally use poor quality of coal , thus amount of ash produced by it is pretty large A modern 2000MW plant produces about 5000 tons of ash daily The stations use some conveyor arrangement to carry ash to dump sites directly or for carrying and loading it to trucks and wagons which transport it to the site of disposal
  • 19. CONDENSER Steam after rotating steam turbine comes to condenser. Condenser refers here to the shell and tube heat exchanger (or surface condenser) installed at the outlet of every steam turbine in Thermal power stations of utility companies generally. These condensers are heat exchangers which convert steam from its gaseous to its liquid state, also known as phase transition. In so doing, the latent heat of steam is given out inside the condenser. Where water is in short supply an air cooled condenser is often used. An air cooled condenser is however significantly more expensive and cannot achieve as low a steam turbine backpressure (and therefore less efficient) as a surface condenser. The purpose is to condense the outlet (or exhaust) steam from steam turbine to obtain maximum efficiency and also to get the condensed steam in the form of pure water, otherwise known as condensate, back to steam generator or (boiler) as boiler feed water.
  • 20.
  • 21. COOLING TOWERS AND PONDS o A condenser needs huge quantity of water to condense the steam . o Typically a 2000MW plant needs about 1500MGallon of water. oMost plants use a closed cooling system where warm water coming from condenser is cooled and reused oSmall plants use spray ponds and medium and large plants use cooling towers. oCooling tower is a steel or concrete hyperbolic structure having a reservoir at the base for storage of cooled water oHeight of the cooling tower may be 150 m or so and diameter at the base is 150 m
  • 22. FEED WATER HEATER Advantages of heating water before feeding back to the boiler:- a)Feed water heating improves overall plant efficiency. b)The dissolved oxygen and carbon dioxide which would otherwise cause boiler corrosion are removed in feed water heater c)Thermal stresses due to cold water entering the boiler drum are avoided. d)Quantity of steam produced by the boiler is increased. e)Some other impurities carried by the steam and condensate, due to corrosion of boiler and condenser are precipitated outside the boiler.
  • 23. ECONOMISER Flue gases coming out of the boiler carry lot of heat. An economiser extracts a part of this heat from flue gases and uses it for heating feed water. This use of economiser results in saving coal consumption and higher boiler efficiency
  • 25. AIR PREHEATER After flue gases leave economiser, some further heat can be extracted from them and used to heat incoming heat. Cooling of flue gases by 20 degree centigrade increases the plant efficiency by 1%. Air preheaters may be of three types Plate type Tubular type Regenerative type
  • 26. INSTALLED CAPACITY ( 01-04-2014) SL.No. Power Station Installed Capacity (MW) M P SHARE (MW) 1 Amarkantak II (2x120 MW)  240 240  2 Amarkantak Extn (210 MW)  210 210 3 Satpura II (200+210 MW)  410 410 4 Satpura III (2x210 MW)  420 420 5 Satpura IV (2x250 MW)  500 500
  • 27. REFERENCES Generation of electrical power- B.R.GUPTA www.google.com www.slideshare.com

Notas del editor

  1. Flue gas – gas which comes out after burning a fuel and it contains a lot of sulphur.