Change the Way We Build –
Part 3
Integrate & Use of Geospatial Data (GIS)
& Building Information Modeling (BIM)
Business Opportunity
LAND BANK
“X” acres (x1 + x2 + x3 + x4)
                                 PROPOSED BUILD AREA
Leased Land – X1 acres           “Y” Sq. Feet (Y1 + Y2 + Y3 + Y4 + Y5)
Project Lands – X2 acres
SEZ / Township Area – X3 acres   Project 1 – Y1 Sq. Feet
Others – X4 acres                Project 2 – Y2 Sq. Feet
                                 Project 3 – Y3 Sq. Feet
                                 Project 4 – Y4 Sq. Feet
                                 Project 5 – Y5 Sq. Feet

In INFRASTRUCTURE Business
• Project Overruns
• Cost Overruns
Fundamentally, IMPACT
• Cash Flow
• Return on Investment (ROI)
• Net Profit
End-to-End Product Solution
Automate Land                                          •Digitize existing Land Bank parcels
                                                       using GIS technology
Bank Records                                           •Build a SINGLE Data Warehouse
                       Integrate GIS Data              around the information generated
                       to Land Bank Records            •Use Data Mining to extract necessary
                                                       information from the Data Warehouse




                      Build BIM Models for
                      Building / Project on
                      the Land Parcel(s)
                                                          Manage Facility

 • Software Development
 • GIS Data Preparation and attaching relevant data to Land Parcels
 • Centralized of ALL Building Drawings and Layouts (Physical Activity)
      • Data Gathering / Cleansing
      • Categorization
      • Digitization wherever required
 • Creation of Centralized Data Warehouse and Integration of GIS Data
 • Convert 2D drawings and layouts into BIM Models
 • BIM as Facility Management Tool
End-to-End Product Solution
Automate Land
Bank Records Data
                                    Integrate GIS Data
                                    to Land Bank Records Data


   Facilitates Integrated Project
                                      Build BIM Models for
   Delivery Approach                  Building / Project on
                                      the Land Parcel(s)
                                                                Manage Facility



                        Integrate with
                        Transaction Systems

                                                                         Transactional /
                        Transactional Data and
                                                                         Functional
                        Entries in ERP Product
                                                                         Reports
BIM in Real Estate
                                        1
                    Effort/effect




                                                                                                  2
                                                  4


                                                                    3




                                    1       Ability to affect costs and functional capabilities

                                    2       Cost of design changes
                                    3       Traditional design process effort distribution

                                    4       BIM enhanced design process effort                        Patrick McLeamy, President of IAI
                                            distribution
Slide courtesy of C. Eastman
Notional BIM Project Cost
                                                                     Saving Curve in Real Estate
                                                                                                    Procurement Stage

                                                                                                                        Execution Stage
                   Project Delivery Selection Stage
Conception Stage




                                                      Design Stage

                                                                     Construction Documents Stage
                                                                                                                                                                     Utilization                                 Closure
                                                                                                                                                                       Stage                                      Stage
                                                                                                                                          Optimized approach with virtual modeling and analysis with reduced change
                                                                                                                                          orders & delivery time and lower operating and sustainment costs

                                                                                                                                                      Typical approach failing to do routine maintenance
                                                                                                                                                      and having to replace items earlier and more often

                                                                                                                                                 Typical design/build approach with required maintenance


                                                                                                                                              The savings we can currently experience
                                                                                                                                              with faster delivery and fewer change orders



                                                                                                                                                                                   The yet untapped $avings



                                                                                                           IAI “BuildingSMART” model supports lifecycle data

                                                                                                                                                                                                           Copyrights: NIBS 2007
BIM in the Lifecycle of a Project




                     KNOWLEDGE
FEEDBACK




                                   Copyrights: NIBS 2007
Integrated GIS & BIM
Theatre / World
           Country                                              Geospatial
                   Installation /
                      Region
                                                                Information
                           State / Province                        (GIS)
                                    District / Takula
                                                 City
                                                        Site
                                                               Real
                                                           Property Asset
                                                                            Land / Parcel

                                                                            Facility / Built
                                                                                          Building
                                                                                                      System
                                                                                                                Sub-Systems
                                                                                                      Space                   Components
                                                                                                                   Level
                                                                                                      Overlay
                                                                                                                                Room
                                                                                          Structure
                                                                                                      System
                                                                                                                Sub-Systems
                                                                                                      Space                   Components
                                                                                                                   Level
                                                                                                      Overlay                   Room
                  Building information                                                    Linear Structure
                  (Building Information                                                                           Node
                                                                                                                Segment
                  Models)
                                                                                                                                Copyrights: NIBS 2007
GIS & BIM Services
    BIM-based Scenario Planning System
    Road & Basic Infrastructure Planning
    Landscape Information Modeling
     ◦ Virtual Modeling
     ◦ Mock ups
    Large-scale Asset Management
    Identify Location for Retail Stores
    Location Analysis
    Tailoring Product Offering to Customers on Shop-to-
     Shop Basis
    Facility Management
Next Step
   To know more or Initiate a discussion on
    “BIM & GIS Integration” for your
    esteemed business

       Please send in your views / comments to
              amol.vidwans@gmail.com
                         OR
               Call on +919665037357
THANK YOU

Más contenido relacionado

La actualidad más candente

MOSAIC BIM- Innovative Design & Construction Solutions
MOSAIC BIM- Innovative Design & Construction SolutionsMOSAIC BIM- Innovative Design & Construction Solutions
MOSAIC BIM- Innovative Design & Construction Solutionscloudfusion
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction Marc Goldman
 
The NBS BIM Toolkit and Digital Plan of Work
The NBS BIM Toolkit and Digital Plan of WorkThe NBS BIM Toolkit and Digital Plan of Work
The NBS BIM Toolkit and Digital Plan of WorkThe NBS
 
Vico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIMVico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIMBe2camp Admin
 
BIM Uses In Design
BIM Uses In DesignBIM Uses In Design
BIM Uses In Designnevena_psu
 
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014Protectionandmanagement
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionReshma Philip
 
2011.05.04 BIM Presentation - Next Level
2011.05.04   BIM Presentation - Next Level2011.05.04   BIM Presentation - Next Level
2011.05.04 BIM Presentation - Next LevelAntman1963
 
Building Energy parametric optimization / collaboration
Building Energy parametric optimization / collaborationBuilding Energy parametric optimization / collaboration
Building Energy parametric optimization / collaborationTero Järvinen
 
iBIM and Knowledge Management
iBIM and Knowledge ManagementiBIM and Knowledge Management
iBIM and Knowledge ManagementBe2camp Admin
 
BIM project execution
BIM project executionBIM project execution
BIM project executionStephen Au
 
SkyBIM Cloud based management & real-time costing of BIM projects
SkyBIM Cloud based management & real-time costing of BIM projectsSkyBIM Cloud based management & real-time costing of BIM projects
SkyBIM Cloud based management & real-time costing of BIM projectsSkyBIM
 
Bim and project management
Bim and project managementBim and project management
Bim and project managementOmar Selim
 
The Value Of BIM For Lifecycle Management in Critical Facilities When Time Qu...
The Value Of BIM For Lifecycle Management in Critical Facilities When Time Qu...The Value Of BIM For Lifecycle Management in Critical Facilities When Time Qu...
The Value Of BIM For Lifecycle Management in Critical Facilities When Time Qu...AndyFuhrman
 
BIM protocols: What are they? Do we need them? What should they contain?
BIM protocols: What are they? Do we need them? What should they contain?BIM protocols: What are they? Do we need them? What should they contain?
BIM protocols: What are they? Do we need them? What should they contain?Applecore Designs Limited
 
BIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use casesBIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use casesDaan Moreels
 

La actualidad más candente (20)

MOSAIC BIM- Innovative Design & Construction Solutions
MOSAIC BIM- Innovative Design & Construction SolutionsMOSAIC BIM- Innovative Design & Construction Solutions
MOSAIC BIM- Innovative Design & Construction Solutions
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction
 
Introduction to Building Information Modeling
Introduction to Building Information Modeling Introduction to Building Information Modeling
Introduction to Building Information Modeling
 
The NBS BIM Toolkit and Digital Plan of Work
The NBS BIM Toolkit and Digital Plan of WorkThe NBS BIM Toolkit and Digital Plan of Work
The NBS BIM Toolkit and Digital Plan of Work
 
Vico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIMVico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIM
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
BIM Introduction
BIM IntroductionBIM Introduction
BIM Introduction
 
BIM Uses In Design
BIM Uses In DesignBIM Uses In Design
BIM Uses In Design
 
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
BIM for Facility Managers - Hani Afendi - Facilities Show, 19 June 2014
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuction
 
2011.05.04 BIM Presentation - Next Level
2011.05.04   BIM Presentation - Next Level2011.05.04   BIM Presentation - Next Level
2011.05.04 BIM Presentation - Next Level
 
Building Energy parametric optimization / collaboration
Building Energy parametric optimization / collaborationBuilding Energy parametric optimization / collaboration
Building Energy parametric optimization / collaboration
 
Bim
BimBim
Bim
 
iBIM and Knowledge Management
iBIM and Knowledge ManagementiBIM and Knowledge Management
iBIM and Knowledge Management
 
BIM project execution
BIM project executionBIM project execution
BIM project execution
 
SkyBIM Cloud based management & real-time costing of BIM projects
SkyBIM Cloud based management & real-time costing of BIM projectsSkyBIM Cloud based management & real-time costing of BIM projects
SkyBIM Cloud based management & real-time costing of BIM projects
 
Bim and project management
Bim and project managementBim and project management
Bim and project management
 
The Value Of BIM For Lifecycle Management in Critical Facilities When Time Qu...
The Value Of BIM For Lifecycle Management in Critical Facilities When Time Qu...The Value Of BIM For Lifecycle Management in Critical Facilities When Time Qu...
The Value Of BIM For Lifecycle Management in Critical Facilities When Time Qu...
 
BIM protocols: What are they? Do we need them? What should they contain?
BIM protocols: What are they? Do we need them? What should they contain?BIM protocols: What are they? Do we need them? What should they contain?
BIM protocols: What are they? Do we need them? What should they contain?
 
BIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use casesBIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use cases
 

Destacado

BIM for Risk Management
BIM for Risk ManagementBIM for Risk Management
BIM for Risk ManagementBiswajit Kundu
 
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FMBIM User Day
 
BIM SHOW LIVE 14 - Story of BIM from design to use
BIM SHOW LIVE 14 - Story of BIM from design to useBIM SHOW LIVE 14 - Story of BIM from design to use
BIM SHOW LIVE 14 - Story of BIM from design to useBuiltEnvironmentUBM
 
How to Create GIS and BIM Interoperability
How to Create GIS and BIM InteroperabilityHow to Create GIS and BIM Interoperability
How to Create GIS and BIM InteroperabilitySafe Software
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information ModellingNemat Syed
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentationryanabarton
 

Destacado (7)

bim & energy analysis
bim & energy analysisbim & energy analysis
bim & energy analysis
 
BIM for Risk Management
BIM for Risk ManagementBIM for Risk Management
BIM for Risk Management
 
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
 
BIM SHOW LIVE 14 - Story of BIM from design to use
BIM SHOW LIVE 14 - Story of BIM from design to useBIM SHOW LIVE 14 - Story of BIM from design to use
BIM SHOW LIVE 14 - Story of BIM from design to use
 
How to Create GIS and BIM Interoperability
How to Create GIS and BIM InteroperabilityHow to Create GIS and BIM Interoperability
How to Create GIS and BIM Interoperability
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information Modelling
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
 

Similar a Change the Way We build - Part 3

Bim presentation km 21-10-2011
Bim presentation km 21-10-2011Bim presentation km 21-10-2011
Bim presentation km 21-10-2011KarinSundberg
 
VideoSurveyor (Georgia Tech)
VideoSurveyor (Georgia Tech)VideoSurveyor (Georgia Tech)
VideoSurveyor (Georgia Tech)habibfathi
 
Smarter Buildings: Bæredygtige bygninger med lavt energiforbrug, Jens Cajus, IBM
Smarter Buildings: Bæredygtige bygninger med lavt energiforbrug, Jens Cajus, IBMSmarter Buildings: Bæredygtige bygninger med lavt energiforbrug, Jens Cajus, IBM
Smarter Buildings: Bæredygtige bygninger med lavt energiforbrug, Jens Cajus, IBMIBM Danmark
 
Opposites Attract SOA, Agile, MDA
Opposites Attract SOA, Agile, MDAOpposites Attract SOA, Agile, MDA
Opposites Attract SOA, Agile, MDADenzil Wasson
 
Mohamad Afshar Moving Beyond Project Level S O A
Mohamad  Afshar    Moving Beyond Project Level S O AMohamad  Afshar    Moving Beyond Project Level S O A
Mohamad Afshar Moving Beyond Project Level S O ASOA Symposium
 
Dynamics Day 2012: Dynamics NAV Vertical Solutions
Dynamics Day 2012: Dynamics NAV Vertical SolutionsDynamics Day 2012: Dynamics NAV Vertical Solutions
Dynamics Day 2012: Dynamics NAV Vertical SolutionsIntergen
 
Au 09 Bi Mmeans Business.1.05.10
Au 09 Bi Mmeans Business.1.05.10Au 09 Bi Mmeans Business.1.05.10
Au 09 Bi Mmeans Business.1.05.10friscozephyr
 
Mohamad Afshar Moving Beyond Project Level S O A V1
Mohamad  Afshar    Moving Beyond Project Level S O A V1Mohamad  Afshar    Moving Beyond Project Level S O A V1
Mohamad Afshar Moving Beyond Project Level S O A V1SOA Symposium
 
PCTY 2012, TRIRIGA Space og Energy Management v. Jens Cajus
PCTY 2012, TRIRIGA Space og Energy Management v. Jens CajusPCTY 2012, TRIRIGA Space og Energy Management v. Jens Cajus
PCTY 2012, TRIRIGA Space og Energy Management v. Jens CajusIBM Danmark
 
Video Surveyor NSF FInal Presentation
Video Surveyor NSF FInal PresentationVideo Surveyor NSF FInal Presentation
Video Surveyor NSF FInal PresentationStanford University
 
CIS Modernization Assessment & Transformation
CIS Modernization Assessment & TransformationCIS Modernization Assessment & Transformation
CIS Modernization Assessment & TransformationInfosys
 
5 Cloud Commandments - Why Cloud Management Makes Sense
5 Cloud Commandments - Why Cloud Management Makes Sense5 Cloud Commandments - Why Cloud Management Makes Sense
5 Cloud Commandments - Why Cloud Management Makes SenseRightScale
 
What is BI on Cloud
What is BI on CloudWhat is BI on Cloud
What is BI on Cloudtdwiindia
 

Similar a Change the Way We build - Part 3 (20)

Bim And Consulting 120720
Bim And Consulting 120720Bim And Consulting 120720
Bim And Consulting 120720
 
Bim presentation km 21-10-2011
Bim presentation km 21-10-2011Bim presentation km 21-10-2011
Bim presentation km 21-10-2011
 
VideoSurveyor (Georgia Tech)
VideoSurveyor (Georgia Tech)VideoSurveyor (Georgia Tech)
VideoSurveyor (Georgia Tech)
 
Open BIM Benefits - Howard Jeffrey
Open BIM Benefits - Howard JeffreyOpen BIM Benefits - Howard Jeffrey
Open BIM Benefits - Howard Jeffrey
 
Cloud Computing for the Construction Industry
Cloud Computing for the Construction IndustryCloud Computing for the Construction Industry
Cloud Computing for the Construction Industry
 
Implementation of oracle e business suite
Implementation of oracle e business suiteImplementation of oracle e business suite
Implementation of oracle e business suite
 
Smarter Buildings: Bæredygtige bygninger med lavt energiforbrug, Jens Cajus, IBM
Smarter Buildings: Bæredygtige bygninger med lavt energiforbrug, Jens Cajus, IBMSmarter Buildings: Bæredygtige bygninger med lavt energiforbrug, Jens Cajus, IBM
Smarter Buildings: Bæredygtige bygninger med lavt energiforbrug, Jens Cajus, IBM
 
Opposites Attract SOA, Agile, MDA
Opposites Attract SOA, Agile, MDAOpposites Attract SOA, Agile, MDA
Opposites Attract SOA, Agile, MDA
 
Mohamad Afshar Moving Beyond Project Level S O A
Mohamad  Afshar    Moving Beyond Project Level S O AMohamad  Afshar    Moving Beyond Project Level S O A
Mohamad Afshar Moving Beyond Project Level S O A
 
Dynamics Day 2012: Dynamics NAV Vertical Solutions
Dynamics Day 2012: Dynamics NAV Vertical SolutionsDynamics Day 2012: Dynamics NAV Vertical Solutions
Dynamics Day 2012: Dynamics NAV Vertical Solutions
 
Au 09 Bi Mmeans Business.1.05.10
Au 09 Bi Mmeans Business.1.05.10Au 09 Bi Mmeans Business.1.05.10
Au 09 Bi Mmeans Business.1.05.10
 
Mohamad Afshar Moving Beyond Project Level S O A V1
Mohamad  Afshar    Moving Beyond Project Level S O A V1Mohamad  Afshar    Moving Beyond Project Level S O A V1
Mohamad Afshar Moving Beyond Project Level S O A V1
 
PCTY 2012, TRIRIGA Space og Energy Management v. Jens Cajus
PCTY 2012, TRIRIGA Space og Energy Management v. Jens CajusPCTY 2012, TRIRIGA Space og Energy Management v. Jens Cajus
PCTY 2012, TRIRIGA Space og Energy Management v. Jens Cajus
 
Video Surveyor NSF FInal Presentation
Video Surveyor NSF FInal PresentationVideo Surveyor NSF FInal Presentation
Video Surveyor NSF FInal Presentation
 
CIS Modernization Assessment & Transformation
CIS Modernization Assessment & TransformationCIS Modernization Assessment & Transformation
CIS Modernization Assessment & Transformation
 
5 Cloud Commandments - Why Cloud Management Makes Sense
5 Cloud Commandments - Why Cloud Management Makes Sense5 Cloud Commandments - Why Cloud Management Makes Sense
5 Cloud Commandments - Why Cloud Management Makes Sense
 
BIM Interoperability - Andrew Bellerby
BIM Interoperability - Andrew BellerbyBIM Interoperability - Andrew Bellerby
BIM Interoperability - Andrew Bellerby
 
What is BI on Cloud
What is BI on CloudWhat is BI on Cloud
What is BI on Cloud
 
CeBIT-Preview Hamburg
CeBIT-Preview HamburgCeBIT-Preview Hamburg
CeBIT-Preview Hamburg
 
Pulse Executive Panel
Pulse Executive PanelPulse Executive Panel
Pulse Executive Panel
 

Más de Amol Vidwans

Tpdroid Electric Cycle Kit
Tpdroid Electric Cycle KitTpdroid Electric Cycle Kit
Tpdroid Electric Cycle KitAmol Vidwans
 
Smart mobility solutions
Smart mobility solutionsSmart mobility solutions
Smart mobility solutionsAmol Vidwans
 
MSW solid waste management
MSW solid waste managementMSW solid waste management
MSW solid waste managementAmol Vidwans
 
Web 2.0 Presentation - Final
Web 2.0 Presentation - FinalWeb 2.0 Presentation - Final
Web 2.0 Presentation - FinalAmol Vidwans
 
Port Security - Possible Technology Interventions and Solutioning
Port Security - Possible Technology Interventions and SolutioningPort Security - Possible Technology Interventions and Solutioning
Port Security - Possible Technology Interventions and SolutioningAmol Vidwans
 
Future technology trends and possibilities for agro industry
Future technology trends and possibilities for agro industryFuture technology trends and possibilities for agro industry
Future technology trends and possibilities for agro industryAmol Vidwans
 
Open source a presentation
Open source   a presentationOpen source   a presentation
Open source a presentationAmol Vidwans
 
Work done at MARG in FY 2010-11
Work done at MARG in FY 2010-11Work done at MARG in FY 2010-11
Work done at MARG in FY 2010-11Amol Vidwans
 
Contribution towards the SAP Journey at MARG
Contribution towards the SAP Journey at MARGContribution towards the SAP Journey at MARG
Contribution towards the SAP Journey at MARGAmol Vidwans
 
WAN Network Optimization Solution
WAN Network Optimization SolutionWAN Network Optimization Solution
WAN Network Optimization SolutionAmol Vidwans
 
High Network Availability at MARG
High Network Availability at MARGHigh Network Availability at MARG
High Network Availability at MARGAmol Vidwans
 
Desktop Virtualization at Club Mahindra
Desktop Virtualization at Club MahindraDesktop Virtualization at Club Mahindra
Desktop Virtualization at Club MahindraAmol Vidwans
 
Enterprise Connectivity at MARG
Enterprise Connectivity at MARGEnterprise Connectivity at MARG
Enterprise Connectivity at MARGAmol Vidwans
 
Integrated Video Communication Solution at MARG
Integrated Video Communication Solution at MARGIntegrated Video Communication Solution at MARG
Integrated Video Communication Solution at MARGAmol Vidwans
 
Work done at MARG in FY 2011-12
Work done at MARG in FY 2011-12Work done at MARG in FY 2011-12
Work done at MARG in FY 2011-12Amol Vidwans
 
Disruptive Technologies to watch out for in Apparel Retail Industry
Disruptive Technologies to watch out for in Apparel Retail IndustryDisruptive Technologies to watch out for in Apparel Retail Industry
Disruptive Technologies to watch out for in Apparel Retail IndustryAmol Vidwans
 
Chevron India IT (2003 - 2006) - a brief presentation
Chevron India IT (2003 - 2006) - a brief presentationChevron India IT (2003 - 2006) - a brief presentation
Chevron India IT (2003 - 2006) - a brief presentationAmol Vidwans
 
Website Management
Website ManagementWebsite Management
Website ManagementAmol Vidwans
 
Korn Ferry ProSpective Assessment (Amol Vidwans)
Korn Ferry ProSpective Assessment (Amol Vidwans)Korn Ferry ProSpective Assessment (Amol Vidwans)
Korn Ferry ProSpective Assessment (Amol Vidwans)Amol Vidwans
 
Professional & Achievement Details
Professional & Achievement DetailsProfessional & Achievement Details
Professional & Achievement DetailsAmol Vidwans
 

Más de Amol Vidwans (20)

Tpdroid Electric Cycle Kit
Tpdroid Electric Cycle KitTpdroid Electric Cycle Kit
Tpdroid Electric Cycle Kit
 
Smart mobility solutions
Smart mobility solutionsSmart mobility solutions
Smart mobility solutions
 
MSW solid waste management
MSW solid waste managementMSW solid waste management
MSW solid waste management
 
Web 2.0 Presentation - Final
Web 2.0 Presentation - FinalWeb 2.0 Presentation - Final
Web 2.0 Presentation - Final
 
Port Security - Possible Technology Interventions and Solutioning
Port Security - Possible Technology Interventions and SolutioningPort Security - Possible Technology Interventions and Solutioning
Port Security - Possible Technology Interventions and Solutioning
 
Future technology trends and possibilities for agro industry
Future technology trends and possibilities for agro industryFuture technology trends and possibilities for agro industry
Future technology trends and possibilities for agro industry
 
Open source a presentation
Open source   a presentationOpen source   a presentation
Open source a presentation
 
Work done at MARG in FY 2010-11
Work done at MARG in FY 2010-11Work done at MARG in FY 2010-11
Work done at MARG in FY 2010-11
 
Contribution towards the SAP Journey at MARG
Contribution towards the SAP Journey at MARGContribution towards the SAP Journey at MARG
Contribution towards the SAP Journey at MARG
 
WAN Network Optimization Solution
WAN Network Optimization SolutionWAN Network Optimization Solution
WAN Network Optimization Solution
 
High Network Availability at MARG
High Network Availability at MARGHigh Network Availability at MARG
High Network Availability at MARG
 
Desktop Virtualization at Club Mahindra
Desktop Virtualization at Club MahindraDesktop Virtualization at Club Mahindra
Desktop Virtualization at Club Mahindra
 
Enterprise Connectivity at MARG
Enterprise Connectivity at MARGEnterprise Connectivity at MARG
Enterprise Connectivity at MARG
 
Integrated Video Communication Solution at MARG
Integrated Video Communication Solution at MARGIntegrated Video Communication Solution at MARG
Integrated Video Communication Solution at MARG
 
Work done at MARG in FY 2011-12
Work done at MARG in FY 2011-12Work done at MARG in FY 2011-12
Work done at MARG in FY 2011-12
 
Disruptive Technologies to watch out for in Apparel Retail Industry
Disruptive Technologies to watch out for in Apparel Retail IndustryDisruptive Technologies to watch out for in Apparel Retail Industry
Disruptive Technologies to watch out for in Apparel Retail Industry
 
Chevron India IT (2003 - 2006) - a brief presentation
Chevron India IT (2003 - 2006) - a brief presentationChevron India IT (2003 - 2006) - a brief presentation
Chevron India IT (2003 - 2006) - a brief presentation
 
Website Management
Website ManagementWebsite Management
Website Management
 
Korn Ferry ProSpective Assessment (Amol Vidwans)
Korn Ferry ProSpective Assessment (Amol Vidwans)Korn Ferry ProSpective Assessment (Amol Vidwans)
Korn Ferry ProSpective Assessment (Amol Vidwans)
 
Professional & Achievement Details
Professional & Achievement DetailsProfessional & Achievement Details
Professional & Achievement Details
 

Change the Way We build - Part 3

  • 1. Change the Way We Build – Part 3 Integrate & Use of Geospatial Data (GIS) & Building Information Modeling (BIM)
  • 2. Business Opportunity LAND BANK “X” acres (x1 + x2 + x3 + x4) PROPOSED BUILD AREA Leased Land – X1 acres “Y” Sq. Feet (Y1 + Y2 + Y3 + Y4 + Y5) Project Lands – X2 acres SEZ / Township Area – X3 acres Project 1 – Y1 Sq. Feet Others – X4 acres Project 2 – Y2 Sq. Feet Project 3 – Y3 Sq. Feet Project 4 – Y4 Sq. Feet Project 5 – Y5 Sq. Feet In INFRASTRUCTURE Business • Project Overruns • Cost Overruns Fundamentally, IMPACT • Cash Flow • Return on Investment (ROI) • Net Profit
  • 3. End-to-End Product Solution Automate Land •Digitize existing Land Bank parcels using GIS technology Bank Records •Build a SINGLE Data Warehouse Integrate GIS Data around the information generated to Land Bank Records •Use Data Mining to extract necessary information from the Data Warehouse Build BIM Models for Building / Project on the Land Parcel(s) Manage Facility • Software Development • GIS Data Preparation and attaching relevant data to Land Parcels • Centralized of ALL Building Drawings and Layouts (Physical Activity) • Data Gathering / Cleansing • Categorization • Digitization wherever required • Creation of Centralized Data Warehouse and Integration of GIS Data • Convert 2D drawings and layouts into BIM Models • BIM as Facility Management Tool
  • 4. End-to-End Product Solution Automate Land Bank Records Data Integrate GIS Data to Land Bank Records Data Facilitates Integrated Project Build BIM Models for Delivery Approach Building / Project on the Land Parcel(s) Manage Facility Integrate with Transaction Systems Transactional / Transactional Data and Functional Entries in ERP Product Reports
  • 5. BIM in Real Estate 1 Effort/effect 2 4 3 1 Ability to affect costs and functional capabilities 2 Cost of design changes 3 Traditional design process effort distribution 4 BIM enhanced design process effort Patrick McLeamy, President of IAI distribution Slide courtesy of C. Eastman
  • 6. Notional BIM Project Cost Saving Curve in Real Estate Procurement Stage Execution Stage Project Delivery Selection Stage Conception Stage Design Stage Construction Documents Stage Utilization Closure Stage Stage Optimized approach with virtual modeling and analysis with reduced change orders & delivery time and lower operating and sustainment costs Typical approach failing to do routine maintenance and having to replace items earlier and more often Typical design/build approach with required maintenance The savings we can currently experience with faster delivery and fewer change orders The yet untapped $avings IAI “BuildingSMART” model supports lifecycle data Copyrights: NIBS 2007
  • 7. BIM in the Lifecycle of a Project KNOWLEDGE FEEDBACK Copyrights: NIBS 2007
  • 8. Integrated GIS & BIM Theatre / World Country Geospatial Installation / Region Information State / Province (GIS) District / Takula City Site Real Property Asset Land / Parcel Facility / Built Building System Sub-Systems Space Components Level Overlay Room Structure System Sub-Systems Space Components Level Overlay Room Building information Linear Structure (Building Information Node Segment Models) Copyrights: NIBS 2007
  • 9. GIS & BIM Services  BIM-based Scenario Planning System  Road & Basic Infrastructure Planning  Landscape Information Modeling ◦ Virtual Modeling ◦ Mock ups  Large-scale Asset Management  Identify Location for Retail Stores  Location Analysis  Tailoring Product Offering to Customers on Shop-to- Shop Basis  Facility Management
  • 10. Next Step  To know more or Initiate a discussion on “BIM & GIS Integration” for your esteemed business Please send in your views / comments to amol.vidwans@gmail.com OR Call on +919665037357