Objective of the presentation
• To understand the formula, the application and the benefits
of Program, Evaluation, and Review Technique (PERT)
analysis in Project Management.
Program (Project) Evaluation and Review Technique (PERT): is a
project management tool used to schedule, organize, and coordinate
tasks within a project. It is basically a method to analyse the tasks
involved in completing a given project, especially the time needed
to complete each task, and to identify the minimum time needed to
complete the total project.
What is PERT ?
Uses Of PERT in our daily lives
• PERT is used when activity times are uncertain.
• In many instances , managers have attempted to apply PERT
principles to other types of projects including:
 Hospital planning for such issues as costs and social security.
 Educational planning and development.
 Various Accounting Functions.
 Real Estate Development.
 PERT and Computer Project-Scheduling Software.
Uses Of PERT in our daily lives
Examples when PERT technique is used-
• A company decides to increase its production capacity by building a new
production unit . The project consists of separate tasks, some of which cannot
be started before others are completed. Thus PERT helps in listing the
activities along with the time expected for each activity.
• A company decides to launch a new product in the market. It requires several
steps. Some of these steps cannot begin until the others are completed. Thus
PERT helps in estimation of completion time and how much delay is possible
in the project completion.
PERT is applied to:
• Very large-scale
• One time
• Complex
• Non-routine infrastructure
• Research and Development Projects
Determine the duration of the project
• OPTIMISTIC TIME: Best time if everything goes perfectly
• REALISTIC TIME: Most likely time
• PESSIMISTIC TIME: A worst-case situation
B + 4M + P
Expected Time = -------------------
6
Three time estimates are required to compute the parameters of an
activity’s duration distribution:
Example:
Expected time for Excavation activity if B=12, M=18, P=60,
12 + 4(18) + 60
Expected Time = -------------------------
6
= 24 days
Determine the critical path
The critical path is
•Determined by adding the times for the activities in each sequence.
•Determining the longest path in the project.
The critical path determines the total calendar time required for the project. If
activities outside the critical path speed up or slow down (within limits), the
total project time does not change.
The amount of time that a non–critical path activity can be delayed without the
project is referred to as a slack time.
Project Crashing
Critical Path is helpful to determine
ES – Earliest Start time
EF - Earliest Finish time
LS – Latest Start time
LF - Latest Finish time
The project can be accelerated by adding the resources required to decrease the
time for the activities in the critical path.
Shortening of the project sometimes is referred to as Project Crashing.
•Make adjustments in the PERT chart as the project progresses.
•As the project unfolds, the estimated times can be replaced
with actual times.
In cases where
There are delays,
Additional resources may be needed to stay on schedule
The PERT chart may be modified to reflect the new situation.
Activity time
Crashing activity
Crash time
Crash cost
Normal Activity
Normal
time
Normal
cost
Slope = crash cost per unit time
Activity Crashing and Time-Cost Relationship
Time-Cost Relationship
 Crashing costs increase as project duration decreases
 Indirect costs increase as project duration increases
 Reduce project length as long as crashing costs are less than indirect costs
Time-Cost Tradeoff
time
Direct cost
Indirect cost
Total project costMin total cost =
optimal project time
Activity Crashing and Time-Cost Relationship
CASE STUDY
Analysis and Implementation of PERT in the Building of an
Aircraft
CASE STUDY
CONCLUSION
Organizations and the world in which they operate continue to
become more complex. Huge numbers of choices and relentless
time pressures and margin pressures make the decisions you face
more daunting and more difficult. Meanwhile, new enterprise
applications and software are generating massive amounts of data –
and it can seem like an overwhelming task to turn that data into
insight and answers.
But all that data and the availability of more and cheaper computing
power are creating an important opportunity for decision makers.
•O.R. is ideally designed to help you take advantage of. PERT.
•Professionals thrive on challenges that involve large numbers of
variables, complex systems, and significant risks.
As a result, PERT can help today’s executives with many of the
specific challenges.
Pert and its applications

Más contenido relacionado

La actualidad más candente

Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project management
Rahul Dubey
 
Project management & Network analysis
Project management & Network analysisProject management & Network analysis
Project management & Network analysis
Harinadh Karimikonda
 

La actualidad más candente (20)

Network Techniques
Network TechniquesNetwork Techniques
Network Techniques
 
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
Project Management Tools and Techniques (PERT- Project Evaluation and Review ...
 
Network Techniques for Project Management
Network Techniques for Project ManagementNetwork Techniques for Project Management
Network Techniques for Project Management
 
Sequencing problems in Operations Research
Sequencing problems in Operations ResearchSequencing problems in Operations Research
Sequencing problems in Operations Research
 
Pert & cpm project management
Pert & cpm   project managementPert & cpm   project management
Pert & cpm project management
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Project management & Network analysis
Project management & Network analysisProject management & Network analysis
Project management & Network analysis
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
time cost trade off
 time cost trade off time cost trade off
time cost trade off
 
Critical Path Ppt
Critical Path PptCritical Path Ppt
Critical Path Ppt
 
Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )
 
Critical path method(cpm)
Critical path method(cpm)Critical path method(cpm)
Critical path method(cpm)
 
Critical path method (cpm)
Critical path method (cpm)Critical path method (cpm)
Critical path method (cpm)
 
Project Management PERT and CPM
Project Management PERT and CPMProject Management PERT and CPM
Project Management PERT and CPM
 
Critical Path Method(CPM)
Critical Path Method(CPM)Critical Path Method(CPM)
Critical Path Method(CPM)
 
PERT
PERTPERT
PERT
 
Chapter22 networktechniquesforprojectmanagement
Chapter22 networktechniquesforprojectmanagementChapter22 networktechniquesforprojectmanagement
Chapter22 networktechniquesforprojectmanagement
 
Pert cpm
Pert cpmPert cpm
Pert cpm
 
Project Management Techniques
Project Management TechniquesProject Management Techniques
Project Management Techniques
 
09. Project Cost Management
09. Project Cost Management09. Project Cost Management
09. Project Cost Management
 

Similar a Pert and its applications

pert & CPM in production Engg an Operation Research
pert & CPM in production Engg an Operation Researchpert & CPM in production Engg an Operation Research
pert & CPM in production Engg an Operation Research
Bikash Choudhuri
 
Activity schedule and affective control of component based project
Activity schedule and affective control of component based projectActivity schedule and affective control of component based project
Activity schedule and affective control of component based project
eSAT Journals
 

Similar a Pert and its applications (20)

Unit IV-Project Management
Unit IV-Project ManagementUnit IV-Project Management
Unit IV-Project Management
 
Programme evaluation & review technique (pert)
Programme evaluation & review technique (pert)Programme evaluation & review technique (pert)
Programme evaluation & review technique (pert)
 
Pert Cpm Nis
Pert   Cpm NisPert   Cpm Nis
Pert Cpm Nis
 
Seminar on pert
Seminar on pertSeminar on pert
Seminar on pert
 
Project time management
Project time managementProject time management
Project time management
 
PERT
PERTPERT
PERT
 
pert & CPM in production Engg an Operation Research
pert & CPM in production Engg an Operation Researchpert & CPM in production Engg an Operation Research
pert & CPM in production Engg an Operation Research
 
PERT (Program evaluation review technique)
PERT (Program evaluation review technique) PERT (Program evaluation review technique)
PERT (Program evaluation review technique)
 
Pert and mbo
Pert and mboPert and mbo
Pert and mbo
 
Techniques of OR.pptx
Techniques of OR.pptxTechniques of OR.pptx
Techniques of OR.pptx
 
Cpm n pert
Cpm n pertCpm n pert
Cpm n pert
 
PERT-CPM for project management .pptx
PERT-CPM for project management    .pptxPERT-CPM for project management    .pptx
PERT-CPM for project management .pptx
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
 
PERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursingPERT Ghant chart and bench marking with application to nursing
PERT Ghant chart and bench marking with application to nursing
 
7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt7. (lecture 5) Project scheduling..ppt
7. (lecture 5) Project scheduling..ppt
 
unit-3 POM.pptx
unit-3 POM.pptxunit-3 POM.pptx
unit-3 POM.pptx
 
NET WORK ANALYSIS.pptx
NET WORK ANALYSIS.pptxNET WORK ANALYSIS.pptx
NET WORK ANALYSIS.pptx
 
PERT VS CPM.docx
PERT VS CPM.docxPERT VS CPM.docx
PERT VS CPM.docx
 
Activity schedule and affective control of component based project
Activity schedule and affective control of component based projectActivity schedule and affective control of component based project
Activity schedule and affective control of component based project
 
project management-cpm and pert methods for managers
project management-cpm and pert methods for managersproject management-cpm and pert methods for managers
project management-cpm and pert methods for managers
 

Último

Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 

Último (20)

PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 

Pert and its applications

  • 1. Program Evaluation Review Technique (PERT) and its applications in Project Management Submitted By- Clayburn Calvert(26) Shruti Mishra(27) Amrit Mohanty(28) Amit Raj(29) Ravi Sunkara(30) Submitted to: Dr. Subhajit Bhattacharya
  • 2. Objective of the presentation • To understand the formula, the application and the benefits of Program, Evaluation, and Review Technique (PERT) analysis in Project Management. Program (Project) Evaluation and Review Technique (PERT): is a project management tool used to schedule, organize, and coordinate tasks within a project. It is basically a method to analyse the tasks involved in completing a given project, especially the time needed to complete each task, and to identify the minimum time needed to complete the total project. What is PERT ?
  • 3. Uses Of PERT in our daily lives • PERT is used when activity times are uncertain. • In many instances , managers have attempted to apply PERT principles to other types of projects including:  Hospital planning for such issues as costs and social security.  Educational planning and development.  Various Accounting Functions.  Real Estate Development.  PERT and Computer Project-Scheduling Software.
  • 4. Uses Of PERT in our daily lives Examples when PERT technique is used- • A company decides to increase its production capacity by building a new production unit . The project consists of separate tasks, some of which cannot be started before others are completed. Thus PERT helps in listing the activities along with the time expected for each activity. • A company decides to launch a new product in the market. It requires several steps. Some of these steps cannot begin until the others are completed. Thus PERT helps in estimation of completion time and how much delay is possible in the project completion. PERT is applied to: • Very large-scale • One time • Complex • Non-routine infrastructure • Research and Development Projects
  • 5. Determine the duration of the project • OPTIMISTIC TIME: Best time if everything goes perfectly • REALISTIC TIME: Most likely time • PESSIMISTIC TIME: A worst-case situation B + 4M + P Expected Time = ------------------- 6 Three time estimates are required to compute the parameters of an activity’s duration distribution: Example: Expected time for Excavation activity if B=12, M=18, P=60, 12 + 4(18) + 60 Expected Time = ------------------------- 6 = 24 days
  • 6. Determine the critical path The critical path is •Determined by adding the times for the activities in each sequence. •Determining the longest path in the project. The critical path determines the total calendar time required for the project. If activities outside the critical path speed up or slow down (within limits), the total project time does not change. The amount of time that a non–critical path activity can be delayed without the project is referred to as a slack time.
  • 7. Project Crashing Critical Path is helpful to determine ES – Earliest Start time EF - Earliest Finish time LS – Latest Start time LF - Latest Finish time The project can be accelerated by adding the resources required to decrease the time for the activities in the critical path. Shortening of the project sometimes is referred to as Project Crashing. •Make adjustments in the PERT chart as the project progresses. •As the project unfolds, the estimated times can be replaced with actual times. In cases where There are delays, Additional resources may be needed to stay on schedule The PERT chart may be modified to reflect the new situation.
  • 8. Activity time Crashing activity Crash time Crash cost Normal Activity Normal time Normal cost Slope = crash cost per unit time Activity Crashing and Time-Cost Relationship
  • 9. Time-Cost Relationship  Crashing costs increase as project duration decreases  Indirect costs increase as project duration increases  Reduce project length as long as crashing costs are less than indirect costs Time-Cost Tradeoff time Direct cost Indirect cost Total project costMin total cost = optimal project time Activity Crashing and Time-Cost Relationship
  • 10. CASE STUDY Analysis and Implementation of PERT in the Building of an Aircraft
  • 11.
  • 13. CONCLUSION Organizations and the world in which they operate continue to become more complex. Huge numbers of choices and relentless time pressures and margin pressures make the decisions you face more daunting and more difficult. Meanwhile, new enterprise applications and software are generating massive amounts of data – and it can seem like an overwhelming task to turn that data into insight and answers. But all that data and the availability of more and cheaper computing power are creating an important opportunity for decision makers. •O.R. is ideally designed to help you take advantage of. PERT. •Professionals thrive on challenges that involve large numbers of variables, complex systems, and significant risks. As a result, PERT can help today’s executives with many of the specific challenges.