SlideShare una empresa de Scribd logo
1 de 22
© 2011, Carestream Health
Building Quality
Into Your
Technical
Communications
Department
Spectrum
April 1, 2011
p.2
Agenda
• Background
• Model 1: Quality Management System (QMS)
• Model 2: Capability Maturity Model (CMM)
• Model 3: Cost of Quality (CoQ)
• Elements of Quality
• Implementation
• Final Thoughts
p.3
Background:
Carestream Health, Inc.
 Health imaging hardware, software, and
services
 Global sales and service
 Regulated products
 Product development sites around the
world
p.4
Background:
Technical Communication and Localization (TCL)
Customers
Employees
Partners
Create
Content
Localize Deploy
Manage Content
p.5
Model 1:
Quality Management System (QMS)
AT A GLANCE
 Background
 QMS
 CMM
 CoQ
 Elements
 Implementation
 Final Thoughts
The organizational structure, procedures, processes and
resources needed to implement quality management.
Quality management includes:
Source: http://en.wikipedia.org/wiki/Quality_management_system
• Quality planning
• Quality control
• Quality assurance
• Quality improvement
p.6
Elements of a QMS
 Organizational structure
 Responsibilities
 Methods
 Data management
 Processes
 Resources
 Customer satisfaction
 Continuous improvement
 Product quality
Source: http://en.wikipedia.org/wiki/Quality_management_system
p.7
Elements of a QMS for Medical Devices
 Personal training and qualifications
 Controlling the product design
 Controlling documentation
 Controlling purchasing
 Product identification and traceability
at all stages of production
 Controlling and defining production
and process
 Defining and controlling inspection,
measuring, and test equipment
 Validating processes
 Product acceptance
 Controlling nonconforming product
 Instituting corrective and preventive action
when errors occur
 Labeling and packaging controls
 Handling, storage, distribution,
and installation
 Records
 Servicing
 Statistical techniques
Source: http://en.wikipedia.org/wiki/Quality_management_system
p.8
Aligning the TCL QMS with our Corporate QMS
• Roles and responsibilities
• Standard Operating Procedures (SOPs)
• Corrective Action and Preventive Action (CAPA)
• Training
• Feedback
• Management Review (MR)
• Audit
p.9
Model 2:
Capability Maturity Model (CMM)
AT A GLANCE
 Background
 QMS
 CMM
 CoQ
 Elements
 Implementation
 Final Thoughts
A tool developed by Carnegie-Mellon University
to improve software development.
This tool is widely leveraged as a general
model to aid in improving organizational
business processes.
Source: http://en.wikipedia.org/wiki/Capability_Maturity_Model
p.10
CMM Levels
Level 1: Initial
Chaotic
Level 2: Repeatable
Level 3: Well
Defined
Level 4: Managed
Level 5: Optimizing
Use metrics to monitor control of as-is processes.
Systems-view of process performance. Take corrective
action when not within capability.
Ad hoc, undocumented, reactive, ever-changing, unpredictable. Success
is based on heroics of individuals. Individuals are clueless as to issues.
Regulations are not known or ignored.
Focus is on continuously improving process
performance. Statistical measures used to
reduce variation. Robust global development.
Some processes are repeatable, but results are not always predictable.
Processes exist but fail in stressful times. A reactive compliance to
regulations. Reliance on outside resources. Quality exists at project level.
Basic requirements and project management.
SOPs are in place. Review defects. Some improvement over time.
Sporadic efforts and results. Focus on process standardization.
Tailored application of processes. Coordinated communications.
Source: http://en.wikipedia.org/wiki/Capability_Maturity_Model
p.11
Model 3: Cost of Quality (CoQ)
AT A GLANCE
 Background
 QMS
 CMM
 CoQ
 Elements
 Implementation
 Final Thoughts
Armand V. Feigenbaum defined Cost of Quality
as a means to quantify the total cost of
quality-related efforts and deficiencies.
p.12
Cost of Quality
Prevention Appraisal Internal Failure External Failure
Arise from efforts to
keep defects from
occurring
Arise from detecting
defects
Arise from defects
caught internally and
dealt with by
discarding or
repairing the defects
Arise from defects
that reach customers
Examples:
Training
SOPs
Quality Planning
Product Design
Verification
Examples:
Inspection
Audit
Testing
Examples:
Scrap
Rework
Examples:
Customer complaints
Warranty costs
Good will
Product Service
Product recall
$ $$ $$$ $$$$
Source: http://en.wikipedia.org/wiki/Quality_costs
p.13
CoQ in Technical Communications
Prevention Appraisal Internal Failure External Failure
Training
Standard Operating
Procedures
Templates
Scripts
Standards Guide
Style Guide
Training Plan
Design Documents
File naming
conventions
Request Forms
Edit
SME Review
Validation
Trade Trial
Pilot
Linguistic Review
Desk Edit
Proof
Usability Study
Rework
Churn
Reprints
Scrap
Slipped dates
Missed deliverables
How-to-Support calls
Returns
Modifications
Service Bulletins
Product Recall
Sales discontinuance
Product Liability
Loss of reputation
p.14
CoQ in Technical Communications
Prevention Appraisal Internal Failure External Failure
- Training
- SOPs
- Templates
- Scripts
- Standards Guide
- Style Guide
- Training Plan
- Design Documents
- File naming
conventions
- Request Forms
- Edit
- SME Review
- Validation
- Trade Trial
- Pilot
- Linguistic Review
- Desk Edit
- Proof
- Usability Study
- Rework
- Churn
- Reprints
- Scrap
- Slipped dates
- Missed Deliverables
- Support calls
- Returns
- Modifications
- Service Bulletins
- Product Recall
- Sales
discontinuance
- Product Liability
- Loss of reputation
p.15
Quality Elements in Technical
Communications
• SOP
• Standard or Style Guide
• Template
• Script
• Editing
• Review/Approve
• Validation/Verification
• Doc Training Plan
• Design Document
• Desk Edit
• Linguistic Review
• Training
• Spell Check
• What have we missed?
AT A GLANCE
 Background
 QMS
 CMM
 CoQ
 Elements
 Implementation
 Final Thoughts
p.16
Implementation
AT A GLANCE
 Background
 QMS
 CMM
 CoQ
 Elements
 Implementation
 Final Thoughts
Where do we start?
CMM Level 2
What do we include?
Quality Elements for prevention & appraisal
How do we manage change?
Tuckman’s Model
p.17
Quality Elements Mapped into TCL Process
Create Content Localize Deploy
Plan
Manage Content
Quality
p.18
Tuckman’s Group Development
AT A GLANCE
 Background
 QMS
 CMM
 CoQ
 Elements
 Implementation
 Final Thoughts
Source: Bruce W. Tuckman, “Development Sequence in Small Groups,”
Psychological Bulletin, 1955
Forming
StormingNorming
Performing
p.19
Group Dynamic During Maturity
Level 1: Initial
Chaotic
Level 2: Repeatable
Level 3: Well
Defined
Level 4: Managed
Level 5: Optimizing
Forming
StormingNorming
Performing
p.20
Action Register
TCL QMS Action Plan
Client Satisfaction Graph Quality Metric Graph
Action Who Due Status
1. Get buy in from leadership
2. Communication QMS Vision
3. Establish roles
4. Document SOPs
5. Train on SOPs, QMS, etc.
6. Implement processes for
audit/appraisal, corrective action, &
preventive action
7. Establish measure system
8. Implement improvements
p.21
Final Thoughts
AT A GLANCE
 Background
 QMS
 CMM
 CoQ
 Elements
 Implementation
 Final Thoughts
?!
p.22
Questions?
John Lukes
John.Lukes@carestream.com
Amy Friend
Amy.Friend@carestream.com

Más contenido relacionado

La actualidad más candente

Quality Mangt
Quality MangtQuality Mangt
Quality Mangt
ajithsrc
 
Quality Management
Quality ManagementQuality Management
Quality Management
Buchiri
 
Capability Maturity Model (CMM)
Capability Maturity Model (CMM)Capability Maturity Model (CMM)
Capability Maturity Model (CMM)
Ali Sadhik Shaik
 

La actualidad más candente (20)

Capability Maturity Model Integration (CMMI)
Capability Maturity Model Integration (CMMI)Capability Maturity Model Integration (CMMI)
Capability Maturity Model Integration (CMMI)
 
CMMI v 1.2 Basics
CMMI v 1.2 BasicsCMMI v 1.2 Basics
CMMI v 1.2 Basics
 
CMMI level 2 (MA & PPQA)
CMMI level 2 (MA & PPQA)CMMI level 2 (MA & PPQA)
CMMI level 2 (MA & PPQA)
 
Unit4 Software Engineering Institute (SEI)’s Capability Maturity Model (CMM) ...
Unit4 Software Engineering Institute (SEI)’sCapability Maturity Model (CMM)...Unit4 Software Engineering Institute (SEI)’sCapability Maturity Model (CMM)...
Unit4 Software Engineering Institute (SEI)’s Capability Maturity Model (CMM) ...
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
 
Topic 5 capability maturity model
Topic 5 capability maturity modelTopic 5 capability maturity model
Topic 5 capability maturity model
 
Applying Capability Maturity Model Integration (CMMI) for Your Company Proces...
Applying Capability Maturity Model Integration (CMMI) for Your Company Proces...Applying Capability Maturity Model Integration (CMMI) for Your Company Proces...
Applying Capability Maturity Model Integration (CMMI) for Your Company Proces...
 
Cmm ashish ppt
Cmm ashish pptCmm ashish ppt
Cmm ashish ppt
 
CMMI Certification (Level 1-5)
CMMI Certification (Level 1-5)CMMI Certification (Level 1-5)
CMMI Certification (Level 1-5)
 
Capability Maturity Model Integration
Capability Maturity Model IntegrationCapability Maturity Model Integration
Capability Maturity Model Integration
 
CMMI for Development
CMMI for DevelopmentCMMI for Development
CMMI for Development
 
CMMi
CMMiCMMi
CMMi
 
Capability Maturity Model
Capability Maturity ModelCapability Maturity Model
Capability Maturity Model
 
Cmmi - An overview
Cmmi - An overviewCmmi - An overview
Cmmi - An overview
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
 
Ch27
Ch27Ch27
Ch27
 
Quality Mangt
Quality MangtQuality Mangt
Quality Mangt
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Capability Maturity Model (CMM)
Capability Maturity Model (CMM)Capability Maturity Model (CMM)
Capability Maturity Model (CMM)
 
Testing & Quality Assurance
Testing & Quality AssuranceTesting & Quality Assurance
Testing & Quality Assurance
 

Similar a Building Quality Into Your Technical Communications Department

Quality management system process
Quality management system processQuality management system process
Quality management system process
selinasimpson331
 
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
RAJU852744
 
Lp1 ppt mt6250due 1-22-2012
Lp1 ppt mt6250due 1-22-2012Lp1 ppt mt6250due 1-22-2012
Lp1 ppt mt6250due 1-22-2012
RLLRichmond
 
Software process improvement.ppt
Software process improvement.pptSoftware process improvement.ppt
Software process improvement.ppt
ImXaib
 
Standard_Work_Presentation_1703112688.pdf
Standard_Work_Presentation_1703112688.pdfStandard_Work_Presentation_1703112688.pdf
Standard_Work_Presentation_1703112688.pdf
BrunoTrovalim
 

Similar a Building Quality Into Your Technical Communications Department (20)

Cmmi
CmmiCmmi
Cmmi
 
Topic 8 - Project Quality Management.pdf
Topic 8 - Project Quality Management.pdfTopic 8 - Project Quality Management.pdf
Topic 8 - Project Quality Management.pdf
 
Capability Maturity Model Integartion
Capability Maturity Model IntegartionCapability Maturity Model Integartion
Capability Maturity Model Integartion
 
Pharmaceutical Quality Management System
Pharmaceutical Quality Management SystemPharmaceutical Quality Management System
Pharmaceutical Quality Management System
 
Logical roadmap of creating pmo with cm mi prospective
Logical roadmap of creating pmo with cm mi prospectiveLogical roadmap of creating pmo with cm mi prospective
Logical roadmap of creating pmo with cm mi prospective
 
Product Development Capability Maturity Model PowerPoint Presentation Slides
Product Development Capability Maturity Model PowerPoint Presentation SlidesProduct Development Capability Maturity Model PowerPoint Presentation Slides
Product Development Capability Maturity Model PowerPoint Presentation Slides
 
Capability Maturity Model (CMM).pptx
Capability Maturity Model (CMM).pptxCapability Maturity Model (CMM).pptx
Capability Maturity Model (CMM).pptx
 
Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)
 
eUnit 2 software process model
eUnit 2  software process modeleUnit 2  software process model
eUnit 2 software process model
 
Ch28
Ch28Ch28
Ch28
 
Integrated roadmap for Developing PMO with CMMi Prospective
Integrated roadmap for Developing PMO with CMMi ProspectiveIntegrated roadmap for Developing PMO with CMMi Prospective
Integrated roadmap for Developing PMO with CMMi Prospective
 
Quality management system process
Quality management system processQuality management system process
Quality management system process
 
IT 8076 Software Testing Unit1
IT 8076 Software Testing Unit1IT 8076 Software Testing Unit1
IT 8076 Software Testing Unit1
 
TQM (Total Quality Management)
TQM (Total Quality Management)TQM (Total Quality Management)
TQM (Total Quality Management)
 
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
122 Part 1 - GuideFigure 4-15. Close Project or Phase Dat.docx
 
continuous improvement in school management (4) .pdf
continuous improvement in school management (4) .pdfcontinuous improvement in school management (4) .pdf
continuous improvement in school management (4) .pdf
 
Lp1 ppt mt6250due 1-22-2012
Lp1 ppt mt6250due 1-22-2012Lp1 ppt mt6250due 1-22-2012
Lp1 ppt mt6250due 1-22-2012
 
Software process improvement.ppt
Software process improvement.pptSoftware process improvement.ppt
Software process improvement.ppt
 
Standard_Work_Presentation_1703112688.pdf
Standard_Work_Presentation_1703112688.pdfStandard_Work_Presentation_1703112688.pdf
Standard_Work_Presentation_1703112688.pdf
 
Tqm
TqmTqm
Tqm
 

Más de Amy S. Friend

Más de Amy S. Friend (16)

Amy S Friend-stc-spectrum-Lickety-Split-Learning-Agile-2014
Amy S Friend-stc-spectrum-Lickety-Split-Learning-Agile-2014Amy S Friend-stc-spectrum-Lickety-Split-Learning-Agile-2014
Amy S Friend-stc-spectrum-Lickety-Split-Learning-Agile-2014
 
Amy Friend- STC Spectrum- From Epic to Short Story: A Process to Reduce Cycle...
Amy Friend- STC Spectrum- From Epic to Short Story: A Process to Reduce Cycle...Amy Friend- STC Spectrum- From Epic to Short Story: A Process to Reduce Cycle...
Amy Friend- STC Spectrum- From Epic to Short Story: A Process to Reduce Cycle...
 
Amy Friend- From Epic to Short Story: A Process to Reduce Cycle Times
Amy Friend- From Epic to Short Story: A Process to Reduce Cycle TimesAmy Friend- From Epic to Short Story: A Process to Reduce Cycle Times
Amy Friend- From Epic to Short Story: A Process to Reduce Cycle Times
 
Amy S Friend- STC- To Err Is Human: Applying Six Sigma Quality to Technical C...
Amy S Friend- STC- To Err Is Human: Applying Six Sigma Quality to Technical C...Amy S Friend- STC- To Err Is Human: Applying Six Sigma Quality to Technical C...
Amy S Friend- STC- To Err Is Human: Applying Six Sigma Quality to Technical C...
 
Amy s friend-judyalbers-intrepid-corning-presentation-hr-sept2018
Amy s friend-judyalbers-intrepid-corning-presentation-hr-sept2018Amy s friend-judyalbers-intrepid-corning-presentation-hr-sept2018
Amy s friend-judyalbers-intrepid-corning-presentation-hr-sept2018
 
Amy S Friend & Jerry Tavormina- Waste Watchers: Applying Lean to Technical Co...
Amy S Friend & Jerry Tavormina- Waste Watchers: Applying Lean to Technical Co...Amy S Friend & Jerry Tavormina- Waste Watchers: Applying Lean to Technical Co...
Amy S Friend & Jerry Tavormina- Waste Watchers: Applying Lean to Technical Co...
 
A Stake in the Ground- A Successful Approach To Estimating and Tracking Projects
A Stake in the Ground- A Successful Approach To Estimating and Tracking ProjectsA Stake in the Ground- A Successful Approach To Estimating and Tracking Projects
A Stake in the Ground- A Successful Approach To Estimating and Tracking Projects
 
Get Ready- Tools for Planning a Training Design Project
Get Ready- Tools for Planning a Training Design ProjectGet Ready- Tools for Planning a Training Design Project
Get Ready- Tools for Planning a Training Design Project
 
Riding rollercoasteroflife change
Riding rollercoasteroflife changeRiding rollercoasteroflife change
Riding rollercoasteroflife change
 
Business Connections: Taking Your Employee Resource Group Into the Community
Business Connections: Taking Your Employee Resource Group Into the CommunityBusiness Connections: Taking Your Employee Resource Group Into the Community
Business Connections: Taking Your Employee Resource Group Into the Community
 
Transitioning a Technical Communications Department
Transitioning a Technical Communications DepartmentTransitioning a Technical Communications Department
Transitioning a Technical Communications Department
 
Localization in the Real World: Managing Cost, Schedule and Quality within Pr...
Localization in the Real World: Managing Cost, Schedule and Quality within Pr...Localization in the Real World: Managing Cost, Schedule and Quality within Pr...
Localization in the Real World: Managing Cost, Schedule and Quality within Pr...
 
Perfect Service Delivery
Perfect Service DeliveryPerfect Service Delivery
Perfect Service Delivery
 
Respect in Our Schools - GLSEN Training for Rochester City School District
Respect in Our Schools - GLSEN Training for Rochester City School DistrictRespect in Our Schools - GLSEN Training for Rochester City School District
Respect in Our Schools - GLSEN Training for Rochester City School District
 
Assessing Your Content Management Needs
Assessing Your Content Management NeedsAssessing Your Content Management Needs
Assessing Your Content Management Needs
 
Marketing to LGBT- Corporate Coming Out Continuum
Marketing to LGBT- Corporate Coming Out ContinuumMarketing to LGBT- Corporate Coming Out Continuum
Marketing to LGBT- Corporate Coming Out Continuum
 

Último

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Último (20)

Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 

Building Quality Into Your Technical Communications Department

  • 1. © 2011, Carestream Health Building Quality Into Your Technical Communications Department Spectrum April 1, 2011
  • 2. p.2 Agenda • Background • Model 1: Quality Management System (QMS) • Model 2: Capability Maturity Model (CMM) • Model 3: Cost of Quality (CoQ) • Elements of Quality • Implementation • Final Thoughts
  • 3. p.3 Background: Carestream Health, Inc.  Health imaging hardware, software, and services  Global sales and service  Regulated products  Product development sites around the world
  • 4. p.4 Background: Technical Communication and Localization (TCL) Customers Employees Partners Create Content Localize Deploy Manage Content
  • 5. p.5 Model 1: Quality Management System (QMS) AT A GLANCE  Background  QMS  CMM  CoQ  Elements  Implementation  Final Thoughts The organizational structure, procedures, processes and resources needed to implement quality management. Quality management includes: Source: http://en.wikipedia.org/wiki/Quality_management_system • Quality planning • Quality control • Quality assurance • Quality improvement
  • 6. p.6 Elements of a QMS  Organizational structure  Responsibilities  Methods  Data management  Processes  Resources  Customer satisfaction  Continuous improvement  Product quality Source: http://en.wikipedia.org/wiki/Quality_management_system
  • 7. p.7 Elements of a QMS for Medical Devices  Personal training and qualifications  Controlling the product design  Controlling documentation  Controlling purchasing  Product identification and traceability at all stages of production  Controlling and defining production and process  Defining and controlling inspection, measuring, and test equipment  Validating processes  Product acceptance  Controlling nonconforming product  Instituting corrective and preventive action when errors occur  Labeling and packaging controls  Handling, storage, distribution, and installation  Records  Servicing  Statistical techniques Source: http://en.wikipedia.org/wiki/Quality_management_system
  • 8. p.8 Aligning the TCL QMS with our Corporate QMS • Roles and responsibilities • Standard Operating Procedures (SOPs) • Corrective Action and Preventive Action (CAPA) • Training • Feedback • Management Review (MR) • Audit
  • 9. p.9 Model 2: Capability Maturity Model (CMM) AT A GLANCE  Background  QMS  CMM  CoQ  Elements  Implementation  Final Thoughts A tool developed by Carnegie-Mellon University to improve software development. This tool is widely leveraged as a general model to aid in improving organizational business processes. Source: http://en.wikipedia.org/wiki/Capability_Maturity_Model
  • 10. p.10 CMM Levels Level 1: Initial Chaotic Level 2: Repeatable Level 3: Well Defined Level 4: Managed Level 5: Optimizing Use metrics to monitor control of as-is processes. Systems-view of process performance. Take corrective action when not within capability. Ad hoc, undocumented, reactive, ever-changing, unpredictable. Success is based on heroics of individuals. Individuals are clueless as to issues. Regulations are not known or ignored. Focus is on continuously improving process performance. Statistical measures used to reduce variation. Robust global development. Some processes are repeatable, but results are not always predictable. Processes exist but fail in stressful times. A reactive compliance to regulations. Reliance on outside resources. Quality exists at project level. Basic requirements and project management. SOPs are in place. Review defects. Some improvement over time. Sporadic efforts and results. Focus on process standardization. Tailored application of processes. Coordinated communications. Source: http://en.wikipedia.org/wiki/Capability_Maturity_Model
  • 11. p.11 Model 3: Cost of Quality (CoQ) AT A GLANCE  Background  QMS  CMM  CoQ  Elements  Implementation  Final Thoughts Armand V. Feigenbaum defined Cost of Quality as a means to quantify the total cost of quality-related efforts and deficiencies.
  • 12. p.12 Cost of Quality Prevention Appraisal Internal Failure External Failure Arise from efforts to keep defects from occurring Arise from detecting defects Arise from defects caught internally and dealt with by discarding or repairing the defects Arise from defects that reach customers Examples: Training SOPs Quality Planning Product Design Verification Examples: Inspection Audit Testing Examples: Scrap Rework Examples: Customer complaints Warranty costs Good will Product Service Product recall $ $$ $$$ $$$$ Source: http://en.wikipedia.org/wiki/Quality_costs
  • 13. p.13 CoQ in Technical Communications Prevention Appraisal Internal Failure External Failure Training Standard Operating Procedures Templates Scripts Standards Guide Style Guide Training Plan Design Documents File naming conventions Request Forms Edit SME Review Validation Trade Trial Pilot Linguistic Review Desk Edit Proof Usability Study Rework Churn Reprints Scrap Slipped dates Missed deliverables How-to-Support calls Returns Modifications Service Bulletins Product Recall Sales discontinuance Product Liability Loss of reputation
  • 14. p.14 CoQ in Technical Communications Prevention Appraisal Internal Failure External Failure - Training - SOPs - Templates - Scripts - Standards Guide - Style Guide - Training Plan - Design Documents - File naming conventions - Request Forms - Edit - SME Review - Validation - Trade Trial - Pilot - Linguistic Review - Desk Edit - Proof - Usability Study - Rework - Churn - Reprints - Scrap - Slipped dates - Missed Deliverables - Support calls - Returns - Modifications - Service Bulletins - Product Recall - Sales discontinuance - Product Liability - Loss of reputation
  • 15. p.15 Quality Elements in Technical Communications • SOP • Standard or Style Guide • Template • Script • Editing • Review/Approve • Validation/Verification • Doc Training Plan • Design Document • Desk Edit • Linguistic Review • Training • Spell Check • What have we missed? AT A GLANCE  Background  QMS  CMM  CoQ  Elements  Implementation  Final Thoughts
  • 16. p.16 Implementation AT A GLANCE  Background  QMS  CMM  CoQ  Elements  Implementation  Final Thoughts Where do we start? CMM Level 2 What do we include? Quality Elements for prevention & appraisal How do we manage change? Tuckman’s Model
  • 17. p.17 Quality Elements Mapped into TCL Process Create Content Localize Deploy Plan Manage Content Quality
  • 18. p.18 Tuckman’s Group Development AT A GLANCE  Background  QMS  CMM  CoQ  Elements  Implementation  Final Thoughts Source: Bruce W. Tuckman, “Development Sequence in Small Groups,” Psychological Bulletin, 1955 Forming StormingNorming Performing
  • 19. p.19 Group Dynamic During Maturity Level 1: Initial Chaotic Level 2: Repeatable Level 3: Well Defined Level 4: Managed Level 5: Optimizing Forming StormingNorming Performing
  • 20. p.20 Action Register TCL QMS Action Plan Client Satisfaction Graph Quality Metric Graph Action Who Due Status 1. Get buy in from leadership 2. Communication QMS Vision 3. Establish roles 4. Document SOPs 5. Train on SOPs, QMS, etc. 6. Implement processes for audit/appraisal, corrective action, & preventive action 7. Establish measure system 8. Implement improvements
  • 21. p.21 Final Thoughts AT A GLANCE  Background  QMS  CMM  CoQ  Elements  Implementation  Final Thoughts ?!