TYPES OF CONSTRUCTION CONTRACTS
Contract Definitions
A. From a Legal Point of View
Contract is a mutual agreement between two or more parties that
something shall be done, an agreement enforceable at law.
B. According to FIDIC
Contract means the General Conditions, the Supplementary Conditions,
the Specifications, the Drawings, the Bill of Quantities, the Tender, the
Letter of Acceptance, the Contract Agreement, and such further
documents as may be expressly incorporated in the Letter of Acceptance
or Contract Agreement.
C. According to Method of Payment
The agreement of how the owner will pay the contractor for work
performed such as a lump-sum or cost-plus payment.
TYPES OF CONSTRUCTION CONTRACTS
Two broad categories:
 Price Given in Advance Contracts (Priced-based Contracts)
 Cost Reimbursement Contracts (Cost-based Contracts)
Factors Influencing the Choice of the Type of Contract
 The appropriateness for providing an adequate incentive for
efficient performance by the contractor
 The ability to introduce changes
 The allocation of risks
 The start and completion date of the project
Procurement Management and Contract Administration (COTM 4242): TYPES OF CONSTRUCTION CONTRACTS
Mada Walabu University Andualem Endris (M.Sc)
1.Lump Sum Contact
Sometimes called Drawings and Specifications Contract
a) Main Aspects of Lump Sum Contract
1. The contractor agrees to perform a stipulated job of work in
exchange for a fixed sum of money. In other words a single
tendered price is given for the completion of a specified work to the
satisfaction of the client by a certain date.
2. Payment may be staged at intervals of time on the completion of
milestones.
3. Useful for construction works:
 that can be accurately and completely described at the time of
bidding such as residential and building construction,
 when limited variation is needed,
 when level of risks is low and quantifiable, and
 when the client does not wish to be involved in the management
of his project.
4. The contractor is responsible for preparing his B.O.Q. i.e.
determination of work items, description of work items, obtaining his
own quantity form drawings and specifications and taking the
responsibility for the accuracy of the estimated quantities.
5. The responsibility is on the contractor to include in his price
everything necessary for carrying out the work.
b) Advantages of Lump Sum Contract
1. The final price is known, by the owner, before the work commences.
2. The contractor has more incentive to reduce his cost to increase the
profit.
3. The contractor hopes to complete the job as quickly as possible, to
minimize overhead, to maximize profit and to move to the next Job.
Procurement Management and Contract Administration (COTM 4242): TYPES OF CONSTRUCTION CONTRACTS
Mada Walabu University Andualem Endris (M.Sc)
c) Disadvantages of Lump Sum Contract
1. A great deal of work should be done by the contractors prior to
preparing the estimate. It is wasteful of a skilled estimator’s time.
2. Changes in drawings and specifications can be very expensive and
source of trouble. In other words the contract has very limited
flexibility for design changes.
3. The contractor carries much of the risks. The tendered price may
include high risk contingency.
4. Competent contractors may decide not to bid to avoid a high-risk
lump sum contract.
2. Admeasurement Contract
Sometimes called Unit Price Contract
1. Includes Bill of Quantities Contract and Schedule of Rates Contract.
2. Payment is made (monthly) for quantities of work completed and
measured during the month. The client can introduce variations in the
work.
3. The contractor can claim additional payment for any changes in the
work content.
4. Tender price is usually increased by variations and claims.
a) Main Aspects of Unit Price Contract
1. Items of work of the contract are specified with estimated quantities in
the Bills of Quantities.
2. Estimated quantities are surveyed by Architect/Engineer.
3. Contractors enter unit prices against the estimated quantities of work.
4. The contract is based on estimated quantities of work items and unit
price for each of these work items.
5. Payment is made on the basis of units of work actually done and
measured in the field multiplied by the unit prices.
Procurement Management and Contract Administration (COTM 4242): TYPES OF CONSTRUCTION CONTRACTS
Mada Walabu University Andualem Endris (M.Sc)
6. Re-determination of unit prices when substantial quantity deviations
occur is stipulated in contract conditions.
7. Useful on projects where the nature of the work is well defined, but
the quantities of work cannot be accurately determined in advance of
construction. Suitable for highways, dams, airports…
b) Advantages of Unit Price Contract
1. Saving the heavy cost of preparing many bills of quantities by the
contractors.
2. Fair basis for competition.
3. In comparing with lump-sum contract,
 Changes in contract documents can be made easily by the owner.
 Lower risk for contractor.
c) Disadvantages of Unit Price Contract
The exact final price of the project is not known to the owner until the
completion of the project.
3. Cost Plus Contracts
Sometimes called Cost Reimbursement Contract
a. Main Aspects of Cost Plus (Cost Reimbursement Contract)
1. The contractor will be reimbursed for all actual costs plus an
agreed fee to cover his services (overhead and profit).
2. The contractor must make all his records and accounts available
for inspection by the client or by some agreed neutral third party.
3. The fee can be designated as:
 A fixed percentage of the cost of the work.
 A fixed fee.
 A fixed fee with a guaranteed top price.
 A fixed fee with bonus.
 A fixed fee with an arrangement for sharing any cost saving.
Procurement Management and Contract Administration (COTM 4242): TYPES OF CONSTRUCTION CONTRACTS
Mada Walabu University Andualem Endris (M.Sc)
Suitable:
 when the requirements of the client are vague,
 when it is desirable for design to proceed concurrently with
construction
 for emergency projects, repairs, maintenance work, and alterations.
 for project with unknown technologies or major changes.
 where the contractor possesses a special ability.
 when the client wishes to be involved in contract management.
 Confidential processes.
b. Advantages of Cost Plus Contract
1. Start construction without waiting for the whole set of drawings and
specifications.
2. More flexibility for the owner to make changes as work progresses.
3. Draw the contractor expertise during design.
c. Disadvantages of Cost Reimbursement Contract
1. It is difficult to predict the final cost and the distribution of it, which
may cause financial problems to the owner.
2. Contractor pays less attention to cost control.
3.1 Cost Plus Percentage of Cost Contract
a. Main Aspects of Cost plus Percentage of Cost
1. The contractor is reimbursed for all his costs with a fixed % age of
costs to cover his services.
2. Project/site overheads may be covered by the %age or computed as
one of the costs.
b. Advantages of Cost plus Percentage of Cost
1. Construction can start before design is completed.
Procurement Management and Contract Administration (COTM 4242): TYPES OF CONSTRUCTION CONTRACTS
Mada Walabu University Andualem Endris (M.Sc)
2. If the contractor is efficient in the utilization of resources then the
cost to the client should represent a fair price for the work
undertaken.
c. Disadvantages of Cost plus Percentage of Cost
1. The project total cost is completely unknown before the project
start.
2. No incentive for the contractor to be efficient in his use of labors,
materials or equipment.
3. Minimum efficiency maximizes the profit.
4. Owner must exercise tight cost control, which may be difficult
and/or costly.
3.2 Cost plus Fixed Fee Contract
a. Main Aspects of Cost plus Fixed Fee
1. The owner pays all costs of construction with a fixed sum of money.
The fee is fixed and does not fluctuate with the actual cost of the
project.
2. The work must be fairly well defined by the owner.
b. Advantages of Cost plus Fixed Fee
1. There is incentive for the contractor to complete the work as quickly
as possible since his fee remains constant.
c. Disadvantages of Cost plus Fixed Fee
1. Major variations create problems. The fee must be re-negotiated to
take account of such variations.
2. The speed of commencing the work is undermined since before a
fee can be agreed a fairly detailed description of work must be
made.
3.3 Cost Plus Fixed Fee Plus Profit Sharing Contract
Procurement Management and Contract Administration (COTM 4242): TYPES OF CONSTRUCTION CONTRACTS
Mada Walabu University Andualem Endris (M.Sc)
It is also Known as Guaranteed Maximum Price Contract (GMP)
a. Main Aspects of Cost Plus Fixed Fee Plus Profit Sharing
Contract
1. The contractor guarantees that he will construct the project in full
accordance with the drawings and specifications and that the price
to the owner will not exceed some total upset price.
2. If the price of the work exceeds the assured maximum, the
contractor pays for the excess.
3. Contracts are often competitively bid in a manner similar to that for
lump-sum contracts, but managed as cost plus.
4. The successful bidder is determined on the combined basis of his
quoted maximum price and fixed fee.
5. The contractor and owner agree to a target estimate of
construction.
6. Bonus or penalty arrangements are tied to this target figure.
7. The work must have a fairly definite nature. Drawings and
specifications must be sufficiently developed to enable a reasonably
accurate cost to be determined.
8. Cost target sharing of・ profits
b. Advantages of Cost Plus Fixed Fee Plus Profit Sharing
Contract
1. There is an incentive to carry out the work as quickly and as
economically as possible.
2. The client also stands to benefit through the contactor's
efficiency.
c. Disadvantages of Cost Plus Fixed Fee Plus Profit Sharing
Contract
1. Difficulties may arise in agreeing on a revised target cost if there are
major variations or cost inflation.
Procurement Management and Contract Administration (COTM 4242): TYPES OF CONSTRUCTION CONTRACTS
Mada Walabu University Andualem Endris (M.Sc)
2. A tight cost control must be exercised, which may be difficult and/or
costly.

Más contenido relacionado

La actualidad más candente

Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentationelliotfus
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closuresrinivas2036
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-ContractsNikhil Kumar
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contractguestdb5e498
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentationJeff B
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
contract administration PPT
 contract administration PPT contract administration PPT
contract administration PPTKEVINMISTRY8
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract formskohwenqi
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Processarpantripathi2
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -artijagadish108
 
International construction contract
International construction contractInternational construction contract
International construction contractGlobal Negotiator
 
Extension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentationExtension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentationAyush Joshi
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Managementsrinivas2036
 
Construction phases
Construction phasesConstruction phases
Construction phasesMeesum Zaidi
 

La actualidad más candente (20)

Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentation
 
Construction claims, disputes and project closure
Construction claims, disputes and project closureConstruction claims, disputes and project closure
Construction claims, disputes and project closure
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentation
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
contract administration PPT
 contract administration PPT contract administration PPT
contract administration PPT
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
 
International construction contract
International construction contractInternational construction contract
International construction contract
 
Extension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentationExtension of Time (EoT) in Construction Project presentation
Extension of Time (EoT) in Construction Project presentation
 
Contracts
ContractsContracts
Contracts
 
Types of contracts
Types of contractsTypes of contracts
Types of contracts
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
 
Construction phases
Construction phasesConstruction phases
Construction phases
 
Fidic Form of Contract.
Fidic Form of Contract.Fidic Form of Contract.
Fidic Form of Contract.
 

Similar a Construction contract

Construction practices
Construction practicesConstruction practices
Construction practicesArun Kurali
 
Cost estimates & contract documents ce224 pdf
Cost estimates & contract documents   ce224 pdfCost estimates & contract documents   ce224 pdf
Cost estimates & contract documents ce224 pdfSaqib Imran
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportArissa Loh
 
5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts5 Popular Types of Construction Contracts
5 Popular Types of Construction ContractsSHAZEBALIKHAN1
 
Job,batch and contract costing
Job,batch and contract costingJob,batch and contract costing
Job,batch and contract costingCollen Mahambo
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignmentLwj Welson
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignmentLwj Welson
 
Types of contracts
Types of contracts   Types of contracts
Types of contracts MANNU KUMAR
 
2.12 procurement management 1
2.12  procurement management 12.12  procurement management 1
2.12 procurement management 1reddvise
 
Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011Maatla Moadi
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014SHKLaw
 
Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 CompleteJohn Ashton
 
CE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdfCE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdfChelDems
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureHASMANIRA
 

Similar a Construction contract (20)

Construction practices
Construction practicesConstruction practices
Construction practices
 
Cost estimates & contract documents ce224 pdf
Cost estimates & contract documents   ce224 pdfCost estimates & contract documents   ce224 pdf
Cost estimates & contract documents ce224 pdf
 
Chapter 4- Contract Management
Chapter 4- Contract ManagementChapter 4- Contract Management
Chapter 4- Contract Management
 
Professional Practice 1 Proposal Report
Professional Practice 1 Proposal ReportProfessional Practice 1 Proposal Report
Professional Practice 1 Proposal Report
 
Pp1 group assignment
Pp1 group assignmentPp1 group assignment
Pp1 group assignment
 
PROJECT CONTRACTS.pptx
PROJECT CONTRACTS.pptxPROJECT CONTRACTS.pptx
PROJECT CONTRACTS.pptx
 
5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts
 
Job,batch and contract costing
Job,batch and contract costingJob,batch and contract costing
Job,batch and contract costing
 
contract procedure
contract procedurecontract procedure
contract procedure
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
Pp1 assignment
Pp1 assignmentPp1 assignment
Pp1 assignment
 
Types of contracts
Types of contracts   Types of contracts
Types of contracts
 
2.12 procurement management 1
2.12  procurement management 12.12  procurement management 1
2.12 procurement management 1
 
Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011
 
Effective contract administration may 2014
Effective contract administration may 2014Effective contract administration may 2014
Effective contract administration may 2014
 
Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 Complete
 
CE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdfCE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdf
 
TOPIC2.pdf
TOPIC2.pdfTOPIC2.pdf
TOPIC2.pdf
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment Structure
 
Kandil_Sameh_AR50123
Kandil_Sameh_AR50123Kandil_Sameh_AR50123
Kandil_Sameh_AR50123
 

Más de Delhi Technological University

Más de Delhi Technological University (20)

Chapter 6- Contract Management
Chapter 6- Contract ManagementChapter 6- Contract Management
Chapter 6- Contract Management
 
Chapter 5- Contract Management
Chapter 5- Contract ManagementChapter 5- Contract Management
Chapter 5- Contract Management
 
Chapter 3- Contract Management
Chapter 3- Contract ManagementChapter 3- Contract Management
Chapter 3- Contract Management
 
Chapter 2- Contract Management
Chapter 2- Contract ManagementChapter 2- Contract Management
Chapter 2- Contract Management
 
Chapter 1- Procurement management
Chapter 1- Procurement managementChapter 1- Procurement management
Chapter 1- Procurement management
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
Chapter 3- Construction Law
Chapter 3- Construction Law Chapter 3- Construction Law
Chapter 3- Construction Law
 
Chapter 2- Construction Law
Chapter 2- Construction Law Chapter 2- Construction Law
Chapter 2- Construction Law
 
Chapter 1-Construction Law
Chapter 1-Construction Law Chapter 1-Construction Law
Chapter 1-Construction Law
 
Chapter 5- Lecture
Chapter 5- LectureChapter 5- Lecture
Chapter 5- Lecture
 
Chapter 4- Lecture
Chapter 4- LectureChapter 4- Lecture
Chapter 4- Lecture
 
Chapter 3- Lecture
Chapter 3- LectureChapter 3- Lecture
Chapter 3- Lecture
 
Chapter 2- Lecture
Chapter 2- LectureChapter 2- Lecture
Chapter 2- Lecture
 
Chapter 1- Lecture
Chapter 1- LectureChapter 1- Lecture
Chapter 1- Lecture
 
Construction equipment management chapter 5
Construction equipment management chapter 5Construction equipment management chapter 5
Construction equipment management chapter 5
 
Construction equipment management chapter 4
Construction equipment management chapter 4Construction equipment management chapter 4
Construction equipment management chapter 4
 
Construction equipment management chapter 3
Construction equipment management chapter 3Construction equipment management chapter 3
Construction equipment management chapter 3
 
Construction equipment management chapter 2
Construction equipment management chapter 2Construction equipment management chapter 2
Construction equipment management chapter 2
 
Construction equipment management chapter 1pdf
Construction equipment management chapter 1pdfConstruction equipment management chapter 1pdf
Construction equipment management chapter 1pdf
 
Chapter 5 [compatibility mode]
Chapter 5 [compatibility mode]Chapter 5 [compatibility mode]
Chapter 5 [compatibility mode]
 

Último

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Último (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Construction contract

  • 1. Procurement Management and Contract Administration (COTM 4242): TYPES OF CONSTRUCTION CONTRACTS Mada Walabu University Andualem Endris (M.Sc) TYPES OF CONSTRUCTION CONTRACTS Contract Definitions A. From a Legal Point of View Contract is a mutual agreement between two or more parties that something shall be done, an agreement enforceable at law. B. According to FIDIC Contract means the General Conditions, the Supplementary Conditions, the Specifications, the Drawings, the Bill of Quantities, the Tender, the Letter of Acceptance, the Contract Agreement, and such further documents as may be expressly incorporated in the Letter of Acceptance or Contract Agreement. C. According to Method of Payment The agreement of how the owner will pay the contractor for work performed such as a lump-sum or cost-plus payment. TYPES OF CONSTRUCTION CONTRACTS Two broad categories:  Price Given in Advance Contracts (Priced-based Contracts)  Cost Reimbursement Contracts (Cost-based Contracts) Factors Influencing the Choice of the Type of Contract  The appropriateness for providing an adequate incentive for efficient performance by the contractor  The ability to introduce changes  The allocation of risks  The start and completion date of the project
  • 2. Procurement Management and Contract Administration (COTM 4242): TYPES OF CONSTRUCTION CONTRACTS Mada Walabu University Andualem Endris (M.Sc) 1.Lump Sum Contact Sometimes called Drawings and Specifications Contract a) Main Aspects of Lump Sum Contract 1. The contractor agrees to perform a stipulated job of work in exchange for a fixed sum of money. In other words a single tendered price is given for the completion of a specified work to the satisfaction of the client by a certain date. 2. Payment may be staged at intervals of time on the completion of milestones. 3. Useful for construction works:  that can be accurately and completely described at the time of bidding such as residential and building construction,  when limited variation is needed,  when level of risks is low and quantifiable, and  when the client does not wish to be involved in the management of his project. 4. The contractor is responsible for preparing his B.O.Q. i.e. determination of work items, description of work items, obtaining his own quantity form drawings and specifications and taking the responsibility for the accuracy of the estimated quantities. 5. The responsibility is on the contractor to include in his price everything necessary for carrying out the work. b) Advantages of Lump Sum Contract 1. The final price is known, by the owner, before the work commences. 2. The contractor has more incentive to reduce his cost to increase the profit. 3. The contractor hopes to complete the job as quickly as possible, to minimize overhead, to maximize profit and to move to the next Job.
  • 3. Procurement Management and Contract Administration (COTM 4242): TYPES OF CONSTRUCTION CONTRACTS Mada Walabu University Andualem Endris (M.Sc) c) Disadvantages of Lump Sum Contract 1. A great deal of work should be done by the contractors prior to preparing the estimate. It is wasteful of a skilled estimator’s time. 2. Changes in drawings and specifications can be very expensive and source of trouble. In other words the contract has very limited flexibility for design changes. 3. The contractor carries much of the risks. The tendered price may include high risk contingency. 4. Competent contractors may decide not to bid to avoid a high-risk lump sum contract. 2. Admeasurement Contract Sometimes called Unit Price Contract 1. Includes Bill of Quantities Contract and Schedule of Rates Contract. 2. Payment is made (monthly) for quantities of work completed and measured during the month. The client can introduce variations in the work. 3. The contractor can claim additional payment for any changes in the work content. 4. Tender price is usually increased by variations and claims. a) Main Aspects of Unit Price Contract 1. Items of work of the contract are specified with estimated quantities in the Bills of Quantities. 2. Estimated quantities are surveyed by Architect/Engineer. 3. Contractors enter unit prices against the estimated quantities of work. 4. The contract is based on estimated quantities of work items and unit price for each of these work items. 5. Payment is made on the basis of units of work actually done and measured in the field multiplied by the unit prices.
  • 4. Procurement Management and Contract Administration (COTM 4242): TYPES OF CONSTRUCTION CONTRACTS Mada Walabu University Andualem Endris (M.Sc) 6. Re-determination of unit prices when substantial quantity deviations occur is stipulated in contract conditions. 7. Useful on projects where the nature of the work is well defined, but the quantities of work cannot be accurately determined in advance of construction. Suitable for highways, dams, airports… b) Advantages of Unit Price Contract 1. Saving the heavy cost of preparing many bills of quantities by the contractors. 2. Fair basis for competition. 3. In comparing with lump-sum contract,  Changes in contract documents can be made easily by the owner.  Lower risk for contractor. c) Disadvantages of Unit Price Contract The exact final price of the project is not known to the owner until the completion of the project. 3. Cost Plus Contracts Sometimes called Cost Reimbursement Contract a. Main Aspects of Cost Plus (Cost Reimbursement Contract) 1. The contractor will be reimbursed for all actual costs plus an agreed fee to cover his services (overhead and profit). 2. The contractor must make all his records and accounts available for inspection by the client or by some agreed neutral third party. 3. The fee can be designated as:  A fixed percentage of the cost of the work.  A fixed fee.  A fixed fee with a guaranteed top price.  A fixed fee with bonus.  A fixed fee with an arrangement for sharing any cost saving.
  • 5. Procurement Management and Contract Administration (COTM 4242): TYPES OF CONSTRUCTION CONTRACTS Mada Walabu University Andualem Endris (M.Sc) Suitable:  when the requirements of the client are vague,  when it is desirable for design to proceed concurrently with construction  for emergency projects, repairs, maintenance work, and alterations.  for project with unknown technologies or major changes.  where the contractor possesses a special ability.  when the client wishes to be involved in contract management.  Confidential processes. b. Advantages of Cost Plus Contract 1. Start construction without waiting for the whole set of drawings and specifications. 2. More flexibility for the owner to make changes as work progresses. 3. Draw the contractor expertise during design. c. Disadvantages of Cost Reimbursement Contract 1. It is difficult to predict the final cost and the distribution of it, which may cause financial problems to the owner. 2. Contractor pays less attention to cost control. 3.1 Cost Plus Percentage of Cost Contract a. Main Aspects of Cost plus Percentage of Cost 1. The contractor is reimbursed for all his costs with a fixed % age of costs to cover his services. 2. Project/site overheads may be covered by the %age or computed as one of the costs. b. Advantages of Cost plus Percentage of Cost 1. Construction can start before design is completed.
  • 6. Procurement Management and Contract Administration (COTM 4242): TYPES OF CONSTRUCTION CONTRACTS Mada Walabu University Andualem Endris (M.Sc) 2. If the contractor is efficient in the utilization of resources then the cost to the client should represent a fair price for the work undertaken. c. Disadvantages of Cost plus Percentage of Cost 1. The project total cost is completely unknown before the project start. 2. No incentive for the contractor to be efficient in his use of labors, materials or equipment. 3. Minimum efficiency maximizes the profit. 4. Owner must exercise tight cost control, which may be difficult and/or costly. 3.2 Cost plus Fixed Fee Contract a. Main Aspects of Cost plus Fixed Fee 1. The owner pays all costs of construction with a fixed sum of money. The fee is fixed and does not fluctuate with the actual cost of the project. 2. The work must be fairly well defined by the owner. b. Advantages of Cost plus Fixed Fee 1. There is incentive for the contractor to complete the work as quickly as possible since his fee remains constant. c. Disadvantages of Cost plus Fixed Fee 1. Major variations create problems. The fee must be re-negotiated to take account of such variations. 2. The speed of commencing the work is undermined since before a fee can be agreed a fairly detailed description of work must be made. 3.3 Cost Plus Fixed Fee Plus Profit Sharing Contract
  • 7. Procurement Management and Contract Administration (COTM 4242): TYPES OF CONSTRUCTION CONTRACTS Mada Walabu University Andualem Endris (M.Sc) It is also Known as Guaranteed Maximum Price Contract (GMP) a. Main Aspects of Cost Plus Fixed Fee Plus Profit Sharing Contract 1. The contractor guarantees that he will construct the project in full accordance with the drawings and specifications and that the price to the owner will not exceed some total upset price. 2. If the price of the work exceeds the assured maximum, the contractor pays for the excess. 3. Contracts are often competitively bid in a manner similar to that for lump-sum contracts, but managed as cost plus. 4. The successful bidder is determined on the combined basis of his quoted maximum price and fixed fee. 5. The contractor and owner agree to a target estimate of construction. 6. Bonus or penalty arrangements are tied to this target figure. 7. The work must have a fairly definite nature. Drawings and specifications must be sufficiently developed to enable a reasonably accurate cost to be determined. 8. Cost target sharing of・ profits b. Advantages of Cost Plus Fixed Fee Plus Profit Sharing Contract 1. There is an incentive to carry out the work as quickly and as economically as possible. 2. The client also stands to benefit through the contactor's efficiency. c. Disadvantages of Cost Plus Fixed Fee Plus Profit Sharing Contract 1. Difficulties may arise in agreeing on a revised target cost if there are major variations or cost inflation.
  • 8. Procurement Management and Contract Administration (COTM 4242): TYPES OF CONSTRUCTION CONTRACTS Mada Walabu University Andualem Endris (M.Sc) 2. A tight cost control must be exercised, which may be difficult and/or costly.