TAJUK
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
PWD 203A Standard Form of Contract (Ed.1983)

This form of contract contain no expressed provision that allows the Contractor to
suspend the works if his payment was unduly delayed or he is not getting his
payment at all.

In the PWD203A Form of Contract (2007), it is stipulated that the period for
honouring the certificate is 30 days from the date of the issuance of the certificate.
Clause 30.1 of the PAM Form of Contract (2006) stated that the period of honouring
certificate is within 21 days after the issuance of the certificate. Any payment made
later than the stipulated time frame can be considered as late or delayed payment

PAM Form of Contract 1998

There is no express provision that permits the Contractor to suspend his work when
he is not paid or his payment was not forthcoming in due time after receiving the
Interim Certificate. Clause 25(1) (ii) and Clause 23.4 state that the Contractor is to
proceed regularly and diligently and he is to use his best endeavours to prevent
delay. The clauses clearly demand the Contractor to show a good performance and
continue with the work to prevent disruption to the progress of the project.

PAM Form of Contract 2006

But the new PAM 2006 contains provision that give the Contractor to suspend the
progress of work if the Contractor is faced with problem of delayed or non payment
by the Employer. It is clearly stated in clause 30.7. But it requires the Contractor to
give a written a notice to Employer with reason to suspend the works until the
Employer has paid the amount due to the Contractor
THE DIFFERENCE BETWEEN JKR/PWD AND PAM CONTRACT

                  JKR/PWD                                              PAM

- Standard form of contract for government and   - Standard form of contract for private sector
public sector project.                           and traditional general contract

- JKR/PWD covered all building and engineering   - PAM covered building work only.
work.
                                                 - PAM contract not covered
- Standard form for JKR/PWD are :                    I. Engineering construction contract (other
    I.  203 (Rev 10/83) – without quantities            than building
   II.  203A (Rev 10/83) – with quantities          II. Package deal / Turnkey
  III.  203N (Rev 10/83) – for NSC                 III. Management type
                                                   IV.  Domestic subcontract
  IV.   203P (Rev 10/83) – for nominated
                                                    V.  Serial contract
        suppliers                                  VI.  Periodic /Term contract
   V.   PWP Form DB/T (2000 Edn) For Design       VII.  Continuation control
        And Build Turnkey Contracts              VIII.  Other miscellaneous contract

     Miscellaneous :                             - Standard form for PAM :
   I.   CIDB Form for building contracts 2000      (Building Works)
        Edn                                           I.  PAM 98 – with quantities
  II.   Modified JKR/PWD Forms, eg LPK, MHA          II.  PAM 98 – without quantities
        etc                                         III.  PAM NSC 98
ISSUES PERIOD OF   ISSUE OF                PERIOD OF   ISSUING             AMOUNT
          INTERIM     INTERIM                 HONOURING PERSON                TO BE
          CERTIFICATE CERTIFICATE             THE                             PAID
                      OF SITE                 CERTIFICATE
                      VALUATION

CONTRACT
FORM
PWD        One month        14 days after     30 days from     Superintending Value of
           [Clause 47(a)]   site              the              Officer (S.O)  Work
203A                        valuation         date of the                     Done +
                            [Clause 47 (b)]   issuance                        90%
                                              of the Interim                  Material On
                                              Certificate                     Site
                                              [Clause 47(d)]

PAM        One Month        Upon the          14 days from     Architect      Value of
           [Clause 30.2)    receipt of        the date                        Work Done
1998                        Contractors       of the                          + 90%
                            details           issuance of                     Material On
                            and particulars   Interim                         Site
                            [Clause 30.2]     Certificate
                                              [Clause 30.2]

Más contenido relacionado

La actualidad más candente

Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compile
Timun Loh
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
ahmong4
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
마 이환
 

La actualidad más candente (20)

Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1Sectional completion and partial possession by employer PP2 Coursework 1
Sectional completion and partial possession by employer PP2 Coursework 1
 
Eca presentation-compile
Eca presentation-compileEca presentation-compile
Eca presentation-compile
 
Tender evaluation procedure
Tender evaluation procedureTender evaluation procedure
Tender evaluation procedure
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
ECA Workshop - ECA Form
ECA Workshop - ECA FormECA Workshop - ECA Form
ECA Workshop - ECA Form
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
BS Role
BS RoleBS Role
BS Role
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement method
 
Payments in the construction industry
Payments in the construction industryPayments in the construction industry
Payments in the construction industry
 
Construction Law Final Report
Construction Law Final ReportConstruction Law Final Report
Construction Law Final Report
 
A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006A Case Study based on FIDIC and PAM Form 2006
A Case Study based on FIDIC and PAM Form 2006
 
SMM2 Explained
SMM2 ExplainedSMM2 Explained
SMM2 Explained
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
BS course bldg diagnostic
BS course bldg diagnosticBS course bldg diagnostic
BS course bldg diagnostic
 
Site Possession
Site PossessionSite Possession
Site Possession
 
Certificates and payments
Certificates and paymentsCertificates and payments
Certificates and payments
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
 
UBBL 1984 pdf
UBBL 1984 pdfUBBL 1984 pdf
UBBL 1984 pdf
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
Defects liability
Defects liabilityDefects liability
Defects liability
 

Similar a DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM

Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011
Maatla Moadi
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
Vj NiroSh
 
(Interior const) instruction to bidders
(Interior const) instruction to bidders(Interior const) instruction to bidders
(Interior const) instruction to bidders
piyush1266
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-final
ashleyyeap
 
Ppt by mr pr subramaniam
Ppt by  mr pr subramaniamPpt by  mr pr subramaniam
Ppt by mr pr subramaniam
mcci175
 

Similar a DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM (20)

MSP
MSPMSP
MSP
 
Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011
 
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS GENERAL CONDITIONS  FOR  CONTRACTS OF CIVIL ENGINEERING WORKS
GENERAL CONDITIONS FOR CONTRACTS OF CIVIL ENGINEERING WORKS
 
Psscoc 2008 db contract
Psscoc 2008 db contractPsscoc 2008 db contract
Psscoc 2008 db contract
 
Cm mitemrate ver270206
Cm mitemrate ver270206Cm mitemrate ver270206
Cm mitemrate ver270206
 
Suspension and Termination by Contractor Presentation.pptx
Suspension and Termination by Contractor Presentation.pptxSuspension and Termination by Contractor Presentation.pptx
Suspension and Termination by Contractor Presentation.pptx
 
Professional Practice II (Group Assignment)
Professional Practice II (Group Assignment)Professional Practice II (Group Assignment)
Professional Practice II (Group Assignment)
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 
CONDITIONS OF CONTRACT FOR WORKS OF CIVIL ENGINEERING CONSTRUCTION
CONDITIONS OF CONTRACT  FOR WORKS OF CIVIL  ENGINEERING CONSTRUCTIONCONDITIONS OF CONTRACT  FOR WORKS OF CIVIL  ENGINEERING CONSTRUCTION
CONDITIONS OF CONTRACT FOR WORKS OF CIVIL ENGINEERING CONSTRUCTION
 
Cl report final
Cl report finalCl report final
Cl report final
 
5. international standard contract for construction
5. international standard contract for construction5. international standard contract for construction
5. international standard contract for construction
 
(Interior const) instruction to bidders
(Interior const) instruction to bidders(Interior const) instruction to bidders
(Interior const) instruction to bidders
 
Pp2 group assignment
Pp2 group assignmentPp2 group assignment
Pp2 group assignment
 
07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-deric07 cl-assignment-syafiq-qy-macy-huiyong-deric
07 cl-assignment-syafiq-qy-macy-huiyong-deric
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-final
 
Pp2 assignment-final
Pp2 assignment-finalPp2 assignment-final
Pp2 assignment-final
 
Ppt by mr pr subramaniam
Ppt by  mr pr subramaniamPpt by  mr pr subramaniam
Ppt by mr pr subramaniam
 
PP Seminar Tutorial 7
PP Seminar Tutorial 7PP Seminar Tutorial 7
PP Seminar Tutorial 7
 
TE&A's Newsletter, April, 2019
TE&A's Newsletter, April, 2019TE&A's Newsletter, April, 2019
TE&A's Newsletter, April, 2019
 
FIDIC Pakistan laws of construction 1992.pdf
FIDIC Pakistan laws of construction 1992.pdfFIDIC Pakistan laws of construction 1992.pdf
FIDIC Pakistan laws of construction 1992.pdf
 

Último

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 

Último (20)

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 

DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM

  • 1. TAJUK DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
  • 2. PWD 203A Standard Form of Contract (Ed.1983) This form of contract contain no expressed provision that allows the Contractor to suspend the works if his payment was unduly delayed or he is not getting his payment at all. In the PWD203A Form of Contract (2007), it is stipulated that the period for honouring the certificate is 30 days from the date of the issuance of the certificate. Clause 30.1 of the PAM Form of Contract (2006) stated that the period of honouring certificate is within 21 days after the issuance of the certificate. Any payment made later than the stipulated time frame can be considered as late or delayed payment PAM Form of Contract 1998 There is no express provision that permits the Contractor to suspend his work when he is not paid or his payment was not forthcoming in due time after receiving the Interim Certificate. Clause 25(1) (ii) and Clause 23.4 state that the Contractor is to proceed regularly and diligently and he is to use his best endeavours to prevent delay. The clauses clearly demand the Contractor to show a good performance and continue with the work to prevent disruption to the progress of the project. PAM Form of Contract 2006 But the new PAM 2006 contains provision that give the Contractor to suspend the progress of work if the Contractor is faced with problem of delayed or non payment by the Employer. It is clearly stated in clause 30.7. But it requires the Contractor to give a written a notice to Employer with reason to suspend the works until the Employer has paid the amount due to the Contractor
  • 3. THE DIFFERENCE BETWEEN JKR/PWD AND PAM CONTRACT JKR/PWD PAM - Standard form of contract for government and - Standard form of contract for private sector public sector project. and traditional general contract - JKR/PWD covered all building and engineering - PAM covered building work only. work. - PAM contract not covered - Standard form for JKR/PWD are : I. Engineering construction contract (other I. 203 (Rev 10/83) – without quantities than building II. 203A (Rev 10/83) – with quantities II. Package deal / Turnkey III. 203N (Rev 10/83) – for NSC III. Management type IV. Domestic subcontract IV. 203P (Rev 10/83) – for nominated V. Serial contract suppliers VI. Periodic /Term contract V. PWP Form DB/T (2000 Edn) For Design VII. Continuation control And Build Turnkey Contracts VIII. Other miscellaneous contract Miscellaneous : - Standard form for PAM : I. CIDB Form for building contracts 2000 (Building Works) Edn I. PAM 98 – with quantities II. Modified JKR/PWD Forms, eg LPK, MHA II. PAM 98 – without quantities etc III. PAM NSC 98
  • 4. ISSUES PERIOD OF ISSUE OF PERIOD OF ISSUING AMOUNT INTERIM INTERIM HONOURING PERSON TO BE CERTIFICATE CERTIFICATE THE PAID OF SITE CERTIFICATE VALUATION CONTRACT FORM PWD One month 14 days after 30 days from Superintending Value of [Clause 47(a)] site the Officer (S.O) Work 203A valuation date of the Done + [Clause 47 (b)] issuance 90% of the Interim Material On Certificate Site [Clause 47(d)] PAM One Month Upon the 14 days from Architect Value of [Clause 30.2) receipt of the date Work Done 1998 Contractors of the + 90% details issuance of Material On and particulars Interim Site [Clause 30.2] Certificate [Clause 30.2]