2. Steadily improving each person’s ability to:
Recognize and define important problems P
Solve them D
Learn from problem solving C
Share the learning with others A
6. • PDCA-CQI
• DMAIC
• DMADV
• CQI was originally developed by Walter Shewhart, and is
often referred to as the "Shewhart Cycle". It was taken up
and promoted effectively from the 1950s by the famous
Quality Management authorityW. Edwards Deming, and
is consequently known by many as "the Deming Wheel".
8. PLAN
Plan carefully what is to be done
Phase 1 - Identify the Opportunity
Phase 2 - Analyze the Current Process
Phase 3 - Develop the Optimal Solution
DO
Carry out the plan
(do it)
Phase 4 - Implement Changes
CHECK
Check the Results.
Did the plan work as intended
or were the results different?
Phase 5 - Study the Results
ACT
Act on the results by identifying what
worked as planned and what didn't.
Phase 6 - Standardize the Solution
Phase 7 - Plan for the Future
9. • PDCA-CQI
• DMAIC(duh-may-ick)
• DMADV
DMAIC is an acronym for five (5) interconnected phases:
Define, Measure, Analyze, Improve and Control. It refers
to a data-driven quality strategy for improving processes.
10. • PDCA-CQI
• DMAIC (duh-may-ick)
• DMADV
DMADV consists of five (5) interconnected phases: Define,
Measure, Analyze, Design andVerify. It is a data-driven quality
strategy for designing products and processes, It is also an
integral part of a Six Sigma Quality Initiative.
11. There are for the 7 BasicTools which we are going
to define.
Generally they can be subdivided into:
mathematical statistical Tools
logical tools
4/30/2014 11
12. The concept behind the seven basic tools came
from Kaoru Ishikawa, a renowned quality expert
from Japan.
According to Ishikawa, 95% of quality-related
problems can be resolved with these basic tools.
13. Basic Quality control tools
1. Cause and effect diagram
2. Control Charts
3. Check sheets
4. Histograms
5. Pareto charts
6. Scatter Diagram
7. Flow Charts
a. Deployment flow charts
b. Linear or activity flow charts
14. It’s a diagram that demonstrates
the relationship between Effects
and the categories of their causes
The Arrangement of the Diagram lets it look
like a fishbone it is therefore also called fish-
bone diagram
Its is used for RCA
14
effect
Cause bCause a
Cause dCause c
15. Statistical tool, showing whether
A process is in control or not
Taking samples of a process and detect
possibility of process being out of control
4/30/2014 15
Y
X
Upper limit
Lower limit
Average/Spec
16. A Histogram is a bar graph
usually used to present frequency data
Histograms provide an easy way to evaluate the
distribution of Data over different categories
4/30/2014 16
LSL USL
17. A Pareto Chart is a Histogram
Pareto Charts are used to apply the 80/20 rule of
Joseph Juran which states that 80% of the problems
are the result of 20% of the problems.
A Pareto Chart can be used to identify that 20%
route causes of problem.
4/30/2014 17
Type
X
18. ▪ Statistical tool showing a
trend in a series of values.
▪ Demonstrating correlations
between values and showing
trends for value changes.
4/30/2014 18
Y
X
19. Way of representing a
Procedure using simple
symbols and arrows
A Flow chart lets a process or procedure be
understood easily it also demonstrate the
relationships between the elements.
4/30/2014 19
Input
Within
Spec?
Process Output
adjust
Yes
No
20. ▪ Run Charts are representing change
in measurement over a sequence or time
▪ Determining Cyclic Events and there
average character
4/30/2014 20
Time
Measurement
21. The essentials of this tool set for full support for
complex decision making, identifying key
issues and causes of persistent problems.
It will show the ways to involve teams for
continuous improvements, performance
analysis and problem solving.
22. Management and PlanningTools
1. Activity network diagram
2. Affinity Diagram
3. Interrelationship diagram
4. Prioritization matrix
5. Process decision Program chart
6.Tree diagram
7. Matrix Diagram
23. Renewal of Policies & Procedures
Activation of Committees
Improvement projects by all departments
Implementation of CBAHI standards
Reconstruction of Strategic Plans
Provision of guidance & supervision for
Quality ImprovementTasks
Coordination & support to all departments
for all required works