Vendor certification is a supplier-customer partnership and can
only be successful with the full involvement and agreement of
both partners
OR
It is the combination of activities required to ensure that a
vendor will meet the professional and regulatory expectation of
the sponsor
OR
It is the system that assure that a supplier’s product is produced
under controlled condition, resulting in consistent quality
conformance
DEFINATION :-
3
SPONSOR
VENDOR
(contract
manufacturer)
VENDOR
(contract
labeler)
VENDOR
(contract
packager)
Supplier of
manufacturi
ng materials
Supplier of
labeling
materials
Supplier of
packaging
materials
Contract
Relationship Between Sponsor , Vendor and Supplier
Vendors are mainly categorized in to four different parts:-
Category – 1
 Generally regarded as EXPERTS
 Short lived’ in development cycle
 Contracted to perform limited scope of work
 Minimal monitoring
 Example: Supplier customizes a formulation tank. Sponsor
reviews and approves the blueprints prior to manufacturing.
Then IQ and OQ is planned upon receipt to verify acceptability
Characteristic of vendor categories
5
Category – 2
 Well known suppliers of standard containers ,closures ,raw
materials and excipients .
 Certified to an International Standards Organization (ISO)-
9000 quality management system
 Enhanced monitoring is suggested
 Example: Well-known supplier of containers/closures supplies
multiple lots per year of vials to the sponsor. The sponsor has no
historical quality concerns with the supplier. Testing will be
conducted upon receipt to verify acceptability of materials.
6
Category – 3
 Category 3 vendors may be category 2 vendors who are
experiencing quality issues with current incoming inventory or
have shown a trend of non-conformance over the last 12
months.
 Can be contract laboratory operations that provide routine
analysis, sometimes in large quantities.
 The risk of non-conformance of these vendors is greater than
with category 2 vendors.
 Advanced monitoring program and an annual audit schedule
are recommended.
7
Category – 4
 They are sole-source API manufactures.
 Intense monitoring is suggested in this category.
 Examples: A contract manufacture is supplying clinical trials
supplies. Since this is the first time that the product is being
manufactured at a larger scale, the sponsor has elected to be on
site for each event for monitoring and consultation.
 100% of the lot will be visually inspected for release upon
receipt by the sponsor.
8
Why to qualify vendors ?
9
 Used to determine if the vendor is appropriate for the scope of
work.
 Critical attributes of a partner relationship are Supplier or
customer commitment to a long term relationship.
 Information sharing.
 Joint agreement on specifications and performance standards.
 Performance measurement and feedback.
 Customer confidence in the supplier’s manufacturing capability,
quality, cost, and development.
These attributes will vary depending on the status of the
supplier-customer relationship.
 Pharma firms will then not have to carry out their own quality
audit of the vendor.
 Vendors will be assured that customers of the product will not
expect to carry out their own quality audit of their systems or
products.
 Rapid and efficient qualification process prior to sale and
delivery/acceptance of a system.
 Reduced cost
Benefits of the Certification Process :10
Vendor selection criteria:-
1. Quality
2. Delivery
3. Performance history
4. Warranties and claim polices
5. Production facilities and capacity
6. Financial position
7. Price
8. Technical capability
9. Procedural compliance
10.Communication system
11.Reputation and position in industry
12.Desire for business
11
13. Management and organization
14. Operating controls
15. Repair service
16. Packaging ability
17. Labor relation record
18. Geographical location
19. Amount of past business
12
 The supplier must have suitable equipment to monitor the process.
This equipment must be routinely calibrated and test methods validated.
Statistical process control techniques will usually be applied to demonstrate
that the process remained under control, within acceptable operating ranges,
throughout each production run.
 Process control data for several batches, chosen at random, should be
reviewed to confirm supplier compliance.
Process Evaluation
13
14
 vendor certification requires assurance that the supplier’s
process is under control and that the required quality standards
are not being achieved by inspecting out substandard material.
 Increasingly, vendors are being requested to demonstrate that
their production processes are validated, especially for the
manufacture of bulk pharmaceutical chemicals.
 To demonstrate commitment to quality for other components,
some vendors have opted for ISO 9000 certification. This
certification does not necessarily assure consistent quality.
 Any proposed changes must be clearly documented, with reasons and
supporting data, and be reviewed and accepted by the customer prior to
introduction.
 Some changes may require customer evaluation and even FDA approval
before acceptance Changes require, prior review and agreement with the
supplier.
 For example, if the customer wants to make any replacement of a
packaging line, there would need to be discussions with the supplier of the
packaging components and the customer regarding changes
Process and Specification Changes:-
15
Customer Inspection
 After it has been confirmed that a supplier has a controlled
process, there usually will be a period when both parties evaluate
material quality and compare data.
This provides the needed assurance that supplier and customer
have comparable evaluation ability and minimizes future
potential for disagreements that are due to test results.
Vendor certification provides a strong basis for the application of
reduced testing by the customer.
If the supplier’s process is under control, evaluation by the
customer Is necessary to evaluate any changes during shipment.
16
Decertification
 Certification results in a high level of reliance on the supplier :
reduced incoming inspection, reduced inventories, higher output.
 Any failure by the supplier for matching the customer’s
requirement , may lead to decertification of that supplier for that
material.
 Depending on the nature of the problem it may be possible to work
with the supplier to reestablish certification.
17
CGMP REQUIREMENTS FOR VENDOR QUALIFICATION
 Divided into two sections
1) Site Qualification
2) Site follow-up
 Site Qualification :
Vendors selected are evaluated for compliance with the
appropriate set of regulations.
The results of the audit will be reviewed and the need for
a ‘‘site follow-up visit’’ .
 Site qualification visits are generally performed on a
cyclical basis; at least once every 24 months is suggested
unless the supplier becomes problematic.
 continuous monitoring program is also an essential component
18
BENEFIT :
Ability to evaluate the systems that the vendor uses
to produce regulated work product.
 If a systems ‘‘gap’’ is detected in any of the quality systems
the sponsor should request corrective action prior to initiating
the work
RISK :
 Here the systems review is theoretical, not practical
 No ‘‘real’’ data can be reviewed prior to initiating the work
 The systems cannot be adequately tested without ‘‘real’’ data
19
SITE FOLLOW-UP :
 Carried out during the course of the project
 Examples of issues that will usually result in site follow-up
include:-
1) Lack of adherence to standard operating procedures.
2) Lack of appropriate documentation of training, major
renovations to the physical structure of the facility.
3) If standard operating procedure (SOP) or data integrity
questions arise during the course of the study or project.
20
21
BENEFIT :
 Ability to evaluate the systems that the vendor uses to produce
regulated work product in ‘‘real time’’ with data generated for a
specific project
RISK :
Any corrections that may be needed will not occur in a timely
manner due to late identification of deficiencies will delay the
project
FACTORS TO BE CONSIDER WHEN PLANNING FOLLOW UP VISIT :
22
The relationship and experience with vendor
 The extent of vendor experience with the sponsor scope of work
 The sponsor’s regulatory commitments and compliance requirements
 The associated risks if project fails
STANDARD PROCEDURE FOR CONDUCTING QUALITY AUDIT :
 Standard procedures for conducting the quality audit should be addressed in the
Vendor qualification program
 An audit cycle includes
1. The preparation of an audit
2. Performance of the audit
3. Reporting of the results of the audit
4. Audit closure or follow-up requirements
23
Step1: Preparing for the Audit
 Most critical part of the audit
 Takes longer to complete than performing the actual audit
By putting more time into the preparation phase, the performance of the
audit will proceed smoothly.
 Effective audit plan will include the following elements:
 Purpose for the audit
 Scope of the audit
 Resources required of the sponsor to complete the audit
 Number of auditors
 Type of auditor or expertise required
 Assignment of a lead auditor to take responsibility for the audit.
 Reference documents to be used in planning and performing the audit
24
Step 2: Performing the Audit
The performance of an audit begins with an introductory meeting wherein
all parties are introduced and the agenda is discussed
The performance of an audit is the collection of evidence and verification of
information through the following means:
 Interviews
 Examination of documents
 Direct observation of activities, processes, and conditions
 Review of raw data related to critical documents
25
Step 3: Reporting the Results
 Audit report should present a summary of the results or findings
of the audit.
 This includes both positive findings and any areas identified for
improvement.
 Written summary prior to leaving the vendor’s facility allows the
vendor to begin working on the corrective action plans.
 Formal audit report is the product of the audit.
 Lead auditor is responsible for submitting the formal report in a
timely fashion.
 Final audit report should be prepared within 2 weeks from the
date of the audit
26
Step 4: Audit Closure, Corrective Action, and Follow-Up
 After audit , vendor is responsible for developing a corrective
action plan to address any weaknesses or deficiencies identified
by the sponsor’s auditors
 It is the sponsor’s responsibility to ensure that the corrective
actions are effective and implemented in a timely manner
 The sponsor must verify all commitments through the course of
routine monitoring
27
COMMON PITFALLS IN VENDOR QUALIFICATION
28
 Not establishing the habit of routine update meetings
 Overestimating the capabilities of the vendor
 Having a false sense of confidence that the vendor will maintain
itself at the same level throughout the contractual relationship
 Underestimating the resource-intensiveness of maintaining a
vendor Qualified
 Not switching vendors when appropriate
 Not dealing with situations of non-conformance in a timely and
effective manner
 Overburdening the supplier, as though you were its only client
REFERANCE:-
1. Sidney H. Willing, "Good Manufacturing Practices for pharmaceuticals",
Drugs and Pharm. Sci. Series, Vol. 109, Marcel Dekker Inc., N.Y.
2. Charles A. Weber, John R. Current and W.C. Benton “Vendor selection
criteria and methods” European Journal of Operational Research 50 (1991) 2-
18 North-Holland, Faculty of Management Sciences, College of Business,
The Ohio State University, 1775 College Road, Columbus, OH 43210-1399,
USA
3. Elizabeth M. Troll, Karen L. Hughes “The Vendor Qualification Program”
(2004) CHP-10,MARCEL DEKKER Inc.
29
30

Más contenido relacionado

La actualidad más candente

Investigational New drug application [INDA]
Investigational New drug application [INDA]Investigational New drug application [INDA]
Investigational New drug application [INDA]Sagar Savale
 
Validation master plan
Validation master planValidation master plan
Validation master planDr. Amsavel A
 
Out of specification shravan
Out of specification shravanOut of specification shravan
Out of specification shravanshravan dubey
 
Purchasing and inventory control in drug store
Purchasing and inventory control in drug storePurchasing and inventory control in drug store
Purchasing and inventory control in drug storePriyanka Kalamkar
 
Purchase specifications & Maintenance of stores For Raw materials
Purchase specifications & Maintenance of stores For Raw materialsPurchase specifications & Maintenance of stores For Raw materials
Purchase specifications & Maintenance of stores For Raw materialsYash Menghani
 
Inventory management rqm, eoq, im
Inventory management rqm, eoq, imInventory management rqm, eoq, im
Inventory management rqm, eoq, imchiranjibi68
 
Investigator's Brochure
Investigator's BrochureInvestigator's Brochure
Investigator's BrochureRiyaz Gohil
 
Glp 112070804004
Glp  112070804004Glp  112070804004
Glp 112070804004Patel Parth
 
QUALITY AUDITS
QUALITY AUDITSQUALITY AUDITS
QUALITY AUDITSMcpl Moshi
 
Pilot Plant Techniques for SOLID dosage forms
Pilot Plant Techniques for SOLID dosage formsPilot Plant Techniques for SOLID dosage forms
Pilot Plant Techniques for SOLID dosage formsD.R. Chandravanshi
 
Indian Regulatory Requirements
Indian Regulatory RequirementsIndian Regulatory Requirements
Indian Regulatory RequirementsAudumbar Mali
 
clinical pharmacy
clinical pharmacyclinical pharmacy
clinical pharmacySohan Patel
 
Pharmacy and Therapeutic committee
Pharmacy and Therapeutic committeePharmacy and Therapeutic committee
Pharmacy and Therapeutic committeeAPOLLO JAMES
 

La actualidad más candente (20)

Investigational New drug application [INDA]
Investigational New drug application [INDA]Investigational New drug application [INDA]
Investigational New drug application [INDA]
 
Quality Risk Management
Quality Risk ManagementQuality Risk Management
Quality Risk Management
 
Validation master plan
Validation master planValidation master plan
Validation master plan
 
Out of specification shravan
Out of specification shravanOut of specification shravan
Out of specification shravan
 
Purchasing and inventory control in drug store
Purchasing and inventory control in drug storePurchasing and inventory control in drug store
Purchasing and inventory control in drug store
 
Clinical Pharmacy
Clinical PharmacyClinical Pharmacy
Clinical Pharmacy
 
cGMP.
cGMP.cGMP.
cGMP.
 
Purchase specifications & Maintenance of stores For Raw materials
Purchase specifications & Maintenance of stores For Raw materialsPurchase specifications & Maintenance of stores For Raw materials
Purchase specifications & Maintenance of stores For Raw materials
 
Inventory management rqm, eoq, im
Inventory management rqm, eoq, imInventory management rqm, eoq, im
Inventory management rqm, eoq, im
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality Management
 
Investigator's Brochure
Investigator's BrochureInvestigator's Brochure
Investigator's Brochure
 
Inventory control
Inventory controlInventory control
Inventory control
 
Glp 112070804004
Glp  112070804004Glp  112070804004
Glp 112070804004
 
QUALITY AUDITS
QUALITY AUDITSQUALITY AUDITS
QUALITY AUDITS
 
Pilot Plant Techniques for SOLID dosage forms
Pilot Plant Techniques for SOLID dosage formsPilot Plant Techniques for SOLID dosage forms
Pilot Plant Techniques for SOLID dosage forms
 
Indian Regulatory Requirements
Indian Regulatory RequirementsIndian Regulatory Requirements
Indian Regulatory Requirements
 
clinical pharmacy
clinical pharmacyclinical pharmacy
clinical pharmacy
 
Pharmacy and Therapeutic committee
Pharmacy and Therapeutic committeePharmacy and Therapeutic committee
Pharmacy and Therapeutic committee
 
Quality audit
Quality auditQuality audit
Quality audit
 
WHO Guidance on Technology Transfers
WHO Guidance on Technology TransfersWHO Guidance on Technology Transfers
WHO Guidance on Technology Transfers
 

Destacado

Vendor Selection Process
Vendor Selection ProcessVendor Selection Process
Vendor Selection Processgrinehart
 
Supplier evaluation & selection
Supplier evaluation & selectionSupplier evaluation & selection
Supplier evaluation & selectionAnkit
 
Raw material
Raw materialRaw material
Raw materialAmit Shah
 
SUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATIONSUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATIONZamri Yahya
 
Effective Supplier Selection - Boeing 787
Effective Supplier Selection - Boeing 787Effective Supplier Selection - Boeing 787
Effective Supplier Selection - Boeing 787Uyoyo Edosio
 
Supplier selection
Supplier selectionSupplier selection
Supplier selectionjoecobe
 
Supplier evaluation criteria
Supplier evaluation criteriaSupplier evaluation criteria
Supplier evaluation criteriaArt Acosta
 
The Sourcing Of Outsourcing
The Sourcing Of OutsourcingThe Sourcing Of Outsourcing
The Sourcing Of OutsourcingJohn Meyerson
 
Kitchen Cabinet company order processing procedures
Kitchen Cabinet company order processing proceduresKitchen Cabinet company order processing procedures
Kitchen Cabinet company order processing proceduresDieter Drews
 
Creating an Approved Supplier Program as a Prerequisite for a Successful HACC...
Creating an Approved Supplier Program as a Prerequisite for a Successful HACC...Creating an Approved Supplier Program as a Prerequisite for a Successful HACC...
Creating an Approved Supplier Program as a Prerequisite for a Successful HACC...TraceGains
 
Pharmaceutical Bulk Drugs By Shreyas Chemicals, Vadodara
Pharmaceutical Bulk Drugs By Shreyas Chemicals, VadodaraPharmaceutical Bulk Drugs By Shreyas Chemicals, Vadodara
Pharmaceutical Bulk Drugs By Shreyas Chemicals, VadodaraIndiaMART InterMESH Limited
 
Supplier development literature review and key future research areas 2012
Supplier development literature  review and key future research areas  2012Supplier development literature  review and key future research areas  2012
Supplier development literature review and key future research areas 2012Dr. Muddassir Ahmed, Ph.D
 
Auditing of a Marketing Department- Capstone
Auditing of a Marketing Department- CapstoneAuditing of a Marketing Department- Capstone
Auditing of a Marketing Department- CapstoneFelicia Fort, MBA
 

Destacado (19)

Vendor Selection Process
Vendor Selection ProcessVendor Selection Process
Vendor Selection Process
 
Supplier evaluation & selection
Supplier evaluation & selectionSupplier evaluation & selection
Supplier evaluation & selection
 
Raw material
Raw materialRaw material
Raw material
 
SUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATIONSUPPLIER SELECTION AND EVALUATION
SUPPLIER SELECTION AND EVALUATION
 
Vendor Management
Vendor ManagementVendor Management
Vendor Management
 
Supplier Selection
Supplier SelectionSupplier Selection
Supplier Selection
 
Effective Supplier Selection - Boeing 787
Effective Supplier Selection - Boeing 787Effective Supplier Selection - Boeing 787
Effective Supplier Selection - Boeing 787
 
Supplier selection
Supplier selectionSupplier selection
Supplier selection
 
Supplier evaluation criteria
Supplier evaluation criteriaSupplier evaluation criteria
Supplier evaluation criteria
 
Vendor rating system
Vendor rating systemVendor rating system
Vendor rating system
 
The Sourcing Of Outsourcing
The Sourcing Of OutsourcingThe Sourcing Of Outsourcing
The Sourcing Of Outsourcing
 
Ivivc acyclovir
Ivivc acyclovirIvivc acyclovir
Ivivc acyclovir
 
Kitchen Cabinet company order processing procedures
Kitchen Cabinet company order processing proceduresKitchen Cabinet company order processing procedures
Kitchen Cabinet company order processing procedures
 
Creating an Approved Supplier Program as a Prerequisite for a Successful HACC...
Creating an Approved Supplier Program as a Prerequisite for a Successful HACC...Creating an Approved Supplier Program as a Prerequisite for a Successful HACC...
Creating an Approved Supplier Program as a Prerequisite for a Successful HACC...
 
Pharmaceutical Bulk Drugs By Shreyas Chemicals, Vadodara
Pharmaceutical Bulk Drugs By Shreyas Chemicals, VadodaraPharmaceutical Bulk Drugs By Shreyas Chemicals, Vadodara
Pharmaceutical Bulk Drugs By Shreyas Chemicals, Vadodara
 
Supplier development literature review and key future research areas 2012
Supplier development literature  review and key future research areas  2012Supplier development literature  review and key future research areas  2012
Supplier development literature review and key future research areas 2012
 
Auditing of a Marketing Department- Capstone
Auditing of a Marketing Department- CapstoneAuditing of a Marketing Department- Capstone
Auditing of a Marketing Department- Capstone
 
Ivivc
IvivcIvivc
Ivivc
 
SUPPLIER SELECTION AND DEVELOPMENT
SUPPLIER SELECTION AND DEVELOPMENTSUPPLIER SELECTION AND DEVELOPMENT
SUPPLIER SELECTION AND DEVELOPMENT
 

Similar a Vendor selection

vender certification.ppsx
vender certification.ppsxvender certification.ppsx
vender certification.ppsxRajesh Raut
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualificationDeekshitha HS
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualificationShihabPatel
 
vendorqualification-180226hhhhjjj172821.pdf
vendorqualification-180226hhhhjjj172821.pdfvendorqualification-180226hhhhjjj172821.pdf
vendorqualification-180226hhhhjjj172821.pdfVaibhavwagh48
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production departmentPRANJAY PATIL
 
Incorporate Domestic and International Regulations for Effective GMP Auditing
Incorporate Domestic and International Regulations for Effective GMP AuditingIncorporate Domestic and International Regulations for Effective GMP Auditing
Incorporate Domestic and International Regulations for Effective GMP AuditingInstitute of Validation Technology
 
Supplier Partnership.pdf
Supplier Partnership.pdfSupplier Partnership.pdf
Supplier Partnership.pdfKhariharan13
 
Rx 360 Audit Programs and BSI Sep15
Rx 360 Audit Programs and BSI Sep15Rx 360 Audit Programs and BSI Sep15
Rx 360 Audit Programs and BSI Sep15Vivian Berni
 
Quality managment
Quality managmentQuality managment
Quality managmentAnkit
 
Control on purchased product qm
Control on purchased product qmControl on purchased product qm
Control on purchased product qmAshu0711
 
Supplier Quality Improvement
Supplier Quality ImprovementSupplier Quality Improvement
Supplier Quality Improvementgstevick1980
 
Magna supplier quality_requirements_manual_rev2
Magna supplier quality_requirements_manual_rev2Magna supplier quality_requirements_manual_rev2
Magna supplier quality_requirements_manual_rev2Dr Lendy Spires
 

Similar a Vendor selection (20)

vender certification.ppsx
vender certification.ppsxvender certification.ppsx
vender certification.ppsx
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualification
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualification
 
vendorqualification-180226hhhhjjj172821.pdf
vendorqualification-180226hhhhjjj172821.pdfvendorqualification-180226hhhhjjj172821.pdf
vendorqualification-180226hhhhjjj172821.pdf
 
Vendor certification
Vendor certificationVendor certification
Vendor certification
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production department
 
Cqe preparation | supplier management
Cqe preparation | supplier managementCqe preparation | supplier management
Cqe preparation | supplier management
 
Packaging material vendor audit
Packaging material vendor auditPackaging material vendor audit
Packaging material vendor audit
 
Introduction to CMMI-DEV v1.3 - Day 2
Introduction to CMMI-DEV v1.3  - Day 2Introduction to CMMI-DEV v1.3  - Day 2
Introduction to CMMI-DEV v1.3 - Day 2
 
Vendor qualification
Vendor qualification Vendor qualification
Vendor qualification
 
Vendor Audit
Vendor AuditVendor Audit
Vendor Audit
 
Incorporate Domestic and International Regulations for Effective GMP Auditing
Incorporate Domestic and International Regulations for Effective GMP AuditingIncorporate Domestic and International Regulations for Effective GMP Auditing
Incorporate Domestic and International Regulations for Effective GMP Auditing
 
Supplier quality assurance
Supplier quality assuranceSupplier quality assurance
Supplier quality assurance
 
Supplier Partnership.pdf
Supplier Partnership.pdfSupplier Partnership.pdf
Supplier Partnership.pdf
 
Rx 360 Audit Programs and BSI Sep15
Rx 360 Audit Programs and BSI Sep15Rx 360 Audit Programs and BSI Sep15
Rx 360 Audit Programs and BSI Sep15
 
Supplier quality management
Supplier quality managementSupplier quality management
Supplier quality management
 
Quality managment
Quality managmentQuality managment
Quality managment
 
Control on purchased product qm
Control on purchased product qmControl on purchased product qm
Control on purchased product qm
 
Supplier Quality Improvement
Supplier Quality ImprovementSupplier Quality Improvement
Supplier Quality Improvement
 
Magna supplier quality_requirements_manual_rev2
Magna supplier quality_requirements_manual_rev2Magna supplier quality_requirements_manual_rev2
Magna supplier quality_requirements_manual_rev2
 

Último

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxShobhayan Kirtania
 

Último (20)

Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptx
 

Vendor selection

  • 1. VENDOR SELECTION IN PHARMACEUTICAL INDUSTRY By AQSA FATIMA M.Pharmacy 2nd semester SULTAN UL ULOOM COLLLEGE OF PHARMACY 1
  • 2. Content :- 2  Definition  Categories  Benefits of certification  Steps involve in certification  cGMP requirement for vendor certification  Standard procedure for conducting Quality Audit  References
  • 3. Vendor certification is a supplier-customer partnership and can only be successful with the full involvement and agreement of both partners OR It is the combination of activities required to ensure that a vendor will meet the professional and regulatory expectation of the sponsor OR It is the system that assure that a supplier’s product is produced under controlled condition, resulting in consistent quality conformance DEFINATION :- 3
  • 4. SPONSOR VENDOR (contract manufacturer) VENDOR (contract labeler) VENDOR (contract packager) Supplier of manufacturi ng materials Supplier of labeling materials Supplier of packaging materials Contract Relationship Between Sponsor , Vendor and Supplier
  • 5. Vendors are mainly categorized in to four different parts:- Category – 1  Generally regarded as EXPERTS  Short lived’ in development cycle  Contracted to perform limited scope of work  Minimal monitoring  Example: Supplier customizes a formulation tank. Sponsor reviews and approves the blueprints prior to manufacturing. Then IQ and OQ is planned upon receipt to verify acceptability Characteristic of vendor categories 5
  • 6. Category – 2  Well known suppliers of standard containers ,closures ,raw materials and excipients .  Certified to an International Standards Organization (ISO)- 9000 quality management system  Enhanced monitoring is suggested  Example: Well-known supplier of containers/closures supplies multiple lots per year of vials to the sponsor. The sponsor has no historical quality concerns with the supplier. Testing will be conducted upon receipt to verify acceptability of materials. 6
  • 7. Category – 3  Category 3 vendors may be category 2 vendors who are experiencing quality issues with current incoming inventory or have shown a trend of non-conformance over the last 12 months.  Can be contract laboratory operations that provide routine analysis, sometimes in large quantities.  The risk of non-conformance of these vendors is greater than with category 2 vendors.  Advanced monitoring program and an annual audit schedule are recommended. 7
  • 8. Category – 4  They are sole-source API manufactures.  Intense monitoring is suggested in this category.  Examples: A contract manufacture is supplying clinical trials supplies. Since this is the first time that the product is being manufactured at a larger scale, the sponsor has elected to be on site for each event for monitoring and consultation.  100% of the lot will be visually inspected for release upon receipt by the sponsor. 8
  • 9. Why to qualify vendors ? 9  Used to determine if the vendor is appropriate for the scope of work.  Critical attributes of a partner relationship are Supplier or customer commitment to a long term relationship.  Information sharing.  Joint agreement on specifications and performance standards.  Performance measurement and feedback.  Customer confidence in the supplier’s manufacturing capability, quality, cost, and development. These attributes will vary depending on the status of the supplier-customer relationship.
  • 10.  Pharma firms will then not have to carry out their own quality audit of the vendor.  Vendors will be assured that customers of the product will not expect to carry out their own quality audit of their systems or products.  Rapid and efficient qualification process prior to sale and delivery/acceptance of a system.  Reduced cost Benefits of the Certification Process :10
  • 11. Vendor selection criteria:- 1. Quality 2. Delivery 3. Performance history 4. Warranties and claim polices 5. Production facilities and capacity 6. Financial position 7. Price 8. Technical capability 9. Procedural compliance 10.Communication system 11.Reputation and position in industry 12.Desire for business 11
  • 12. 13. Management and organization 14. Operating controls 15. Repair service 16. Packaging ability 17. Labor relation record 18. Geographical location 19. Amount of past business 12
  • 13.  The supplier must have suitable equipment to monitor the process. This equipment must be routinely calibrated and test methods validated. Statistical process control techniques will usually be applied to demonstrate that the process remained under control, within acceptable operating ranges, throughout each production run.  Process control data for several batches, chosen at random, should be reviewed to confirm supplier compliance. Process Evaluation 13
  • 14. 14  vendor certification requires assurance that the supplier’s process is under control and that the required quality standards are not being achieved by inspecting out substandard material.  Increasingly, vendors are being requested to demonstrate that their production processes are validated, especially for the manufacture of bulk pharmaceutical chemicals.  To demonstrate commitment to quality for other components, some vendors have opted for ISO 9000 certification. This certification does not necessarily assure consistent quality.
  • 15.  Any proposed changes must be clearly documented, with reasons and supporting data, and be reviewed and accepted by the customer prior to introduction.  Some changes may require customer evaluation and even FDA approval before acceptance Changes require, prior review and agreement with the supplier.  For example, if the customer wants to make any replacement of a packaging line, there would need to be discussions with the supplier of the packaging components and the customer regarding changes Process and Specification Changes:- 15
  • 16. Customer Inspection  After it has been confirmed that a supplier has a controlled process, there usually will be a period when both parties evaluate material quality and compare data. This provides the needed assurance that supplier and customer have comparable evaluation ability and minimizes future potential for disagreements that are due to test results. Vendor certification provides a strong basis for the application of reduced testing by the customer. If the supplier’s process is under control, evaluation by the customer Is necessary to evaluate any changes during shipment. 16
  • 17. Decertification  Certification results in a high level of reliance on the supplier : reduced incoming inspection, reduced inventories, higher output.  Any failure by the supplier for matching the customer’s requirement , may lead to decertification of that supplier for that material.  Depending on the nature of the problem it may be possible to work with the supplier to reestablish certification. 17
  • 18. CGMP REQUIREMENTS FOR VENDOR QUALIFICATION  Divided into two sections 1) Site Qualification 2) Site follow-up  Site Qualification : Vendors selected are evaluated for compliance with the appropriate set of regulations. The results of the audit will be reviewed and the need for a ‘‘site follow-up visit’’ .  Site qualification visits are generally performed on a cyclical basis; at least once every 24 months is suggested unless the supplier becomes problematic.  continuous monitoring program is also an essential component 18
  • 19. BENEFIT : Ability to evaluate the systems that the vendor uses to produce regulated work product.  If a systems ‘‘gap’’ is detected in any of the quality systems the sponsor should request corrective action prior to initiating the work RISK :  Here the systems review is theoretical, not practical  No ‘‘real’’ data can be reviewed prior to initiating the work  The systems cannot be adequately tested without ‘‘real’’ data 19
  • 20. SITE FOLLOW-UP :  Carried out during the course of the project  Examples of issues that will usually result in site follow-up include:- 1) Lack of adherence to standard operating procedures. 2) Lack of appropriate documentation of training, major renovations to the physical structure of the facility. 3) If standard operating procedure (SOP) or data integrity questions arise during the course of the study or project. 20
  • 21. 21 BENEFIT :  Ability to evaluate the systems that the vendor uses to produce regulated work product in ‘‘real time’’ with data generated for a specific project RISK : Any corrections that may be needed will not occur in a timely manner due to late identification of deficiencies will delay the project
  • 22. FACTORS TO BE CONSIDER WHEN PLANNING FOLLOW UP VISIT : 22 The relationship and experience with vendor  The extent of vendor experience with the sponsor scope of work  The sponsor’s regulatory commitments and compliance requirements  The associated risks if project fails
  • 23. STANDARD PROCEDURE FOR CONDUCTING QUALITY AUDIT :  Standard procedures for conducting the quality audit should be addressed in the Vendor qualification program  An audit cycle includes 1. The preparation of an audit 2. Performance of the audit 3. Reporting of the results of the audit 4. Audit closure or follow-up requirements 23
  • 24. Step1: Preparing for the Audit  Most critical part of the audit  Takes longer to complete than performing the actual audit By putting more time into the preparation phase, the performance of the audit will proceed smoothly.  Effective audit plan will include the following elements:  Purpose for the audit  Scope of the audit  Resources required of the sponsor to complete the audit  Number of auditors  Type of auditor or expertise required  Assignment of a lead auditor to take responsibility for the audit.  Reference documents to be used in planning and performing the audit 24
  • 25. Step 2: Performing the Audit The performance of an audit begins with an introductory meeting wherein all parties are introduced and the agenda is discussed The performance of an audit is the collection of evidence and verification of information through the following means:  Interviews  Examination of documents  Direct observation of activities, processes, and conditions  Review of raw data related to critical documents 25
  • 26. Step 3: Reporting the Results  Audit report should present a summary of the results or findings of the audit.  This includes both positive findings and any areas identified for improvement.  Written summary prior to leaving the vendor’s facility allows the vendor to begin working on the corrective action plans.  Formal audit report is the product of the audit.  Lead auditor is responsible for submitting the formal report in a timely fashion.  Final audit report should be prepared within 2 weeks from the date of the audit 26
  • 27. Step 4: Audit Closure, Corrective Action, and Follow-Up  After audit , vendor is responsible for developing a corrective action plan to address any weaknesses or deficiencies identified by the sponsor’s auditors  It is the sponsor’s responsibility to ensure that the corrective actions are effective and implemented in a timely manner  The sponsor must verify all commitments through the course of routine monitoring 27
  • 28. COMMON PITFALLS IN VENDOR QUALIFICATION 28  Not establishing the habit of routine update meetings  Overestimating the capabilities of the vendor  Having a false sense of confidence that the vendor will maintain itself at the same level throughout the contractual relationship  Underestimating the resource-intensiveness of maintaining a vendor Qualified  Not switching vendors when appropriate  Not dealing with situations of non-conformance in a timely and effective manner  Overburdening the supplier, as though you were its only client
  • 29. REFERANCE:- 1. Sidney H. Willing, "Good Manufacturing Practices for pharmaceuticals", Drugs and Pharm. Sci. Series, Vol. 109, Marcel Dekker Inc., N.Y. 2. Charles A. Weber, John R. Current and W.C. Benton “Vendor selection criteria and methods” European Journal of Operational Research 50 (1991) 2- 18 North-Holland, Faculty of Management Sciences, College of Business, The Ohio State University, 1775 College Road, Columbus, OH 43210-1399, USA 3. Elizabeth M. Troll, Karen L. Hughes “The Vendor Qualification Program” (2004) CHP-10,MARCEL DEKKER Inc. 29