SlideShare una empresa de Scribd logo
1 de 16
Descargar para leer sin conexión
ECO IRGAH
VALEY
Student name : Salman Altuwairki
NO. : 428102630
Course : Urban design project 2
Date : 2011
Supervisor : Dr. Ziad Alameddine
Course : Urban design project 2   Student name : Salman Altuwairki
                                                                                      Date : 2011                       NO. : 428102630
                                                                                                                        Supervisor : Dr. Ziad Alameddine




 Introduction
   :
The importance of the site drives from being linked with king Abdullah Road ,
As well as its proximity to KSU , DQ , Historical Irgah city . In addition The site
is characterized by the natural features of wadi Hanifa . During the initial
survey of the study area it’s noticed that there are urban problems such as
random planning , the absence of regulations in addition to the incomplete
facilities . There for . It’s most important to establish a clear vision to the
development of the area based on comprehensive urban design process .




 Urban
   process :                                                                               Goals       and overall objectives of
         Data                        Preparing                 Preparing the
           collection               the master                  details plan            1 – the project:
                                                                                            To identify the urban problems in the study area and resolutions .
                                       plan                                             2 - To improving the area by raising the aesthetic value .
                                                                                        3 –To Enhancing the environmental and sustainability aspects .
      • Selection of study                                   • Urban details
        area                   • Study of urban design       • Lots patterns            4 - To raise the value of the region economically .
      • Site analysis            consideration
      • Preparation of the
                               • Case studies
                                                             • Set backs
                                                             • Building mass
                                                                                        5 – To add character to the area .
                               • Design alternatives
        project program        • Land use plan               • Urban codes              6 - To connecting the area in a better way .
                               • Road network , pedestrian
                                 movement and public
                                 spaces
Location surveys
     location :
                                                                          Project      area :                                               Historical        studies
                                     N
                                                    The most Direct way
                                                    Makah Road
                                                    West Ring Road
                                                                                                                     N
                                                    King Abdullah Road
                                                    East Ring Road
                                                    King Fahd Road
                                                    Salbouk Road




  Strategic location
  Its in the west of Riyadh city near to                                  The project area is surrounded by natural & man                   Old Irgah is an ancient town was known
  King Saud university and the                                            made features , To the north , south and east                     before Islam .its total area 12 Sq. Km
  Diplomatic Quarter . About 30                                           Irgah valley . And to the west , The site is                      . And still some of these signs of the old
  minutes from the airport (42Km)                                         surrounded by high voltage Electrical Towers .                    city remain . Despite the existence of the
  .And its surrounded by major                                                                                                              study area in the range of .
  Roads.                                                                              Study area ( 2.4 Sq. km )                             * Source : http://www.ergah.com/ergah/3/3/1/
     Topology :
The study area is flat land . It is surrounded by Hanifa                      Climate :                                                          Old Irgah district
valley which has a beautiful topography & natural                         Riyadh climate is characterized by an extremely hot in
elements                                                                  summer and cold in winter and it is characterized by low
                                                                          humidity throughout the year about (40 – 49 ) %,
                                                                          especially in the summer, the great difference between             
                                           Valley                                                                                            The number of population in Irgah is
               +643
                                                                          temperatures during the day and night. The rate of                  community: by The Municipality .
                                                                                                                                             about 46000 people
                +655
                                           Study area                     rainfall is between 10 and 13.1 centimeters .
                                                                                                                                             43% are males & 57 % are females . Also 85
                                           Rain water Stream line                                                           sunrise          % are Saudis & 15 % are foreign . And 28 %
                                           Wadi stream direction
                                                                               N                                            sunset           are singles & 72 % are married . Current
                         +655
                                                                                                                                             population density is about 15000 people .
                                                                                                                           Desirable
                       +640                                                                                                wind
                                                                                                                           Undesirable
                                                                                                                                                         Economy :
                                                                                                                           wind
                                                                                                                                                    land prices in the commercial streets
                                                                                                                             Sun movement
                                                                                                                                                    are between 2000 – 3000 SR & in the
                                                                                                                                                    residential between 1300 – 1700 . All
                                                                                                                                                    the study area is private properties
                                                                                                                                                    ,55 % are rented .
                                                                                                                           winter        summer
THE URBAN ASSEMBLY KIT



Grain of building
                                Building mass


                                                                    Large buildings                        Medium buildings                    Small buildings
                                                                   Area : 9580 Sq. m                       Area : 1350 Sq. m                  Area : 300 Sq. m

Block pattern

                                Block lots




 Public open                                                                     Area : 48000 sq. m
                                                                                                                  Area : 82000 sq. m
                                                                                 Number of lots : 61
   space                                     Area : 51000 sq. m                                                   Number of lots : 77     Area starts from : 44000 sq. m
                                             Number of lots : 63                                                                          Number of lots : 38




                                                       Vehicles                                                  Pedestrian

Framework of                      movement
   streets
                                                                                             Hi density                                 Active ways
                                                                                             Mid density                                Inactive ways
                                                                                             low density                                Meeting points




Current Irgah           A

                        A
                            B
                    B
THE URBAN ASSEMBLY KIT
   Land     use :
 The most useage in the area is residential then
 the utilities . And very little commercial or mix
 use to serve the area .
                                                                    Building
                                                                The study area can be divide into three conditions          :
                                                                   condition:
                                                                1- Old building
                                                                2- Modern building ( less than 5 years old ) .
                                                                3- New building ( less than 1 year or under construction )

                                                                                                                                             Old Building
                                                                                                             Old building
                                                                                                             Modern building
                                                                                                             New building
                Land use percentage
                            2%
                   17%
              9%
               5%                  67%

                                                                                                                                           Modern Building
                   Residential   Mixed use
                   Mosques       Services
                   Warehouses
                                                                    Building
                                                                Most of building in the area is made of    concrete and
    Building heights:                                             materialsbuildings have
                                                                there are few of  :
The majority of the buildings are 2 levels . There are
some higher building like the schools & hospital .
                                                                                                                                             New Building

                                               1-2 floors
                                               3-4 floors
                                               5 floors
                                               and more




                                                                                                                                           Concrete Building



Local  mosque                               Hospital      Service              Public school                                 Privateschool
  Service ranges                             ranges                               Service ranges                                Service ranges
Site analysis
          character analysis :                                                          WINDOWS & DOORS PATTERNS



  Villas

                                                                                    Rectangular shape                  arc shape


                                                                    Openings & signs                       Sky lines types


 Mix use
 Buildings
                                                                Side entrance to residence ,            Different levels in roofs
                                                                 front to shops & irregular
                                                                           signs



Residential
  Building


                                                                 Middle door to residence                   Straight roofs




  Type of
 Service in
study areas

                     Education                 Medical                            Financial                     Temporary Religious




  Street
 furniture


                    Trees & lightning   High Voltage Electric                platforms                          Garbage cans
                                               Tower
Site analysis
   movement analysis :

                                                                                                                                 Major     problems




                                                                                                                         No cross line in the streets



                                                                                                                                                  Light column in the
                                                                                                                                                        Street




                                                                                                                       Unfinished asphalt
                                                                                                                          & pavement




     Main streets 40m                 Sub-streets 20-30m                                    Secondary street 15m

       Car movement                    Pedestrians movement                                   Entrance& exits             Critical intersection


                                                                       Ramp in the street
                        Mosque in the island




                                       Critical intersect & not safe                                                      Amart Irgah.ST
Visual surveys
   Mental map :




    residential    Ibin Kaldoon School   node

    Mix use        Irgah Hospital
    Haifa valley
                   Alrajhi Bank                 Riyadh   city view
    services
                   Paths                         Skyline :
    Empty land
                   Edges


Views    :


                                                Land   marks :                        Vista   :
Preparing The Master Plan
Opportunities                 and Constraints :
             Opportunities                               Constraints
         Visual link to Old Irgah                       Built buildings
  Physical Link to the surrounding Hnifa                 Land prices
                   valley
  Rise the commercial use in the area             Hot weather of Riyadh city

    Suitable area for recreational use      The possibility of reducing the privacy
                                                  of the residential areas

 Physical Link to the current residential
                   area
                                                                                        B- Using zero emission transportation :
    Gathering the governmental uses
                                                                                             The transportation for the developed area should not be producing CO2 . The area users
                                                                                             will using electrical buses , moving walkway , bikes ,
   Creating new character to the area




Urban          design principles and consideration :
1- sustainability :

    A- Using Solar power to generate electricity :
      all buildings will be covered with solar panels & using
      the new transparent solar technology in windows
      which directed to the sun
                                                                                      2- safety :
                                                                                            Using a safe movement system which solve the issues of the pedestrian ,
                                                                                            handy caps , bikers and vehicles interaction . By separated lanes . Speed
                                                                                            reduction , cross lines elements , etc.




                                                                                      3- Social:
                                                                                          A- Maintain privacy
                                                                                          B – linked community
B- Water treatment & reuse :
      All the buildings will have water treatment systems
                                                                                      Development                  of project program :
which will filter & reuse the gray
      water in toilets or in plantation then send the black                            usage   Cultural   Public   Commercial   Hotel   Office   Hosing   Theme park   Square   Parking lots   Roads   Green   Water   Etc.

water to the city water treatment                                                               9.4       5.2         7.5        9        1      12.3        5.5        4.2          5         18.5    19.6    6.2     1.6
                                                                                         %
      plant.
Preparing The Master Plan
Urban     design alternative and concepts alternatives :

First Concept                             Criteria      Value evaluation
                                                                           Selection   and development of the optimal alternative :
                              Character                   8%       5
                              Enclosure of space          8%       5
                              Clarity of public space     8%       7
                              Accessibility and
                                                         10%       5
                              permeability
                              Legibility                  8%       5
                              Adaptability               10%       4
                              Diversity                   8%       5
                              Sustainability             15%       4
                              Enrich existing built
                                                         10%       7
                              natural environments
                              Response to project
                                                         15%       8
                              program
                              Total                      100%      55




Second Concept                            Criteria      Value evaluation
                              Character                   8%       6
                              Enclosure of space          8%       3
                              Clarity of public space     8%       2
                              Accessibility and
                                                         10%       7
                              permeability
                              Legibility                  8%       5
                              Adaptability               10%       2
                              Diversity                   8%       3
                              Sustainability             15%       5
                              Enrich existing built
                                                         10%       7
                              natural environments
                              Response to project
                                                         15%       10
                              program
                              Total                      100%      50



Third Concept                         Criteria          Value evaluation
                             Character                   8%       7
                             Enclosure of space          8%       6
                             Clarity of public space     8%       6
                             Accessibility and
                                                        10%       10
                             permeability
                             Legibility                  8%       6
                             Adaptability               10%       4
                             Diversity                   8%       5
                             Sustainability             15%       12
                             Enrich existing built
                                                        10%       7
                             natural environments
                             Response to project
                                                        15%       9
                             program
                             Total                      100%      72
Land use & Movement
Land             uses                                                                                                                                              Code   Building type   FAR    No. Floor   Site area   Foot print     No.
                                                                                                                                                                                                               sq. m        sq. m      parking

                                                                                                                                                                     1       Museum        .71       2        31240.76    11201.13      1000

                                                                                                                                                                     2        Office       5.2       12        6657.6      3718.8       1390

                                                                                                                                                                     3        Offices      3.2       12        8143.9      2646.8       1270

                                                                                                                                                                     4        Offices      4.4       12        6028.5      2646.8       1270

                                                                                                                                     2       2                       5      commercial     3.4       10        8068.2      2769.8       1107
                                                                                                                             3                   1
                                                                                                                         4                   2                       6        Offices      3.9       10        7957.0      3159.9       1264
                                                                                                             8                           2
                                                                                                                                 5                                   7        Offices      4.5       10        6508.0      2950.6       1180
                                                                                                                     6
                                                                                                   9         7                                                       8        Offices       9        10        5911.4      5509.7       2200
                                                                                12 11         10
                                                                                                                                                                     9       Mosque         .5       2        26193.6       7385        700
                                                                           14       13                                                                               10      Schools       .75       4        25373.7      4198.3       300
                                                              16 15
                                                         17                                                                                                          11       Offices      3.3       4          7484       6181.5       990
                                                   17             15
                                              16               16
                                        19                 17                                                                                                        12       Offices      2.5       4          7658       4810.6       770
                                                    18                                                                                                               13       Offices      5.7       4         2188.3      3141.8       500
                                   22    20 21
                             23                                                                                                                                      14        mall        1.8       5        105230       38023.4      1900

                                                                                                                                                                     15       Office       2.3       5         6672.2      3075.7       615

                                                                                                                                                                     16       Offices      2.6       5         7644.8      4086.7       817

                                                                                                                                                                     17       Offices      3.8       6         5820.2      3737.5       897

                                                                                                                                                                     18       Offices       3        6         6037.5      3053.8       733
                                                                                         24
                                                                                                                                                                     19     commercial      1        6          1400        1050        252

                                                                                                                                                                     20      Mosque         .7       2         6654.5      2327.6       250

                                                                                                                                                                     21       Offices      4.7       6         1346.2      1058.6
     commercial      Residential        Mix                Environmental        Recreation             Educational                   Heath           Governmental
                                                            center                                                                                                   22       school       .87       4        25272.3      7358.4       400

     museum          Hotel                                                                                                                                           23        Gov.        1.78      8         28092        12509       500

                                                                                                                                                                     24        hotel       2.5       13        43000        8500        150




Movement
Vehicles , electrical buses ,
 bikes , pedestrian

Pedestrians : The Bridge
( moving walk ways )


Pedestrians :
Inside The project


Pedestrians :
From gardens
Sections and Details
Sections

                                                                Details




                        A
            B       A                                                  Bridge measurements




                B




                                                                           Crossing details




                            Section A – A / Scale 1 : 500




                            Section B- B / Scale 1: 500
perspectives
perspectives
perspectives
Urban Design Project 2

Más contenido relacionado

La actualidad más candente

Le corbusiers planning concepts
Le corbusiers planning conceptsLe corbusiers planning concepts
Le corbusiers planning conceptsctlachu
 
A study on urban growth trends in kochi
A study on urban growth trends in kochiA study on urban growth trends in kochi
A study on urban growth trends in kochiArun Chandra Babu
 
Dariba kalan in Chandni chowk - Study of urban services
Dariba kalan in Chandni chowk - Study of urban servicesDariba kalan in Chandni chowk - Study of urban services
Dariba kalan in Chandni chowk - Study of urban servicesAr.Apurva Sinkar
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case studyARYAN GUPTA
 
Chandigarh and Navi Mumbai town planning
Chandigarh and Navi Mumbai town planningChandigarh and Navi Mumbai town planning
Chandigarh and Navi Mumbai town planningMUHAMMEDJESWIN
 
Salt Lake City Centre
Salt Lake City CentreSalt Lake City Centre
Salt Lake City CentreRashmi Gautam
 
Bhubaneswar an ideal capital city
Bhubaneswar   an ideal capital cityBhubaneswar   an ideal capital city
Bhubaneswar an ideal capital cityRajesh Kolli
 
Case study kohinoor square Mumbai
Case study kohinoor square MumbaiCase study kohinoor square Mumbai
Case study kohinoor square MumbaiTapu Taba
 
Aranya Community housing- Case Study
Aranya Community housing- Case StudyAranya Community housing- Case Study
Aranya Community housing- Case StudyRajat Rana
 
Urban rejnuvation case study
Urban rejnuvation case studyUrban rejnuvation case study
Urban rejnuvation case studyshivangi5796
 
Gated community thesis
Gated community thesisGated community thesis
Gated community thesisGeeva Chandana
 
urban design Case study, interventions
urban design Case study, interventionsurban design Case study, interventions
urban design Case study, interventionsYOGESHCHAUDHARI91
 
Aranya low cost housing-BV Doshi
Aranya low cost housing-BV DoshiAranya low cost housing-BV Doshi
Aranya low cost housing-BV Doshikusha Ahmed
 
Thesis presentation 2013
Thesis presentation 2013Thesis presentation 2013
Thesis presentation 2013ROHIT SINGLA
 

La actualidad más candente (20)

Le corbusiers planning concepts
Le corbusiers planning conceptsLe corbusiers planning concepts
Le corbusiers planning concepts
 
Urban Redevelopment
Urban RedevelopmentUrban Redevelopment
Urban Redevelopment
 
A study on urban growth trends in kochi
A study on urban growth trends in kochiA study on urban growth trends in kochi
A study on urban growth trends in kochi
 
Chandigarh Planning
Chandigarh PlanningChandigarh Planning
Chandigarh Planning
 
Dariba kalan in Chandni chowk - Study of urban services
Dariba kalan in Chandni chowk - Study of urban servicesDariba kalan in Chandni chowk - Study of urban services
Dariba kalan in Chandni chowk - Study of urban services
 
Group housing case study
Group housing case studyGroup housing case study
Group housing case study
 
Chandigarh and Navi Mumbai town planning
Chandigarh and Navi Mumbai town planningChandigarh and Navi Mumbai town planning
Chandigarh and Navi Mumbai town planning
 
Salt Lake City Centre
Salt Lake City CentreSalt Lake City Centre
Salt Lake City Centre
 
Bhubaneswar an ideal capital city
Bhubaneswar   an ideal capital cityBhubaneswar   an ideal capital city
Bhubaneswar an ideal capital city
 
Case study kohinoor square Mumbai
Case study kohinoor square MumbaiCase study kohinoor square Mumbai
Case study kohinoor square Mumbai
 
Urban studies case study townships
Urban studies case study townshipsUrban studies case study townships
Urban studies case study townships
 
Broadacre city
Broadacre cityBroadacre city
Broadacre city
 
Aranya Community housing- Case Study
Aranya Community housing- Case StudyAranya Community housing- Case Study
Aranya Community housing- Case Study
 
Urban rejnuvation case study
Urban rejnuvation case studyUrban rejnuvation case study
Urban rejnuvation case study
 
Gated community thesis
Gated community thesisGated community thesis
Gated community thesis
 
urban design Case study, interventions
urban design Case study, interventionsurban design Case study, interventions
urban design Case study, interventions
 
Aranya low cost housing-BV Doshi
Aranya low cost housing-BV DoshiAranya low cost housing-BV Doshi
Aranya low cost housing-BV Doshi
 
Magarpatta city
Magarpatta cityMagarpatta city
Magarpatta city
 
Kochi city form new
Kochi city form newKochi city form new
Kochi city form new
 
Thesis presentation 2013
Thesis presentation 2013Thesis presentation 2013
Thesis presentation 2013
 

Destacado

Destacado (10)

Urban design methods
Urban design methodsUrban design methods
Urban design methods
 
Urban Design Studio PPT
Urban Design Studio PPTUrban Design Studio PPT
Urban Design Studio PPT
 
Panaji muncipal market – goa casestudy
Panaji muncipal market – goa casestudyPanaji muncipal market – goa casestudy
Panaji muncipal market – goa casestudy
 
Fish market & commercial development
Fish market & commercial developmentFish market & commercial development
Fish market & commercial development
 
Ranganthan street,T.Nagar - Urban Design
Ranganthan street,T.Nagar - Urban DesignRanganthan street,T.Nagar - Urban Design
Ranganthan street,T.Nagar - Urban Design
 
Urban design Case study GOA PANJIM
Urban design Case study GOA PANJIMUrban design Case study GOA PANJIM
Urban design Case study GOA PANJIM
 
Cept case study
Cept case studyCept case study
Cept case study
 
urban design project 3
urban design project 3urban design project 3
urban design project 3
 
Case Study (Stockholm City)
Case Study (Stockholm City)Case Study (Stockholm City)
Case Study (Stockholm City)
 
Urban Design project 1
Urban Design project 1Urban Design project 1
Urban Design project 1
 

Similar a Urban Design Project 2

Design portfolio_Sonal Aggarwal
Design portfolio_Sonal AggarwalDesign portfolio_Sonal Aggarwal
Design portfolio_Sonal AggarwalSonal Aggarwal
 
Design portfolio_Sonal Aggarwal
Design portfolio_Sonal AggarwalDesign portfolio_Sonal Aggarwal
Design portfolio_Sonal AggarwalSonal Aggarwal
 
Site analysis for a neighborhood
Site analysis for a neighborhoodSite analysis for a neighborhood
Site analysis for a neighborhoodAjit Katari
 
Site planning in Architectural Projects- Principles and Approaches
Site planning  in Architectural Projects- Principles and ApproachesSite planning  in Architectural Projects- Principles and Approaches
Site planning in Architectural Projects- Principles and ApproachesJitKumarGupta1
 
Brownfield project by Shrikant
Brownfield project  by ShrikantBrownfield project  by Shrikant
Brownfield project by ShrikantShriKant49
 
Abdelmalik - input2012
Abdelmalik - input2012Abdelmalik - input2012
Abdelmalik - input2012INPUT 2012
 
Urban Planning Legislation project - Fall 2013
Urban Planning Legislation project - Fall 2013Urban Planning Legislation project - Fall 2013
Urban Planning Legislation project - Fall 2013Galala University
 
Eia of Navi Mumbai International Airport (NMIA)
Eia of Navi Mumbai International Airport (NMIA) Eia of Navi Mumbai International Airport (NMIA)
Eia of Navi Mumbai International Airport (NMIA) Monika Arora
 
final-Synopsis.pptx
final-Synopsis.pptxfinal-Synopsis.pptx
final-Synopsis.pptxAki Shukla
 
Redevelopment strategy,.urban design, pedestrian movment, design testing Hac...
Redevelopment strategy,.urban design, pedestrian movment, design testing  Hac...Redevelopment strategy,.urban design, pedestrian movment, design testing  Hac...
Redevelopment strategy,.urban design, pedestrian movment, design testing Hac...Sujeet Thakare
 
Selected Projects 10 02
Selected Projects 10 02Selected Projects 10 02
Selected Projects 10 02guest92f81f3
 
Grandview District analysis + frameworks
Grandview District analysis + frameworksGrandview District analysis + frameworks
Grandview District analysis + frameworksWigley and Associates
 
Site Planning and Site Analysis for Architectural Projects
Site Planning and Site Analysis for Architectural ProjectsSite Planning and Site Analysis for Architectural Projects
Site Planning and Site Analysis for Architectural ProjectsJIT KUMAR GUPTA
 
World wide examples of urban regeneration
World wide examples of urban regenerationWorld wide examples of urban regeneration
World wide examples of urban regenerationAsraHafeez
 
urban planning REPORT.pdf
urban planning  REPORT.pdfurban planning  REPORT.pdf
urban planning REPORT.pdfFkFe
 
ARANYA HOUSING, INDORE
ARANYA HOUSING, INDOREARANYA HOUSING, INDORE
ARANYA HOUSING, INDOREMadhu Sagar
 
SR5YR5EWYS5R4HYWURDTYHSR4EU6HSRYmapping n1.pptx
SR5YR5EWYS5R4HYWURDTYHSR4EU6HSRYmapping n1.pptxSR5YR5EWYS5R4HYWURDTYHSR4EU6HSRYmapping n1.pptx
SR5YR5EWYS5R4HYWURDTYHSR4EU6HSRYmapping n1.pptxAsmJai
 

Similar a Urban Design Project 2 (20)

Design portfolio_Sonal Aggarwal
Design portfolio_Sonal AggarwalDesign portfolio_Sonal Aggarwal
Design portfolio_Sonal Aggarwal
 
Design portfolio_Sonal Aggarwal
Design portfolio_Sonal AggarwalDesign portfolio_Sonal Aggarwal
Design portfolio_Sonal Aggarwal
 
Urban design 1 Analysis
Urban design 1 AnalysisUrban design 1 Analysis
Urban design 1 Analysis
 
Ward no 49 bhopal
Ward no 49 bhopalWard no 49 bhopal
Ward no 49 bhopal
 
Site analysis for a neighborhood
Site analysis for a neighborhoodSite analysis for a neighborhood
Site analysis for a neighborhood
 
Site planning in Architectural Projects- Principles and Approaches
Site planning  in Architectural Projects- Principles and ApproachesSite planning  in Architectural Projects- Principles and Approaches
Site planning in Architectural Projects- Principles and Approaches
 
Brownfield project by Shrikant
Brownfield project  by ShrikantBrownfield project  by Shrikant
Brownfield project by Shrikant
 
Abdelmalik - input2012
Abdelmalik - input2012Abdelmalik - input2012
Abdelmalik - input2012
 
Portfolio
PortfolioPortfolio
Portfolio
 
Urban Planning Legislation project - Fall 2013
Urban Planning Legislation project - Fall 2013Urban Planning Legislation project - Fall 2013
Urban Planning Legislation project - Fall 2013
 
Eia of Navi Mumbai International Airport (NMIA)
Eia of Navi Mumbai International Airport (NMIA) Eia of Navi Mumbai International Airport (NMIA)
Eia of Navi Mumbai International Airport (NMIA)
 
final-Synopsis.pptx
final-Synopsis.pptxfinal-Synopsis.pptx
final-Synopsis.pptx
 
Redevelopment strategy,.urban design, pedestrian movment, design testing Hac...
Redevelopment strategy,.urban design, pedestrian movment, design testing  Hac...Redevelopment strategy,.urban design, pedestrian movment, design testing  Hac...
Redevelopment strategy,.urban design, pedestrian movment, design testing Hac...
 
Selected Projects 10 02
Selected Projects 10 02Selected Projects 10 02
Selected Projects 10 02
 
Grandview District analysis + frameworks
Grandview District analysis + frameworksGrandview District analysis + frameworks
Grandview District analysis + frameworks
 
Site Planning and Site Analysis for Architectural Projects
Site Planning and Site Analysis for Architectural ProjectsSite Planning and Site Analysis for Architectural Projects
Site Planning and Site Analysis for Architectural Projects
 
World wide examples of urban regeneration
World wide examples of urban regenerationWorld wide examples of urban regeneration
World wide examples of urban regeneration
 
urban planning REPORT.pdf
urban planning  REPORT.pdfurban planning  REPORT.pdf
urban planning REPORT.pdf
 
ARANYA HOUSING, INDORE
ARANYA HOUSING, INDOREARANYA HOUSING, INDORE
ARANYA HOUSING, INDORE
 
SR5YR5EWYS5R4HYWURDTYHSR4EU6HSRYmapping n1.pptx
SR5YR5EWYS5R4HYWURDTYHSR4EU6HSRYmapping n1.pptxSR5YR5EWYS5R4HYWURDTYHSR4EU6HSRYmapping n1.pptx
SR5YR5EWYS5R4HYWURDTYHSR4EU6HSRYmapping n1.pptx
 

Último

Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...samsungultra782445
 
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证wpkuukw
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证eeanqy
 
Furniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxFurniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxNikhil Raut
 
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipRaebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipNitya salvi
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfOffice Furniture Plus - Irving
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxbalqisyamutia
 
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime PondicherryPondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherrymeghakumariji156
 
ab-initio-training basics and architecture
ab-initio-training basics and architectureab-initio-training basics and architecture
ab-initio-training basics and architecturesaipriyacoool
 
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...Nitya salvi
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样awasv46j
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...gajnagarg
 
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...RitikaRoy32
 
Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahimamgadibrahim92
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationZenSeloveres
 
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...Amil baba
 
BLOCK CHAIN PROJECT block chain project
BLOCK CHAIN  PROJECT block chain projectBLOCK CHAIN  PROJECT block chain project
BLOCK CHAIN PROJECT block chain projectujraj8767
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...instagramfab782445
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxbingyichin04
 

Último (20)

Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
Abortion pills in Riyadh +966572737505 <> buy cytotec <> unwanted kit Saudi A...
 
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
 
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
怎样办理伦敦国王学院毕业证(KCL毕业证书)成绩单留信认证
 
Furniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptxFurniture & Joinery Details_Designs.pptx
Furniture & Joinery Details_Designs.pptx
 
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for FriendshipRaebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
Raebareli Girl Whatsapp Number 📞 8617370543 | Girls Number for Friendship
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdf
 
Minimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptxMinimalist Orange Portfolio by Slidesgo.pptx
Minimalist Orange Portfolio by Slidesgo.pptx
 
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime PondicherryPondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
 
ab-initio-training basics and architecture
ab-initio-training basics and architectureab-initio-training basics and architecture
ab-initio-training basics and architecture
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
 
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
 
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
一比一原版(WLU毕业证)罗瑞尔大学毕业证成绩单留信学历认证原版一模一样
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
 
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
UI:UX Design and Empowerment Strategies for Underprivileged Transgender Indiv...
 
Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahim
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
 
BLOCK CHAIN PROJECT block chain project
BLOCK CHAIN  PROJECT block chain projectBLOCK CHAIN  PROJECT block chain project
BLOCK CHAIN PROJECT block chain project
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 

Urban Design Project 2

  • 1. ECO IRGAH VALEY Student name : Salman Altuwairki NO. : 428102630 Course : Urban design project 2 Date : 2011 Supervisor : Dr. Ziad Alameddine
  • 2. Course : Urban design project 2 Student name : Salman Altuwairki Date : 2011 NO. : 428102630 Supervisor : Dr. Ziad Alameddine Introduction : The importance of the site drives from being linked with king Abdullah Road , As well as its proximity to KSU , DQ , Historical Irgah city . In addition The site is characterized by the natural features of wadi Hanifa . During the initial survey of the study area it’s noticed that there are urban problems such as random planning , the absence of regulations in addition to the incomplete facilities . There for . It’s most important to establish a clear vision to the development of the area based on comprehensive urban design process . Urban process : Goals and overall objectives of Data Preparing Preparing the collection the master details plan 1 – the project: To identify the urban problems in the study area and resolutions . plan 2 - To improving the area by raising the aesthetic value . 3 –To Enhancing the environmental and sustainability aspects . • Selection of study • Urban details area • Study of urban design • Lots patterns 4 - To raise the value of the region economically . • Site analysis consideration • Preparation of the • Case studies • Set backs • Building mass 5 – To add character to the area . • Design alternatives project program • Land use plan • Urban codes 6 - To connecting the area in a better way . • Road network , pedestrian movement and public spaces
  • 3. Location surveys  location : Project area : Historical studies N The most Direct way Makah Road West Ring Road N King Abdullah Road East Ring Road King Fahd Road Salbouk Road Strategic location Its in the west of Riyadh city near to The project area is surrounded by natural & man Old Irgah is an ancient town was known King Saud university and the made features , To the north , south and east before Islam .its total area 12 Sq. Km Diplomatic Quarter . About 30 Irgah valley . And to the west , The site is . And still some of these signs of the old minutes from the airport (42Km) surrounded by high voltage Electrical Towers . city remain . Despite the existence of the .And its surrounded by major study area in the range of . Roads. Study area ( 2.4 Sq. km ) * Source : http://www.ergah.com/ergah/3/3/1/  Topology : The study area is flat land . It is surrounded by Hanifa  Climate : Old Irgah district valley which has a beautiful topography & natural Riyadh climate is characterized by an extremely hot in elements summer and cold in winter and it is characterized by low humidity throughout the year about (40 – 49 ) %, especially in the summer, the great difference between  Valley The number of population in Irgah is +643 temperatures during the day and night. The rate of community: by The Municipality . about 46000 people +655 Study area rainfall is between 10 and 13.1 centimeters . 43% are males & 57 % are females . Also 85 Rain water Stream line sunrise % are Saudis & 15 % are foreign . And 28 % Wadi stream direction N sunset are singles & 72 % are married . Current +655 population density is about 15000 people . Desirable +640 wind Undesirable  Economy : wind land prices in the commercial streets Sun movement are between 2000 – 3000 SR & in the residential between 1300 – 1700 . All the study area is private properties ,55 % are rented . winter summer
  • 4. THE URBAN ASSEMBLY KIT Grain of building Building mass Large buildings Medium buildings Small buildings Area : 9580 Sq. m Area : 1350 Sq. m Area : 300 Sq. m Block pattern Block lots Public open Area : 48000 sq. m Area : 82000 sq. m Number of lots : 61 space Area : 51000 sq. m Number of lots : 77 Area starts from : 44000 sq. m Number of lots : 63 Number of lots : 38 Vehicles Pedestrian Framework of movement streets Hi density Active ways Mid density Inactive ways low density Meeting points Current Irgah A A B B
  • 5. THE URBAN ASSEMBLY KIT Land use : The most useage in the area is residential then the utilities . And very little commercial or mix use to serve the area .  Building The study area can be divide into three conditions : condition: 1- Old building 2- Modern building ( less than 5 years old ) . 3- New building ( less than 1 year or under construction ) Old Building Old building Modern building New building Land use percentage 2% 17% 9% 5% 67% Modern Building Residential Mixed use Mosques Services Warehouses  Building Most of building in the area is made of concrete and  Building heights: materialsbuildings have there are few of : The majority of the buildings are 2 levels . There are some higher building like the schools & hospital . New Building 1-2 floors 3-4 floors 5 floors and more Concrete Building Local mosque Hospital Service Public school Privateschool Service ranges ranges Service ranges Service ranges
  • 6. Site analysis  character analysis : WINDOWS & DOORS PATTERNS Villas Rectangular shape arc shape Openings & signs Sky lines types Mix use Buildings Side entrance to residence , Different levels in roofs front to shops & irregular signs Residential Building Middle door to residence Straight roofs Type of Service in study areas Education Medical Financial Temporary Religious Street furniture Trees & lightning High Voltage Electric platforms Garbage cans Tower
  • 7. Site analysis  movement analysis : Major problems No cross line in the streets Light column in the Street Unfinished asphalt & pavement Main streets 40m Sub-streets 20-30m Secondary street 15m Car movement Pedestrians movement Entrance& exits Critical intersection Ramp in the street Mosque in the island Critical intersect & not safe Amart Irgah.ST
  • 8. Visual surveys  Mental map : residential Ibin Kaldoon School node Mix use Irgah Hospital Haifa valley Alrajhi Bank Riyadh city view services Paths Skyline : Empty land Edges Views : Land marks : Vista :
  • 9. Preparing The Master Plan Opportunities and Constraints : Opportunities Constraints Visual link to Old Irgah Built buildings Physical Link to the surrounding Hnifa Land prices valley Rise the commercial use in the area Hot weather of Riyadh city Suitable area for recreational use The possibility of reducing the privacy of the residential areas Physical Link to the current residential area B- Using zero emission transportation : Gathering the governmental uses The transportation for the developed area should not be producing CO2 . The area users will using electrical buses , moving walkway , bikes , Creating new character to the area Urban design principles and consideration : 1- sustainability : A- Using Solar power to generate electricity : all buildings will be covered with solar panels & using the new transparent solar technology in windows which directed to the sun 2- safety : Using a safe movement system which solve the issues of the pedestrian , handy caps , bikers and vehicles interaction . By separated lanes . Speed reduction , cross lines elements , etc. 3- Social: A- Maintain privacy B – linked community B- Water treatment & reuse : All the buildings will have water treatment systems Development of project program : which will filter & reuse the gray water in toilets or in plantation then send the black usage Cultural Public Commercial Hotel Office Hosing Theme park Square Parking lots Roads Green Water Etc. water to the city water treatment 9.4 5.2 7.5 9 1 12.3 5.5 4.2 5 18.5 19.6 6.2 1.6 % plant.
  • 10. Preparing The Master Plan Urban design alternative and concepts alternatives : First Concept Criteria Value evaluation Selection and development of the optimal alternative : Character 8% 5 Enclosure of space 8% 5 Clarity of public space 8% 7 Accessibility and 10% 5 permeability Legibility 8% 5 Adaptability 10% 4 Diversity 8% 5 Sustainability 15% 4 Enrich existing built 10% 7 natural environments Response to project 15% 8 program Total 100% 55 Second Concept Criteria Value evaluation Character 8% 6 Enclosure of space 8% 3 Clarity of public space 8% 2 Accessibility and 10% 7 permeability Legibility 8% 5 Adaptability 10% 2 Diversity 8% 3 Sustainability 15% 5 Enrich existing built 10% 7 natural environments Response to project 15% 10 program Total 100% 50 Third Concept Criteria Value evaluation Character 8% 7 Enclosure of space 8% 6 Clarity of public space 8% 6 Accessibility and 10% 10 permeability Legibility 8% 6 Adaptability 10% 4 Diversity 8% 5 Sustainability 15% 12 Enrich existing built 10% 7 natural environments Response to project 15% 9 program Total 100% 72
  • 11. Land use & Movement Land uses Code Building type FAR No. Floor Site area Foot print No. sq. m sq. m parking 1 Museum .71 2 31240.76 11201.13 1000 2 Office 5.2 12 6657.6 3718.8 1390 3 Offices 3.2 12 8143.9 2646.8 1270 4 Offices 4.4 12 6028.5 2646.8 1270 2 2 5 commercial 3.4 10 8068.2 2769.8 1107 3 1 4 2 6 Offices 3.9 10 7957.0 3159.9 1264 8 2 5 7 Offices 4.5 10 6508.0 2950.6 1180 6 9 7 8 Offices 9 10 5911.4 5509.7 2200 12 11 10 9 Mosque .5 2 26193.6 7385 700 14 13 10 Schools .75 4 25373.7 4198.3 300 16 15 17 11 Offices 3.3 4 7484 6181.5 990 17 15 16 16 19 17 12 Offices 2.5 4 7658 4810.6 770 18 13 Offices 5.7 4 2188.3 3141.8 500 22 20 21 23 14 mall 1.8 5 105230 38023.4 1900 15 Office 2.3 5 6672.2 3075.7 615 16 Offices 2.6 5 7644.8 4086.7 817 17 Offices 3.8 6 5820.2 3737.5 897 18 Offices 3 6 6037.5 3053.8 733 24 19 commercial 1 6 1400 1050 252 20 Mosque .7 2 6654.5 2327.6 250 21 Offices 4.7 6 1346.2 1058.6 commercial Residential Mix Environmental Recreation Educational Heath Governmental center 22 school .87 4 25272.3 7358.4 400 museum Hotel 23 Gov. 1.78 8 28092 12509 500 24 hotel 2.5 13 43000 8500 150 Movement Vehicles , electrical buses , bikes , pedestrian Pedestrians : The Bridge ( moving walk ways ) Pedestrians : Inside The project Pedestrians : From gardens
  • 12. Sections and Details Sections Details A B A Bridge measurements B Crossing details Section A – A / Scale 1 : 500 Section B- B / Scale 1: 500