SlideShare una empresa de Scribd logo
1 de 6
Descargar para leer sin conexión
October 2, 2014 
Docket Management Facility 
U.S. Department of Transportation 
Room W12-140 
1200 New Jersey Avenue, SE 
Washington, DC 20590-0001 
Re: Docket No. FHWA-2013-0037; Statewide and Nonmetropolitan Transportation Planning; Metropolitan Transportation Planning 
On behalf of the 6,000 members of the American Road and Transportation Builders Association (ARTBA), I respectfully offer comments on the U.S. Department of Transportation’s (DOT’s) Notice of Proposed Rulemaking concerning statewide and nonmetropolitan transportation planning and metropolitan transportation planning. 
ARTBA’s membership includes private and public sector members that plan, design, construct and maintain the nation’s roadways, waterways, bridges, ports, airports, rail and transit systems. Our industry generates more than $380 billion annually in U.S. economic activity and sustains more than 3.3 million American jobs. 
ARTBA members undertake a variety of activities that are subject to both the transportation planning and environmental review and approval processes in the normal course of their business operations. ARTBA’s public sector members adopt, approve, or fund transportation plans, programs, or projects. ARTBA’s private sector members plan, design, construct and provide supplies for these federal transportation improvement projects. This document represents the collective views of our 6,000 member companies and organizations. 
The “Moving Ahead for Progress in the 21st Century Act” (MAP-21) initiated a significant change in the nature of the federal highway program. Whereas the core purpose of the highway program under prior surface transportation reauthorization laws was to share the cost of state and local improvements to highways on the federal-aid system, MAP-21 establishes two clear roles for the federal government in the nation’s highway system: 
1. Establish goals and metrics for the physical condition and operational performance of the core highways that are important to the nation’s economy—the Interstate Highway System (IHS) and the National Highway System (NHS). MAP-21 recognizes highways provide critical infrastructure to support the nation’s economy, and that their condition and performance underpin the future growth and strength of the economy. To that end, MAP-21 consolidates a number of categorical highway programs into a new National Highway Performance Program (NHPP) to channel federal highway investment into projects that contribute to achieving the national goals established in the legislation.
2 
2. Create a National Freight Policy that recognizes the importance of freight movements to the overall performance of the economy. Under MAP-21, a clear federal responsibility is established for assuring that freight moves safely and efficiently by improving highway freight corridors and removing bottlenecks that impede the efficient flow of freight over the nation’s highways. 
Enacting historic changes through legislation is just the first step in this process. It is essential the new law be implemented effectively and in ways that give the greatest return to those whose funds are invested in highways—the taxpayers whose motor fuel taxes are credited to the Highway Trust Fund to support highway and bridge improvements. MAP-21 takes a number of important steps to address past criticisms of federal highway investment, including eliminating earmarks, reducing diversions of highway revenues to non-highway uses and consolidating numerous programs into a handful that give recipients more flexibility to use limited resources to enhance the performance of the nation’s highways. Whether taxpayers receive the benefits will depend on how the new legislation is implemented and states use their new autonomy. 
To that end, ARTBA offers the following comments on DOT’s proposed planning regulations: 
Focus on the goals enumerated in the law 
The authors of MAP-21 had the opportunity to include a host of external goals such as livability, reduction of transportation-related greenhouse gas emissions, reduction of reliance on foreign oil, adaptation to the effects of climate change, public health, housing, land-use patterns and air quality in the planning and performance process. Instead, Section 1203 of MAP-21 listed only one goal—environmental sustainability—that is not directly related to physical conditions and operational performance of the National Highway System. The same is true for the metropolitan and statewide planning processes laid out in Sections 1201-1202. 
Accordingly, DOT should focus on implementing the goals and standards as spelled out in MAP- 21. While there may be stakeholders and perspectives that did not achieve their full objectives in the legislative process, we urge you to resist any recommendations to re-open the delicate compromise achieved in MAP-21 through over interpretation of the measure’s performance process. The simple fact is that few interest groups, including ARTBA, are entirely satisfied with every aspect of major legislation. That reality should in no way tarnish MAP-21’s meaningful policy reforms. Further, the common ground found during the legislative process is one of the main reasons MAP-21 was among the few significant pieces of legislation to secure broad bipartisan support during the 112th Congress. 
Establishing Performance Goals and Measures 
For the purpose of carrying out the NHPP established in Section 119 of Title 23, Section 1203 of MAP-21 (Title 23, Section 150) requires the Secretary to establish performance measures for the IHS and the rest of the NHS. These are to form the basis for states and Metropolitan Planning Organizations (MPOs) to develop their highway asset management plans. Performance goals and measures should be directly related to the outcomes sought. MAP-21 establishes specific national goals related to the NHPP and the performance measures should be tied toward the achievement of these goals. Prior to the enactment of MAP-21, the mission of the federal highway program was clouded as the program was restructured time and again to be all things to
3 
all people. MAP-21’s national performance goals provide an opportunity to clearly demonstrate the mission of federal highway investment. 
The traditional standard used to measure highway performance has been congestion, which has been measured in a number of ways, including the effect on travel time, duration, variability and cause. These are the concepts used both by the Texas Transportation Institute (TTI) in its annual report on the cost of congestion in urban areas and by the U.S.DOT in its annual Conditions and Performance report. It should be noted that ARTBA fully appreciates the importance of mass transit facilities in reducing urban congestion—a fact demonstrated by the joint sponsorship of the TTI annual congestion report by ARTBA and the American Public Transportation Association. 
To reflect the complexity of congestion, the performance standards developed by the Secretary should not focus on just one measure, but should reflect the various causes and consequences of congestion and should include the following: 
1. The performance measures should be data driven. In recent years, TTI has significantly improved its sources and uses of congestion data and, as new technologies are developed. That process should continue. The performance measures set by the Secretary should be updated and revised on a regular schedule to incorporate the latest and most reliable data. 
2. The performance measures should fully incorporate the economic costs of congestion. In calculating the cost of congestion, the TTI report focuses on two elements – the cost of travel time and wasted fuel. These, however, are only part of the story. More important is the cost congestion imposes on the productivity of the economy, including imposing delays on the manufacturing process, increasing logistics cost of planning shipments to avoid congestion and bottlenecks, and forcing firms to make non-optimal location decisions, among others, as well as the cost to public health and safety in terms of increased collisions. The performance measures should recognize these costs as well as the time and fuel costs calculated by the TTI. 
3. The performance measures should also recognize the impact of infrastructure conditions on roadway safety. A 2009 study from the Pacific Institute for Research and Evaluation found that more than half of highway fatalities are related to deficient roadway conditions. These crashes were estimated to cost the U.S. more than $217 billion per year. 
4. The performance measures should be integrated with the national freight policy. Highway bottlenecks cost freight shippers more than $8 billion each year. The performance measures should incorporate data on freight, as well as overall travel. 
5. The performance measures should not be chosen on the basis of preferred solutions. Different stakeholders and analysts have strongly held views as to how highway congestion should be addressed. These views, however, should not be used to establish performance measures. Performance measures should be based on actual
4 
existing travel data and should be neutral as to how the states resolve the problem in their state asset management plans. 
Assuring Accountability and Transparency 
MAP-21 significantly alters the relationship between state and local transportation agencies and the public whose highway user taxes are invested in highway improvements. Under prior surface transportation laws, the main requirement for obligating federal funds for a project was the project’s conformity to the requirements of the program providing the funds. There was no requirement for the recipient of funds to justify the project or provide information about how the project achieves national goals or expected benefits, other than that the project be part of the state’s or MPO’s long-range transportation plan and be on the statewide transportation improvement program (STIP) or transportation improvement program (TIP). As a result, the public received little information that could be used to evaluate the benefits received from the motor fuel and other taxes paid into the federal Highway Trust Fund. 
MAP-21 transforms the federal highway program into one where project selection is driven by performance targets. While MAP-21 focuses on development and implementation of state asset management plans to improve the condition and performance of the NHS, the success of this approach will depend on public understanding of the benefits of highway improvements and their views on the taxes they pay for highway investments. The more information taxpayers have on the purposes and benefits of highway and bridge improvement projects, the better will be their ability to evaluate the federal highway program. This can be accomplished in conjunction with the requirement in Section 1503(c) of MAP-21 that the U.S. DOT publish detailed information on all federally-aided highway projects on its website. The model for this should be the format used by the Department to report on the obligation and use of highway funds provided under the American Recovery and Reinvestment Act (ARRA), but expanded to include information on the goal or goals each project is intended to achieve and what the project did achieve when completed. 
We are extremely disappointed the Department has not yet complied with this requirement, despite the zeal it took in how new ARRA transportation funds were utilized. We urge the DOT to begin this important process in educating the public on the specific value each state receives from federal highway and bridge investment. 
Implementing the National Highway Performance Program (NHPP) 
Although Section 1104 of MAP-21 expands the definition of the National Highway System to include some roads, border crossings and intermodal connectors not currently part of the NHS, it is clear in the legislation that the sole focus of the NHS, and thus the NHPP, is highways and does not include other modes. While the goals of the NHPP include mitigating the environmental impact of highway travel and protecting and enhancing the natural environment, we urge you to resist recommendations that may suggest these goals constitute shifting Highway Account resources to other modes of transportation. MAP-21 is clear that the only other permissible uses of NHPP funds, other than for NHS highway and bridge improvements, are: 
1. Ferry boats and ferry boat facilities that connect to the NHS;
5 
2. Federal-aid roads off the NHS if the project is in the same corridor as an access- controlled NHS route and provides a higher ratio of benefits to cost as a project on the NHS route; 
3. Construction of a transit project, with the same limitations as in (2); 
4. Bicycle routes and pedestrian walkways; and 
5. Bus terminals servicing the NHS. 
These are the same exceptions that existed under SAFETEA-LU, and there is nothing in MAP- 21 to suggest Congress now means they should be a platform for shifting limited Highway Account resources to other modes. 
Similarly, there is no reason the state and MPO asset management plans required under MAP-21 should channel federal highway funds into other modes to any greater extent than under SAFETEA-LU and prior surface transportation authorization laws. The major change made by MAP-21 to state and MPO transportation improvement plans is that they are to be outcome- oriented with a focus on contributing to the national performance goals established in Section 150. 
Programmatic Agreements 
While ARTBA realizes a separate rulemaking is forthcoming on the subject of programmatic agreements, they are also covered in DOT’s proposed planning regulations. As a general note, ARTBA has consistently encouraged the use of programmatic agreements, which have been highlighted in the Federal Highway Administration’s (FHWA) “Every Day Counts” program as an effective tool in reducing project delay. 
ARTBA recommends that as states take advantage of these programmatic agreements, DOT should examine the agreements and quantify the benefits in terms of time saved. Also, a clearinghouse of programmatic agreements should be created in order to highlight the most effective examples. Such information would be useful in helping to demonstrate to additional states the advantages of this new option. 
Transportation Planning & the National Environmental Policy Act (NEPA) 
MAP-21 encourages the integration of NEPA with the transportation planning process. ARTBA has long supported this concept, as allowing transportation planning materials to be used during the NEPA process serves to reduce unnecessary duplication of work and shorten delay. 
Specifically, ARTBA has some concerns over the use of the phrase “significant new information” in determining whether or not an existing planning document may be used during NEPA review. In determining whether or not “significant new information” has become available between the time of the planning document and NEPA, deference should be given to the determination of the state project sponsor, which will have the greatest familiarity with both documents. Also, as with other planning decisions, the decision on whether “significant new information” precludes the use of a planning document during the NEPA process should not be
6 
reviewable by a court. In instances where “significant new information” is available, DOT should develop a mechanism where the planning document can be updated, as opposed to creation of an entirely new document. 
Finally, a clearinghouse highlighting the successful implementation of planning products into NEPA reviews should be established. Such a resource will enable project sponsors to share how to best use this new tool offered by MAP-21 in order to reduce project delay. 
Setting Standards for Pavement Conditions 
Another key component of the MAP-21 performance management process is its requirement for the U.S. Secretary of Transportation to establish measures to assess the condition of pavements on the Interstate System and set minimum conditions states must maintain to avoid penalties. It is well understood that much of the Interstate Highway System, which was constructed in the 1960s and 1970s has exceeded its life expectancy and is in need of substantial repair. ARTBA therefore is eager to work with the Department in developing these requirements. 
ARTBA looks forward to continuing to participate with DOT in effectively implementing MAP- 21’s project delivery reforms and look forward to continuing a dialogue on this critical endeavor. 
Sincerely, 
T. Peter Ruane 
President & C.E.O

Más contenido relacionado

La actualidad más candente

FHWA MOU with the State of Texas Regarding Environmental Reviews.
FHWA MOU with the State of Texas Regarding Environmental Reviews.FHWA MOU with the State of Texas Regarding Environmental Reviews.
FHWA MOU with the State of Texas Regarding Environmental Reviews.artba
 
Artba Senate Finance Committee May
Artba Senate Finance Committee MayArtba Senate Finance Committee May
Artba Senate Finance Committee Mayartba
 
May 29 2014 Draft Small Business Wotus Hearing Statement
May 29 2014 Draft Small Business Wotus Hearing StatementMay 29 2014 Draft Small Business Wotus Hearing Statement
May 29 2014 Draft Small Business Wotus Hearing Statementartba
 
09/25/13: Senate EPW Highway Trust Fund Hearing
09/25/13: Senate EPW Highway Trust Fund Hearing09/25/13: Senate EPW Highway Trust Fund Hearing
09/25/13: Senate EPW Highway Trust Fund Hearingartba
 
June 11 ARTBA T&I wotus hearing statement
June 11 ARTBA T&I wotus hearing statementJune 11 ARTBA T&I wotus hearing statement
June 11 ARTBA T&I wotus hearing statementartba
 
ARTBA Comments Re: FRL-9910-13-OFCO; Adminstrative Wage Garnishment
ARTBA Comments Re: FRL-9910-13-OFCO; Adminstrative Wage GarnishmentARTBA Comments Re: FRL-9910-13-OFCO; Adminstrative Wage Garnishment
ARTBA Comments Re: FRL-9910-13-OFCO; Adminstrative Wage Garnishmentartba
 
02/12/14: Testimony to Senate Environment & Public Works Committee
02/12/14: Testimony to Senate Environment & Public Works Committee02/12/14: Testimony to Senate Environment & Public Works Committee
02/12/14: Testimony to Senate Environment & Public Works Committeeartba
 
EPA Proposed “Waters of the United States” Rule
EPA Proposed “Waters of the United States” RuleEPA Proposed “Waters of the United States” Rule
EPA Proposed “Waters of the United States” Ruleartba
 
Coalition letter urging withdrawal of EPA/Corps “Waters of the U.S.” propose...
 Coalition letter urging withdrawal of EPA/Corps “Waters of the U.S.” propose... Coalition letter urging withdrawal of EPA/Corps “Waters of the U.S.” propose...
Coalition letter urging withdrawal of EPA/Corps “Waters of the U.S.” propose...artba
 
Comments on Virginia P3 Risk Management Guidelines
Comments on Virginia P3 Risk Management GuidelinesComments on Virginia P3 Risk Management Guidelines
Comments on Virginia P3 Risk Management Guidelinesartba
 
FHWA MOU with the State of Alaska Regarding Delegation of CEs.
FHWA MOU with the State of Alaska Regarding Delegation of CEs.FHWA MOU with the State of Alaska Regarding Delegation of CEs.
FHWA MOU with the State of Alaska Regarding Delegation of CEs.artba
 
03/10: Draft Core Toll Concessions P3 Model Contract Guide
03/10: Draft Core Toll Concessions P3 Model Contract Guide03/10: Draft Core Toll Concessions P3 Model Contract Guide
03/10: Draft Core Toll Concessions P3 Model Contract Guideartba
 
04/24/13: State of the Highway Trust Fund: Long-Term Solutions for Solvency
04/24/13: State of the Highway Trust Fund: Long-Term Solutions for Solvency04/24/13: State of the Highway Trust Fund: Long-Term Solutions for Solvency
04/24/13: State of the Highway Trust Fund: Long-Term Solutions for Solvencyartba
 
Coalition Letter to Senate on Failure to Advance S. 1140, the “Federal Water ...
Coalition Letter to Senate on Failure to Advance S. 1140, the “Federal Water ...Coalition Letter to Senate on Failure to Advance S. 1140, the “Federal Water ...
Coalition Letter to Senate on Failure to Advance S. 1140, the “Federal Water ...artba
 
ARTBA Comments on the Federal Accounting Standard Board’s Disclosure Requirem...
ARTBA Comments on the Federal Accounting Standard Board’s Disclosure Requirem...ARTBA Comments on the Federal Accounting Standard Board’s Disclosure Requirem...
ARTBA Comments on the Federal Accounting Standard Board’s Disclosure Requirem...artba
 
Comments Opposing ESA protections for the Long-Eared Bat
 Comments Opposing ESA protections for the Long-Eared Bat Comments Opposing ESA protections for the Long-Eared Bat
Comments Opposing ESA protections for the Long-Eared Batartba
 
Comments Objecting to ESA protections for the Long-Eared Bat
Comments Objecting to ESA protections for the Long-Eared BatComments Objecting to ESA protections for the Long-Eared Bat
Comments Objecting to ESA protections for the Long-Eared Batartba
 
LTR Wac For Small Business CMTE Hearing 7-30-14
LTR Wac For Small Business CMTE Hearing 7-30-14LTR Wac For Small Business CMTE Hearing 7-30-14
LTR Wac For Small Business CMTE Hearing 7-30-14artba
 
05/08: California Assumption of CE Responsibilities
05/08: California Assumption of CE Responsibilities05/08: California Assumption of CE Responsibilities
05/08: California Assumption of CE Responsibilitiesartba
 
Coalition Letter to Senate Appropriators Supporting Increased Corps Funding
Coalition Letter to Senate Appropriators Supporting Increased Corps FundingCoalition Letter to Senate Appropriators Supporting Increased Corps Funding
Coalition Letter to Senate Appropriators Supporting Increased Corps Fundingartba
 

La actualidad más candente (20)

FHWA MOU with the State of Texas Regarding Environmental Reviews.
FHWA MOU with the State of Texas Regarding Environmental Reviews.FHWA MOU with the State of Texas Regarding Environmental Reviews.
FHWA MOU with the State of Texas Regarding Environmental Reviews.
 
Artba Senate Finance Committee May
Artba Senate Finance Committee MayArtba Senate Finance Committee May
Artba Senate Finance Committee May
 
May 29 2014 Draft Small Business Wotus Hearing Statement
May 29 2014 Draft Small Business Wotus Hearing StatementMay 29 2014 Draft Small Business Wotus Hearing Statement
May 29 2014 Draft Small Business Wotus Hearing Statement
 
09/25/13: Senate EPW Highway Trust Fund Hearing
09/25/13: Senate EPW Highway Trust Fund Hearing09/25/13: Senate EPW Highway Trust Fund Hearing
09/25/13: Senate EPW Highway Trust Fund Hearing
 
June 11 ARTBA T&I wotus hearing statement
June 11 ARTBA T&I wotus hearing statementJune 11 ARTBA T&I wotus hearing statement
June 11 ARTBA T&I wotus hearing statement
 
ARTBA Comments Re: FRL-9910-13-OFCO; Adminstrative Wage Garnishment
ARTBA Comments Re: FRL-9910-13-OFCO; Adminstrative Wage GarnishmentARTBA Comments Re: FRL-9910-13-OFCO; Adminstrative Wage Garnishment
ARTBA Comments Re: FRL-9910-13-OFCO; Adminstrative Wage Garnishment
 
02/12/14: Testimony to Senate Environment & Public Works Committee
02/12/14: Testimony to Senate Environment & Public Works Committee02/12/14: Testimony to Senate Environment & Public Works Committee
02/12/14: Testimony to Senate Environment & Public Works Committee
 
EPA Proposed “Waters of the United States” Rule
EPA Proposed “Waters of the United States” RuleEPA Proposed “Waters of the United States” Rule
EPA Proposed “Waters of the United States” Rule
 
Coalition letter urging withdrawal of EPA/Corps “Waters of the U.S.” propose...
 Coalition letter urging withdrawal of EPA/Corps “Waters of the U.S.” propose... Coalition letter urging withdrawal of EPA/Corps “Waters of the U.S.” propose...
Coalition letter urging withdrawal of EPA/Corps “Waters of the U.S.” propose...
 
Comments on Virginia P3 Risk Management Guidelines
Comments on Virginia P3 Risk Management GuidelinesComments on Virginia P3 Risk Management Guidelines
Comments on Virginia P3 Risk Management Guidelines
 
FHWA MOU with the State of Alaska Regarding Delegation of CEs.
FHWA MOU with the State of Alaska Regarding Delegation of CEs.FHWA MOU with the State of Alaska Regarding Delegation of CEs.
FHWA MOU with the State of Alaska Regarding Delegation of CEs.
 
03/10: Draft Core Toll Concessions P3 Model Contract Guide
03/10: Draft Core Toll Concessions P3 Model Contract Guide03/10: Draft Core Toll Concessions P3 Model Contract Guide
03/10: Draft Core Toll Concessions P3 Model Contract Guide
 
04/24/13: State of the Highway Trust Fund: Long-Term Solutions for Solvency
04/24/13: State of the Highway Trust Fund: Long-Term Solutions for Solvency04/24/13: State of the Highway Trust Fund: Long-Term Solutions for Solvency
04/24/13: State of the Highway Trust Fund: Long-Term Solutions for Solvency
 
Coalition Letter to Senate on Failure to Advance S. 1140, the “Federal Water ...
Coalition Letter to Senate on Failure to Advance S. 1140, the “Federal Water ...Coalition Letter to Senate on Failure to Advance S. 1140, the “Federal Water ...
Coalition Letter to Senate on Failure to Advance S. 1140, the “Federal Water ...
 
ARTBA Comments on the Federal Accounting Standard Board’s Disclosure Requirem...
ARTBA Comments on the Federal Accounting Standard Board’s Disclosure Requirem...ARTBA Comments on the Federal Accounting Standard Board’s Disclosure Requirem...
ARTBA Comments on the Federal Accounting Standard Board’s Disclosure Requirem...
 
Comments Opposing ESA protections for the Long-Eared Bat
 Comments Opposing ESA protections for the Long-Eared Bat Comments Opposing ESA protections for the Long-Eared Bat
Comments Opposing ESA protections for the Long-Eared Bat
 
Comments Objecting to ESA protections for the Long-Eared Bat
Comments Objecting to ESA protections for the Long-Eared BatComments Objecting to ESA protections for the Long-Eared Bat
Comments Objecting to ESA protections for the Long-Eared Bat
 
LTR Wac For Small Business CMTE Hearing 7-30-14
LTR Wac For Small Business CMTE Hearing 7-30-14LTR Wac For Small Business CMTE Hearing 7-30-14
LTR Wac For Small Business CMTE Hearing 7-30-14
 
05/08: California Assumption of CE Responsibilities
05/08: California Assumption of CE Responsibilities05/08: California Assumption of CE Responsibilities
05/08: California Assumption of CE Responsibilities
 
Coalition Letter to Senate Appropriators Supporting Increased Corps Funding
Coalition Letter to Senate Appropriators Supporting Increased Corps FundingCoalition Letter to Senate Appropriators Supporting Increased Corps Funding
Coalition Letter to Senate Appropriators Supporting Increased Corps Funding
 

Destacado

Coalition Comments on OSHA Clarification to Workplace Injury and Illness Regu...
Coalition Comments on OSHA Clarification to Workplace Injury and Illness Regu...Coalition Comments on OSHA Clarification to Workplace Injury and Illness Regu...
Coalition Comments on OSHA Clarification to Workplace Injury and Illness Regu...artba
 
Suggested Best Practices for Design-Build in Transportation Construction
Suggested Best Practices for Design-Build in Transportation ConstructionSuggested Best Practices for Design-Build in Transportation Construction
Suggested Best Practices for Design-Build in Transportation Constructionartba
 
ARTBA Comments Supporting FHWA’s Draft Availability Payments Concessions Publ...
ARTBA Comments Supporting FHWA’s Draft Availability Payments Concessions Publ...ARTBA Comments Supporting FHWA’s Draft Availability Payments Concessions Publ...
ARTBA Comments Supporting FHWA’s Draft Availability Payments Concessions Publ...artba
 
Multi-Industry Letter to Congress on EPA Ozone Standards
Multi-Industry Letter to Congress on EPA Ozone StandardsMulti-Industry Letter to Congress on EPA Ozone Standards
Multi-Industry Letter to Congress on EPA Ozone Standardsartba
 
02/25: Multi-Industry Regulatory Reform Letter
02/25: Multi-Industry Regulatory Reform Letter02/25: Multi-Industry Regulatory Reform Letter
02/25: Multi-Industry Regulatory Reform Letterartba
 
9/17 Coalition Letter to U.S. Senate
9/17 Coalition Letter to U.S. Senate9/17 Coalition Letter to U.S. Senate
9/17 Coalition Letter to U.S. Senateartba
 
03/05: State Department Approval of Keystone XL Pipeline
03/05: State Department Approval of Keystone XL Pipeline03/05: State Department Approval of Keystone XL Pipeline
03/05: State Department Approval of Keystone XL Pipelineartba
 
Industry letter supporting S. 2006, “The Regulatory Accountability Act of 2015.”
Industry letter supporting S. 2006, “The Regulatory Accountability Act of 2015.”Industry letter supporting S. 2006, “The Regulatory Accountability Act of 2015.”
Industry letter supporting S. 2006, “The Regulatory Accountability Act of 2015.”artba
 
1/08 – Industry Letter Supporting Passage of Keystone XL Pipeline Legislation
1/08 – Industry Letter Supporting Passage of Keystone XL Pipeline Legislation1/08 – Industry Letter Supporting Passage of Keystone XL Pipeline Legislation
1/08 – Industry Letter Supporting Passage of Keystone XL Pipeline Legislationartba
 
ARTBA Comments on “Waters of the United States” Proposed Rule
 ARTBA Comments on “Waters of the United States” Proposed Rule ARTBA Comments on “Waters of the United States” Proposed Rule
ARTBA Comments on “Waters of the United States” Proposed Ruleartba
 
ARTBA and Industry Allies Urge Funding Agreement for U.S./Canada Bridge Project
ARTBA and Industry Allies Urge Funding Agreement for U.S./Canada Bridge ProjectARTBA and Industry Allies Urge Funding Agreement for U.S./Canada Bridge Project
ARTBA and Industry Allies Urge Funding Agreement for U.S./Canada Bridge Projectartba
 
01/21: EPA Draft NOx Science Assessment
01/21: EPA Draft NOx Science Assessment01/21: EPA Draft NOx Science Assessment
01/21: EPA Draft NOx Science Assessmentartba
 
Artba comments on OSHA workplace injury and illness reporting rule
Artba comments on OSHA workplace injury and illness reporting ruleArtba comments on OSHA workplace injury and illness reporting rule
Artba comments on OSHA workplace injury and illness reporting ruleartba
 

Destacado (13)

Coalition Comments on OSHA Clarification to Workplace Injury and Illness Regu...
Coalition Comments on OSHA Clarification to Workplace Injury and Illness Regu...Coalition Comments on OSHA Clarification to Workplace Injury and Illness Regu...
Coalition Comments on OSHA Clarification to Workplace Injury and Illness Regu...
 
Suggested Best Practices for Design-Build in Transportation Construction
Suggested Best Practices for Design-Build in Transportation ConstructionSuggested Best Practices for Design-Build in Transportation Construction
Suggested Best Practices for Design-Build in Transportation Construction
 
ARTBA Comments Supporting FHWA’s Draft Availability Payments Concessions Publ...
ARTBA Comments Supporting FHWA’s Draft Availability Payments Concessions Publ...ARTBA Comments Supporting FHWA’s Draft Availability Payments Concessions Publ...
ARTBA Comments Supporting FHWA’s Draft Availability Payments Concessions Publ...
 
Multi-Industry Letter to Congress on EPA Ozone Standards
Multi-Industry Letter to Congress on EPA Ozone StandardsMulti-Industry Letter to Congress on EPA Ozone Standards
Multi-Industry Letter to Congress on EPA Ozone Standards
 
02/25: Multi-Industry Regulatory Reform Letter
02/25: Multi-Industry Regulatory Reform Letter02/25: Multi-Industry Regulatory Reform Letter
02/25: Multi-Industry Regulatory Reform Letter
 
9/17 Coalition Letter to U.S. Senate
9/17 Coalition Letter to U.S. Senate9/17 Coalition Letter to U.S. Senate
9/17 Coalition Letter to U.S. Senate
 
03/05: State Department Approval of Keystone XL Pipeline
03/05: State Department Approval of Keystone XL Pipeline03/05: State Department Approval of Keystone XL Pipeline
03/05: State Department Approval of Keystone XL Pipeline
 
Industry letter supporting S. 2006, “The Regulatory Accountability Act of 2015.”
Industry letter supporting S. 2006, “The Regulatory Accountability Act of 2015.”Industry letter supporting S. 2006, “The Regulatory Accountability Act of 2015.”
Industry letter supporting S. 2006, “The Regulatory Accountability Act of 2015.”
 
1/08 – Industry Letter Supporting Passage of Keystone XL Pipeline Legislation
1/08 – Industry Letter Supporting Passage of Keystone XL Pipeline Legislation1/08 – Industry Letter Supporting Passage of Keystone XL Pipeline Legislation
1/08 – Industry Letter Supporting Passage of Keystone XL Pipeline Legislation
 
ARTBA Comments on “Waters of the United States” Proposed Rule
 ARTBA Comments on “Waters of the United States” Proposed Rule ARTBA Comments on “Waters of the United States” Proposed Rule
ARTBA Comments on “Waters of the United States” Proposed Rule
 
ARTBA and Industry Allies Urge Funding Agreement for U.S./Canada Bridge Project
ARTBA and Industry Allies Urge Funding Agreement for U.S./Canada Bridge ProjectARTBA and Industry Allies Urge Funding Agreement for U.S./Canada Bridge Project
ARTBA and Industry Allies Urge Funding Agreement for U.S./Canada Bridge Project
 
01/21: EPA Draft NOx Science Assessment
01/21: EPA Draft NOx Science Assessment01/21: EPA Draft NOx Science Assessment
01/21: EPA Draft NOx Science Assessment
 
Artba comments on OSHA workplace injury and illness reporting rule
Artba comments on OSHA workplace injury and illness reporting ruleArtba comments on OSHA workplace injury and illness reporting rule
Artba comments on OSHA workplace injury and illness reporting rule
 

Similar a Comments on DOT Planning Regulations

04/29: 2 New CEs Created Under MAP-21
04/29: 2 New CEs Created Under MAP-2104/29: 2 New CEs Created Under MAP-21
04/29: 2 New CEs Created Under MAP-21artba
 
Hattiesburg final document
Hattiesburg final documentHattiesburg final document
Hattiesburg final documentDonna Lum
 
08/28: Texas Assumption of CE Responsibilities
08/28: Texas Assumption of CE Responsibilities08/28: Texas Assumption of CE Responsibilities
08/28: Texas Assumption of CE Responsibilitiesartba
 
Artba Senate Summary
Artba Senate SummaryArtba Senate Summary
Artba Senate Summaryartba
 
Final TRB paper_061914_certified
Final TRB paper_061914_certifiedFinal TRB paper_061914_certified
Final TRB paper_061914_certifiedMelissa Taylor
 
Charging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing WorkCharging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing WorkTexxi Global
 
Budget Critique Portland
Budget Critique PortlandBudget Critique Portland
Budget Critique PortlandEric Schlimgen
 
PLAN 2040 RTP Update Overview
PLAN 2040 RTP Update OverviewPLAN 2040 RTP Update Overview
PLAN 2040 RTP Update OverviewMelissaARC
 
San mateo annual tma report
San mateo annual tma reportSan mateo annual tma report
San mateo annual tma reportAdina Levin
 
2014 ARTBA Annual Report
2014 ARTBA Annual Report2014 ARTBA Annual Report
2014 ARTBA Annual Reportartba
 
Rural Long Range Transportation Plan 2005 - 2030
Rural Long Range Transportation Plan 2005 - 2030Rural Long Range Transportation Plan 2005 - 2030
Rural Long Range Transportation Plan 2005 - 2030LSCOG
 
Artba p3 policy recommendations
Artba p3 policy recommendations Artba p3 policy recommendations
Artba p3 policy recommendations artba
 
Transportation Improvement Program 2014 - 2019
Transportation Improvement Program 2014 - 2019Transportation Improvement Program 2014 - 2019
Transportation Improvement Program 2014 - 2019LSCOG
 
ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse ...
ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse ...ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse ...
ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse ...artba
 

Similar a Comments on DOT Planning Regulations (20)

04/29: 2 New CEs Created Under MAP-21
04/29: 2 New CEs Created Under MAP-2104/29: 2 New CEs Created Under MAP-21
04/29: 2 New CEs Created Under MAP-21
 
FHWA MAP-21 Summary
FHWA MAP-21 SummaryFHWA MAP-21 Summary
FHWA MAP-21 Summary
 
Senate Bill Summary 110411
Senate Bill Summary 110411Senate Bill Summary 110411
Senate Bill Summary 110411
 
Hattiesburg final document
Hattiesburg final documentHattiesburg final document
Hattiesburg final document
 
Map 21 Outline
Map 21 OutlineMap 21 Outline
Map 21 Outline
 
08/28: Texas Assumption of CE Responsibilities
08/28: Texas Assumption of CE Responsibilities08/28: Texas Assumption of CE Responsibilities
08/28: Texas Assumption of CE Responsibilities
 
Artba Senate Summary
Artba Senate SummaryArtba Senate Summary
Artba Senate Summary
 
Final TRB paper_061914_certified
Final TRB paper_061914_certifiedFinal TRB paper_061914_certified
Final TRB paper_061914_certified
 
Charging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing WorkCharging Ahead | Making Road User Pricing Work
Charging Ahead | Making Road User Pricing Work
 
Budget Critique Portland
Budget Critique PortlandBudget Critique Portland
Budget Critique Portland
 
PLAN 2040 RTP Update Overview
PLAN 2040 RTP Update OverviewPLAN 2040 RTP Update Overview
PLAN 2040 RTP Update Overview
 
San mateo annual tma report
San mateo annual tma reportSan mateo annual tma report
San mateo annual tma report
 
2014 ARTBA Annual Report
2014 ARTBA Annual Report2014 ARTBA Annual Report
2014 ARTBA Annual Report
 
Rural Long Range Transportation Plan 2005 - 2030
Rural Long Range Transportation Plan 2005 - 2030Rural Long Range Transportation Plan 2005 - 2030
Rural Long Range Transportation Plan 2005 - 2030
 
Artba p3 policy recommendations
Artba p3 policy recommendations Artba p3 policy recommendations
Artba p3 policy recommendations
 
Transportation Improvement Program 2014 - 2019
Transportation Improvement Program 2014 - 2019Transportation Improvement Program 2014 - 2019
Transportation Improvement Program 2014 - 2019
 
Surface Transportation - Finance Context & Issues
Surface Transportation - Finance Context & IssuesSurface Transportation - Finance Context & Issues
Surface Transportation - Finance Context & Issues
 
my VMT paper
my VMT papermy VMT paper
my VMT paper
 
Rules Change Letter_122810
Rules Change Letter_122810Rules Change Letter_122810
Rules Change Letter_122810
 
ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse ...
ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse ...ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse ...
ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse ...
 

Más de artba

2017 media kit
2017 media kit2017 media kit
2017 media kitartba
 
September October tb_2016
September October tb_2016September October tb_2016
September October tb_2016artba
 
Transportation Builder July/August 2016
Transportation Builder July/August 2016Transportation Builder July/August 2016
Transportation Builder July/August 2016artba
 
The National Work Zone Management Conference Agenda 2016
The National Work Zone Management Conference Agenda 2016The National Work Zone Management Conference Agenda 2016
The National Work Zone Management Conference Agenda 2016artba
 
ARTBA 2016 National Convention Program
ARTBA 2016 National Convention ProgramARTBA 2016 National Convention Program
ARTBA 2016 National Convention Programartba
 
May/June Transportation Builder
May/June Transportation BuilderMay/June Transportation Builder
May/June Transportation Builderartba
 
Northeastern regional meeting
Northeastern regional meetingNortheastern regional meeting
Northeastern regional meetingartba
 
Southern regional meeting
Southern regional meetingSouthern regional meeting
Southern regional meetingartba
 
Central regional meeting
Central regional meetingCentral regional meeting
Central regional meetingartba
 
Western regional meeting
Western regional meetingWestern regional meeting
Western regional meetingartba
 
Western regional meeting
Western regional meetingWestern regional meeting
Western regional meetingartba
 
July/August 2015 TB magazine
July/August 2015 TB magazineJuly/August 2015 TB magazine
July/August 2015 TB magazineartba
 
September/October 2015 TB magazine
September/October 2015 TB magazineSeptember/October 2015 TB magazine
September/October 2015 TB magazineartba
 
November/December 2015 TB
November/December 2015 TBNovember/December 2015 TB
November/December 2015 TBartba
 
January/February 2016 TB
January/February 2016 TBJanuary/February 2016 TB
January/February 2016 TBartba
 
March/April 2016 TB
March/April 2016 TBMarch/April 2016 TB
March/April 2016 TBartba
 
2016 ­ARTBA FIP Schedule
2016 ­ARTBA FIP Schedule2016 ­ARTBA FIP Schedule
2016 ­ARTBA FIP Scheduleartba
 
2016 ARTBA FIP Program
2016 ARTBA FIP Program2016 ARTBA FIP Program
2016 ARTBA FIP Programartba
 
2016 ILDP Agenda
2016 ILDP Agenda2016 ILDP Agenda
2016 ILDP Agendaartba
 
P3 Agenda 2016
P3 Agenda 2016P3 Agenda 2016
P3 Agenda 2016artba
 

Más de artba (20)

2017 media kit
2017 media kit2017 media kit
2017 media kit
 
September October tb_2016
September October tb_2016September October tb_2016
September October tb_2016
 
Transportation Builder July/August 2016
Transportation Builder July/August 2016Transportation Builder July/August 2016
Transportation Builder July/August 2016
 
The National Work Zone Management Conference Agenda 2016
The National Work Zone Management Conference Agenda 2016The National Work Zone Management Conference Agenda 2016
The National Work Zone Management Conference Agenda 2016
 
ARTBA 2016 National Convention Program
ARTBA 2016 National Convention ProgramARTBA 2016 National Convention Program
ARTBA 2016 National Convention Program
 
May/June Transportation Builder
May/June Transportation BuilderMay/June Transportation Builder
May/June Transportation Builder
 
Northeastern regional meeting
Northeastern regional meetingNortheastern regional meeting
Northeastern regional meeting
 
Southern regional meeting
Southern regional meetingSouthern regional meeting
Southern regional meeting
 
Central regional meeting
Central regional meetingCentral regional meeting
Central regional meeting
 
Western regional meeting
Western regional meetingWestern regional meeting
Western regional meeting
 
Western regional meeting
Western regional meetingWestern regional meeting
Western regional meeting
 
July/August 2015 TB magazine
July/August 2015 TB magazineJuly/August 2015 TB magazine
July/August 2015 TB magazine
 
September/October 2015 TB magazine
September/October 2015 TB magazineSeptember/October 2015 TB magazine
September/October 2015 TB magazine
 
November/December 2015 TB
November/December 2015 TBNovember/December 2015 TB
November/December 2015 TB
 
January/February 2016 TB
January/February 2016 TBJanuary/February 2016 TB
January/February 2016 TB
 
March/April 2016 TB
March/April 2016 TBMarch/April 2016 TB
March/April 2016 TB
 
2016 ­ARTBA FIP Schedule
2016 ­ARTBA FIP Schedule2016 ­ARTBA FIP Schedule
2016 ­ARTBA FIP Schedule
 
2016 ARTBA FIP Program
2016 ARTBA FIP Program2016 ARTBA FIP Program
2016 ARTBA FIP Program
 
2016 ILDP Agenda
2016 ILDP Agenda2016 ILDP Agenda
2016 ILDP Agenda
 
P3 Agenda 2016
P3 Agenda 2016P3 Agenda 2016
P3 Agenda 2016
 

Último

KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...IT Industry
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptxYasinAhmad20
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdflambardar420420
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfssuser5750e1
 
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In DubaiDubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In Dubaikojalkojal131
 
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...tewhimanshu23
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024Insiger
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Indegene Limited IPO Detail - Divadhvik
Indegene Limited IPO Detail  - DivadhvikIndegene Limited IPO Detail  - Divadhvik
Indegene Limited IPO Detail - Divadhvikdhvikdiva
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...Andy (Avraham) Blumenthal
 
The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdomlunadelior
 
11052024_First India Newspaper Jaipur.pdf
11052024_First India Newspaper Jaipur.pdf11052024_First India Newspaper Jaipur.pdf
11052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsVoterMood
 
10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdfFIRST INDIA
 

Último (17)

KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
KING VISHNU BHAGWANON KA BHAGWAN PARAMATMONKA PARATOMIC PARAMANU KASARVAMANVA...
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In DubaiDubai Call Girls Pinky O525547819 Call Girl's In Dubai
Dubai Call Girls Pinky O525547819 Call Girl's In Dubai
 
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
9953056974 Call Girls In Pratap Nagar, Escorts (Delhi) NCR
 
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
Unveiling the Characteristics of Political Institutions_ A Comprehensive Anal...
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024Job-Oriеntеd Courses That Will Boost Your Career in 2024
Job-Oriеntеd Courses That Will Boost Your Career in 2024
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
Indegene Limited IPO Detail - Divadhvik
Indegene Limited IPO Detail  - DivadhvikIndegene Limited IPO Detail  - Divadhvik
Indegene Limited IPO Detail - Divadhvik
 
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7call girls inMahavir Nagar  (delhi) call me [🔝9953056974🔝] escort service 24X7
call girls inMahavir Nagar (delhi) call me [🔝9953056974🔝] escort service 24X7
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
The political system of the united kingdom
The political system of the united kingdomThe political system of the united kingdom
The political system of the united kingdom
 
11052024_First India Newspaper Jaipur.pdf
11052024_First India Newspaper Jaipur.pdf11052024_First India Newspaper Jaipur.pdf
11052024_First India Newspaper Jaipur.pdf
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full Details
 
10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf10052024_First India Newspaper Jaipur.pdf
10052024_First India Newspaper Jaipur.pdf
 

Comments on DOT Planning Regulations

  • 1. October 2, 2014 Docket Management Facility U.S. Department of Transportation Room W12-140 1200 New Jersey Avenue, SE Washington, DC 20590-0001 Re: Docket No. FHWA-2013-0037; Statewide and Nonmetropolitan Transportation Planning; Metropolitan Transportation Planning On behalf of the 6,000 members of the American Road and Transportation Builders Association (ARTBA), I respectfully offer comments on the U.S. Department of Transportation’s (DOT’s) Notice of Proposed Rulemaking concerning statewide and nonmetropolitan transportation planning and metropolitan transportation planning. ARTBA’s membership includes private and public sector members that plan, design, construct and maintain the nation’s roadways, waterways, bridges, ports, airports, rail and transit systems. Our industry generates more than $380 billion annually in U.S. economic activity and sustains more than 3.3 million American jobs. ARTBA members undertake a variety of activities that are subject to both the transportation planning and environmental review and approval processes in the normal course of their business operations. ARTBA’s public sector members adopt, approve, or fund transportation plans, programs, or projects. ARTBA’s private sector members plan, design, construct and provide supplies for these federal transportation improvement projects. This document represents the collective views of our 6,000 member companies and organizations. The “Moving Ahead for Progress in the 21st Century Act” (MAP-21) initiated a significant change in the nature of the federal highway program. Whereas the core purpose of the highway program under prior surface transportation reauthorization laws was to share the cost of state and local improvements to highways on the federal-aid system, MAP-21 establishes two clear roles for the federal government in the nation’s highway system: 1. Establish goals and metrics for the physical condition and operational performance of the core highways that are important to the nation’s economy—the Interstate Highway System (IHS) and the National Highway System (NHS). MAP-21 recognizes highways provide critical infrastructure to support the nation’s economy, and that their condition and performance underpin the future growth and strength of the economy. To that end, MAP-21 consolidates a number of categorical highway programs into a new National Highway Performance Program (NHPP) to channel federal highway investment into projects that contribute to achieving the national goals established in the legislation.
  • 2. 2 2. Create a National Freight Policy that recognizes the importance of freight movements to the overall performance of the economy. Under MAP-21, a clear federal responsibility is established for assuring that freight moves safely and efficiently by improving highway freight corridors and removing bottlenecks that impede the efficient flow of freight over the nation’s highways. Enacting historic changes through legislation is just the first step in this process. It is essential the new law be implemented effectively and in ways that give the greatest return to those whose funds are invested in highways—the taxpayers whose motor fuel taxes are credited to the Highway Trust Fund to support highway and bridge improvements. MAP-21 takes a number of important steps to address past criticisms of federal highway investment, including eliminating earmarks, reducing diversions of highway revenues to non-highway uses and consolidating numerous programs into a handful that give recipients more flexibility to use limited resources to enhance the performance of the nation’s highways. Whether taxpayers receive the benefits will depend on how the new legislation is implemented and states use their new autonomy. To that end, ARTBA offers the following comments on DOT’s proposed planning regulations: Focus on the goals enumerated in the law The authors of MAP-21 had the opportunity to include a host of external goals such as livability, reduction of transportation-related greenhouse gas emissions, reduction of reliance on foreign oil, adaptation to the effects of climate change, public health, housing, land-use patterns and air quality in the planning and performance process. Instead, Section 1203 of MAP-21 listed only one goal—environmental sustainability—that is not directly related to physical conditions and operational performance of the National Highway System. The same is true for the metropolitan and statewide planning processes laid out in Sections 1201-1202. Accordingly, DOT should focus on implementing the goals and standards as spelled out in MAP- 21. While there may be stakeholders and perspectives that did not achieve their full objectives in the legislative process, we urge you to resist any recommendations to re-open the delicate compromise achieved in MAP-21 through over interpretation of the measure’s performance process. The simple fact is that few interest groups, including ARTBA, are entirely satisfied with every aspect of major legislation. That reality should in no way tarnish MAP-21’s meaningful policy reforms. Further, the common ground found during the legislative process is one of the main reasons MAP-21 was among the few significant pieces of legislation to secure broad bipartisan support during the 112th Congress. Establishing Performance Goals and Measures For the purpose of carrying out the NHPP established in Section 119 of Title 23, Section 1203 of MAP-21 (Title 23, Section 150) requires the Secretary to establish performance measures for the IHS and the rest of the NHS. These are to form the basis for states and Metropolitan Planning Organizations (MPOs) to develop their highway asset management plans. Performance goals and measures should be directly related to the outcomes sought. MAP-21 establishes specific national goals related to the NHPP and the performance measures should be tied toward the achievement of these goals. Prior to the enactment of MAP-21, the mission of the federal highway program was clouded as the program was restructured time and again to be all things to
  • 3. 3 all people. MAP-21’s national performance goals provide an opportunity to clearly demonstrate the mission of federal highway investment. The traditional standard used to measure highway performance has been congestion, which has been measured in a number of ways, including the effect on travel time, duration, variability and cause. These are the concepts used both by the Texas Transportation Institute (TTI) in its annual report on the cost of congestion in urban areas and by the U.S.DOT in its annual Conditions and Performance report. It should be noted that ARTBA fully appreciates the importance of mass transit facilities in reducing urban congestion—a fact demonstrated by the joint sponsorship of the TTI annual congestion report by ARTBA and the American Public Transportation Association. To reflect the complexity of congestion, the performance standards developed by the Secretary should not focus on just one measure, but should reflect the various causes and consequences of congestion and should include the following: 1. The performance measures should be data driven. In recent years, TTI has significantly improved its sources and uses of congestion data and, as new technologies are developed. That process should continue. The performance measures set by the Secretary should be updated and revised on a regular schedule to incorporate the latest and most reliable data. 2. The performance measures should fully incorporate the economic costs of congestion. In calculating the cost of congestion, the TTI report focuses on two elements – the cost of travel time and wasted fuel. These, however, are only part of the story. More important is the cost congestion imposes on the productivity of the economy, including imposing delays on the manufacturing process, increasing logistics cost of planning shipments to avoid congestion and bottlenecks, and forcing firms to make non-optimal location decisions, among others, as well as the cost to public health and safety in terms of increased collisions. The performance measures should recognize these costs as well as the time and fuel costs calculated by the TTI. 3. The performance measures should also recognize the impact of infrastructure conditions on roadway safety. A 2009 study from the Pacific Institute for Research and Evaluation found that more than half of highway fatalities are related to deficient roadway conditions. These crashes were estimated to cost the U.S. more than $217 billion per year. 4. The performance measures should be integrated with the national freight policy. Highway bottlenecks cost freight shippers more than $8 billion each year. The performance measures should incorporate data on freight, as well as overall travel. 5. The performance measures should not be chosen on the basis of preferred solutions. Different stakeholders and analysts have strongly held views as to how highway congestion should be addressed. These views, however, should not be used to establish performance measures. Performance measures should be based on actual
  • 4. 4 existing travel data and should be neutral as to how the states resolve the problem in their state asset management plans. Assuring Accountability and Transparency MAP-21 significantly alters the relationship between state and local transportation agencies and the public whose highway user taxes are invested in highway improvements. Under prior surface transportation laws, the main requirement for obligating federal funds for a project was the project’s conformity to the requirements of the program providing the funds. There was no requirement for the recipient of funds to justify the project or provide information about how the project achieves national goals or expected benefits, other than that the project be part of the state’s or MPO’s long-range transportation plan and be on the statewide transportation improvement program (STIP) or transportation improvement program (TIP). As a result, the public received little information that could be used to evaluate the benefits received from the motor fuel and other taxes paid into the federal Highway Trust Fund. MAP-21 transforms the federal highway program into one where project selection is driven by performance targets. While MAP-21 focuses on development and implementation of state asset management plans to improve the condition and performance of the NHS, the success of this approach will depend on public understanding of the benefits of highway improvements and their views on the taxes they pay for highway investments. The more information taxpayers have on the purposes and benefits of highway and bridge improvement projects, the better will be their ability to evaluate the federal highway program. This can be accomplished in conjunction with the requirement in Section 1503(c) of MAP-21 that the U.S. DOT publish detailed information on all federally-aided highway projects on its website. The model for this should be the format used by the Department to report on the obligation and use of highway funds provided under the American Recovery and Reinvestment Act (ARRA), but expanded to include information on the goal or goals each project is intended to achieve and what the project did achieve when completed. We are extremely disappointed the Department has not yet complied with this requirement, despite the zeal it took in how new ARRA transportation funds were utilized. We urge the DOT to begin this important process in educating the public on the specific value each state receives from federal highway and bridge investment. Implementing the National Highway Performance Program (NHPP) Although Section 1104 of MAP-21 expands the definition of the National Highway System to include some roads, border crossings and intermodal connectors not currently part of the NHS, it is clear in the legislation that the sole focus of the NHS, and thus the NHPP, is highways and does not include other modes. While the goals of the NHPP include mitigating the environmental impact of highway travel and protecting and enhancing the natural environment, we urge you to resist recommendations that may suggest these goals constitute shifting Highway Account resources to other modes of transportation. MAP-21 is clear that the only other permissible uses of NHPP funds, other than for NHS highway and bridge improvements, are: 1. Ferry boats and ferry boat facilities that connect to the NHS;
  • 5. 5 2. Federal-aid roads off the NHS if the project is in the same corridor as an access- controlled NHS route and provides a higher ratio of benefits to cost as a project on the NHS route; 3. Construction of a transit project, with the same limitations as in (2); 4. Bicycle routes and pedestrian walkways; and 5. Bus terminals servicing the NHS. These are the same exceptions that existed under SAFETEA-LU, and there is nothing in MAP- 21 to suggest Congress now means they should be a platform for shifting limited Highway Account resources to other modes. Similarly, there is no reason the state and MPO asset management plans required under MAP-21 should channel federal highway funds into other modes to any greater extent than under SAFETEA-LU and prior surface transportation authorization laws. The major change made by MAP-21 to state and MPO transportation improvement plans is that they are to be outcome- oriented with a focus on contributing to the national performance goals established in Section 150. Programmatic Agreements While ARTBA realizes a separate rulemaking is forthcoming on the subject of programmatic agreements, they are also covered in DOT’s proposed planning regulations. As a general note, ARTBA has consistently encouraged the use of programmatic agreements, which have been highlighted in the Federal Highway Administration’s (FHWA) “Every Day Counts” program as an effective tool in reducing project delay. ARTBA recommends that as states take advantage of these programmatic agreements, DOT should examine the agreements and quantify the benefits in terms of time saved. Also, a clearinghouse of programmatic agreements should be created in order to highlight the most effective examples. Such information would be useful in helping to demonstrate to additional states the advantages of this new option. Transportation Planning & the National Environmental Policy Act (NEPA) MAP-21 encourages the integration of NEPA with the transportation planning process. ARTBA has long supported this concept, as allowing transportation planning materials to be used during the NEPA process serves to reduce unnecessary duplication of work and shorten delay. Specifically, ARTBA has some concerns over the use of the phrase “significant new information” in determining whether or not an existing planning document may be used during NEPA review. In determining whether or not “significant new information” has become available between the time of the planning document and NEPA, deference should be given to the determination of the state project sponsor, which will have the greatest familiarity with both documents. Also, as with other planning decisions, the decision on whether “significant new information” precludes the use of a planning document during the NEPA process should not be
  • 6. 6 reviewable by a court. In instances where “significant new information” is available, DOT should develop a mechanism where the planning document can be updated, as opposed to creation of an entirely new document. Finally, a clearinghouse highlighting the successful implementation of planning products into NEPA reviews should be established. Such a resource will enable project sponsors to share how to best use this new tool offered by MAP-21 in order to reduce project delay. Setting Standards for Pavement Conditions Another key component of the MAP-21 performance management process is its requirement for the U.S. Secretary of Transportation to establish measures to assess the condition of pavements on the Interstate System and set minimum conditions states must maintain to avoid penalties. It is well understood that much of the Interstate Highway System, which was constructed in the 1960s and 1970s has exceeded its life expectancy and is in need of substantial repair. ARTBA therefore is eager to work with the Department in developing these requirements. ARTBA looks forward to continuing to participate with DOT in effectively implementing MAP- 21’s project delivery reforms and look forward to continuing a dialogue on this critical endeavor. Sincerely, T. Peter Ruane President & C.E.O