SlideShare una empresa de Scribd logo
1 de 55
European BPW
projects
Dr. Arzu ÖZYOL
BPW-TURKEY
GENERAL
INFORMATION
Part 1
Grants
for to implement projects or activities
in relation to
European Union Policies
within different fields such as
research, education, health, consumer
protection, protection of the environment,
humanitarian aid, human rights and etc.
Beneficiaries
non-governmental organisations
small and mediums size entrepreneurs
and
public organisations,
but
exceptionally individuals
Grants
are a form of
complementary financing.
The EU does not finance projects up to 100%;
It is not a profit for their beneficiaries;
It is not for previous actions that are already completed.
Generally
only one grant
for the same action
Before 31 March each year,
annual work programme
İncluding
area of activity, objectives, timetable,
available budget, award conditions, etc….
By the official calls for proposals,
candidates invites to present a
proposal for action within a
given deadline
that corresponds to the
objectives pursued and
fulfils the
required conditions.
All applications are examined and evaluated
on the basis of
criteria
that have clearly been announced
ensuring equal treatment;
candidates are individually
informed
the final decision concerning their proposal
Grants without a call for
proposals
for the
Beneficiaries
with
specific competences or characteristics
for
certain actions
or
emergency nature of the action.
Grants are made with public money,
the European Commission publish the list of
grants for the previous years
within
the principle of transparency
by
30 June of each year,
The EUprovides funding and grants
for
a broad range of projects and programs
covering
different areas such as
human rights including gender equality,
life long learning programmes including vocational trainings,
health, consumer protection,
environmental protection
and
EU's priorities
such as
active citizenship concept
and
rural development
Funding
is managed according to strict rules
to ensure tight control over
how funds are spent
in
a transparent& accountable
manner
28 EU Commissioners
have
the ultimate political responsibility
for to ensure
EU funds are spent properly.
at country level
national governments
are
responsible for
conducting checks
and
annual audits
Over 76% of the EU budget is
used for
structural funds
with
different types of programs
managed by different bodies
such as
rural development and
social and training programs
EU-funds
for
to buy services, goods or works
for
the operations of EU institutions or programs
Public Contracts
through calls for tenders (public procurement)
for
technical assistance, consultancy, conference organisation,
IT equipment purchases, etc.
Project Cycle Management
(PCM)
PCM is divided into different project phases
from
programming, through formulation to evaluation and
auditing.
Project Manager
have to be familiar with all different phases of
PCM
to implement and manage an EU funded projects
successfully
and
to fulfil the requirements of the European Commission.
Logical Framework Approach
(LFA)
is a very effective
analytical and managerial
tool
within
Project Cycle Management
for
to developand implement
the Project
successfully.
Analysis Phase
including
analysis of problem,
analysis of goals,
analysis of strategies,
analysis of stakeholders.
Determination Phase
including
determination of activities,
determination of budget,
determination of logical framework
by
predicting indicators, prerequisites, assumptions and
possible risks
In between
Analysis and Determination Phases,
work packages
should be determined.
At least 4 common work packages are often used
Evaluation and Monitoring ( for interim reports, final
report, financial evaluation etc)
Sustainability ( activities to provide institutional, financial and
environmental sustainability of the projects)
Dissemination ( activities for to disseminate Project
outcomes and visibility of EU)
Social Marketting (Activities for to increase participation of
beneficiaries to the Project)
Before moving over determination phase
inputs
such as
human resources, equipments, subcontractors..
and
outputs
such as
number of beneficiaries, workshops, promotion
materials, reports, questionnaries..
for
each work package
THEORATICAL
ASPECTS
Part 2
LET’s DO PROJECT!!!!!
WHAT IS PROJECT?
It is the group of activities that
realize in specified place, in
specified period of time within
the specified budget in order to
achieve specified goal.
WHAT IS PROJECT CYCLE
MANAGEMENT?
By resting the integrated
methodology for to prepare,
implement and evaluate the
proposed Project in the framework
of logical framework approach for
to provide quality, effectiveness
and efficiency from the beginning
to the end.
PHASES of PCM24
Pre-evaluation
Implementation
Determination
of required
Project’s
Budget
Determination
of Project Idea
Analysis of
Project’s Idea
Final Evaluation
Planning and
Implementation of
Projects includes
six interconnected
phases…
FUNCTIONAL GRADES
for PCM
1st Grade: Analysis Grade includes analyses
of fundamental problem, relevant
stakeholders, final goal, strategies,
activities, input-output stability.
2nd Grade: Planning Grade includes
determination of projects’ activity plan,
logical framework matrix and budget in
details.
ANALYSIS GRADE of PCM
1. Step: Analysis of specified problem
2. Step : Analysis of target goal
3. Step : Analysis of partnership
4. Step : Analysis of proposed
strategy
Analysis of Specified Problem
It is the analysis of current
situation in order to clarify all
the reasons of specified
problem in details.
The procedures for to
analyze specified problem
Determinations of all the reasons
related with the specified
problem that we want to change,
The major problem places at the
top of the tree,
All the causalities place at the
trees from top to bottom (the
reasons that cause the same
problem place at the same level).
Problem Tree29
High infant
dead rate
Increasing in
the number of
severe infection
cases
Epidemic
Diseaseas
Malnutrition
The lack of the
services for
preventive
vaccination
The problems in
drinking water
supply
The problems
for to access
national
health-care
services
RESULT
REASON
Lack of
knowledge
of the
mothers
about child-
care
The lack of
capacity in
public
medical
institutions
Incapacity in
infrastructure
investmentsLow income
level of the
habitants
The Analysis of target goal
It is the methodological
approach to identify final goal
by re-expressing the problems
that are classified in problem
tree, favorably.
Target Goal Tree31
Reducing
infant dead
rateDecreasing in the
number of severe
infection cases
Decreasing in
epidemic
diseaseas
Improving in
malnutrition
Improving the
public services for
preventive
vaccination
Providing
supporting
information for
to supply safe
drinking water
Providing
services for to
enable national
health-care
service
PURPOSE
STRATEGIES
Providing services
to increase
awareness of the
mothers about
child-care
Providing
services to
compensate low
capacities of
public
medical
institutions
Attempting for
to increase the
capacity of
infrastructure
Attempting for
to increase
income level of
the habitants
The Analysis of proposed
strategies
Strategy is the tool that should be used in
order to reach final goal within specified
intervention area in the framework of the
Projects’ proposal (according to
duration, budget and political restraints
that we face with).
In target goal tree, the tools that we
place under the common goal of the
project, are the alternative strategies of
the Project.
Strategies
In order to determine the common
strategy(s), all of the alternative
strategies that were placed in the
tree of target goal should be
evaluated in the framework of
duration, budget, capacity of the
partnership, technologic
practicability, urgency,
complementary issues, snow-ball
effects, economic, political and
social restraints.
Analysis of stakeholders
“Stakeholder” means that all
relevant institutions, organizations
and groups that are effected by the
specified problem and/or have
impact on the target goal in
negative or affirmative manner.
STAKEHOLDERS
Primary Stakeholders: The groups that
will be influenced by the results of the
Project perniciously or favorably. Target
group, and final beneficiaries are
accepted as primary stakeholders.
Secondary Stakeholders: They are the
organizations and institutions in the
partnership in order to provide services
to the target group through the
implementation process.
Primary Stakeholders
Target Group: The group that are
influenced by the current situation
perniciously. They will be
influenced by the results of the
Project favorably.
Final Beneficiaries: The group that
probably influenced by the results
of the Project in long-term.
Secondary Stakeholders
Associate Partners: The institutions,
organizations that will implement the
project and/or provide supports to
the applicant organizations by using
the Projects’ fund.
Contributory Partners: Institutions and
organizations (mostly public) that
have a role to solve the specified
problem of the Project without using
the Projects’ fund.
Projects’ Activities
Projects’ activities are the tools that are used to
achieve Projects’ goal(s). There is a distinctive
difference between Project and Activity. For
example,
“The Conference to increase environmental
awareness of the society “
Where;
The Conference is the activity while the Increasing
environmental awareness is the title of Project
(including many other activities besides the
Conference to achieve final goal)
Gathering Projects’
Activities into Groups
The group of activities for
preperation: The activities for to
enable convenient background for
the proposed Project, determination
of job definitions of the partnership,
revision of activity plan, preparing of
contracts for purchase etc.
Gathering Projects’ Activities
into Groups
Evaluation and Monitoring:
The activities that are
necessary to increase
effectiveness and efficiency of
the Project such as reporting,
financial auditing and etc.
Gathering Projects’ Activities
into Groups
 Social Marketing Activities: The
activities that are realized to
increase participation of the
target group to the Project.
 Activities for Sustainability: The
activities to provide continuity of
the projects’ results after the
funding of Project will be ended.
Gathering Projects’ Activities
into Groups
 Promotion and Dissemination
Activities: The activities to
increase awareness of the
Projects’ goals and outcomes as
well as the priorities and
philosophy of funding institution.
PLANNING GRADE of PCM
1st STEP: Planning of Activities
2nd STEP: Planning of Projects’
expenses (budgeting)
3rd STEP: Planning Logical
Framework Matrix
PLANNING of PROJECTS’
ACTIVITIES
Activity Plan is the logical diagram
chart that should be developed to
present all project activities
according to interconnected in
each others within the period of
implementations by emphasizing
the responsible partner.
ACTIVITIES 1stMonth 2stMonth 3rdMonth 4thMonth 5thMonth 6thMonth ResponsiblePartner
I-TITLEOFTHE1stACTIVITYGROUP
I.1-SUBTITLE
I.2-SUBTITLE
I.3SUBTITLE
II.TITLEOFTHE2ndACTIVITYGROUP
II.1SUBTITLE
II.2SUBTITLE
II.3SUBTITLE
II.4SUBTITLE
Planning of Projects’ expenses
(budgeting)
After planning activities, the
required sources for to realize
these activities in terms of human
resources, equipment, materials,
outsourcing and general
managerial expenses should be
defined in order to determine total
budgeting of the Project.
Major Budgetary Items (EU-
funds)
Human Resource
Travel and Accommodation
Equipment and Material
Local Office/Projects’ Expenses
Expenses for outsourcing services
Administrative Expenses
Others
Logical Framework
Approach
The important points of the proposed
Project are placed into the matrix;
The scope of the Project
Performance Indicators
Activities and Tools
Assumptions for to achieve final goal
Logical Framework Approach
The required sources for the validation
of Project’s results
The expenses of the Project
Prerequisites for to achieve final goal
50
The Matrix of Logical Framework
Performance
Indicators
The sources for
the validation of
Project’s results
Assumptions
Assumptions
Indicators
The sources
for the
validatio
Assumptions
Indicators
The sources
for the
validatio
Assumptions
Indicators
The sources
for the
validation
Results
Overall
Goal
Objective of
the Project
Activities Tools Costs
Prerequisites
Scope of the
Project
BPW-TURKEY and
EU-PROJECTS
PART 3
Pearl, Step, SİSAM, B-PLAN
PEARL Project; Pace to Employment and Assurance for a
Respectable Life - Strengthening Civil society in the Pre-
Accession Process: NGO Grant Facility Programme’s
Promotion and Protection of women’s Rights Grant Scheme/
Ref. No: NGO-A1-73/
To increase the employment possibility of female students
living in the orphans through vocational training courses in 9
different areas,
To enable them to be world citizens with self-confidence
through Personal Empowerment Program,
To increase awareness about gender equality at institutional
level,
To make the orphanages gain the formation of continuous
education centres
7 workshops were established and required equipment were
provided in the scope of the project.
Solution Time for Employment Problem (STEP) -
CFCU/TR0604.01/01, The Promotion of Civil Society Dialogue
between EU and Turkey Programme within the scope of
“Youth Initiatives for Dialogue” component to the
Programme.
STEP Project aimed to provide a step for youngsters by
enabling them to pro-active and intervene on Youth Policies
and Employment Problems.
The main outcome of the project was an E-Dialogue Platform
serving actively to Youth and Youth Platforms throughout
Europe.
Civil Initiative Strategic Research Center, (SISAM), TR0801.08-
02/27
To promote collaboration between NGOs working for gender
equality and increase their effectiveness on national decision
making mechanisms,
To make contributions to the activities that are realised to
promote participatory democracy in Turkey.
At high level International Conference has been organized for 2
days (supported by the Director UN Global Compact Georg Kell
and United States Ambassador-at-Large for Global Women's
Issues Melanne Verveer) in order to promote “The Women
Empowerment Principles”.
B-PLAN-Build Personal Labour Acting in Net, 504648-LLP-1-2009-1-
IT-LEONARDO-LPM /
B-Plan is a guidance methodology aiming at strengthening the
individual awareness on the entrepreneurial skills necessary to
start-up a successful business mainly among underrepresented
individuals like as youth, women, people with migrant
background or formally low skilled.
B-Plan Guidance Model was based on 8 Work-packages,
implemented in 27 months, the first four dedicated to the
development phases, and the last four related to the
fundamental dissemination and exploitation phases, and to the
management and the quality planning.

Más contenido relacionado

La actualidad más candente

The Use of Evidence in Developing Countries: Experiences and Challenges -
The Use of Evidence in Developing Countries: Experiences and Challenges - The Use of Evidence in Developing Countries: Experiences and Challenges -
The Use of Evidence in Developing Countries: Experiences and Challenges -
LIDC
 
Training module on stakeholder engagement
Training module on stakeholder engagementTraining module on stakeholder engagement
Training module on stakeholder engagement
weADAPT
 
Lessons Learned from OVC Evaluations for Future Public Health Evaluations
Lessons Learned from OVC Evaluations for Future Public Health EvaluationsLessons Learned from OVC Evaluations for Future Public Health Evaluations
Lessons Learned from OVC Evaluations for Future Public Health Evaluations
MEASURE Evaluation
 
Evaluation of health programs
Evaluation of health programsEvaluation of health programs
Evaluation of health programs
nium
 
103-Basco Identifying metrics to fully assess the impact of federal R&D inves...
103-Basco Identifying metrics to fully assess the impact of federal R&D inves...103-Basco Identifying metrics to fully assess the impact of federal R&D inves...
103-Basco Identifying metrics to fully assess the impact of federal R&D inves...
innovationoecd
 

La actualidad más candente (20)

Introducing Policy Implementation and Evaluation.
  Introducing Policy Implementation and Evaluation.  Introducing Policy Implementation and Evaluation.
Introducing Policy Implementation and Evaluation.
 
Labor Markets Core Course 2013: Monitoring and evaluation
Labor Markets Core Course 2013: Monitoring and evaluation Labor Markets Core Course 2013: Monitoring and evaluation
Labor Markets Core Course 2013: Monitoring and evaluation
 
POLICY MAKING PROCESS training policy influence appiah-kubi, 16 dec 2015
POLICY MAKING PROCESS training policy influence appiah-kubi, 16 dec 2015POLICY MAKING PROCESS training policy influence appiah-kubi, 16 dec 2015
POLICY MAKING PROCESS training policy influence appiah-kubi, 16 dec 2015
 
Process of public policy
Process of public policyProcess of public policy
Process of public policy
 
Policy evaluation
Policy evaluationPolicy evaluation
Policy evaluation
 
The Use of Evidence in Developing Countries: Experiences and Challenges -
The Use of Evidence in Developing Countries: Experiences and Challenges - The Use of Evidence in Developing Countries: Experiences and Challenges -
The Use of Evidence in Developing Countries: Experiences and Challenges -
 
Planning, monitoring & evaluation of health care program
Planning, monitoring & evaluation of health care programPlanning, monitoring & evaluation of health care program
Planning, monitoring & evaluation of health care program
 
Training module on stakeholder engagement
Training module on stakeholder engagementTraining module on stakeholder engagement
Training module on stakeholder engagement
 
Chapter 5 policy implementation
Chapter 5 policy implementationChapter 5 policy implementation
Chapter 5 policy implementation
 
Health system strengthening evidence review – A summary of the 2021 update
Health system strengthening evidence review – A summary of the 2021 updateHealth system strengthening evidence review – A summary of the 2021 update
Health system strengthening evidence review – A summary of the 2021 update
 
A Systematic Approach to the Planning, Implementation, Monitoring, and Evalua...
A Systematic Approach to the Planning, Implementation, Monitoring, and Evalua...A Systematic Approach to the Planning, Implementation, Monitoring, and Evalua...
A Systematic Approach to the Planning, Implementation, Monitoring, and Evalua...
 
Policy Implementation
Policy ImplementationPolicy Implementation
Policy Implementation
 
Policy formulation
Policy formulationPolicy formulation
Policy formulation
 
Data4Impact expert workshop. The Conceptual Framework of Societal Impact of R&I
Data4Impact expert workshop. The Conceptual Framework of Societal Impact of R&IData4Impact expert workshop. The Conceptual Framework of Societal Impact of R&I
Data4Impact expert workshop. The Conceptual Framework of Societal Impact of R&I
 
Lessons Learned from OVC Evaluations for Future Public Health Evaluations
Lessons Learned from OVC Evaluations for Future Public Health EvaluationsLessons Learned from OVC Evaluations for Future Public Health Evaluations
Lessons Learned from OVC Evaluations for Future Public Health Evaluations
 
Evaluation of health programs
Evaluation of health programsEvaluation of health programs
Evaluation of health programs
 
The selection and use oThe Selection and Use of Indicatorsf indicators
The selection and use oThe Selection and Use of Indicatorsf indicatorsThe selection and use oThe Selection and Use of Indicatorsf indicators
The selection and use oThe Selection and Use of Indicatorsf indicators
 
Health system strengthening in LMICs and fragile states – what and how?
 Health system strengthening in LMICs and fragile states – what and how? Health system strengthening in LMICs and fragile states – what and how?
Health system strengthening in LMICs and fragile states – what and how?
 
Monitoring and Evaluation system for PFES: Key findings and policy recommenda...
Monitoring and Evaluation system for PFES: Key findings and policy recommenda...Monitoring and Evaluation system for PFES: Key findings and policy recommenda...
Monitoring and Evaluation system for PFES: Key findings and policy recommenda...
 
103-Basco Identifying metrics to fully assess the impact of federal R&D inves...
103-Basco Identifying metrics to fully assess the impact of federal R&D inves...103-Basco Identifying metrics to fully assess the impact of federal R&D inves...
103-Basco Identifying metrics to fully assess the impact of federal R&D inves...
 

Destacado

Stakeholder engagement - online training resource for adaptation
Stakeholder engagement - online training resource for adaptationStakeholder engagement - online training resource for adaptation
Stakeholder engagement - online training resource for adaptation
Vestlandsforsking WRNI
 
Fundraising training andreas beckmann
Fundraising training andreas beckmannFundraising training andreas beckmann
Fundraising training andreas beckmann
climateclimate
 
CIPS - Advance Diploma Guide
CIPS - Advance Diploma GuideCIPS - Advance Diploma Guide
CIPS - Advance Diploma Guide
Zdenek Kompanek
 

Destacado (16)

Pengalaman Melaksanakan Koordinasi Pembangunan Air Minum dan Penyehatan Lingk...
Pengalaman Melaksanakan Koordinasi Pembangunan Air Minum dan Penyehatan Lingk...Pengalaman Melaksanakan Koordinasi Pembangunan Air Minum dan Penyehatan Lingk...
Pengalaman Melaksanakan Koordinasi Pembangunan Air Minum dan Penyehatan Lingk...
 
German Fundraising Congress 2015 - Disruptive Change Workshop
German Fundraising Congress 2015 - Disruptive Change WorkshopGerman Fundraising Congress 2015 - Disruptive Change Workshop
German Fundraising Congress 2015 - Disruptive Change Workshop
 
Stakeholder engagement - online training resource for adaptation
Stakeholder engagement - online training resource for adaptationStakeholder engagement - online training resource for adaptation
Stakeholder engagement - online training resource for adaptation
 
Fundraising training andreas beckmann
Fundraising training andreas beckmannFundraising training andreas beckmann
Fundraising training andreas beckmann
 
Dealing with Disruptive Change: The Power of Stakeholder Connections
Dealing with Disruptive Change: The Power of Stakeholder ConnectionsDealing with Disruptive Change: The Power of Stakeholder Connections
Dealing with Disruptive Change: The Power of Stakeholder Connections
 
Tnc stakeholder anaylsis exercise
Tnc stakeholder anaylsis exerciseTnc stakeholder anaylsis exercise
Tnc stakeholder anaylsis exercise
 
Advanced diploma presentation slides july 2013
Advanced diploma presentation slides july 2013Advanced diploma presentation slides july 2013
Advanced diploma presentation slides july 2013
 
Reinventing the Nonprofit Leader
Reinventing the Nonprofit LeaderReinventing the Nonprofit Leader
Reinventing the Nonprofit Leader
 
Yoap organizational fundraising initiative(yofi)
Yoap organizational fundraising initiative(yofi)Yoap organizational fundraising initiative(yofi)
Yoap organizational fundraising initiative(yofi)
 
CIPS - Advance Diploma Guide
CIPS - Advance Diploma GuideCIPS - Advance Diploma Guide
CIPS - Advance Diploma Guide
 
How to Fundraise for a Stronger Nonprofit
How to Fundraise for a Stronger NonprofitHow to Fundraise for a Stronger Nonprofit
How to Fundraise for a Stronger Nonprofit
 
Creating a Fundraising Strategy
Creating a Fundraising StrategyCreating a Fundraising Strategy
Creating a Fundraising Strategy
 
Surat Edaran Dirjen Cipta Karya no.40 Tahun 2016 Pedoman Umum Program KOTAKU
Surat Edaran Dirjen Cipta Karya no.40 Tahun 2016 Pedoman Umum Program KOTAKUSurat Edaran Dirjen Cipta Karya no.40 Tahun 2016 Pedoman Umum Program KOTAKU
Surat Edaran Dirjen Cipta Karya no.40 Tahun 2016 Pedoman Umum Program KOTAKU
 
Malnutrition project proposal ( Increasing knowlege about importance of a bal...
Malnutrition project proposal ( Increasing knowlege about importance of a bal...Malnutrition project proposal ( Increasing knowlege about importance of a bal...
Malnutrition project proposal ( Increasing knowlege about importance of a bal...
 
Pedoman umum program kotaku sesuai SE DJCK No 40/2016
Pedoman umum program kotaku sesuai SE DJCK No 40/2016Pedoman umum program kotaku sesuai SE DJCK No 40/2016
Pedoman umum program kotaku sesuai SE DJCK No 40/2016
 
Laporan puskesmas buniwangi
Laporan puskesmas buniwangiLaporan puskesmas buniwangi
Laporan puskesmas buniwangi
 

Similar a Projectsforfundraisingjeju

Similar a Projectsforfundraisingjeju (20)

Benefits of M&E.PDF
Benefits of M&E.PDFBenefits of M&E.PDF
Benefits of M&E.PDF
 
Final Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptxFinal Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptx
 
Horizon 2020 - Alain Thielemans
Horizon 2020 - Alain ThielemansHorizon 2020 - Alain Thielemans
Horizon 2020 - Alain Thielemans
 
European Project Design
European Project DesignEuropean Project Design
European Project Design
 
Writing evaluation report of a project
Writing evaluation report of a projectWriting evaluation report of a project
Writing evaluation report of a project
 
E health system design
E health system designE health system design
E health system design
 
Masterclass on project building
Masterclass on project buildingMasterclass on project building
Masterclass on project building
 
JISC BCE: Evaluation Phase 1
JISC BCE: Evaluation Phase 1JISC BCE: Evaluation Phase 1
JISC BCE: Evaluation Phase 1
 
A transdisciplinary research hand injuries in Bangladesh final May22.pptx
A transdisciplinary research hand injuries in Bangladesh final May22.pptxA transdisciplinary research hand injuries in Bangladesh final May22.pptx
A transdisciplinary research hand injuries in Bangladesh final May22.pptx
 
M&E.ppt
M&E.pptM&E.ppt
M&E.ppt
 
evaluating project proposal, group assignment.docx
evaluating project proposal, group assignment.docxevaluating project proposal, group assignment.docx
evaluating project proposal, group assignment.docx
 
Global Poverty Action Fund (GPAF) Funding Seminar
Global Poverty Action Fund (GPAF) Funding SeminarGlobal Poverty Action Fund (GPAF) Funding Seminar
Global Poverty Action Fund (GPAF) Funding Seminar
 
External Evaluation Consultancy Assignment; OXFAM DRR Programme: Supporting C...
External Evaluation Consultancy Assignment; OXFAM DRR Programme: Supporting C...External Evaluation Consultancy Assignment; OXFAM DRR Programme: Supporting C...
External Evaluation Consultancy Assignment; OXFAM DRR Programme: Supporting C...
 
3rd EIA Law, Policy and Institutional Arrangements.pptx
3rd EIA Law, Policy and Institutional Arrangements.pptx3rd EIA Law, Policy and Institutional Arrangements.pptx
3rd EIA Law, Policy and Institutional Arrangements.pptx
 
Basic concepts of health planning
Basic concepts of health planningBasic concepts of health planning
Basic concepts of health planning
 
Measuring the impact and return of social and community programs
Measuring the impact and return of social and community programsMeasuring the impact and return of social and community programs
Measuring the impact and return of social and community programs
 
Chapter three planinig.pptx
Chapter three planinig.pptxChapter three planinig.pptx
Chapter three planinig.pptx
 
Ia Clinic Penang
Ia Clinic PenangIa Clinic Penang
Ia Clinic Penang
 
Policy analysis
Policy analysisPolicy analysis
Policy analysis
 
Measuring Impact and Return on Investment of Corporate Social Investment and ...
Measuring Impact and Return on Investment of Corporate Social Investment and ...Measuring Impact and Return on Investment of Corporate Social Investment and ...
Measuring Impact and Return on Investment of Corporate Social Investment and ...
 

Más de Arzu Özyol (6)

Bpw internation al and un csw
Bpw internation al and un cswBpw internation al and un csw
Bpw internation al and un csw
 
Women in parliament
Women in parliamentWomen in parliament
Women in parliament
 
Water diplomacy
Water diplomacyWater diplomacy
Water diplomacy
 
Women in agriculture
Women in agricultureWomen in agriculture
Women in agriculture
 
Women and environment for jeju
Women and environment for jejuWomen and environment for jeju
Women and environment for jeju
 
Bpw arzu özyol
Bpw arzu özyolBpw arzu özyol
Bpw arzu özyol
 

Último

Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
alinstan901
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 

Último (15)

Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysis
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 

Projectsforfundraisingjeju

  • 1. European BPW projects Dr. Arzu ÖZYOL BPW-TURKEY
  • 3. Grants for to implement projects or activities in relation to European Union Policies within different fields such as research, education, health, consumer protection, protection of the environment, humanitarian aid, human rights and etc.
  • 4. Beneficiaries non-governmental organisations small and mediums size entrepreneurs and public organisations, but exceptionally individuals
  • 5. Grants are a form of complementary financing. The EU does not finance projects up to 100%; It is not a profit for their beneficiaries; It is not for previous actions that are already completed. Generally only one grant for the same action
  • 6. Before 31 March each year, annual work programme İncluding area of activity, objectives, timetable, available budget, award conditions, etc….
  • 7. By the official calls for proposals, candidates invites to present a proposal for action within a given deadline that corresponds to the objectives pursued and fulfils the required conditions.
  • 8. All applications are examined and evaluated on the basis of criteria that have clearly been announced ensuring equal treatment; candidates are individually informed the final decision concerning their proposal
  • 9. Grants without a call for proposals for the Beneficiaries with specific competences or characteristics for certain actions or emergency nature of the action.
  • 10. Grants are made with public money, the European Commission publish the list of grants for the previous years within the principle of transparency by 30 June of each year,
  • 11. The EUprovides funding and grants for a broad range of projects and programs covering different areas such as human rights including gender equality, life long learning programmes including vocational trainings, health, consumer protection, environmental protection and EU's priorities such as active citizenship concept and rural development
  • 12. Funding is managed according to strict rules to ensure tight control over how funds are spent in a transparent& accountable manner
  • 13. 28 EU Commissioners have the ultimate political responsibility for to ensure EU funds are spent properly. at country level national governments are responsible for conducting checks and annual audits
  • 14. Over 76% of the EU budget is used for structural funds with different types of programs managed by different bodies such as rural development and social and training programs
  • 15. EU-funds for to buy services, goods or works for the operations of EU institutions or programs Public Contracts through calls for tenders (public procurement) for technical assistance, consultancy, conference organisation, IT equipment purchases, etc.
  • 16. Project Cycle Management (PCM) PCM is divided into different project phases from programming, through formulation to evaluation and auditing. Project Manager have to be familiar with all different phases of PCM to implement and manage an EU funded projects successfully and to fulfil the requirements of the European Commission.
  • 17. Logical Framework Approach (LFA) is a very effective analytical and managerial tool within Project Cycle Management for to developand implement the Project successfully.
  • 18. Analysis Phase including analysis of problem, analysis of goals, analysis of strategies, analysis of stakeholders. Determination Phase including determination of activities, determination of budget, determination of logical framework by predicting indicators, prerequisites, assumptions and possible risks
  • 19. In between Analysis and Determination Phases, work packages should be determined. At least 4 common work packages are often used Evaluation and Monitoring ( for interim reports, final report, financial evaluation etc) Sustainability ( activities to provide institutional, financial and environmental sustainability of the projects) Dissemination ( activities for to disseminate Project outcomes and visibility of EU) Social Marketting (Activities for to increase participation of beneficiaries to the Project)
  • 20. Before moving over determination phase inputs such as human resources, equipments, subcontractors.. and outputs such as number of beneficiaries, workshops, promotion materials, reports, questionnaries.. for each work package
  • 22. WHAT IS PROJECT? It is the group of activities that realize in specified place, in specified period of time within the specified budget in order to achieve specified goal.
  • 23. WHAT IS PROJECT CYCLE MANAGEMENT? By resting the integrated methodology for to prepare, implement and evaluate the proposed Project in the framework of logical framework approach for to provide quality, effectiveness and efficiency from the beginning to the end.
  • 24. PHASES of PCM24 Pre-evaluation Implementation Determination of required Project’s Budget Determination of Project Idea Analysis of Project’s Idea Final Evaluation Planning and Implementation of Projects includes six interconnected phases…
  • 25. FUNCTIONAL GRADES for PCM 1st Grade: Analysis Grade includes analyses of fundamental problem, relevant stakeholders, final goal, strategies, activities, input-output stability. 2nd Grade: Planning Grade includes determination of projects’ activity plan, logical framework matrix and budget in details.
  • 26. ANALYSIS GRADE of PCM 1. Step: Analysis of specified problem 2. Step : Analysis of target goal 3. Step : Analysis of partnership 4. Step : Analysis of proposed strategy
  • 27. Analysis of Specified Problem It is the analysis of current situation in order to clarify all the reasons of specified problem in details.
  • 28. The procedures for to analyze specified problem Determinations of all the reasons related with the specified problem that we want to change, The major problem places at the top of the tree, All the causalities place at the trees from top to bottom (the reasons that cause the same problem place at the same level).
  • 29. Problem Tree29 High infant dead rate Increasing in the number of severe infection cases Epidemic Diseaseas Malnutrition The lack of the services for preventive vaccination The problems in drinking water supply The problems for to access national health-care services RESULT REASON Lack of knowledge of the mothers about child- care The lack of capacity in public medical institutions Incapacity in infrastructure investmentsLow income level of the habitants
  • 30. The Analysis of target goal It is the methodological approach to identify final goal by re-expressing the problems that are classified in problem tree, favorably.
  • 31. Target Goal Tree31 Reducing infant dead rateDecreasing in the number of severe infection cases Decreasing in epidemic diseaseas Improving in malnutrition Improving the public services for preventive vaccination Providing supporting information for to supply safe drinking water Providing services for to enable national health-care service PURPOSE STRATEGIES Providing services to increase awareness of the mothers about child-care Providing services to compensate low capacities of public medical institutions Attempting for to increase the capacity of infrastructure Attempting for to increase income level of the habitants
  • 32. The Analysis of proposed strategies Strategy is the tool that should be used in order to reach final goal within specified intervention area in the framework of the Projects’ proposal (according to duration, budget and political restraints that we face with). In target goal tree, the tools that we place under the common goal of the project, are the alternative strategies of the Project.
  • 33. Strategies In order to determine the common strategy(s), all of the alternative strategies that were placed in the tree of target goal should be evaluated in the framework of duration, budget, capacity of the partnership, technologic practicability, urgency, complementary issues, snow-ball effects, economic, political and social restraints.
  • 34. Analysis of stakeholders “Stakeholder” means that all relevant institutions, organizations and groups that are effected by the specified problem and/or have impact on the target goal in negative or affirmative manner.
  • 35. STAKEHOLDERS Primary Stakeholders: The groups that will be influenced by the results of the Project perniciously or favorably. Target group, and final beneficiaries are accepted as primary stakeholders. Secondary Stakeholders: They are the organizations and institutions in the partnership in order to provide services to the target group through the implementation process.
  • 36. Primary Stakeholders Target Group: The group that are influenced by the current situation perniciously. They will be influenced by the results of the Project favorably. Final Beneficiaries: The group that probably influenced by the results of the Project in long-term.
  • 37. Secondary Stakeholders Associate Partners: The institutions, organizations that will implement the project and/or provide supports to the applicant organizations by using the Projects’ fund. Contributory Partners: Institutions and organizations (mostly public) that have a role to solve the specified problem of the Project without using the Projects’ fund.
  • 38. Projects’ Activities Projects’ activities are the tools that are used to achieve Projects’ goal(s). There is a distinctive difference between Project and Activity. For example, “The Conference to increase environmental awareness of the society “ Where; The Conference is the activity while the Increasing environmental awareness is the title of Project (including many other activities besides the Conference to achieve final goal)
  • 39. Gathering Projects’ Activities into Groups The group of activities for preperation: The activities for to enable convenient background for the proposed Project, determination of job definitions of the partnership, revision of activity plan, preparing of contracts for purchase etc.
  • 40. Gathering Projects’ Activities into Groups Evaluation and Monitoring: The activities that are necessary to increase effectiveness and efficiency of the Project such as reporting, financial auditing and etc.
  • 41. Gathering Projects’ Activities into Groups  Social Marketing Activities: The activities that are realized to increase participation of the target group to the Project.  Activities for Sustainability: The activities to provide continuity of the projects’ results after the funding of Project will be ended.
  • 42. Gathering Projects’ Activities into Groups  Promotion and Dissemination Activities: The activities to increase awareness of the Projects’ goals and outcomes as well as the priorities and philosophy of funding institution.
  • 43. PLANNING GRADE of PCM 1st STEP: Planning of Activities 2nd STEP: Planning of Projects’ expenses (budgeting) 3rd STEP: Planning Logical Framework Matrix
  • 44. PLANNING of PROJECTS’ ACTIVITIES Activity Plan is the logical diagram chart that should be developed to present all project activities according to interconnected in each others within the period of implementations by emphasizing the responsible partner.
  • 45. ACTIVITIES 1stMonth 2stMonth 3rdMonth 4thMonth 5thMonth 6thMonth ResponsiblePartner I-TITLEOFTHE1stACTIVITYGROUP I.1-SUBTITLE I.2-SUBTITLE I.3SUBTITLE II.TITLEOFTHE2ndACTIVITYGROUP II.1SUBTITLE II.2SUBTITLE II.3SUBTITLE II.4SUBTITLE
  • 46. Planning of Projects’ expenses (budgeting) After planning activities, the required sources for to realize these activities in terms of human resources, equipment, materials, outsourcing and general managerial expenses should be defined in order to determine total budgeting of the Project.
  • 47. Major Budgetary Items (EU- funds) Human Resource Travel and Accommodation Equipment and Material Local Office/Projects’ Expenses Expenses for outsourcing services Administrative Expenses Others
  • 48. Logical Framework Approach The important points of the proposed Project are placed into the matrix; The scope of the Project Performance Indicators Activities and Tools Assumptions for to achieve final goal
  • 49. Logical Framework Approach The required sources for the validation of Project’s results The expenses of the Project Prerequisites for to achieve final goal
  • 50. 50 The Matrix of Logical Framework Performance Indicators The sources for the validation of Project’s results Assumptions Assumptions Indicators The sources for the validatio Assumptions Indicators The sources for the validatio Assumptions Indicators The sources for the validation Results Overall Goal Objective of the Project Activities Tools Costs Prerequisites Scope of the Project
  • 52. PEARL Project; Pace to Employment and Assurance for a Respectable Life - Strengthening Civil society in the Pre- Accession Process: NGO Grant Facility Programme’s Promotion and Protection of women’s Rights Grant Scheme/ Ref. No: NGO-A1-73/ To increase the employment possibility of female students living in the orphans through vocational training courses in 9 different areas, To enable them to be world citizens with self-confidence through Personal Empowerment Program, To increase awareness about gender equality at institutional level, To make the orphanages gain the formation of continuous education centres 7 workshops were established and required equipment were provided in the scope of the project.
  • 53. Solution Time for Employment Problem (STEP) - CFCU/TR0604.01/01, The Promotion of Civil Society Dialogue between EU and Turkey Programme within the scope of “Youth Initiatives for Dialogue” component to the Programme. STEP Project aimed to provide a step for youngsters by enabling them to pro-active and intervene on Youth Policies and Employment Problems. The main outcome of the project was an E-Dialogue Platform serving actively to Youth and Youth Platforms throughout Europe.
  • 54. Civil Initiative Strategic Research Center, (SISAM), TR0801.08- 02/27 To promote collaboration between NGOs working for gender equality and increase their effectiveness on national decision making mechanisms, To make contributions to the activities that are realised to promote participatory democracy in Turkey. At high level International Conference has been organized for 2 days (supported by the Director UN Global Compact Georg Kell and United States Ambassador-at-Large for Global Women's Issues Melanne Verveer) in order to promote “The Women Empowerment Principles”.
  • 55. B-PLAN-Build Personal Labour Acting in Net, 504648-LLP-1-2009-1- IT-LEONARDO-LPM / B-Plan is a guidance methodology aiming at strengthening the individual awareness on the entrepreneurial skills necessary to start-up a successful business mainly among underrepresented individuals like as youth, women, people with migrant background or formally low skilled. B-Plan Guidance Model was based on 8 Work-packages, implemented in 27 months, the first four dedicated to the development phases, and the last four related to the fundamental dissemination and exploitation phases, and to the management and the quality planning.