The presentation was on final year design project, "Production of LPG from NGLs and condensate". It includes process selection, establishing a flow diagram for the selected process, the sizing of main equipments, detailed design of four Major equipments along with P & ID control for the systems and finally the economic evaluation was conducted to check the feasibility of the process. The final product composition of LPG was simulated using Aspen HYSYS and found to be 49% Propane and 21% butane.
6. V-111
EH-112 FA-110
V-311
V-211
EH-312
EH-212
DA-210
DA-310
V-331
G-333
FA-332 EA-330
DA-320
EA-320
EA-421
1 32
54 6
48
11
8
47
9
12
19
20
23 24
21
25 26
28
29
39
31
33
32
30
27
35
G-512
FA-511
46
44
45
53
54
34
40
41
38
7
10
Raw gas
Make up
glycol
Ethane
LPG
Sales gas
Drain
15
18
Flare
FlareFlare
Flare
22
G-321
V-411
EA-410
FA 420
EA-430
FA 440
DA 450
DA 510
C 412
C 413
C 451
G 311
H2O
24
90.04
35
61.23
-9.5
14.29
68.68
15.40
2257
49
55
36
13
50
51
52
14
16
17
37
42
43
56
57
58
7. List of Equipments
Name of equipment Number of Equipment
Three phase separator 1
Two phase separator 2
Absorber 1
Stripper 1
Distillation column 3
Heat exchanger 4
Heater 3
Cooler 1
Tank 2
Pump 4
Compressor 1
Turbo expander 1
Valve 5
9. Determinant Equation used Result
Determination of vessel diameter
Vertical terminal vapor
velocity, Ut
K×
𝛒 𝐋−𝛒 𝐯
𝛒 𝐯
0.74 ft
Vapor velocity, Uv Uv = 0.75UT 0.56 ft
Vessel internal diameter, D
D = (
𝟒𝐐 𝐯
𝛑𝐔 𝐕
)1/2 +
0.25ft
2.56 ft
Determination of vessel height
Light liquid height, HL Assumed 1ft
Heavy liquid height, HH Assumed 1ft
Height of the light liquid above the
outlet, HR
HR =
𝐐 𝐋𝐋 𝐓 𝐇
𝐀 𝐋 0.75 ft
Liquid height above the settling area
for the light liquid, HA
Assumed 0.5ft
Height above feed nozzle, HD HD min = 24+ 0.5dN 2.5ft
HBN
HBN = 0.5dN + greater
of (2ft or HS + 0.5 ft)
0.85
Vessel shell height, HT
HT = HH + HL + HR +
HA + HBN + HD + 1.5 8.1 ft
Head height, h = 0.64 for r/h=2:1
For mist eliminator, extra height = 1.5 ft
Total height of the vessel = 9.38 ft
10. Elements Equation/condition
used
Result
Inlet feed
nozzle, dN
dN ≥ (
𝟒 𝐐 𝐦 𝛒 𝐌
𝟔𝟎𝛑
)
1/2 6.065 in
Vapor outlet
pipe
𝛒 𝐠 × 𝐕𝐠
𝟐
= 3750
kg/m.s2
5.047 in
Light liquid
outlet pipe
maximum allowable
velocity is 1m/s
0.364 in
Water outlet
pipe
maximum allowable
velocity is 1m/s
0.215 in
Elements Equation/condition applied Result
Shell Wall Thickness,
𝒕 𝐬𝐡𝐞𝐥𝐥
𝐓𝐡 𝐬𝐡𝐞𝐥𝐥 =
𝐏𝐃
𝟐𝐒𝐄 − 𝟏. 𝟐𝐏
+ 𝛔 𝐜 𝟏. 𝟕 𝐢𝐧
Head Wall Thickness,
thead
Thead =
𝐏𝐃
𝟐𝐒𝐄−𝟎.𝟐𝐏
+ 𝛔 𝐜 1.63 in
Skirt thickness, tS
S =
𝐖
𝛑×𝐃 𝐬𝐨×𝐭 𝐬
DSO = 34.08 + 2ts
1.49 inch
Skirt height Assumed 2ft
Elements Equation used Result
Determination of baffle area
Area of the baffle
plate, AL
AL=A-AD 4.76 ft2
Determination of baffle thickness
Baffle thickness, bt bt =
𝛃𝐩𝐛 𝟐
𝛔
3.58 in
Material-ASTM A516 GRADE 70
11.
12. Controllers used
-Two level controllers
- Two flow controllers
Controlled variables
- Heavy and total liquid level
-Vapor and light liquid velocity
13. Tray specifications
i. Bubble caps of 4 in. nominal sizes
- I.D. = 3.875 in and O.D. = 4 in.
- Cap height above the tray = 4 in.
- Arranged in triangular pitch
- 37 caps in 6 rows, 50 slots per cap
- Slot size =
1
8
in. × 1
1
2
in
ii. Tray spacing = 18 in. (assumed)
iii. Weir – Inlet and Outlet weirs
iv. Vertical, straight segmental and tapered downcomers
v. Riser nominal I.D. = 2.63 in.
vi. Downcomer width = 5.04 in. and weir length = 2.275 ft.
vii. Length of outlet weir and inlet weir (downcomer side) =
2.275 ft.
Nozzles Conditions Values
Inlet and outlet gas
streams
g × Vg
2 ≤ 3750
kg/m.s2
Internal diameter = 6.065
in.
Thickness = 0.6 in.
Inlet and outlet
TEG streams
Max. allowable
velocity ≤ 1 m/s
Internal diameter = 1.049
in.
Thickness = 0.271 in.
14. Mechanical design
Materials chosen
For shell, head the nozzles - carbon steel
(ASME SA516 Grade 60)
For trays - stainless steel
For skirt – carbon steel (ASME SA-516,
Grade 70)
Insulator – Asbestos
Mechanical Design of Glycol Contactor
Elements Equations Values
Shell thickness
ts =
𝑃 × 𝑅
𝑓 ×𝐽 − 0.6 ×𝑃
+ c
2 in.
Head wall thickness
th =
𝑃 × 𝐷𝑖
2 × 𝑓 × 𝐽 − 0.2 ×𝑃
+ c
1.804 in.
Insulation thickness Assumed 1.18 in.
Elements Equations/Conditions Values
Height Assumed 2 ft.
Inside
diameter
Column outside diameter +
Insulation thickness
3 ft. 10.2 in.
Thickness Considering stress due to
dead weight, wind load and
permissible tensile stress
1.896 in.Total pressure drop = 12.628 in. liquid
16. Individual Equipment (cont’d)
P & ID of Glycol Contactor
- One analyzer controller
- One level controller
- Pressure differential transmitters
for different trays
21. Individual Equipment (cont’d)
Mechanical Design of Demethanizer (Da 450)
Determination of Number of Stages
Elements Equation Value
Number of
Minimum Stages Nmin =
ln
xM,D ×xP,B
xE,D×xE,B
ln αEP
5
Minimum Reflux
Ratio
F(1-q) =
αiFzi
αi− φ
Vmin =
αiDxi,D
αi− φ
Lmin = Vmin – D
Rmin =
Lmin
D
0.124
Actual Reflux Ratio Ractual = 1.5Rmin 0.161
Actual Number of
Stages
Gilliand correlation: Graph of
R− Rmin
R+1
vs
N− Nmin
N+1
Nactual = N/efficiency
23
Determination of Column Diameter
Elements Equation Value
Flooding Velocity, uf
K1
ρL− ρV
ρL
0.7604 m/s
Operating Vapor Velocity 0.75 × uf 0.5703 m/s
Maximum Volumetric Flow
Rate
𝑉 × 𝑀𝑊𝑉
𝜌 𝑉 × 3600
0.7203 m3/s
Net Area Required Maximum volumetric flow rate
Operating vapor velocity
1.263 m2
Column Cross Sectional
Area
For downcomer area as 12% of
total column area
Ac =
1.263 m2
0.88
1.435 m2
Required Diameter
D =
4 AC
π
1.352 m
Determination of Column Height
H = h1 + h2 + h3 + h4 = 16.6 m
With Skirt height (4m), Total height = 20.6 m
22. Individual Equipment (cont’d)
Mechanical Design of Demethanizer (Da 450)
Tray Specifications
• Height of weir, hW = 50 mm (assumed)
• Weir length = 1.041 m
• Hole size = 5 mm
• Pitch length = 12.5 mm
• Number of Active Holes= 5557
• Tray spacing = 0.61 m
• Plate thickness = 5 mm
• Dry tray pressure drop, hdt = 100 mm liquid
• Dry plate pressure drop = 100 mm liquid
• Total tray pressure drop = 192 mm liquid
Material of Construction
- Shell and heads: Carbon steel (SA 203 GR B)
- Tray, downcomer and weir: Stainless Steel
- Skirt : Carbon steel (ASTM SA 516 GR 65)
- Insulation : Foam glass
Determination of Thickness
Elements Equation Value
Shell Thickness ts =
PR
SE−0.6P
+ CC
7.48 mm
Tray Thickness Assumed 2 mm
Head Thickness
(2:1 Semi elliptical heads)
th =
PD
2SE−0.2P
+ CC
7.46 mm
Insulation Thickness Assumed 50 mm
Skirt Thickness Trial and error 10 mm
Determination of Pipe Diameter
Elements Equation Value (inch)
Feed Nozzle ρFVF
2 ≤1500 kg/m.s2 10.02
Vapor Outlet Nozzle ρVVV
2 ≤ 3750 kg/m.s2 10.75
Liquid Outlet Nozzle VL ≤ 1m/s 5.047
23. Individual Equipment (cont’d)
Mechanical Drawing of Demethanizer
Mechanical drawing includes
- Dimensions of trays
- Pipe diameter
- Skirt thickness and height
- Column height and diameter
- Shell thickness
- Insulation thickness
- Dimensions for mist eliminator
- Height of head
24. Individual Equipment (cont’d)
P & ID of Demethanizer
Controllers used
- Two field mounted temperature
controllers
- Two board mounted level
controllers
- One field mounted analyzer
controller
- One pressure indicator
25. Individual Equipment (cont’d)
P & ID of Demethanizer
Controllers used
- Two field mounted temperature
controllers
- Two board mounted level
controllers
- One field mounted analyzer
controller
- One pressure indicator
26. Plot Plan and Plant Layout
LPG Unit
Dehydration Unit
NGL Unit
Condensate Unit
Administration Building
Space for
Future
Expansion
Final Product StorageStore House
Canteen
Laboratory
Flare
Utilities
Control
Room
Garden
Play Ground MosqueResidential Buildings
Entrance
and
Parking
Fire &
Safety
27. Economic Analysis
Total Purchased Equipment Cost = $1,620,905
Total capital investment = $9,775,354
Total variable production cost = $4,047,052
Fixed charges = $218,081
General expenses = $1,164,181
Total product cost (Annual) = Total variable production cost + Fixed charges + General
expenses = $5,429,314
Total annual sales = Income from selling LPG + Income from selling pipeline gas = $11,093,860
Total annual net profit (before tax) = $5,882,627
Assuming, Tax rate = 7%
Total annual net profit (after tax) = $5,470,843
Salvage value = $207605.5
Payback period = 3 years (with i=20%) and 2 years (with 0% interest)
IRR = 30.66%, with MARR = 20%
As IRR>MARR, the project is feasible.