Approach:
– path through which ship can enter the harbour safely.
Approach channel:
When sea around the harbour has depth less than draft
required for the largest ship visiting the harbour a separate
approach demarcated and dredged for required depth is
necessary.
Lock gates:
–When water level of sea around the port is varying to a
large extend
1. On leeward side - safe 2. On windward side
basin
basin
sea
sea
Asnidha V, Asst. Prof, CE Dept. Mdit
1. Pointing down
stream
3.Pointing upstream
• Not favorable
– Silt deposits
– Requires maintenance
dredging
Harbour
basin
Harbour
basin
Harbour
basin
2.Pointing midstream
• Difficulty in
maneuvering
Asnidha V, Asst. Prof, CE Dept. Mdit
• Depth – draft of largest ship
• Width – widest ship
• Length – type of entrance
• Tidal Entrances
– Entrance without gates
• Impounded Entrances
– Entrance with gates
I. Entrance with one pair of gates
a) Ebb gates
b) Storm gates or flood gates
II. Entrance with two or three pair of gates
1 a.Ebb gates
• Stop flow of water from
harbour during low tides.
• Entry of ship – only during
high water level.
1 b.Storm gates or
flood gates
• Stop flow of water into the
harbour during flood
WL. In
harbour is
above L.W.L harbour
Asnidha V, Asst. Prof, CE Dept. Mdit
2.Entrance with two or three pair of gates
• Water level in lock
chamber can be
altered.
• Entry and exit of
ship takes more
time
sea
W.L. =19.85m
Lock
chamber
W.L.= 18.95 m
harbour basin
W.L. = 20.25 m
Asnidha V, Asst. Prof, CE Dept. Mdit
• Lock is a device for raising or lowering boats between stretches
of water.
• It is used to make river more easily navigable or to allow a canal
to take a reasonably direct line across land that is not level
 Give access to docks
 Consist of chamber, enclosed quay walls on each side
 Paved at the bottom by an inverted arch flooring, to resist
upward water pressure, when dock level is low
 Locks have two pairs of gates with a lock chamber in
between.
 costly
• width varying from 25m and above
• depth 8m to 12m
• length 240m and above
• It may be wooden or iron
• Wooden gates consists of series of horizontal beams of green
heart
• Iron gates consists of plate iron ribs, covered with a skin of
iron sheeting
• Shape
– usually straight or curved
• Curved gate
– is strong against the transverse water pressure
– Curved gates are theoretically the best type
– But curved gates are longer and costlier
Asnidha V, Asst. Prof, CE Dept. Mdit
Support for lock gates
• Gate is fitted with a pivot cap at bottom of heel post
and an encircling anchor strap at the top
• Usually opened and closed, by two sets of chains,
one for opening and other for closing
• Chains are fastened at 1/3rd its height on both sides
• For small boat canal gates, lock gates can be
operated by hand
Asnidha V, Asst. Prof, CE Dept. Mdit
THANK YOU

Más contenido relacionado

La actualidad más candente

Design principles and requirements of harbours
Design principles and requirements of harboursDesign principles and requirements of harbours
Design principles and requirements of harbours
Latif Hyder Wadho
 
CHAPTER - 2. HARBOUR PLANNING.pptx
CHAPTER - 2. HARBOUR PLANNING.pptxCHAPTER - 2. HARBOUR PLANNING.pptx
CHAPTER - 2. HARBOUR PLANNING.pptx
jaswanthyadav12
 
Docks and their classification
Docks and their classificationDocks and their classification
Docks and their classification
Latif Hyder Wadho
 

La actualidad más candente (20)

Harbours Engineering
 Harbours Engineering  Harbours Engineering
Harbours Engineering
 
Dock and harbour
Dock and harbourDock and harbour
Dock and harbour
 
HARBOUR ENGINEERING
HARBOUR ENGINEERING HARBOUR ENGINEERING
HARBOUR ENGINEERING
 
Design principles and requirements of harbours
Design principles and requirements of harboursDesign principles and requirements of harbours
Design principles and requirements of harbours
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
 
Components of railway track
Components of railway trackComponents of railway track
Components of railway track
 
Harbour engineering by Shankaregowda MIT Mysore
Harbour engineering by Shankaregowda MIT MysoreHarbour engineering by Shankaregowda MIT Mysore
Harbour engineering by Shankaregowda MIT Mysore
 
Berthing structures
Berthing structuresBerthing structures
Berthing structures
 
3. NATURAL PHENOMENA (PHE) GTU 3170623
3. NATURAL PHENOMENA (PHE) GTU 31706233. NATURAL PHENOMENA (PHE) GTU 3170623
3. NATURAL PHENOMENA (PHE) GTU 3170623
 
CHAPTER - 2. HARBOUR PLANNING.pptx
CHAPTER - 2. HARBOUR PLANNING.pptxCHAPTER - 2. HARBOUR PLANNING.pptx
CHAPTER - 2. HARBOUR PLANNING.pptx
 
Airport engineering PART-1
Airport engineering PART-1 Airport engineering PART-1
Airport engineering PART-1
 
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavementppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
 
4. WATER TRANSPORTATION (TRE) GTU 3150611
4. WATER TRANSPORTATION (TRE) GTU 31506114. WATER TRANSPORTATION (TRE) GTU 3150611
4. WATER TRANSPORTATION (TRE) GTU 3150611
 
Railway engg geometric design
Railway engg geometric designRailway engg geometric design
Railway engg geometric design
 
6. NAVIGATIONAL AIDS (PHE) GTU 3170623
6. NAVIGATIONAL AIDS (PHE) GTU 31706236. NAVIGATIONAL AIDS (PHE) GTU 3170623
6. NAVIGATIONAL AIDS (PHE) GTU 3170623
 
Docks and their classification
Docks and their classificationDocks and their classification
Docks and their classification
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Airport marking
Airport markingAirport marking
Airport marking
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
 
H & d ppt 05 wet docks
H & d ppt 05 wet docksH & d ppt 05 wet docks
H & d ppt 05 wet docks
 

Similar a H & d ppt 07 lock & lock gates

Chapter-5 Harbour Facilities.pptx
Chapter-5 Harbour Facilities.pptxChapter-5 Harbour Facilities.pptx
Chapter-5 Harbour Facilities.pptx
Chhagan2
 
Dams arvind gupta-12march13 (2)
Dams   arvind gupta-12march13 (2)Dams   arvind gupta-12march13 (2)
Dams arvind gupta-12march13 (2)
Arvind Gupta
 

Similar a H & d ppt 07 lock & lock gates (20)

harbour-160808044336.ppt
harbour-160808044336.pptharbour-160808044336.ppt
harbour-160808044336.ppt
 
Harbour 160808044336 (1)
Harbour 160808044336 (1)Harbour 160808044336 (1)
Harbour 160808044336 (1)
 
H & d ppt 06 repair docks
H & d ppt 06 repair docksH & d ppt 06 repair docks
H & d ppt 06 repair docks
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
Chapter-5 Harbour Facilities.pptx
Chapter-5 Harbour Facilities.pptxChapter-5 Harbour Facilities.pptx
Chapter-5 Harbour Facilities.pptx
 
Dams.pptx
Dams.pptxDams.pptx
Dams.pptx
 
Dams PPT
Dams PPTDams PPT
Dams PPT
 
Presentation (1).pptx
Presentation (1).pptxPresentation (1).pptx
Presentation (1).pptx
 
Marine civil engineering and Gujarat
Marine civil engineering and GujaratMarine civil engineering and Gujarat
Marine civil engineering and Gujarat
 
project
projectproject
project
 
Lock
LockLock
Lock
 
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages
 
Docks & harbors construction
Docks & harbors construction  Docks & harbors construction
Docks & harbors construction
 
Dam types
Dam typesDam types
Dam types
 
Presentation1 hydro;ogy-SKK.pdf
Presentation1 hydro;ogy-SKK.pdfPresentation1 hydro;ogy-SKK.pdf
Presentation1 hydro;ogy-SKK.pdf
 
Hydraulic Structure Deep Hazam.pdf
Hydraulic Structure Deep Hazam.pdfHydraulic Structure Deep Hazam.pdf
Hydraulic Structure Deep Hazam.pdf
 
BOAT LIFT
BOAT LIFTBOAT LIFT
BOAT LIFT
 
weir & barrage
weir & barrageweir & barrage
weir & barrage
 
Dams arvind gupta-12march13 (2)
Dams   arvind gupta-12march13 (2)Dams   arvind gupta-12march13 (2)
Dams arvind gupta-12march13 (2)
 
Docks and Harbors.pptx
Docks and Harbors.pptxDocks and Harbors.pptx
Docks and Harbors.pptx
 

Último

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Último (20)

Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 

H & d ppt 07 lock & lock gates

  • 1. HARBOUR AND DOCK ENGINEERING Presentation 7Asnidha V, Asst. Prof, CE Dept. Mdit
  • 2. Asnidha V, Asst. Prof, CE Dept. Mdit
  • 3. Approach: – path through which ship can enter the harbour safely. Approach channel: When sea around the harbour has depth less than draft required for the largest ship visiting the harbour a separate approach demarcated and dredged for required depth is necessary. Lock gates: –When water level of sea around the port is varying to a large extend
  • 4. 1. On leeward side - safe 2. On windward side basin basin sea sea Asnidha V, Asst. Prof, CE Dept. Mdit
  • 5. 1. Pointing down stream 3.Pointing upstream • Not favorable – Silt deposits – Requires maintenance dredging Harbour basin Harbour basin Harbour basin 2.Pointing midstream • Difficulty in maneuvering Asnidha V, Asst. Prof, CE Dept. Mdit
  • 6. • Depth – draft of largest ship • Width – widest ship • Length – type of entrance
  • 7. • Tidal Entrances – Entrance without gates • Impounded Entrances – Entrance with gates I. Entrance with one pair of gates a) Ebb gates b) Storm gates or flood gates II. Entrance with two or three pair of gates
  • 8. 1 a.Ebb gates • Stop flow of water from harbour during low tides. • Entry of ship – only during high water level. 1 b.Storm gates or flood gates • Stop flow of water into the harbour during flood WL. In harbour is above L.W.L harbour Asnidha V, Asst. Prof, CE Dept. Mdit
  • 9. 2.Entrance with two or three pair of gates • Water level in lock chamber can be altered. • Entry and exit of ship takes more time sea W.L. =19.85m Lock chamber W.L.= 18.95 m harbour basin W.L. = 20.25 m Asnidha V, Asst. Prof, CE Dept. Mdit
  • 10. • Lock is a device for raising or lowering boats between stretches of water. • It is used to make river more easily navigable or to allow a canal to take a reasonably direct line across land that is not level  Give access to docks  Consist of chamber, enclosed quay walls on each side  Paved at the bottom by an inverted arch flooring, to resist upward water pressure, when dock level is low  Locks have two pairs of gates with a lock chamber in between.  costly
  • 11.
  • 12.
  • 13. • width varying from 25m and above • depth 8m to 12m • length 240m and above
  • 14.
  • 15.
  • 16. • It may be wooden or iron • Wooden gates consists of series of horizontal beams of green heart • Iron gates consists of plate iron ribs, covered with a skin of iron sheeting • Shape – usually straight or curved • Curved gate – is strong against the transverse water pressure – Curved gates are theoretically the best type – But curved gates are longer and costlier Asnidha V, Asst. Prof, CE Dept. Mdit
  • 17.
  • 18.
  • 19.
  • 20. Support for lock gates • Gate is fitted with a pivot cap at bottom of heel post and an encircling anchor strap at the top • Usually opened and closed, by two sets of chains, one for opening and other for closing • Chains are fastened at 1/3rd its height on both sides • For small boat canal gates, lock gates can be operated by hand Asnidha V, Asst. Prof, CE Dept. Mdit
  • 21.