Chair’s Welcome
BIM: Re-defining the role of the project manager.
APM Knowledge SIG
• House keeping
• Mobile phones – off or silent
• Twitter: #APMBIM
UK Government Strategy
May 2011
Sep 2011
July 2013
BIM is a formal requirement for all
centrally procured government
construction projects by 2016.
Construction 2025
Why Change?– Public Sector
 Use of co-ordinated project
information should be a contractual
requirement
 Government project sponsors should
have sufficient expertise to fulfil their
roles effectively
 A productivity target of 30% real cost
reduction by the year 2000 should be
launched
 Annual reductions of 10% of cost and
construction time... Defects in projects
should be reduced by 20% per year
 ...Government to commit itself to
becoming best practice clients seeking
improvement in efficiency and quality
 Promising developments... New
technology such as 3D object
orientated modelling...
Latham, 1994 Egan, 1998
Latham (1994)
“There is an increasing
(if sometimes reluctant)
acceptance that Project
Management, and a
separate discipline of Project
Managers, are permanent
and growing features of the
construction scene.”
Egan(1998)
“at the project manager
level, we see a need for
training in integrating
projects and leading
performance
improvement, from
conception to final
delivery.”
So... What is BIM?
 ‘Building Information Modelling (BIM) is both a new technology
and a new way of working.
 ‘BIM involves much more than simply implementing new software.
It is a different way of thinking’
 ‘BIM combines technology with new working practices to improve
the quality of the delivered product and also improve the reliability,
timeliness and consistency of the process.’
What is BIM? RICS Definition
RICS
New Technology
 Use of 3D models
shared across supply
chain team
 Design and
construction
information embedded
into objects within the
model
 Sophisticated analysis
possible
Structured Information
 Information stored within objects in the model can be viewed used for
analysis and reporting
A New Way of Working
A New Way of Working
Level 0
• Working with 2D CAD Drawings
• Other project information in written documents
A New Way of Working
Level 1
• May still using CAD, sometimes 3D drawings / simple models
• Introducing structured project information
• Introducing structured co-ordination processes
A New Way of Working
Level 2
• Shift to 3D model with integrated attribute information
• Separate model files for architecture, structural, M&E etc
• Much project information now embedded in the model
• Structured processes for co-ordination essential
A New Way of Working
Level 3
• Single shared model across project team
• Single version of the truth
• Structured process to manage co-ordination of information
• Integration project insurance, fully collaborative
MEP Consultant Structural Engineer Architect
 Models worked on separately by each member of the project team
Level 2 BIM
With thanks to Associated Architects
 BIM is not limited to new assets
 BIM is not limited to the design phase
 BIM is not limited to buildings
 BIM is not just for big projects
Where and When to Use BIM
BIM can be applied to projects of
any size, across all phases of the
lifecycle and to all types of built
asset.
Where and When to Use BIM
BIM
BIM for PM’s - Not yet on the radar?
BIM
BIM for PM’s - Another thing to juggle?
Case Study
HMYOI Cookham Wood
Cookham Wood - Ministry of Justice
 Key custodial establishment for the South East
 A new house block housing
180 young offenders
 Associated education building
Cookham Wood - Ministry of Justice
 Project now complete
 Two Stage Open Book with the adoption of BIM, Project Bank
Accounts and Government Soft Landings
 20% cost reduction achieved benchmarked against similar
projects
 Library of standard components with associated data produced
which will be re-used on future MOJ projects
 Lessons and experience were fed into the development of
PAS1192-2
Case Study Documentation
Available from http://www.bimtaskgroup.org
Project Process
BIM
Process
How did PM’s role change?
BIM Client
Requirements
Standards
Software
Platforms
Stake-
holders
BIM
Deliverables
Managing
Change
Co-
ordinates
Planning the
work and
data
segregation
File
Security
Level of
Detail
H+S
Know what you want from BIM
Lessons from Cookham Wood
 In order to incorporate BIM, the client requirements and processes have to be
carefully understood
 Alignment between BIM processes and wider project processes is needed. The
MOJ undertook a comprehensive review of the internal processes used to
operate it’s projects.
 The EIR should be explicit about which of the ten ‘Client’s Strategic Purposes’
the COBie* data will be used for.
 The brief and the BIM Clients Information Requirements need to be written in
plain English with no ambiguity.
Selected Lessons:
* COBie = Construction Operations Building Information Exchange
The BIM Process
Key Documents – PAS 1192 Part 2
PAS1192-2 Process Cycle
CAPEX START
New project
Survey of Existing Assets (Assessment)
Prepare
Employer’s
Information
Requirements
(EIR)
Summary:-
• Describes information exchange
and collaborative working
requirements
• Forms part of employer’s
requirements
• To be incorporated in supplier
Project Execution Plan
• Where possible base on CIC Scope
of Services
Procurement
The EIR
PAS1192-2 Process Cycle
EXECUTION
Procurement
Prepare BIM
Execution Plan
(BEP)
Summary:-
• Demonstrates supplier’s approach,
capability, capacity and competence
to delivery of EIR
• Likely to be developed in two
phases, pre- and post-contract
award
• Post-contract is re-submitted to
include contributions from whole of
supply chain capability and Master
Information Delivery Plan (MIDP)
Contract Award
PAS1192-2 Process Cycle
DELIVERY
Contract Award
Prepare Master
Information
Delivery Plan
(MIDP)
Summary:-
• Facilitates management of the
delivery of the project
• Consists of everything requested in
the EIR plus information needed for
management of the project and
project documentation, along with
standard method and procedure
and specification of IT solutions and
data exchange formats.
Mobilization
PAS1192-2 Process Cycle
PRODUCTION
Mobilization
Project
Information Model
(PIM)
Summary:-
• Project delivered through detailed
design and construction and on to
handover
• Common Data Environment
continually updated and at defined
COBIE data drop stages
• At Level 2 BIM the PIM is likely to
be a set of federated models along
with associated non-graphical data
and documentation
Opex Start
PAS1192-2 Process Cycle
OPEX START
Production
Asset Information
Model
(AIM)
Summary:-
• PAS1192-2 recommends COBIE-
UK-2012 be used for information
exchange to create the AIM
• Government Soft Landings (GSL)
provides a mechanism to support
effective handover of the asset into
operational use
Assessment
The BIM Process – Data Drops
Strategic Definition
Preparation and
Brief
Concept Design
Developed Design Technical Design
Handover and
Close Out
In Use
1 To proceed
2 To procure
3 To construct
4 To accept handover
5 To monitor performance
Project Stage (RIBA 2013) Client Decision
Construction
Where to learn more
www.fgould.com/uk/topics/BIM/www.cic.org.uk/national/BiMhubs.shtmlwww.bimtaskgroup.org/
Adrian Malone
Head of BIM and Knowledge
Management
Faithful+Gould
0113 306 6884
adrian.malone@fgould.com
@adrianmalone

Más contenido relacionado

La actualidad más candente

AUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_PresentationAUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_Presentation
Ahmad Balawi
 

La actualidad más candente (20)

Leveraging BIM throughout the construction process
Leveraging BIM throughout the construction processLeveraging BIM throughout the construction process
Leveraging BIM throughout the construction process
 
International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5
 
Bim services
Bim servicesBim services
Bim services
 
AUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_PresentationAUD_DXB_BIM_Educationsl_Presentation
AUD_DXB_BIM_Educationsl_Presentation
 
ThinkBIM - Rachel Park (Mace)
ThinkBIM - Rachel Park (Mace)ThinkBIM - Rachel Park (Mace)
ThinkBIM - Rachel Park (Mace)
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 
Bim
BimBim
Bim
 
An Introduction to BIM
An Introduction to BIM An Introduction to BIM
An Introduction to BIM
 
BIM for Risk Management
BIM for Risk ManagementBIM for Risk Management
BIM for Risk Management
 
Bim level-2 information-management
Bim level-2 information-managementBim level-2 information-management
Bim level-2 information-management
 
BIM Strategy in practice
BIM Strategy in practiceBIM Strategy in practice
BIM Strategy in practice
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
 
what is BIM
what is BIMwhat is BIM
what is BIM
 
BIM: What kind of information is modeled in Parametric Building Information M...
BIM: What kind of information is modeled in Parametric Building Information M...BIM: What kind of information is modeled in Parametric Building Information M...
BIM: What kind of information is modeled in Parametric Building Information M...
 
BIM Analysis
BIM AnalysisBIM Analysis
BIM Analysis
 
Synergis University 2014-BIM for Construction
Synergis University 2014-BIM for ConstructionSynergis University 2014-BIM for Construction
Synergis University 2014-BIM for Construction
 
CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)
 
bim+ Presentation BIM Manager
bim+ Presentation BIM Managerbim+ Presentation BIM Manager
bim+ Presentation BIM Manager
 
Bim challenges and potential
Bim challenges and potentialBim challenges and potential
Bim challenges and potential
 

Destacado

MTECH Project Services (EN)
MTECH Project Services (EN)MTECH Project Services (EN)
MTECH Project Services (EN)
Paul Worthington
 
How to be in the top 10% of programme managers: Patrick Mayfield
How to be in the top 10% of programme managers: Patrick Mayfield  How to be in the top 10% of programme managers: Patrick Mayfield
How to be in the top 10% of programme managers: Patrick Mayfield
Association for Project Management
 

Destacado (20)

BIM and the East Riding of Yorkshire Council - Tom Oulton
BIM and the East Riding of Yorkshire Council - Tom OultonBIM and the East Riding of Yorkshire Council - Tom Oulton
BIM and the East Riding of Yorkshire Council - Tom Oulton
 
Building a High-Level Process Model for Soliciting Requirements on Software T...
Building a High-Level Process Model for Soliciting Requirements on Software T...Building a High-Level Process Model for Soliciting Requirements on Software T...
Building a High-Level Process Model for Soliciting Requirements on Software T...
 
MTECH Project Services (EN)
MTECH Project Services (EN)MTECH Project Services (EN)
MTECH Project Services (EN)
 
0868 001
0868 0010868 001
0868 001
 
5th Qatar BIM User Day, Defining the role of the BIM Manager
5th Qatar BIM User Day, Defining the role of the BIM Manager5th Qatar BIM User Day, Defining the role of the BIM Manager
5th Qatar BIM User Day, Defining the role of the BIM Manager
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
APM Presents - Why Value Management might reveal just what managing projects...
APM Presents - Why Value Management might reveal just what managing  projects...APM Presents - Why Value Management might reveal just what managing  projects...
APM Presents - Why Value Management might reveal just what managing projects...
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuction
 
APM London branch BIM Breakfast: Introduction to BIM
APM London branch BIM Breakfast: Introduction to BIM APM London branch BIM Breakfast: Introduction to BIM
APM London branch BIM Breakfast: Introduction to BIM
 
BIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project DeliveryBIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project Delivery
 
BIM for Construction, BPMs and Owners
BIM for Construction, BPMs and OwnersBIM for Construction, BPMs and Owners
BIM for Construction, BPMs and Owners
 
Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)
 
HKIBIM Building Information Modelling (BIM) awareness Seminar
HKIBIM Building Information Modelling (BIM) awareness SeminarHKIBIM Building Information Modelling (BIM) awareness Seminar
HKIBIM Building Information Modelling (BIM) awareness Seminar
 
Before we count the bricks we cost plan
Before we count the bricks we cost planBefore we count the bricks we cost plan
Before we count the bricks we cost plan
 
How to be in the top 10% of programme managers: Patrick Mayfield
How to be in the top 10% of programme managers: Patrick Mayfield  How to be in the top 10% of programme managers: Patrick Mayfield
How to be in the top 10% of programme managers: Patrick Mayfield
 
Dissecting open innovation
Dissecting open innovationDissecting open innovation
Dissecting open innovation
 
Motivating enterprise-wide initiatives Cath Tillotson
Motivating enterprise-wide initiatives Cath TillotsonMotivating enterprise-wide initiatives Cath Tillotson
Motivating enterprise-wide initiatives Cath Tillotson
 
Agile project management in heavy engineering design (John Underhill, Babcock)
Agile project management in heavy engineering design (John Underhill, Babcock)Agile project management in heavy engineering design (John Underhill, Babcock)
Agile project management in heavy engineering design (John Underhill, Babcock)
 
APM Four seasons of risk - Scotland: Identification
APM Four seasons of risk - Scotland: IdentificationAPM Four seasons of risk - Scotland: Identification
APM Four seasons of risk - Scotland: Identification
 
Preparing to fail by failing to prepare, 25th feb, london
Preparing to fail by failing to prepare, 25th feb, londonPreparing to fail by failing to prepare, 25th feb, london
Preparing to fail by failing to prepare, 25th feb, london
 

Similar a Building information modelling - redefining the role of the project manager: Adrian Malone

Sustainability In Government - Bim Webinar
Sustainability In Government - Bim WebinarSustainability In Government - Bim Webinar
Sustainability In Government - Bim Webinar
4 All of Us
 
Ramboll - BIM - Now It's Serious
Ramboll - BIM - Now It's SeriousRamboll - BIM - Now It's Serious
Ramboll - BIM - Now It's Serious
Graham H Stewart
 

Similar a Building information modelling - redefining the role of the project manager: Adrian Malone (20)

Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15
 
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
 
Sustainability In Government - Bim Webinar
Sustainability In Government - Bim WebinarSustainability In Government - Bim Webinar
Sustainability In Government - Bim Webinar
 
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...BIM for Local Government - Presentation by John Lorimer, Local Government BIM...
BIM for Local Government - Presentation by John Lorimer, Local Government BIM...
 
Edinburgh Revit User Group - BIM Level 2 to LOD Presentation
Edinburgh Revit User Group - BIM Level 2 to LOD PresentationEdinburgh Revit User Group - BIM Level 2 to LOD Presentation
Edinburgh Revit User Group - BIM Level 2 to LOD Presentation
 
BIM protocols: What are they? Do we need them? What should they contain?
BIM protocols: What are they? Do we need them? What should they contain?BIM protocols: What are they? Do we need them? What should they contain?
BIM protocols: What are they? Do we need them? What should they contain?
 
Ramboll - BIM - Now It's Serious
Ramboll - BIM - Now It's SeriousRamboll - BIM - Now It's Serious
Ramboll - BIM - Now It's Serious
 
Viasys VDC City Models
Viasys VDC City Models Viasys VDC City Models
Viasys VDC City Models
 
Corporate member event September 2015, BIM and Soft Landings
Corporate member event September 2015, BIM and Soft LandingsCorporate member event September 2015, BIM and Soft Landings
Corporate member event September 2015, BIM and Soft Landings
 
Analogue to Digital
Analogue to DigitalAnalogue to Digital
Analogue to Digital
 
ETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEightETDP 2015 D2 Next Generation Bim - InEight
ETDP 2015 D2 Next Generation Bim - InEight
 
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire  20th JanContractor Lead BIM: Baxall Construction: CE Lancashire  20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
 
Foundation works norwich - 15th october 2012
Foundation works   norwich - 15th october 2012Foundation works   norwich - 15th october 2012
Foundation works norwich - 15th october 2012
 
Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction Industry
 
BIM Presentation Issue 1 - 9 March 2015
BIM Presentation Issue 1 - 9 March 2015BIM Presentation Issue 1 - 9 March 2015
BIM Presentation Issue 1 - 9 March 2015
 
Software Applications
Software ApplicationsSoftware Applications
Software Applications
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation Slide
 
Alistair Gardner ty BIM Overview 090212
Alistair Gardner ty BIM Overview 090212Alistair Gardner ty BIM Overview 090212
Alistair Gardner ty BIM Overview 090212
 
Salah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bimSalah Yousif, module 1, introduction to bim and the business case of bim
Salah Yousif, module 1, introduction to bim and the business case of bim
 
BIFM North Region Key Learning Event - BIM & Soft Landings
BIFM North Region Key Learning Event - BIM & Soft LandingsBIFM North Region Key Learning Event - BIM & Soft Landings
BIFM North Region Key Learning Event - BIM & Soft Landings
 

Más de Association for Project Management

Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Association for Project Management
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
Association for Project Management
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Association for Project Management
 

Más de Association for Project Management (20)

Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...Projecting for the Future: Harmonising Energy and Environment, APM North West...
Projecting for the Future: Harmonising Energy and Environment, APM North West...
 
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...New to Nuclear - Transition into nuclear from other sectors, APM North West N...
New to Nuclear - Transition into nuclear from other sectors, APM North West N...
 
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...Tell us what to do, not how to do it, APM North West Network Conference, Syne...
Tell us what to do, not how to do it, APM North West Network Conference, Syne...
 
The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...The Future is Fractional, APM North West Network Conference, Synergies Across...
The Future is Fractional, APM North West Network Conference, Synergies Across...
 
Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...Lessons learned across projects, APM North West Network Conference, Synergies...
Lessons learned across projects, APM North West Network Conference, Synergies...
 
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
Agile Adaptability: Navigating Project Management in a Dynamic World, APM Nor...
 
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
Inclusive Practices in Project Management: Leveraging Digital Frameworks for ...
 
Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024Leadership - the project professionals secret weapon, 24 April 2024
Leadership - the project professionals secret weapon, 24 April 2024
 
APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...APM Project Management Awards - Hints and tips for a winning award entry webi...
APM Project Management Awards - Hints and tips for a winning award entry webi...
 
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
The Vyrnwy Aqueduct Modernisation Programme webinar, 17 April 2024
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Staurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptxStaurt Earl - ARCC Programme for APM Awards.pptx
Staurt Earl - ARCC Programme for APM Awards.pptx
 
If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?If AI changes everything – do feelings still matter?
If AI changes everything – do feelings still matter?
 
AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...AI in the project profession: examples of current use and roadmaps to adoptio...
AI in the project profession: examples of current use and roadmaps to adoptio...
 
Katharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainabilityKatharine Fox, WRAP - Valuing sustainability
Katharine Fox, WRAP - Valuing sustainability
 
The silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutionsThe silent project disruptor: Building AI solutions
The silent project disruptor: Building AI solutions
 
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdfPersonal Resilience in Project Management 2 - TV Edit 1a.pdf
Personal Resilience in Project Management 2 - TV Edit 1a.pdf
 

Último

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 

Último (20)

Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 

Building information modelling - redefining the role of the project manager: Adrian Malone

  • 2. Chair’s Welcome BIM: Re-defining the role of the project manager. APM Knowledge SIG • House keeping • Mobile phones – off or silent • Twitter: #APMBIM
  • 3. UK Government Strategy May 2011 Sep 2011 July 2013 BIM is a formal requirement for all centrally procured government construction projects by 2016.
  • 5. Why Change?– Public Sector  Use of co-ordinated project information should be a contractual requirement  Government project sponsors should have sufficient expertise to fulfil their roles effectively  A productivity target of 30% real cost reduction by the year 2000 should be launched  Annual reductions of 10% of cost and construction time... Defects in projects should be reduced by 20% per year  ...Government to commit itself to becoming best practice clients seeking improvement in efficiency and quality  Promising developments... New technology such as 3D object orientated modelling... Latham, 1994 Egan, 1998
  • 6. Latham (1994) “There is an increasing (if sometimes reluctant) acceptance that Project Management, and a separate discipline of Project Managers, are permanent and growing features of the construction scene.”
  • 7. Egan(1998) “at the project manager level, we see a need for training in integrating projects and leading performance improvement, from conception to final delivery.”
  • 9.  ‘Building Information Modelling (BIM) is both a new technology and a new way of working.  ‘BIM involves much more than simply implementing new software. It is a different way of thinking’  ‘BIM combines technology with new working practices to improve the quality of the delivered product and also improve the reliability, timeliness and consistency of the process.’ What is BIM? RICS Definition RICS
  • 10. New Technology  Use of 3D models shared across supply chain team  Design and construction information embedded into objects within the model  Sophisticated analysis possible
  • 11. Structured Information  Information stored within objects in the model can be viewed used for analysis and reporting
  • 12. A New Way of Working
  • 13. A New Way of Working Level 0 • Working with 2D CAD Drawings • Other project information in written documents
  • 14. A New Way of Working Level 1 • May still using CAD, sometimes 3D drawings / simple models • Introducing structured project information • Introducing structured co-ordination processes
  • 15. A New Way of Working Level 2 • Shift to 3D model with integrated attribute information • Separate model files for architecture, structural, M&E etc • Much project information now embedded in the model • Structured processes for co-ordination essential
  • 16. A New Way of Working Level 3 • Single shared model across project team • Single version of the truth • Structured process to manage co-ordination of information • Integration project insurance, fully collaborative
  • 17. MEP Consultant Structural Engineer Architect  Models worked on separately by each member of the project team Level 2 BIM With thanks to Associated Architects
  • 18.  BIM is not limited to new assets  BIM is not limited to the design phase  BIM is not limited to buildings  BIM is not just for big projects Where and When to Use BIM
  • 19. BIM can be applied to projects of any size, across all phases of the lifecycle and to all types of built asset. Where and When to Use BIM
  • 20. BIM BIM for PM’s - Not yet on the radar?
  • 21. BIM BIM for PM’s - Another thing to juggle?
  • 23. Cookham Wood - Ministry of Justice  Key custodial establishment for the South East  A new house block housing 180 young offenders  Associated education building
  • 24. Cookham Wood - Ministry of Justice  Project now complete  Two Stage Open Book with the adoption of BIM, Project Bank Accounts and Government Soft Landings  20% cost reduction achieved benchmarked against similar projects  Library of standard components with associated data produced which will be re-used on future MOJ projects  Lessons and experience were fed into the development of PAS1192-2
  • 25. Case Study Documentation Available from http://www.bimtaskgroup.org
  • 26. Project Process BIM Process How did PM’s role change?
  • 28. Lessons from Cookham Wood  In order to incorporate BIM, the client requirements and processes have to be carefully understood  Alignment between BIM processes and wider project processes is needed. The MOJ undertook a comprehensive review of the internal processes used to operate it’s projects.  The EIR should be explicit about which of the ten ‘Client’s Strategic Purposes’ the COBie* data will be used for.  The brief and the BIM Clients Information Requirements need to be written in plain English with no ambiguity. Selected Lessons: * COBie = Construction Operations Building Information Exchange
  • 30. Key Documents – PAS 1192 Part 2
  • 31. PAS1192-2 Process Cycle CAPEX START New project Survey of Existing Assets (Assessment) Prepare Employer’s Information Requirements (EIR) Summary:- • Describes information exchange and collaborative working requirements • Forms part of employer’s requirements • To be incorporated in supplier Project Execution Plan • Where possible base on CIC Scope of Services Procurement
  • 33. PAS1192-2 Process Cycle EXECUTION Procurement Prepare BIM Execution Plan (BEP) Summary:- • Demonstrates supplier’s approach, capability, capacity and competence to delivery of EIR • Likely to be developed in two phases, pre- and post-contract award • Post-contract is re-submitted to include contributions from whole of supply chain capability and Master Information Delivery Plan (MIDP) Contract Award
  • 34. PAS1192-2 Process Cycle DELIVERY Contract Award Prepare Master Information Delivery Plan (MIDP) Summary:- • Facilitates management of the delivery of the project • Consists of everything requested in the EIR plus information needed for management of the project and project documentation, along with standard method and procedure and specification of IT solutions and data exchange formats. Mobilization
  • 35. PAS1192-2 Process Cycle PRODUCTION Mobilization Project Information Model (PIM) Summary:- • Project delivered through detailed design and construction and on to handover • Common Data Environment continually updated and at defined COBIE data drop stages • At Level 2 BIM the PIM is likely to be a set of federated models along with associated non-graphical data and documentation Opex Start
  • 36. PAS1192-2 Process Cycle OPEX START Production Asset Information Model (AIM) Summary:- • PAS1192-2 recommends COBIE- UK-2012 be used for information exchange to create the AIM • Government Soft Landings (GSL) provides a mechanism to support effective handover of the asset into operational use Assessment
  • 37. The BIM Process – Data Drops Strategic Definition Preparation and Brief Concept Design Developed Design Technical Design Handover and Close Out In Use 1 To proceed 2 To procure 3 To construct 4 To accept handover 5 To monitor performance Project Stage (RIBA 2013) Client Decision Construction
  • 38. Where to learn more www.fgould.com/uk/topics/BIM/www.cic.org.uk/national/BiMhubs.shtmlwww.bimtaskgroup.org/
  • 39. Adrian Malone Head of BIM and Knowledge Management Faithful+Gould 0113 306 6884 adrian.malone@fgould.com @adrianmalone