SlideShare una empresa de Scribd logo
1 de 55
Expertcivil.com
 Precast Concrete is a construction product
produced by casting concrete in a reusable
mold or "form" which is then cured in a
controlled environment, transported to the
construction site and lifted into place. In
contrast, standard concrete is poured into
site-specific forms and cured on site.
 also known as "prefabricated“
 produced in plants in a location away from
the construction site
 These components are manufactured by
industrial methods based on mass
production in order to build a large number
of buildings in a short time at low cost.
Expertcivil.com
 Precast concrete building
components and site amenities
 Earth retaining systems
 Sanitary and Storm water
management products
 Precast concrete transportation
products
 Marine Products
 Pre-stressed / Structural Products
Expertcivil.com
 Concrete is cast off site
 Identical forms can used several times
 Batter quality control
 Control on curing
 Un affected by weather , when casting
 Construction in less time
 Less cost
 Waste materials can be used
( fly ash)
 Fire resistant
 Can avoid air born pollution on site
( dusting )
Expertcivil.com
 Costlier for small projects
 Required skilled workers
 Transportation is costly of large members for
small projects.
 It’s required to be design and detailed for
transportation, erection.
 Required different site for its production
Expertcivil.com
 A whole building can be construct.
 Precast beams, columns, footings,
floors, roofs, walls and stairs
 Erection on site with care
 Depending on the load-bearing
structure, Precast buildings by former
Soviet Union and Eastern European
countries can be divided into the
following categories:
· Large-panel systems
· Frame systems
· Slab-column systems
Expertcivil.com
 "large-panel system“ composed of large
wall and floor concrete panels connected
in the vertical and horizontal.
 Panels form a box-like structure .
 Both vertical and horizontal panels resist
gravity load.
 Wall panels are usually one story high.
Horizontal floor and roof panels span
either as one-way or two-way slabs.
 When properly joined together, these
horizontal elements act as diaphragms
that transfer the lateral loads to the walls.
Expertcivil.com
Expertcivil.com
Expertcivil.com
 Precast frames can be constructed using either linear elements or spatial beam-column
sub-assemblages.
 The connecting faces are at the beam-column junctions.
 The beams can be seated on corbels at the columns, for ease of construction.
 To aid the shear transfer from the beam to the column. The beam-column joints
accomplished in this way are hinged.
 However, rigid beam-column connections are used in some cases, when the continuity
of longitudinal reinforcement through the beam-column joint needs to be ensured.
Expertcivil.com
Expertcivil.com
Expertcivil.com
Expertcivil.com
Expertcivil.com
Expertcivil.com
 These systems rely on shear walls to sustain lateral load effects, whereas the slab-
column structure resists mainly gravity loads.
 Pre-stressed slab-column system were introduced in the last decade of the Soviet
Union (period 1980)
 Reinforced concrete slabs are poured on the ground in forms.
 The slab panels are lifted to the top of the column and then moved downwards to the
final position. Temporary supports are used to keep the slabs in the position until the
connection with the columns has been achieved.
 In the connections, the steel bars (dowels) that project from the edges of the slabs are
welded to the dowels of the adjacent components and transverse reinforcement bars
are installed in place. The connections are then filled with concrete that is poured at
the site.
 Most buildings of this type have some kind of lateral load-resisting elements, mainly
consisting of cast-in-place or precast shear walls
Expertcivil.com
Expertcivil.com
 Good formwork to be used
 Lubricant should be applied to forms
 Quality concrete to be used
 Suitable method of vibration should be used
 Water for Curing should be good
 Steam curing can be use for mass production, if cost is available
Expertcivil.com
 Once a piece has been fabricated, it is
necessary to remove it from the mold without
being damaged.
 Breakaway forms should be used to allow a
member to lift away from the casting bed
without becoming wedged within the form
 Orientation of members during storage,
shipping and final in-place position is critical
 Sand bed will help protect edge
 Tilt tables or turning rigs are used to reduce
stripping stresses
 Warpage in storage may be caused by
 temperature or shrinkage differential
between surfaces
 creep
 The member should be oriented in the yard so
that the sun does not overheat one side
Expertcivil.com
 The loads and forces on precast and
pre-stressed concrete members
during production, transportation or
erection will frequently require a
separate analysis
 Support points and orientation are
usually different from members in
their final position
 it may be necessary to cast in extra
lifting devices to facilitate these
maneuvers.
 The number and location of lifting
devices are chosen to keep stresses
within the allowable limits
 special handling required by the
design should be clearly shown on
drawings
Expertcivil.com
 Lifting points must be located to keep
member stresses within limits and to ensure
proper alignment of the piece as it is being
lifted
 Members with unsymmetrical geometry or
projecting sections may require
supplemental lifting points to achieve even
support during handling
 “Come-alongs” or “chain-falls” are
frequently used for these auxiliary lines
 When the member has areas of small cross
section or large cantilevers, it may be
necessary to add a structural steel “strong
back” to the piece to provide added strength
 temporary loads
Expertcivil.com
 Columns with eccentric loads from other
framing members produce side-sway which
means the columns lean out of plumb
 A similar condition can exist when cladding
panels are erected on one
side of a multistory structure
 Unbalanced loads due to partially complete
erection may result in beam rotation
 The erection drawings should address these
Conditions
 Some solutions are:
Install wood wedges between flange of tee
and top of beam,
Use connection to columns that prevent
rotation,
Erect tees on both sides of beam
Expertcivil.com
 Rotations and deflections of framing
members may be caused by cladding
panels. This may result in alignment
problems and require connections that
allow for alignment adjustment after
all panels are erected
 Careful planning of the erection
sequence is important
Expertcivil.com
The project can be economical, considering the following factors:
 Stability and stresses on the element during handling
 Transportation size and weight regulations and equipment restrictions
 Available crane capacity at both the plant and the project site.
 Position of the crane must be considered, since capacity is a function of reach
 Storage space, truck turning radius, and other site restrictions
Expertcivil.com
Koshland Integrated Natural Science
Center
 Located on the Haverford College campus
 4-story laboratory facility with basement
 Also contains classrooms, offices, &
communal spaces
 Total area 185,423 ft2
 Total project cost of $42.6 Million
 Construction was done in phases
 The work was completed in 6 months
Expertcivil.com
 Superstructure – Precast concrete framing
 Precast beams : 24”x12” spanning 21’
 Precast columns : 16”x16” & 20”x20”
 Foundation – (concrete masonry unit) CMU foundation/retaining walls, precast piers
 Floor System – 10” precast plank with 2” topping
 Façade – Stone & precast panels
 Roof System – Steel framing with metal deck; precast plank
 Typical story height of 13’
Expertcivil.com
Expansion Jts. -
Expertcivil.com
Expertcivil.com
Expertcivil.com
Expertcivil.com
 Bridge can also construct with
precast.
 Parts of a bridge, Substructures and
superstructures
 In India growth of precast in bridge
is slow
 But, Precast is growing continues
very rapidly in other countries, not
only for bridges in the short span
range, but also for spans in excess
of 45 meters.
 Based on type of bridge and site
condition method of construction is
to be adopted.
Expertcivil.com
 Culvert
 T-Beam deck slab bridge
 Arch bridge
 Cantilever bridges
 Continuous bridges
 Suspension bridges
 Cable-stayed bridges
Expertcivil.com
 Prestressed concrete bridges are usually lower in first cost than all other types of
bridges.
 With savings in maintenance, precast bridges offer maximum economy.
 Every operation in the manufacturing process provides a point of inspection and
control over quality
 Faster construction
 Formwork of the superstructure can be eliminate
 Piers, Abutments and wing walls can be made of precast concrete pieces quickly
assembled on the field.
 Precast concrete bridges can be installed during all seasons
 The durability of precast prestressed concrete bridge is good and the resulting low
maintenance requirements.
 No painting is needed.
 Superstructure can be made as shallow as possible in order to provide maximum
clearance with good structural designing
 Greater fire resistance and design aesthetic is another advantage.
Expertcivil.com
 T-Beam deck slab bridge
 Simplest type of Precast bridge, most
of the bridges in India are of this type
 Sub- structure is cast in situ
 In superstructure, Main girders are
precast post tensioned, casted away
from site and are transported to site.
 Secondary girders and Deck slab are
casted on Precast post tensioned
girders on site or precast slab can be
used.
Expertcivil.com
 Post tensioning technique is to be used
in girders
 In post tensioning, the concrete units
are casted bye incorporating duct to
house the tendons, when concrete
attains sufficient strength, high-tension
wires are tensioned bye means of
jacks, after then the duct is grouted.
 Forces are transmitted to the concrete
at the end anchorage
Expertcivil.com
Expertcivil.com
Expertcivil.com
Expertcivil.com
Expertcivil.com
Expertcivil.com
Expertcivil.com
Expertcivil.com
Expertcivil.com
Expertcivil.com
Expertcivil.com
Expertcivil.com
 During designing all the loads are to
considered and losses are also to be
considered as per IS1343 for pre-
stressed concrete.
 Casting and curing is to be done
properly for quality concrete. Suitable
method of post tensioning is to be
adopted.
 Casted elements are to be stoked care
fully, details should be given by
designer
for storing members.
 Transportation is to be done carefully to
avoid damage to the precast elements.
 Erection process is to be well decided
and planed based on type of bridge and
site condition.
Expertcivil.com
Hangzhou Bay Bridge
 Longest trans-oceanic highway bridge in the world, with a cable-stayed portion
across Hangzhou bay in the eastern coastal region of China (6-lanes)
 Total length of bridge is 35.67mt.
 Construction of the bridge was completed on June 14, 2007.
 The bridge shortened the highway travel distance between Ningbo and Shanghai
from 400 km to 280 km and reduced travel time from 4 to 2.5 hours.
 40 piers with large number of girders
 Girder is of 70m length and 16.5m wide in plan
 830 cubic meter of concrete for one girder and took 8 hours to cast one girder
 Barge crane was used for erection of girders for 25 km. and for other portion
special machine was built
Expertcivil.com
Expertcivil.com
Expertcivil.com
Expertcivil.com
Expertcivil.com
Expertcivil.com
 Director - Martin P. Korn, President - Douglas ConeInitially, PCI, 1954
 John Diaz & Ron Tola, Professor Parfitt – Thesis Advisor, Haverford College
 Book, N. Krishna Raju, “Prestressed Concrete”, McGraw-Hill, 2008
 Book, Rangwala, ”Bridge Engineering”, Charotar, 2010
 Internet , “Google”,– Images
 Internet, “Youtude”,- Videos
Expertcivil.com
World’s No.1 Online Civil Engineering Portal
Courses | Articles | Spreadsheet | E-Book| Software | Notes
Expertcivil.com

Más contenido relacionado

Similar a PRE-CAST-CONSTRUCTION-Expertcivil.pptx

High rise building design
High rise building design High rise building design
High rise building design Somesh Siddharth
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systemsAkshay Revekar
 
Finalppthighrise 130504010636-phpapp02
Finalppthighrise 130504010636-phpapp02Finalppthighrise 130504010636-phpapp02
Finalppthighrise 130504010636-phpapp02satwik345
 
High rise structure
High rise structureHigh rise structure
High rise structureAnuj Singhal
 
Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62hlksd
 
Speedy construction presentation
Speedy construction presentationSpeedy construction presentation
Speedy construction presentationsomitra bhardwaj
 
Pre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concretePre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concreteRajat Nainwal
 
Formwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfFormwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfLiesaStone
 
Design of Precast Elements
Design of Precast ElementsDesign of Precast Elements
Design of Precast ElementsRahul Biswas
 
Tilt up concrete structures
Tilt up concrete structuresTilt up concrete structures
Tilt up concrete structuresMECandPMV
 
Precast construction
Precast constructionPrecast construction
Precast constructionDivya Vishnoi
 
Pre fabricatted and pre engineered building
Pre fabricatted and pre engineered buildingPre fabricatted and pre engineered building
Pre fabricatted and pre engineered buildingAnchitSharma17
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSOUMYA KHANDELWAL
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMSagar Shah
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structuresjamali husain
 
documents.pub_pre-fabricated-structures.pdf
documents.pub_pre-fabricated-structures.pdfdocuments.pub_pre-fabricated-structures.pdf
documents.pub_pre-fabricated-structures.pdfBiswaKeshanPanda1
 

Similar a PRE-CAST-CONSTRUCTION-Expertcivil.pptx (20)

High rise building design
High rise building design High rise building design
High rise building design
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Finalppthighrise 130504010636-phpapp02
Finalppthighrise 130504010636-phpapp02Finalppthighrise 130504010636-phpapp02
Finalppthighrise 130504010636-phpapp02
 
high rise building
high rise buildinghigh rise building
high rise building
 
High rise structure
High rise structureHigh rise structure
High rise structure
 
Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62Pre enginnered buildings master-builder_july08, pp.48-62
Pre enginnered buildings master-builder_july08, pp.48-62
 
Speedy construction presentation
Speedy construction presentationSpeedy construction presentation
Speedy construction presentation
 
Master template for MEC 2014 Workshop
Master template for MEC 2014 WorkshopMaster template for MEC 2014 Workshop
Master template for MEC 2014 Workshop
 
Pre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concretePre cast vs cast-in-situ concrete
Pre cast vs cast-in-situ concrete
 
Formwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdfFormwork & Falsework Practice_2009(July)_to AK.pdf
Formwork & Falsework Practice_2009(July)_to AK.pdf
 
Design of Precast Elements
Design of Precast ElementsDesign of Precast Elements
Design of Precast Elements
 
Tilt up concrete structures
Tilt up concrete structuresTilt up concrete structures
Tilt up concrete structures
 
Precast construction
Precast constructionPrecast construction
Precast construction
 
Pre fabricatted and pre engineered building
Pre fabricatted and pre engineered buildingPre fabricatted and pre engineered building
Pre fabricatted and pre engineered building
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALS
 
Tos syllabus
Tos syllabusTos syllabus
Tos syllabus
 
Guida ARBED edifici alti
Guida ARBED edifici altiGuida ARBED edifici alti
Guida ARBED edifici alti
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
Pre fabricated structures
Pre fabricated structuresPre fabricated structures
Pre fabricated structures
 
documents.pub_pre-fabricated-structures.pdf
documents.pub_pre-fabricated-structures.pdfdocuments.pub_pre-fabricated-structures.pdf
documents.pub_pre-fabricated-structures.pdf
 

Más de atiulla001

سالار.pdf
سالار.pdfسالار.pdf
سالار.pdfatiulla001
 
Third Language Hindi.pdf
Third Language Hindi.pdfThird Language Hindi.pdf
Third Language Hindi.pdfatiulla001
 
2nd cycle experiments.docx
2nd cycle experiments.docx2nd cycle experiments.docx
2nd cycle experiments.docxatiulla001
 
RCC_module_3_MJ (1).pdf
RCC_module_3_MJ (1).pdfRCC_module_3_MJ (1).pdf
RCC_module_3_MJ (1).pdfatiulla001
 
SHAHERYAR SEMINAR REPORT 2025.pdf
SHAHERYAR SEMINAR REPORT 2025.pdfSHAHERYAR SEMINAR REPORT 2025.pdf
SHAHERYAR SEMINAR REPORT 2025.pdfatiulla001
 
160665-construction-template-16x9.pptx
160665-construction-template-16x9.pptx160665-construction-template-16x9.pptx
160665-construction-template-16x9.pptxatiulla001
 

Más de atiulla001 (6)

سالار.pdf
سالار.pdfسالار.pdf
سالار.pdf
 
Third Language Hindi.pdf
Third Language Hindi.pdfThird Language Hindi.pdf
Third Language Hindi.pdf
 
2nd cycle experiments.docx
2nd cycle experiments.docx2nd cycle experiments.docx
2nd cycle experiments.docx
 
RCC_module_3_MJ (1).pdf
RCC_module_3_MJ (1).pdfRCC_module_3_MJ (1).pdf
RCC_module_3_MJ (1).pdf
 
SHAHERYAR SEMINAR REPORT 2025.pdf
SHAHERYAR SEMINAR REPORT 2025.pdfSHAHERYAR SEMINAR REPORT 2025.pdf
SHAHERYAR SEMINAR REPORT 2025.pdf
 
160665-construction-template-16x9.pptx
160665-construction-template-16x9.pptx160665-construction-template-16x9.pptx
160665-construction-template-16x9.pptx
 

Último

CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10uasjlagroup
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一diploma 1
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一lvtagr7
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case StudySophia Viganò
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfAayushChavan5
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`dajasot375
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)jennyeacort
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIyuj
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girlsssuser7cb4ff
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造kbdhl05e
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfSumit Lathwal
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryWilliamVickery6
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝soniya singh
 

Último (20)

CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
CREATING A POSITIVE SCHOOL CULTURE CHAPTER 10
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case Study
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdf
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
How to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AIHow to Empower the future of UX Design with Gen AI
How to Empower the future of UX Design with Gen AI
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
 
Call Girls Meghani Nagar 7397865700 Independent Call Girls
Call Girls Meghani Nagar 7397865700  Independent Call GirlsCall Girls Meghani Nagar 7397865700  Independent Call Girls
Call Girls Meghani Nagar 7397865700 Independent Call Girls
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造
 
Architecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdfArchitecture case study India Habitat Centre, Delhi.pdf
Architecture case study India Habitat Centre, Delhi.pdf
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William Vickery
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
 

PRE-CAST-CONSTRUCTION-Expertcivil.pptx

  • 2.  Precast Concrete is a construction product produced by casting concrete in a reusable mold or "form" which is then cured in a controlled environment, transported to the construction site and lifted into place. In contrast, standard concrete is poured into site-specific forms and cured on site.  also known as "prefabricated“  produced in plants in a location away from the construction site  These components are manufactured by industrial methods based on mass production in order to build a large number of buildings in a short time at low cost. Expertcivil.com
  • 3.  Precast concrete building components and site amenities  Earth retaining systems  Sanitary and Storm water management products  Precast concrete transportation products  Marine Products  Pre-stressed / Structural Products Expertcivil.com
  • 4.  Concrete is cast off site  Identical forms can used several times  Batter quality control  Control on curing  Un affected by weather , when casting  Construction in less time  Less cost  Waste materials can be used ( fly ash)  Fire resistant  Can avoid air born pollution on site ( dusting ) Expertcivil.com
  • 5.  Costlier for small projects  Required skilled workers  Transportation is costly of large members for small projects.  It’s required to be design and detailed for transportation, erection.  Required different site for its production Expertcivil.com
  • 6.  A whole building can be construct.  Precast beams, columns, footings, floors, roofs, walls and stairs  Erection on site with care  Depending on the load-bearing structure, Precast buildings by former Soviet Union and Eastern European countries can be divided into the following categories: · Large-panel systems · Frame systems · Slab-column systems Expertcivil.com
  • 7.  "large-panel system“ composed of large wall and floor concrete panels connected in the vertical and horizontal.  Panels form a box-like structure .  Both vertical and horizontal panels resist gravity load.  Wall panels are usually one story high. Horizontal floor and roof panels span either as one-way or two-way slabs.  When properly joined together, these horizontal elements act as diaphragms that transfer the lateral loads to the walls. Expertcivil.com
  • 10.  Precast frames can be constructed using either linear elements or spatial beam-column sub-assemblages.  The connecting faces are at the beam-column junctions.  The beams can be seated on corbels at the columns, for ease of construction.  To aid the shear transfer from the beam to the column. The beam-column joints accomplished in this way are hinged.  However, rigid beam-column connections are used in some cases, when the continuity of longitudinal reinforcement through the beam-column joint needs to be ensured. Expertcivil.com
  • 16.  These systems rely on shear walls to sustain lateral load effects, whereas the slab- column structure resists mainly gravity loads.  Pre-stressed slab-column system were introduced in the last decade of the Soviet Union (period 1980)  Reinforced concrete slabs are poured on the ground in forms.  The slab panels are lifted to the top of the column and then moved downwards to the final position. Temporary supports are used to keep the slabs in the position until the connection with the columns has been achieved.  In the connections, the steel bars (dowels) that project from the edges of the slabs are welded to the dowels of the adjacent components and transverse reinforcement bars are installed in place. The connections are then filled with concrete that is poured at the site.  Most buildings of this type have some kind of lateral load-resisting elements, mainly consisting of cast-in-place or precast shear walls Expertcivil.com
  • 18.  Good formwork to be used  Lubricant should be applied to forms  Quality concrete to be used  Suitable method of vibration should be used  Water for Curing should be good  Steam curing can be use for mass production, if cost is available Expertcivil.com
  • 19.  Once a piece has been fabricated, it is necessary to remove it from the mold without being damaged.  Breakaway forms should be used to allow a member to lift away from the casting bed without becoming wedged within the form  Orientation of members during storage, shipping and final in-place position is critical  Sand bed will help protect edge  Tilt tables or turning rigs are used to reduce stripping stresses  Warpage in storage may be caused by  temperature or shrinkage differential between surfaces  creep  The member should be oriented in the yard so that the sun does not overheat one side Expertcivil.com
  • 20.  The loads and forces on precast and pre-stressed concrete members during production, transportation or erection will frequently require a separate analysis  Support points and orientation are usually different from members in their final position  it may be necessary to cast in extra lifting devices to facilitate these maneuvers.  The number and location of lifting devices are chosen to keep stresses within the allowable limits  special handling required by the design should be clearly shown on drawings Expertcivil.com
  • 21.  Lifting points must be located to keep member stresses within limits and to ensure proper alignment of the piece as it is being lifted  Members with unsymmetrical geometry or projecting sections may require supplemental lifting points to achieve even support during handling  “Come-alongs” or “chain-falls” are frequently used for these auxiliary lines  When the member has areas of small cross section or large cantilevers, it may be necessary to add a structural steel “strong back” to the piece to provide added strength  temporary loads Expertcivil.com
  • 22.  Columns with eccentric loads from other framing members produce side-sway which means the columns lean out of plumb  A similar condition can exist when cladding panels are erected on one side of a multistory structure  Unbalanced loads due to partially complete erection may result in beam rotation  The erection drawings should address these Conditions  Some solutions are: Install wood wedges between flange of tee and top of beam, Use connection to columns that prevent rotation, Erect tees on both sides of beam Expertcivil.com
  • 23.  Rotations and deflections of framing members may be caused by cladding panels. This may result in alignment problems and require connections that allow for alignment adjustment after all panels are erected  Careful planning of the erection sequence is important Expertcivil.com
  • 24. The project can be economical, considering the following factors:  Stability and stresses on the element during handling  Transportation size and weight regulations and equipment restrictions  Available crane capacity at both the plant and the project site.  Position of the crane must be considered, since capacity is a function of reach  Storage space, truck turning radius, and other site restrictions Expertcivil.com
  • 25. Koshland Integrated Natural Science Center  Located on the Haverford College campus  4-story laboratory facility with basement  Also contains classrooms, offices, & communal spaces  Total area 185,423 ft2  Total project cost of $42.6 Million  Construction was done in phases  The work was completed in 6 months Expertcivil.com
  • 26.  Superstructure – Precast concrete framing  Precast beams : 24”x12” spanning 21’  Precast columns : 16”x16” & 20”x20”  Foundation – (concrete masonry unit) CMU foundation/retaining walls, precast piers  Floor System – 10” precast plank with 2” topping  Façade – Stone & precast panels  Roof System – Steel framing with metal deck; precast plank  Typical story height of 13’ Expertcivil.com
  • 31.  Bridge can also construct with precast.  Parts of a bridge, Substructures and superstructures  In India growth of precast in bridge is slow  But, Precast is growing continues very rapidly in other countries, not only for bridges in the short span range, but also for spans in excess of 45 meters.  Based on type of bridge and site condition method of construction is to be adopted. Expertcivil.com
  • 32.  Culvert  T-Beam deck slab bridge  Arch bridge  Cantilever bridges  Continuous bridges  Suspension bridges  Cable-stayed bridges Expertcivil.com
  • 33.  Prestressed concrete bridges are usually lower in first cost than all other types of bridges.  With savings in maintenance, precast bridges offer maximum economy.  Every operation in the manufacturing process provides a point of inspection and control over quality  Faster construction  Formwork of the superstructure can be eliminate  Piers, Abutments and wing walls can be made of precast concrete pieces quickly assembled on the field.  Precast concrete bridges can be installed during all seasons  The durability of precast prestressed concrete bridge is good and the resulting low maintenance requirements.  No painting is needed.  Superstructure can be made as shallow as possible in order to provide maximum clearance with good structural designing  Greater fire resistance and design aesthetic is another advantage. Expertcivil.com
  • 34.  T-Beam deck slab bridge  Simplest type of Precast bridge, most of the bridges in India are of this type  Sub- structure is cast in situ  In superstructure, Main girders are precast post tensioned, casted away from site and are transported to site.  Secondary girders and Deck slab are casted on Precast post tensioned girders on site or precast slab can be used. Expertcivil.com
  • 35.  Post tensioning technique is to be used in girders  In post tensioning, the concrete units are casted bye incorporating duct to house the tendons, when concrete attains sufficient strength, high-tension wires are tensioned bye means of jacks, after then the duct is grouted.  Forces are transmitted to the concrete at the end anchorage Expertcivil.com
  • 47.  During designing all the loads are to considered and losses are also to be considered as per IS1343 for pre- stressed concrete.  Casting and curing is to be done properly for quality concrete. Suitable method of post tensioning is to be adopted.  Casted elements are to be stoked care fully, details should be given by designer for storing members.  Transportation is to be done carefully to avoid damage to the precast elements.  Erection process is to be well decided and planed based on type of bridge and site condition. Expertcivil.com
  • 48. Hangzhou Bay Bridge  Longest trans-oceanic highway bridge in the world, with a cable-stayed portion across Hangzhou bay in the eastern coastal region of China (6-lanes)  Total length of bridge is 35.67mt.  Construction of the bridge was completed on June 14, 2007.  The bridge shortened the highway travel distance between Ningbo and Shanghai from 400 km to 280 km and reduced travel time from 4 to 2.5 hours.  40 piers with large number of girders  Girder is of 70m length and 16.5m wide in plan  830 cubic meter of concrete for one girder and took 8 hours to cast one girder  Barge crane was used for erection of girders for 25 km. and for other portion special machine was built Expertcivil.com
  • 54.  Director - Martin P. Korn, President - Douglas ConeInitially, PCI, 1954  John Diaz & Ron Tola, Professor Parfitt – Thesis Advisor, Haverford College  Book, N. Krishna Raju, “Prestressed Concrete”, McGraw-Hill, 2008  Book, Rangwala, ”Bridge Engineering”, Charotar, 2010  Internet , “Google”,– Images  Internet, “Youtude”,- Videos Expertcivil.com
  • 55. World’s No.1 Online Civil Engineering Portal Courses | Articles | Spreadsheet | E-Book| Software | Notes Expertcivil.com