 we’re renewable energy experts
dedicated to helping you embrace
  solar energy without capital cost or hassle
Large-scale Solar Development Experts                                                        Some of our Clients
With over 40 successful systems in operation financed with solar Power Purchase
Agreements, we’re comfortable with almost every type of commercial PV system                 Caltech
and site.
                                                                                             UC San Diego
One of the Top Three PPA Providers in the United States
                                                                                             BT (British Telecom)
Ranked by an independent third party report as one of the top three solar PPA                Fresno Intl Airport
providers in the country, we’re proud of our quality. We provide transparent system
modeling and price projections based on today’s figures, not forecasts. We’ll never           Arizona State
inflate or overstate equipment performance or site analyses.                                  University
                                                                                             CAL ISO
Backed by Leading Energy Investors                                                           County of Ventura
We’re backed by a global expert in energy finance and leading investor in private
power projects and companies. This partnership ensures our short and long term               Marshall Medical
execution capabilities.
                                                                                             West County
                                                                                             Wastewater District
Experienced Solar Owners and Managers                                                        Point Loma
We’re prepared to take on a variety of sites, technology, and deployment—and
ready for challenges. Our team consists of specialists in engineering, construction,         Nazarene University
tax equity relations, government affairs, financial modeling, and long term opera-
tions.                                                                                       Placer County
                                                                                             Detention Center




                                                                                       Fresno International Airport, 2.4 MW
[what we do]


Project Analysis                                                       Solar Power Purchase
We oversee design and engineering to ensure that
our quality standards are being met during the pre
                                                                       Agreements
                                                                       A solar Power Purchase Agreement (PPA)
construction stage.
                                                                       is a long-term contract to buy solar-
                                                                       generated electricity at a predetermined
                                                                       price. Using our own source of funds, we
Design and Engineering                                                 build a solar energy facility on a custom-
We oversee design and engineering to ensure that
                                                                       er’s site, and own, operate, and maintain
our quality standards are being met during the pre
                                                                       the facility for the life of the agreement.
construction stage.
                                                                       Benefits of a solar PPA include:
Construction Management
We provide construction oversight on all jobs to                         No upfront costs
ensure that construction and material meet our pre-                    We secure the capital to develop the
defined specifications.                                                  solar facility, freeing the host’s capital
                                                                       for use in its core business. There is no
                                                                       capital required by the host customer.
Operations and Management
Our Asset Management Services team continually
monitors and maintains the solar facilities to ensure                    Stable energy rates
that they are optimized for maximum solar produc-                      A solar PPA is a long-term energy con-
tion.                                                                  tract with defined pricing for every kWh
                                                                       you consume. Predictable forward pric-
                                                                       ing can act as a hedge against unknown
                                                                       rising electric utility rates.

                                                                         No operational risk
                                                                       We continually optimize and maintain
                                                                       the solar system for the term of the
                                                                       PPA—host customers pay only for the
                                                                       power generated.


                                                “ Withou
                                                  Without the solar Power Purchase Agreement, our cost to
                                                  deploy would have been more challenging. Our ratepay-
                                                  ers win as we now have contractual stability over
                                                      win,
                                                  much of our energy costs for years to come. The
                                                  workin relationship between our staff and Solar Power
                                                  working
                                                  Partne was extremely well tuned.
                                                  Partners


                                                  EJ Shala
                                                     Shalaby,
                                                                                                   ”
                                                  General Manager
                                                  West County Wastewater District
                                                       Co
who we are
Bob Powell
President and Chief Executive Officer
Bob is an energy industry veteran, having served as CFO at Pacific Gas and Electric Company’s utility,
where he completed long and short-term financings in addition to executing power purchase con-
tracts in the solar, wind, and biomass sectors. Before that, he was a Partner in PricewaterhouseCoo-
pers LLP’s national energy practice, and a partner at Arthur Andersen LLP’s worldwide energy and
communications practice. He holds engineering undergraduate degree and a management graduate
degree, both from the Georgia Institute of Technology.



Phil Henson
Senior Vice President and Chief Financial Officer
Phil has over 20 years of experience in energy and natural resources finance. He previously was the
co-head of the Power and Utilities Group of XL Capital Assurance, Inc. (XLCA) He’s held management
roles with ING, UBS, and holds graduate degrees from Georgetown University and Chicago Graduate
School of Business.




Hugh Kuhn
Senior Vice President and Chief Operating Officer
Hugh is an early-industry leader with more than 25 years of business and engineering experience. He
held positions with Hewlett-Packard and Pacific Gas & Electric Company, where he developed energy
conservation, load shifting, and cogeneration strategies for commercial and industrial customers.
Hugh holds a BS in Environmental Earth Sciences from Stanford University and an MS in Mechanical
Engineering from Colorado State University.




Todd Michaels
Senior Vice President, Project Development and Marketing
Todd is responsible for SPP’s track history of completed projects. He spent several years with AT&T
Communications, SBC Communications, and BBN Planet/GTE Network Services, bridging the gap
between the lab, market, and end user. He is active in The Solar Alliance, CALSEIA, BOMA
International, US Green Building Council, and the Construction Specification Institute (CSI). Todd
holds a BS in Computer Information Systems from Indiana University (cum laude).




Shakil Rahman
Senior Vice President and General Counsel
Shakil has over twenty years as both in-house and external counsel, specializing in project finance
and energy. He was a Principal and General Counsel of Sapphire Power Partners, where he pro-
vided project development, regulatory, and legal consulting services to owners as well as devel-
oping photovoltaic utility scale projects, and VP and General Counsel for Delta Power Company.
He practiced as an attorney at Skadden, Arps, Slate, Meagher & Flom, LLP, and expatriate legal
counsel for Karnaphuli Fertilizer Company Ltd. He holds an AB in English from Cornell University,
and a JD from State University of New York at Buffalo, School of Law.
[what we’ve done]

45 total projects in operation

The combined estimated annual production from all systems is
                                                                               “    Solar Power Partners made
                                                                                    the process of incorporat-
equivalent to removing the following emissions:
                                                                                    ing solar energy at Marshall
                                                                                    Medical easy. We hope that
                             16,985 metric tons of carbon dioxide                   our project encourages other
                                                                                    healthcare facilities to en-
                                                                                    gage in obtaining renewable
                                                                                    energy. It’s a win for every-
                             2,207 homes' electricity use per year                  one: our organization, our
                                                                                    patients, and the community.


                             1,910,574 gallons of gas
                                                                                    James Whipple
                                                                                    CEO, Marshall Medical Center    ”
Calculations are according to the US Environmental Protection Agency
(www.epa.gov)




Schools and Universities                                               Water Districts
      UC San Diego 1.2 MW
                                                                         West County Wastewater District 1.014 MW
      Caltech 238.68 kW
                                                                         Valley Center Water District 1.1 MW
      Point Loma Nazarene University 488 kW
      Lagunitas School District 57 kW                                    Redwood Valley Water District 99.2 kW
      York School 37 kW
                                                                         Water district in Concord, CA 566 kW
      Westover School 158.6 kW                                           (under construction)
      Grant Elementary 202.50 KW
                                                                         Sanitation agency in Alameda, CA 468 kW
      Arizona State University 6.3 MW (under construction)               (under construction)
Corporations                                               Hospitals and Healthcare
 West (British Telecom) 601 kW 1.014 MW
  BT County Wastewater District
                                                             Marshall Medical 668.80 kW
 Valley Center Water District 1.1 MW
   Major national grocery chain 18 sites, 3.8 MW total
                                                             St. Mary Medical Center 230 kW
 RedwoodPharmaceuticals 967.68 kW
   Roche Valley Water District 99.2 kW
                                                             Molokai General Hospital 105.84 kW
 Water district in Concord, CA 566 kW
   International electronics manufacturer, 498 kW (under
 (under construction)
   construction)

 Sanitation agency inmanufacturer,468 kW (under con-
   International food Alameda, CA 3.2 MW
 (under construction)
   struction)




Airports and Municipalities                                Agriculture
   Fresno Yosemite International Airport 2.4 MW total        Abbey Ranch 59.40 MW

   County of Ventura 492 kW                                  Borges of California 269.78 kW

   Maui Economic Development Board 65 kW

   Placer County Detention Center 400 kW
Why SPP?
SPP offers a different approach to
providing solar energy by cultivating
long-term partnerships.

We’re a solid company with strong
corporate and project investors who
ensure our short term execution capability
and long term viability. No other company
of our size offers our comprehensive ser-
vices, including site assessment, financial
modeling, oversight of design, engineer-
ing, and construction, project financing,
and long-term asset management.


Contact us for a
free assessment
to find out if a solar PPA is right
for you.




            Solar Power Partners
      100 Shoreline Highway Suite 210B
            Mill Valley, CA 94941
                415.389.8981
        info@solarpowerpartners.com
      www.solarpowerpartners.com

Más contenido relacionado

Similar a Solar Power Partners

Solar Energy Choices Magazine3
Solar Energy Choices Magazine3Solar Energy Choices Magazine3
Solar Energy Choices Magazine3comF5
 
Blue Oak Energy - Engineering Services for the Solar Industry
Blue Oak Energy - Engineering Services for the Solar IndustryBlue Oak Energy - Engineering Services for the Solar Industry
Blue Oak Energy - Engineering Services for the Solar IndustryTobin Booth
 
Solarking free commercial solar pv
Solarking free commercial solar pvSolarking free commercial solar pv
Solarking free commercial solar pvDavid Cummings
 
Commercial ppa brochure
Commercial ppa brochureCommercial ppa brochure
Commercial ppa brochureAman Chowdhry
 
RNRE INTRDUCTION AND BUSINESS 16
RNRE INTRDUCTION AND BUSINESS 16RNRE INTRDUCTION AND BUSINESS 16
RNRE INTRDUCTION AND BUSINESS 16Nivrutti Barhate
 
HARTEK POWER - SOLAR PROFILE
HARTEK POWER - SOLAR PROFILE HARTEK POWER - SOLAR PROFILE
HARTEK POWER - SOLAR PROFILE HARTEK POWER
 
BOE 2015 Brochure_email
BOE 2015 Brochure_emailBOE 2015 Brochure_email
BOE 2015 Brochure_emailTobin Booth
 
Blue Oak Energy - Commercial and Utility Solar Construction
Blue Oak Energy - Commercial and Utility Solar ConstructionBlue Oak Energy - Commercial and Utility Solar Construction
Blue Oak Energy - Commercial and Utility Solar ConstructionTobin Booth
 
Barrier Electric Commercial Solar
Barrier Electric Commercial SolarBarrier Electric Commercial Solar
Barrier Electric Commercial SolarSolarAndy67
 
Ozone - Solar Business
Ozone - Solar BusinessOzone - Solar Business
Ozone - Solar BusinessSetu Goyal
 
SunAlpha Zero-Down Solar PPA
SunAlpha Zero-Down Solar PPASunAlpha Zero-Down Solar PPA
SunAlpha Zero-Down Solar PPAsunalphaenergy
 
SunAlphaEnergy_Solar Leasing_6.2015_SLIDESHARE
SunAlphaEnergy_Solar Leasing_6.2015_SLIDESHARESunAlphaEnergy_Solar Leasing_6.2015_SLIDESHARE
SunAlphaEnergy_Solar Leasing_6.2015_SLIDESHAREraghavmittal
 
Emcs overview v0.4
Emcs overview v0.4Emcs overview v0.4
Emcs overview v0.4sanjaya1984
 
Leading Solar Power Plant Installation Services | V3NM
Leading Solar Power Plant Installation Services | V3NMLeading Solar Power Plant Installation Services | V3NM
Leading Solar Power Plant Installation Services | V3NMGOOGLE
 
Staten solarprofile project development for spv power plants
Staten solarprofile project development for spv power plantsStaten solarprofile project development for spv power plants
Staten solarprofile project development for spv power plantsRakesh Singh
 

Similar a Solar Power Partners (20)

Solar Energy Choices Magazine3
Solar Energy Choices Magazine3Solar Energy Choices Magazine3
Solar Energy Choices Magazine3
 
boe_soq_2015
boe_soq_2015boe_soq_2015
boe_soq_2015
 
Blue Oak Energy - Engineering Services for the Solar Industry
Blue Oak Energy - Engineering Services for the Solar IndustryBlue Oak Energy - Engineering Services for the Solar Industry
Blue Oak Energy - Engineering Services for the Solar Industry
 
WATTSCORE ENERGY
WATTSCORE ENERGYWATTSCORE ENERGY
WATTSCORE ENERGY
 
Solarking free commercial solar pv
Solarking free commercial solar pvSolarking free commercial solar pv
Solarking free commercial solar pv
 
Bankability of Solar Projects
Bankability of Solar ProjectsBankability of Solar Projects
Bankability of Solar Projects
 
Bankability Solar 6 Stages Wp Abb
Bankability Solar 6 Stages Wp AbbBankability Solar 6 Stages Wp Abb
Bankability Solar 6 Stages Wp Abb
 
Commercial ppa brochure
Commercial ppa brochureCommercial ppa brochure
Commercial ppa brochure
 
RNRE INTRDUCTION AND BUSINESS 16
RNRE INTRDUCTION AND BUSINESS 16RNRE INTRDUCTION AND BUSINESS 16
RNRE INTRDUCTION AND BUSINESS 16
 
HARTEK POWER - SOLAR PROFILE
HARTEK POWER - SOLAR PROFILE HARTEK POWER - SOLAR PROFILE
HARTEK POWER - SOLAR PROFILE
 
BOE 2015 Brochure_email
BOE 2015 Brochure_emailBOE 2015 Brochure_email
BOE 2015 Brochure_email
 
Blue Oak Energy - Commercial and Utility Solar Construction
Blue Oak Energy - Commercial and Utility Solar ConstructionBlue Oak Energy - Commercial and Utility Solar Construction
Blue Oak Energy - Commercial and Utility Solar Construction
 
Barrier Electric Commercial Solar
Barrier Electric Commercial SolarBarrier Electric Commercial Solar
Barrier Electric Commercial Solar
 
Ozone - Solar Business
Ozone - Solar BusinessOzone - Solar Business
Ozone - Solar Business
 
SunAlpha Zero-Down Solar PPA
SunAlpha Zero-Down Solar PPASunAlpha Zero-Down Solar PPA
SunAlpha Zero-Down Solar PPA
 
SunAlphaEnergy_Solar Leasing_6.2015_SLIDESHARE
SunAlphaEnergy_Solar Leasing_6.2015_SLIDESHARESunAlphaEnergy_Solar Leasing_6.2015_SLIDESHARE
SunAlphaEnergy_Solar Leasing_6.2015_SLIDESHARE
 
Emcs overview v0.4
Emcs overview v0.4Emcs overview v0.4
Emcs overview v0.4
 
Leading Solar Power Plant Installation Services | V3NM
Leading Solar Power Plant Installation Services | V3NMLeading Solar Power Plant Installation Services | V3NM
Leading Solar Power Plant Installation Services | V3NM
 
Staten solarprofile project development for spv power plants
Staten solarprofile project development for spv power plantsStaten solarprofile project development for spv power plants
Staten solarprofile project development for spv power plants
 
L Narayan's Resume
L Narayan's ResumeL Narayan's Resume
L Narayan's Resume
 

Más de Alexander von Welczeck

Más de Alexander von Welczeck (7)

SkyH2O AWS MAXIMUS Specifications 4.10
SkyH2O AWS MAXIMUS Specifications 4.10SkyH2O AWS MAXIMUS Specifications 4.10
SkyH2O AWS MAXIMUS Specifications 4.10
 
SkyH2O STATION Project Overview
SkyH2O STATION Project OverviewSkyH2O STATION Project Overview
SkyH2O STATION Project Overview
 
SkyH2O Corporate Presentation
SkyH2O Corporate PresentationSkyH2O Corporate Presentation
SkyH2O Corporate Presentation
 
SkyH2O Business Brief
SkyH2O Business BriefSkyH2O Business Brief
SkyH2O Business Brief
 
SPP How Solar Works
SPP How Solar WorksSPP How Solar Works
SPP How Solar Works
 
Rahus Solar PPA Customers Guide V20081005 Lr
Rahus Solar PPA Customers Guide V20081005 LrRahus Solar PPA Customers Guide V20081005 Lr
Rahus Solar PPA Customers Guide V20081005 Lr
 
Solar PPA Questions To Ask
Solar PPA Questions To AskSolar PPA Questions To Ask
Solar PPA Questions To Ask
 

Solar Power Partners

  • 2. [introduction] we’re renewable energy experts dedicated to helping you embrace solar energy without capital cost or hassle Large-scale Solar Development Experts Some of our Clients With over 40 successful systems in operation financed with solar Power Purchase Agreements, we’re comfortable with almost every type of commercial PV system Caltech and site. UC San Diego One of the Top Three PPA Providers in the United States BT (British Telecom) Ranked by an independent third party report as one of the top three solar PPA Fresno Intl Airport providers in the country, we’re proud of our quality. We provide transparent system modeling and price projections based on today’s figures, not forecasts. We’ll never Arizona State inflate or overstate equipment performance or site analyses. University CAL ISO Backed by Leading Energy Investors County of Ventura We’re backed by a global expert in energy finance and leading investor in private power projects and companies. This partnership ensures our short and long term Marshall Medical execution capabilities. West County Wastewater District Experienced Solar Owners and Managers Point Loma We’re prepared to take on a variety of sites, technology, and deployment—and ready for challenges. Our team consists of specialists in engineering, construction, Nazarene University tax equity relations, government affairs, financial modeling, and long term opera- tions. Placer County Detention Center Fresno International Airport, 2.4 MW
  • 3. [what we do] Project Analysis Solar Power Purchase We oversee design and engineering to ensure that our quality standards are being met during the pre Agreements A solar Power Purchase Agreement (PPA) construction stage. is a long-term contract to buy solar- generated electricity at a predetermined price. Using our own source of funds, we Design and Engineering build a solar energy facility on a custom- We oversee design and engineering to ensure that er’s site, and own, operate, and maintain our quality standards are being met during the pre the facility for the life of the agreement. construction stage. Benefits of a solar PPA include: Construction Management We provide construction oversight on all jobs to No upfront costs ensure that construction and material meet our pre- We secure the capital to develop the defined specifications. solar facility, freeing the host’s capital for use in its core business. There is no capital required by the host customer. Operations and Management Our Asset Management Services team continually monitors and maintains the solar facilities to ensure Stable energy rates that they are optimized for maximum solar produc- A solar PPA is a long-term energy con- tion. tract with defined pricing for every kWh you consume. Predictable forward pric- ing can act as a hedge against unknown rising electric utility rates. No operational risk We continually optimize and maintain the solar system for the term of the PPA—host customers pay only for the power generated. “ Withou Without the solar Power Purchase Agreement, our cost to deploy would have been more challenging. Our ratepay- ers win as we now have contractual stability over win, much of our energy costs for years to come. The workin relationship between our staff and Solar Power working Partne was extremely well tuned. Partners EJ Shala Shalaby, ” General Manager West County Wastewater District Co
  • 4. who we are Bob Powell President and Chief Executive Officer Bob is an energy industry veteran, having served as CFO at Pacific Gas and Electric Company’s utility, where he completed long and short-term financings in addition to executing power purchase con- tracts in the solar, wind, and biomass sectors. Before that, he was a Partner in PricewaterhouseCoo- pers LLP’s national energy practice, and a partner at Arthur Andersen LLP’s worldwide energy and communications practice. He holds engineering undergraduate degree and a management graduate degree, both from the Georgia Institute of Technology. Phil Henson Senior Vice President and Chief Financial Officer Phil has over 20 years of experience in energy and natural resources finance. He previously was the co-head of the Power and Utilities Group of XL Capital Assurance, Inc. (XLCA) He’s held management roles with ING, UBS, and holds graduate degrees from Georgetown University and Chicago Graduate School of Business. Hugh Kuhn Senior Vice President and Chief Operating Officer Hugh is an early-industry leader with more than 25 years of business and engineering experience. He held positions with Hewlett-Packard and Pacific Gas & Electric Company, where he developed energy conservation, load shifting, and cogeneration strategies for commercial and industrial customers. Hugh holds a BS in Environmental Earth Sciences from Stanford University and an MS in Mechanical Engineering from Colorado State University. Todd Michaels Senior Vice President, Project Development and Marketing Todd is responsible for SPP’s track history of completed projects. He spent several years with AT&T Communications, SBC Communications, and BBN Planet/GTE Network Services, bridging the gap between the lab, market, and end user. He is active in The Solar Alliance, CALSEIA, BOMA International, US Green Building Council, and the Construction Specification Institute (CSI). Todd holds a BS in Computer Information Systems from Indiana University (cum laude). Shakil Rahman Senior Vice President and General Counsel Shakil has over twenty years as both in-house and external counsel, specializing in project finance and energy. He was a Principal and General Counsel of Sapphire Power Partners, where he pro- vided project development, regulatory, and legal consulting services to owners as well as devel- oping photovoltaic utility scale projects, and VP and General Counsel for Delta Power Company. He practiced as an attorney at Skadden, Arps, Slate, Meagher & Flom, LLP, and expatriate legal counsel for Karnaphuli Fertilizer Company Ltd. He holds an AB in English from Cornell University, and a JD from State University of New York at Buffalo, School of Law.
  • 5. [what we’ve done] 45 total projects in operation The combined estimated annual production from all systems is “ Solar Power Partners made the process of incorporat- equivalent to removing the following emissions: ing solar energy at Marshall Medical easy. We hope that 16,985 metric tons of carbon dioxide our project encourages other healthcare facilities to en- gage in obtaining renewable energy. It’s a win for every- 2,207 homes' electricity use per year one: our organization, our patients, and the community. 1,910,574 gallons of gas James Whipple CEO, Marshall Medical Center ” Calculations are according to the US Environmental Protection Agency (www.epa.gov) Schools and Universities Water Districts UC San Diego 1.2 MW West County Wastewater District 1.014 MW Caltech 238.68 kW Valley Center Water District 1.1 MW Point Loma Nazarene University 488 kW Lagunitas School District 57 kW Redwood Valley Water District 99.2 kW York School 37 kW Water district in Concord, CA 566 kW Westover School 158.6 kW (under construction) Grant Elementary 202.50 KW Sanitation agency in Alameda, CA 468 kW Arizona State University 6.3 MW (under construction) (under construction)
  • 6. Corporations Hospitals and Healthcare West (British Telecom) 601 kW 1.014 MW BT County Wastewater District Marshall Medical 668.80 kW Valley Center Water District 1.1 MW Major national grocery chain 18 sites, 3.8 MW total St. Mary Medical Center 230 kW RedwoodPharmaceuticals 967.68 kW Roche Valley Water District 99.2 kW Molokai General Hospital 105.84 kW Water district in Concord, CA 566 kW International electronics manufacturer, 498 kW (under (under construction) construction) Sanitation agency inmanufacturer,468 kW (under con- International food Alameda, CA 3.2 MW (under construction) struction) Airports and Municipalities Agriculture Fresno Yosemite International Airport 2.4 MW total Abbey Ranch 59.40 MW County of Ventura 492 kW Borges of California 269.78 kW Maui Economic Development Board 65 kW Placer County Detention Center 400 kW
  • 7. Why SPP? SPP offers a different approach to providing solar energy by cultivating long-term partnerships. We’re a solid company with strong corporate and project investors who ensure our short term execution capability and long term viability. No other company of our size offers our comprehensive ser- vices, including site assessment, financial modeling, oversight of design, engineer- ing, and construction, project financing, and long-term asset management. Contact us for a free assessment to find out if a solar PPA is right for you. Solar Power Partners 100 Shoreline Highway Suite 210B Mill Valley, CA 94941 415.389.8981 info@solarpowerpartners.com www.solarpowerpartners.com