Construction management
Project
Stakeholders
PM
Project Life
Cycle
Phases of
CP
Phases of
CM
Resources
participate
Construction during British Period
S. No. Important milestones Remarks
1 Construction of light railway line in 1845
2 The first railway bridge over Thane Creek in 1854
3 Construction of the first narrow gauge line in 1862
4 Construction of the Ganges Canal consisting of main
canals and distribution channels
between 1842 and
1854
5 Construction of a major bridge in Dehri-on-Sone in 1900
6 Construction of Juhu Aerodrome in
Mumbai
in 1928
Post Independence notable
construction projects
S. No. Important milestones Remarks
01 Construction
of first nuclear reactor
in 1956
02 Construction of Hirakud Dam in 1957
03 Construction of Bhakra-Nangal Dam in 1970
04 Construction of Iukki Dam in 1976
05 Construction of Mumbai-Pune Expressway in 2000
06 Construction of Tehri Dam in 2005
07 Construction of Bandra-Worli Sea Link Bridge in 2009
What Is a Project?
A project is “a temporary endeavor undertaken to accomplish a unique
product or service” (PMBOK® Guide 2000, p. 4)
OR
A project is an assignment/task/job that has to be undertaken and
completed within a set time, budget, resources and performance
specifications designed to meet the needs of stakeholders.
Characteristics of projects
 unique purpose
 temporary
 require resources, often from various areas
 should have a primary sponsor and/or customer
 involve uncertainty
For example
 The XYZ Agency has donated 7.5 crore to provide 3 BHK homes to 50 families living
in the VARACHHA informal settlement. On 6 February 2004, the agency signed a
contract with the ABC DEVLOPERS to implement the project. The following
requirements, set in the contract:
 The 3 bedroomed houses must meet specifications in line with government policy.
 50 families must be given skills development training in small business development
and small business start-up. This is to ensure that the families will be able to afford
rentals, maintenance of the homes and to expand their homes to accommodate the
growth of the families in the future.
 The project must be completed within three years and the handover of the homes to
the 50 families must be a high profile public event.
From the example we see:
 a clear task - build 3 BHK homes for 50 families;
 a set time – within 3 years;
 a budget – 7.5 crore;
 performance specifications – houses meet specifications in line with
government policy.
 beneficiaries – 50 families;
 stakeholders – donor agency, Department of Housing.
Project stakeholders
Project stakeholders are individuals and organizations who are actively
involved in the project, or whose interests may be positively or negatively
affected by the project.
Key stakeholders in the example above include:
 Project Manager - the individual responsible for managing the project;
 Project beneficiaries – 50 families who are going to receive the houses;
 Performing organization – the ABC DEVLOPERS whose employees are
most directly involved in doing the work of the project.
 Sponsor – XYZ Agency.
In addition to these different typical stakeholders:
 Suppliers and contractors
 Project team members and their families
 Government agencies
 Community representatives and organizations.
Typical Stakeholders
 Sponsor
 Funding Body
 Customer
 Suppliers
 End User
 Environmental Agency
 Maintenance Team
 Neighbours/Community/Shareholders
What is Project Management?
Project management is “the application of knowledge, skills, tools, and
techniques of project activities in order to meet project requirements”
(PMI*, Project Management Body of Knowledge (PMBOK® Guide), 2000, p. 6)
OR
Project Management is the use of knowledge, skills, tools, and techniques to
plan and implement activities to meet or exceed stakeholder needs and
expectations from a project.
*The Project Management Institute (PMI) is an international professional society. Their web
site is www.pmi.org.
The starting point begins the moment the project is given the go- ahead (when a
contract agreement is signed). Project effort starts slowly, builds to a peak, and then
declines to delivery of the project to the customer.
specifications of the project are defined, project objectives are established,
project teams are formed and major responsibilities are assigned.
plans are developed to determine the project steps, beneficiaries,
timeframes, quality standards and budget.
delivering the project
product to the customer
the major portion of the project work takes place
PHASES OF A CONSTRUCTION PROJECT
Initiating Phase
 Select Project
 Collect Historical Information
 Determine Project Objectives
 Determine High-Level Deliverables, Estimates
 Determine High-Level Assumptions
 Determine Business Need
 Develop Product Description
 Define Responsibilities of the Project Manager
 Determine High-Level Resources Requirements
 Finalize the Project Charter
Planning Phase
 Determine Project Team
 Create WBS (Work Breakdown Structure)
 Finalize the Team
 Create WBS dictionary
 Create Network Diagram
 Estimate Time & Cost
 Determine Critical Path
 Create Risk Management Plan
 Develop Schedule
 Develop Budget
 Determine Communication Requirements
 Determine Quality Standards
 Risk Identification, Qualification, Quantification and Resource Planning
 Create Other Management Plans – Scope, Schedule, Cost, Quality,
Staffing, Communications, Procurement
Executing Phase
 Execute the Project Plan
 Manage Project Progress
 Complete Work Packages
 Distribute Information
 Quality Assurance
 Team Development
 Identify Changes
 Use Work Authorization System
Controlling Phase
 Integrated Change Control
 Project Performance Measuring
 Performance Reporting
 Scope Change Control
 Quality Control
 Risk monitoring and Control
 Schedule Control
 Cost Control
 Project Plan Updates
Closing Phase
 Procurement Audits
 Product Verification
 Financial Closure
 Lessons Learned
 Update Records
 End of Project Performance Reporting
 Formal Acceptance
 Project Archives
 Release Resources
Phasesofconstructionmanagement
Planning
scheduling
Controlling & monitoring
communicating
organizing
Directing
coordinating
Phases of construction management
 Inadequate planning leads to frustration towards the
end of the project & poor project performance
Project Start Project End
Machines
The Project Management Profession
• The job of IT Project Manager is in the list of the top
ten most in demand IT skills
• Professional societies like the Project Management
Institute (PMI) have grown tremendously
• Project management research and certification
programs continue to grow.
Project Management Certification
• PMI provides certification as a Project
Management Professional (PMP)
• A PMP has documented sufficient project
experience, agreed to follow a code of ethics, and
passed the PMP exam
• The number of people earning PMP certification is
increasing quickly
• PMI and other organizations are offering new
certification programs.
Growth in PMP Certification 1993-2015
Sources: PMI’s PMP Salary Survey Report 9th edition
Project Management Statistics
 The world as a whole spends nearly $10 trillion on projects of
all kinds.
 More than sixteen million people regard project management
as their profession; on average, a project manager earns more
than $82,000 per year.*
 The Project Management Institute estimates demand for 15.7
million project management jobs from 2010 to 2020, with
6.2 million of those jobs in the United States.
*PMI, The PMI Project Management Fact Book, Second Edition, 2001
PMI (Project Management Institute )
Copyright 2016
Every project has constraints or limitations.
The three main constraints are:
• Scope – work that will be done /
expected results of project
• Cost – cost to complete project /
budget
• Time – amount of time to complete
the project / schedule
Successful project balances constraints to
satisfy project sponsor (customer)!
MODULE 1 Introduction to Construction Management

Más contenido relacionado

La actualidad más candente

05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Control05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Controlakashpadole
 
CONSTRUCTION PLANNING & MANAGEMENT (CPM) PPT
CONSTRUCTION PLANNING & MANAGEMENT (CPM) PPTCONSTRUCTION PLANNING & MANAGEMENT (CPM) PPT
CONSTRUCTION PLANNING & MANAGEMENT (CPM) PPTAbhishekKadve
 
Rate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation EngineeringRate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation EngineeringShanmugasundaram N
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
CONSTRUCTION METHODS BASICS BTCE-503-18
CONSTRUCTION METHODS BASICSBTCE-503-18CONSTRUCTION METHODS BASICSBTCE-503-18
CONSTRUCTION METHODS BASICS BTCE-503-18SANJEEV Wazir
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction managementXubitech
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture) Muhammad Aljalali
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & managementManit Agarwal
 
02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projectsakashpadole
 
Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...A Makwana
 
UNIT-1 PSC.pptx
UNIT-1 PSC.pptxUNIT-1 PSC.pptx
UNIT-1 PSC.pptxjairam131
 
Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management A Makwana
 
Mechanization in construction_Advanced Construction Technology (Semester-6), ...
Mechanization in construction_Advanced Construction Technology (Semester-6), ...Mechanization in construction_Advanced Construction Technology (Semester-6), ...
Mechanization in construction_Advanced Construction Technology (Semester-6), ...A Makwana
 
total quality management in construction industry
total quality management in construction industrytotal quality management in construction industry
total quality management in construction industryMohammed Faazil
 

La actualidad más candente (20)

05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Control05 Project Monitoring & Cost Control
05 Project Monitoring & Cost Control
 
CONSTRUCTION PLANNING & MANAGEMENT (CPM) PPT
CONSTRUCTION PLANNING & MANAGEMENT (CPM) PPTCONSTRUCTION PLANNING & MANAGEMENT (CPM) PPT
CONSTRUCTION PLANNING & MANAGEMENT (CPM) PPT
 
Rate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation EngineeringRate analysis and costing - Estimation, Costing and Valuation Engineering
Rate analysis and costing - Estimation, Costing and Valuation Engineering
 
Construction process
Construction processConstruction process
Construction process
 
7 losses in prestress
7 losses in prestress7 losses in prestress
7 losses in prestress
 
CONSTRUCTION METHODS BASICS BTCE-503-18
CONSTRUCTION METHODS BASICSBTCE-503-18CONSTRUCTION METHODS BASICSBTCE-503-18
CONSTRUCTION METHODS BASICS BTCE-503-18
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture)
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
 
02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projects
 
Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...Construction material management_Construction Management (2180611) (Semester-...
Construction material management_Construction Management (2180611) (Semester-...
 
UNIT-1 PSC.pptx
UNIT-1 PSC.pptxUNIT-1 PSC.pptx
UNIT-1 PSC.pptx
 
1.1 box jacking
1.1 box jacking1.1 box jacking
1.1 box jacking
 
Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management Resources allocation and resources scheduling_Construction Management
Resources allocation and resources scheduling_Construction Management
 
Mechanization in construction_Advanced Construction Technology (Semester-6), ...
Mechanization in construction_Advanced Construction Technology (Semester-6), ...Mechanization in construction_Advanced Construction Technology (Semester-6), ...
Mechanization in construction_Advanced Construction Technology (Semester-6), ...
 
Repair and Rehabilitation
Repair and RehabilitationRepair and Rehabilitation
Repair and Rehabilitation
 
Construction of diaphragm wall
Construction of diaphragm wallConstruction of diaphragm wall
Construction of diaphragm wall
 
Valuation part of Building
Valuation part of Building Valuation part of Building
Valuation part of Building
 
total quality management in construction industry
total quality management in construction industrytotal quality management in construction industry
total quality management in construction industry
 

Similar a MODULE 1 Introduction to Construction Management

Project Management- introduction
Project Management- introductionProject Management- introduction
Project Management- introductionAditi Garg
 
UNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project managementUNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project managementsdbhosale860
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1Imoh Etuk
 
Chapter 1- Overview of Project Management.pdf
Chapter 1- Overview of Project Management.pdfChapter 1- Overview of Project Management.pdf
Chapter 1- Overview of Project Management.pdfLuvamBiz
 
Project initiation topic 2.2_project charters
Project initiation topic 2.2_project chartersProject initiation topic 2.2_project charters
Project initiation topic 2.2_project chartersRudreshSamant
 
Component 4 project iniation process.pdf
Component 4 project iniation process.pdfComponent 4 project iniation process.pdf
Component 4 project iniation process.pdfAnatole9
 
Project management final report
Project management final reportProject management final report
Project management final reportSANKET SENAPATI
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project ProposalJo Balucanag - Bitonio
 
Assignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docxAssignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docxsherni1
 
Project Life Cycle final.pptx
Project Life Cycle final.pptxProject Life Cycle final.pptx
Project Life Cycle final.pptxPranshiGoyal2
 
Project management final report.By- SANKET SENAPATI
Project management final report.By- SANKET SENAPATI Project management final report.By- SANKET SENAPATI
Project management final report.By- SANKET SENAPATI SANKET SENAPATI
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project ManagementMahesh Bendigeri
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&tNishant Pandey
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptxAtulBhagwat6
 

Similar a MODULE 1 Introduction to Construction Management (20)

Project mangment
Project mangmentProject mangment
Project mangment
 
Practical project management based on PMBOK5
Practical project management based on PMBOK5Practical project management based on PMBOK5
Practical project management based on PMBOK5
 
Project Management- introduction
Project Management- introductionProject Management- introduction
Project Management- introduction
 
UNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project managementUNIT-01_Fundamentals_ Project management
UNIT-01_Fundamentals_ Project management
 
BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1BPP Training on Project Management - Day 1
BPP Training on Project Management - Day 1
 
Chapter 1- Overview of Project Management.pdf
Chapter 1- Overview of Project Management.pdfChapter 1- Overview of Project Management.pdf
Chapter 1- Overview of Project Management.pdf
 
Project initiation topic 2.2_project charters
Project initiation topic 2.2_project chartersProject initiation topic 2.2_project charters
Project initiation topic 2.2_project charters
 
Component 4 project iniation process.pdf
Component 4 project iniation process.pdfComponent 4 project iniation process.pdf
Component 4 project iniation process.pdf
 
Project management final report
Project management final reportProject management final report
Project management final report
 
Project Management U 1.pptx
Project Management U 1.pptxProject Management U 1.pptx
Project Management U 1.pptx
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project Proposal
 
Assignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docxAssignment 1 ITECH 2250 IT Project Management Techniques.docx
Assignment 1 ITECH 2250 IT Project Management Techniques.docx
 
UNIT-1.pptx
UNIT-1.pptxUNIT-1.pptx
UNIT-1.pptx
 
Project Life Cycle final.pptx
Project Life Cycle final.pptxProject Life Cycle final.pptx
Project Life Cycle final.pptx
 
Project management final report.By- SANKET SENAPATI
Project management final report.By- SANKET SENAPATI Project management final report.By- SANKET SENAPATI
Project management final report.By- SANKET SENAPATI
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project Management
 
Project governance
Project governanceProject governance
Project governance
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
 
Unit2 Project phases.pptx
Unit2 Project phases.pptxUnit2 Project phases.pptx
Unit2 Project phases.pptx
 

Más de Shree Swami atmanand saraswati inst. of technology, surat

Más de Shree Swami atmanand saraswati inst. of technology, surat (20)

INFRASTRUCTURE FOR SMART CITIES_MOD 2_planning for smart cities
INFRASTRUCTURE FOR SMART CITIES_MOD 2_planning for smart citiesINFRASTRUCTURE FOR SMART CITIES_MOD 2_planning for smart cities
INFRASTRUCTURE FOR SMART CITIES_MOD 2_planning for smart cities
 
INFRASTRUCTURE FOR SMART CITIES_MOD 3_Intelligent transport systems
INFRASTRUCTURE FOR SMART CITIES_MOD 3_Intelligent transport systemsINFRASTRUCTURE FOR SMART CITIES_MOD 3_Intelligent transport systems
INFRASTRUCTURE FOR SMART CITIES_MOD 3_Intelligent transport systems
 
Sem 5 mod-1 disaster management introduction (CIVIL, ELE, MECH, EC, COMP)
Sem 5 mod-1 disaster management introduction (CIVIL, ELE, MECH, EC, COMP)Sem 5 mod-1 disaster management introduction (CIVIL, ELE, MECH, EC, COMP)
Sem 5 mod-1 disaster management introduction (CIVIL, ELE, MECH, EC, COMP)
 
BCT Mod 4 demolition of structure (Updated)
BCT Mod 4 demolition of structure (Updated)BCT Mod 4 demolition of structure (Updated)
BCT Mod 4 demolition of structure (Updated)
 
MOD 3 CONSTRUCTION ECONOMICS (UPDATED)
MOD 3 CONSTRUCTION ECONOMICS (UPDATED)MOD 3 CONSTRUCTION ECONOMICS (UPDATED)
MOD 3 CONSTRUCTION ECONOMICS (UPDATED)
 
MODULE 2 PROJECT ORGANIZATION (updated)
MODULE 2 PROJECT ORGANIZATION (updated)MODULE 2 PROJECT ORGANIZATION (updated)
MODULE 2 PROJECT ORGANIZATION (updated)
 
BCT- Module 5 a coffer-dam (Part_2)
BCT- Module 5 a coffer-dam (Part_2)BCT- Module 5 a coffer-dam (Part_2)
BCT- Module 5 a coffer-dam (Part_2)
 
BCT - Module 5 special work
BCT - Module 5 special workBCT - Module 5 special work
BCT - Module 5 special work
 
Module :- 8 Job layout (PART 2)
Module :- 8 Job layout (PART 2)Module :- 8 Job layout (PART 2)
Module :- 8 Job layout (PART 2)
 
Module :- 8 material management
Module :- 8 material managementModule :- 8 material management
Module :- 8 material management
 
Module :-5 project scheduling and resource levelling
Module :-5 project scheduling and resource levellingModule :-5 project scheduling and resource levelling
Module :-5 project scheduling and resource levelling
 
Mod 3 construction economics
Mod 3 construction economicsMod 3 construction economics
Mod 3 construction economics
 
MODULE 2 project organization
MODULE 2 project organizationMODULE 2 project organization
MODULE 2 project organization
 
Che 10 engineering fundamental
Che  10 engineering fundamentalChe  10 engineering fundamental
Che 10 engineering fundamental
 
Chapter 9 introduction to construction equipments
Chapter  9 introduction to construction equipmentsChapter  9 introduction to construction equipments
Chapter 9 introduction to construction equipments
 
CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)
 
Che 1 pile foundation
Che 1 pile foundationChe 1 pile foundation
Che 1 pile foundation
 
Ch 5 b remote sensing
Ch 5 b remote sensingCh 5 b remote sensing
Ch 5 b remote sensing
 
Ch 5 a gps
Ch 5 a gpsCh 5 a gps
Ch 5 a gps
 
Ch 5 levelling
Ch 5 levellingCh 5 levelling
Ch 5 levelling
 

Último

ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfSanaAli374401
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.MateoGardella
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 

Último (20)

ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 

MODULE 1 Introduction to Construction Management

  • 1. PREPARED BY:- Karm Balar ASST. Prof. S.S.A.S.I.T. S.S.A.S.I.T G.T.U SHREE SWAMI ATMANAND SARASWATI INSTITUTE OF TECHNOLOGY, SURAT Construction management
  • 3.
  • 4. Construction during British Period S. No. Important milestones Remarks 1 Construction of light railway line in 1845 2 The first railway bridge over Thane Creek in 1854 3 Construction of the first narrow gauge line in 1862 4 Construction of the Ganges Canal consisting of main canals and distribution channels between 1842 and 1854 5 Construction of a major bridge in Dehri-on-Sone in 1900 6 Construction of Juhu Aerodrome in Mumbai in 1928
  • 5. Post Independence notable construction projects S. No. Important milestones Remarks 01 Construction of first nuclear reactor in 1956 02 Construction of Hirakud Dam in 1957 03 Construction of Bhakra-Nangal Dam in 1970 04 Construction of Iukki Dam in 1976 05 Construction of Mumbai-Pune Expressway in 2000 06 Construction of Tehri Dam in 2005 07 Construction of Bandra-Worli Sea Link Bridge in 2009
  • 6. What Is a Project? A project is “a temporary endeavor undertaken to accomplish a unique product or service” (PMBOK® Guide 2000, p. 4) OR A project is an assignment/task/job that has to be undertaken and completed within a set time, budget, resources and performance specifications designed to meet the needs of stakeholders. Characteristics of projects  unique purpose  temporary  require resources, often from various areas  should have a primary sponsor and/or customer  involve uncertainty
  • 7. For example  The XYZ Agency has donated 7.5 crore to provide 3 BHK homes to 50 families living in the VARACHHA informal settlement. On 6 February 2004, the agency signed a contract with the ABC DEVLOPERS to implement the project. The following requirements, set in the contract:  The 3 bedroomed houses must meet specifications in line with government policy.  50 families must be given skills development training in small business development and small business start-up. This is to ensure that the families will be able to afford rentals, maintenance of the homes and to expand their homes to accommodate the growth of the families in the future.  The project must be completed within three years and the handover of the homes to the 50 families must be a high profile public event.
  • 8. From the example we see:  a clear task - build 3 BHK homes for 50 families;  a set time – within 3 years;  a budget – 7.5 crore;  performance specifications – houses meet specifications in line with government policy.  beneficiaries – 50 families;  stakeholders – donor agency, Department of Housing.
  • 9. Project stakeholders Project stakeholders are individuals and organizations who are actively involved in the project, or whose interests may be positively or negatively affected by the project. Key stakeholders in the example above include:  Project Manager - the individual responsible for managing the project;  Project beneficiaries – 50 families who are going to receive the houses;  Performing organization – the ABC DEVLOPERS whose employees are most directly involved in doing the work of the project.  Sponsor – XYZ Agency.
  • 10. In addition to these different typical stakeholders:  Suppliers and contractors  Project team members and their families  Government agencies  Community representatives and organizations.
  • 11. Typical Stakeholders  Sponsor  Funding Body  Customer  Suppliers  End User  Environmental Agency  Maintenance Team  Neighbours/Community/Shareholders
  • 12. What is Project Management? Project management is “the application of knowledge, skills, tools, and techniques of project activities in order to meet project requirements” (PMI*, Project Management Body of Knowledge (PMBOK® Guide), 2000, p. 6) OR Project Management is the use of knowledge, skills, tools, and techniques to plan and implement activities to meet or exceed stakeholder needs and expectations from a project. *The Project Management Institute (PMI) is an international professional society. Their web site is www.pmi.org.
  • 13.
  • 14. The starting point begins the moment the project is given the go- ahead (when a contract agreement is signed). Project effort starts slowly, builds to a peak, and then declines to delivery of the project to the customer. specifications of the project are defined, project objectives are established, project teams are formed and major responsibilities are assigned. plans are developed to determine the project steps, beneficiaries, timeframes, quality standards and budget. delivering the project product to the customer the major portion of the project work takes place
  • 15. PHASES OF A CONSTRUCTION PROJECT
  • 16. Initiating Phase  Select Project  Collect Historical Information  Determine Project Objectives  Determine High-Level Deliverables, Estimates  Determine High-Level Assumptions  Determine Business Need  Develop Product Description  Define Responsibilities of the Project Manager  Determine High-Level Resources Requirements  Finalize the Project Charter
  • 17. Planning Phase  Determine Project Team  Create WBS (Work Breakdown Structure)  Finalize the Team  Create WBS dictionary  Create Network Diagram  Estimate Time & Cost  Determine Critical Path  Create Risk Management Plan  Develop Schedule  Develop Budget  Determine Communication Requirements  Determine Quality Standards  Risk Identification, Qualification, Quantification and Resource Planning  Create Other Management Plans – Scope, Schedule, Cost, Quality, Staffing, Communications, Procurement
  • 18. Executing Phase  Execute the Project Plan  Manage Project Progress  Complete Work Packages  Distribute Information  Quality Assurance  Team Development  Identify Changes  Use Work Authorization System
  • 19. Controlling Phase  Integrated Change Control  Project Performance Measuring  Performance Reporting  Scope Change Control  Quality Control  Risk monitoring and Control  Schedule Control  Cost Control  Project Plan Updates
  • 20. Closing Phase  Procurement Audits  Product Verification  Financial Closure  Lessons Learned  Update Records  End of Project Performance Reporting  Formal Acceptance  Project Archives  Release Resources
  • 22.
  • 23.  Inadequate planning leads to frustration towards the end of the project & poor project performance Project Start Project End
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35. The Project Management Profession • The job of IT Project Manager is in the list of the top ten most in demand IT skills • Professional societies like the Project Management Institute (PMI) have grown tremendously • Project management research and certification programs continue to grow.
  • 36. Project Management Certification • PMI provides certification as a Project Management Professional (PMP) • A PMP has documented sufficient project experience, agreed to follow a code of ethics, and passed the PMP exam • The number of people earning PMP certification is increasing quickly • PMI and other organizations are offering new certification programs.
  • 37. Growth in PMP Certification 1993-2015
  • 38. Sources: PMI’s PMP Salary Survey Report 9th edition
  • 39. Project Management Statistics  The world as a whole spends nearly $10 trillion on projects of all kinds.  More than sixteen million people regard project management as their profession; on average, a project manager earns more than $82,000 per year.*  The Project Management Institute estimates demand for 15.7 million project management jobs from 2010 to 2020, with 6.2 million of those jobs in the United States. *PMI, The PMI Project Management Fact Book, Second Edition, 2001 PMI (Project Management Institute )
  • 40. Copyright 2016 Every project has constraints or limitations. The three main constraints are: • Scope – work that will be done / expected results of project • Cost – cost to complete project / budget • Time – amount of time to complete the project / schedule Successful project balances constraints to satisfy project sponsor (customer)!