A Compelling Iron Ore Investment Opportunity
Corporate Presentation
April 2014
TSX: BKI
TSX: BKI
2
Disclaimer
Forward Looking Statement
This Presentation contains ‘‘forward-looking information’’ within the meaning of applicable Canadian securities legislation. Forward-looking information is based on what management
believes to be reasonable assumptions, opinions and estimates of the date such statements are made based on information available to them at that time, including those factors discussed
in the section entitled ‘‘Risk Factors’’ in the Company’s annual information form for the year ended December 31, 2011 (and dated March 26, 2012) or as may be identified in the
Company’s public disclosure from time to time, as filed under the Company’s profile on SEDAR at www.sedar.com. Forward-looking information may include, but is not limited to,
statements with respect to results of the Feasibility Study (as defined below) and the mineral reserve and resource estimate, the future financial or operating performance of the Company,
its subsidiaries and its projects, the development of and the anticipated timing with respect to the Shymanivske project, the ability to obtain financing; and the impact of concerns relating
to permitting, regulation, governmental and local community relations. Generally, forward looking information can be identified by the use of forward-looking terminology such as "plans",
"expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and
phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Estimates underlying the results of the Feasibility Study
arise from engineering, geological and costing work of Lycopodium Minerals Canada Ltd. (“Lycopodium”), Soutex Inc. (“Soutex”), Watts, Griffis and McOuat Limited (“WGM”), Consulting
Geologists and Engineers of Toronto, P&E Mining Consultants Inc. (“P&E”) and the Company. See the technical report relating to the feasibility study for a description of all relevant
estimates, assumptions and parameters. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of
activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: general
business, economic, competitive, geopolitical and social uncertainties; the actual results of current exploration activities; other risks of the mining industry and the risks described in the
annual information form of the Company. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in
forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be
accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking
information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
This Presentation does not constitute an offer to sell, or solicitation of an offer to buy, any securities by any person in any jurisdiction in which it is unlawful for such person to make such an
offering or solicitation. No representation or warranty, express or implied, is made as to the accuracy or completeness of the information set out herein, and nothing contained herein is, or
shall be relied upon, as a promise or representation, whether as to the past or future.
Bankable Feasibility Study (the “Feasibility Study”) – For additional information, please see the Company’s press release dated January 23, 2014.
*Resource estimate compiled using historic Soviet data by Hugues de Corta, who is an independent qualified person as defined by NI 43-101. Readers should not place undue reliance on
historical estimates.
*The mineral resource estimate for the Shymanivske Project is based on results from 185 historical drill holes totaling 37,316 meters and 60 Black Iron drill holes, which were drilled during
the Company’s Twin Hole drill program and the Definition Drill program, totaling 16,518 meters and is effective as of September 2012. Watts, Griffis and McOuat Limted (“WGM”),
Consulting Geologists and Engineers of Toronto, Canada, was retained to audit an in-house mineral resource estimate completed by Black Iron. Mr. Michael Kociumbas, P.Geo, Vice-
President of WGM and Mr. Richard Risto, P.Geo, Senior Geological Associate of WGM, were retained by Black Iron as independent technical consultants and are Qualified Persons as defined
by NI 43-101 and are responsible for reviewing and approving this mineral resource estimate. The Feasibility Study was prepared in accordance with the guidelines of National Instrument
43-101 by the independent firms of Lycopodium Minerals Canada Ltd.; Soutex Mineral & Metallurgical Consultants; Watts, Griffis and McOuat Limited; and P&E Mining Consultants Inc..
*Matt Simpson President & CEO of Black Iron, a Qualified Person as defined by NI-43-101, has reviewed and approved the scientific and technical information in this presentation.
TSX: BKI
3
What Sets Black Iron Apart?
Access to Skilled Labour & Infrastructure –
Two of the Most Challenging Iron Ore Project Development Risks
Key Development Risks
Taxes/Royalties
Human Resources
Access to Infrastructure
Community Opposition
Licensing/Permitting
Access to Water
Electricity Supply
Canada
Brazil
Africa
Australia
Ukraine
3
TSX: BKI
* Please see note on Page 2 4
Black Iron has ALL the Key Fundamentals for
a Successful Low Cost Project in Place
Exceptional
Infrastructure
• Significant infrastructure
advantages (power, rail
and port) with confirmed
access and capacity
• Skilled local workforce
• Local partnerships
Compelling
Economics
• Bankable Feasibility Study
(Shymanivske Project):
- 9.9Mtpa of 68% Fe Conc.
- Pre-tax NPV8 of US$3.3B
- Pre-tax IRR of 48%
• Break even price of $54/t
(after-tax)
Sizeable
Resource
• Large NI 43-101 Compliant
Resource*
- Shymanivske
646Mt (M+I) @ 32% Fe
188Mt (Inf) @ 30% Fe
- Zelenivske (upside)
1.1 - 1.8Bt potential
Skilled
Leadership
• History of creating value
for shareholders
• Significant Ukrainian
political and iron ore
operations experience
Close to
Target Markets
• Located in Kryvyi Rih,
Ukraine a major iron ore
district, close to Europe,
Turkey, Russia, Asia and
Middle East
Metinvest Development
Agreement
• Ukraine’s largest company,
9th globally in iron ore, 16th
in steel
• Committed to half of
project construction
financing (est. $250-$500M)
TSX: BKI
Board of DirectorsKey Management
Matt Simpson – President & CEO
• Former General Manager, Mining for Rio Tinto’s Iron
Ore Company of Canada
• Worked for Hatch designing global metallurgical
refineries
George Mover – COO
• Former Project General Director of Ferrexpo Yeristovo
Mining, Ukraine
• Since 1994 worked on numerous mining projects in
Former Soviet Union (Ukraine, Russia, Kazakhstan,
Armenia)
Paul Bozoki – CFO
• Former CFO of CD Capital Partners, operating in
Former Soviet Union & Ukraine
Aaron Wolfe – VP Corp Development
• Former investment banker with Macquarie
Nikolay Bayrak – VP Gov’t & Community Relations
• Former department head, Ukrainian Ministry of
Emergencies and Public Protection; Former MP and
President of MP’s Parliamentary Social Club
Bruce Humphrey – Chairman
• Former Chairman of Consolidated Thompson Iron
Mines
Jaroslav Kinach
• Former Advisor to Ukraine Prime Minister and
former Ukraine Country Head of EBRD
Chris Westdal
• Canadian Ambassador to Ukraine (1996-98) and to
Russia (2003-06)
Pierre Pettigrew
• Former Canadian Minister for Foreign Affairs and
international Trade
John Detmold
• Chairman & Founder of Invecture Group, S.A. de
C.V. which owns Frontera Copper Corporation
Dave Porter
• Former VP for Rio Tinto’s Iron Ore Company of
Canada and COO of Algoma Steel
Matt Simpson – President & CEO
5
A Track Record of Iron Ore Success
with Rio Tinto’s Iron Ore Company of Canada, and Ferrexpo
TSX: BKI
6
Project Backed by Forbes & Manhattan
Success with Consolidated Thompson’s Bloom Lake Iron Mine
• World class 8Mtpa iron ore concentrate
mine in Quebec
• Advanced from exploration stage
through development to construction
− 8 mtpa capacity (66% Fe concentrate)
expanding to 16 mtpa
− Completed scoping study, 3 feasibility
studies, secured off-take with China’s
third largest steel producer (WISCO)
• Raised over Cdn$1 bn in capital
• Attracted and put in place a qualified
management team
Recently
acquired
for $4.9
billion
$1 mm
market
cap
First F&M
involvement
Forbes&ManhattanInvolvement
2005 Q1-2011
Acquired
for $4.9
billion
TSX: BKI
7
Major Local Development Partner: Metinvest
Ukraine’s Largest Company and a Global Iron Ore & Steel Producer
• Over 100,000 employees; Generated US$12.6 billion of revenues and a 16% EBITDA margin in 2012
• Metinvest is owned by System Capital Management (SCM) and Smart Holding
• SCM has over US$28.4B in assets and operations across 13 different areas including ownership of:
• Global Commodity Ranking:
• DTEK >18GW of electricity
production (~26%)
• Leman Trans, ~21% of
railway cars
• Portinvest, ~13% of
Ukraine’s port capacity
• 9th in Iron Ore with 33.9 MT • 16th in Steel with 18.4 MT • 33rd in Coal with 2.6 MT
TSX: BKI
Sound Capital Structure
Attractive Valuation with Substantial Upside & Funding Support
8
Corporate StructureCapital Structure (TSX: BKI)
Shares Outstanding 159.2 million
Stock Options(1)
5.7 million
Warrants(2)
17.7 million
Fully Diluted Shares 182.6 million
Market Cap(3)
~US$23.1 million
Current Cash Balance(4)
~US$3.4 million
Debt Balance nil
1. 5,713,750 options exercisable at a weighted average price of $0.45 per share.
2. 17,680,000 warrants expire Feb 20, 2017 with strike price of $0.25.
3. As at April 1, 2014, using a closing price of CAD $0.16 per share.
4. As at Dec 31, 2013 per Q4 Audited Financial Statements & Feb 20, 2014 Financing
Metinvest Transaction Summary
Analyst Coverage
• Metinvest acquires 49% of Black Iron Cyprus for a total
commitment up to US$535M
– US$20M due at closing
– Matching of any further equity financed capital
• Metinvest option to increase ownership in Black Iron
Cyprus to 51%
− Option vests after 3 consecutive months of
production at nameplate capacity
− Option priced at a 30% premium to the fair market
value as derived by an independent third party
Black Iron Inc.
(TSX: BKI)
Metinvest B.V.
(Ukraine private)
Black Iron (Cyprus)
Ltd.
(Cyprus private)
Shymanivske Steel
(Ukraine private)
Zelenivske Steel
(Ukraine private)
51% 49%
100% 100%
TSX: BKI
9
Deposits In Mining Friendly Region
Adjacent to existing Iron Ore Producers
• Two mining and exploration permits
covering 5.92 km2
− Mining permit at Shymanivske, which
has been extensively explored, covering
2.56 km2 valid until 2024
− Exploration permit at Zelenivske
covering 3.36 km2 valid until 2014
• Adjacent to ArcelorMittal’s Kryvyi Rih
iron ore complex and Metinvest &
Evraz’s YuGOK iron ore mine
• Plan to acquire a plot of land from
Ukraine Government adjacent to the
Shymanivske deposit for project
waste dumps, concentrator and
tailings
Black Iron’s
Shymanivske Project
M&I: 646Mt @ 31.6%
Inferred: 188Mt @ 30.1%
Black Iron’s
Zelenivske
Project
ArcelorMittal’s Kryvyi Rih
Iron Ore Complex
Metinvest & Evraz’s
YuGOK Iron Ore Mine
Railway lines
** See Black Iron’s website at www.blackiron.com for a Corporate Video highlighting the project location and infrastructure **
TSX: BKI
10
Large Ore Deposit with Growth Potential
• Banded iron formation consisting primarily of
magnetite with some hematite
− Iron band thickness ranges from 40-80 m
− Only 9.7-21.2 m of overburden with a strip ratio
of 1.63:1, life of mine; 1.36:1 for first 8 years
− Very clean ore body low in phosphorus,
manganese and aluminum
• Resource defined by ~54,000 metres of
drilling
― Black Iron completed a Twin Hole Drill
Program consisting of 6,042 metres and a
Phase II Drill Program consisting of 11,435
metres of infill drilling
― Total iron grade and band width align very well
with 37,000 metres of historical drilled data
• Potential for total combined resource
expansion of 1.1 to 1.8BT
− Additional drilling of Shymanivske at North end
of deposit and to depth
− Exploration of the Zelenivske project
Shymanivske
Resource*
Tonnage
(Mt)
Fe Tot
(%)
Fe Mag
(%)
Measured 355.1 32.0 19.5
Indicated 290.7 31.1 17.9
Total Measured
and Indicated
645.8 31.6 18.8
Inferred 188.3 30.1 18.4
* Please see note on page 2Tonnage and grade rounded to first decimals. Cut-off grade of 10% Fe Mag
TSX: BKI
11
Potential Resource Extension at Shymanivske
Ground Gravity Shows Iron Ore Mineralization at North End
• Ground gravity and magnetic surveys
show potential extension of iron ore
mineralization at North end of property as
circled in red
• This area has not been included in the NI
43-101 resource as it has not yet been
sufficiently drilled
• The identified area will be a target of a
future drill program to allow for a second
phase process plant expansion to increase
production and project value
Potential resource
upside to be drilled
Drill hole
Property
boundary
Very likely
Iron in ground
Likely just
dirt in ground
TSX: BKI
Extensive Pit Shell Design and 3D Model
Completed (Property Overview)
12
* Bankable Feasibility Study complete by Lycopodium Minerals Canada Ltd.
TSX: BKI
Concentrator Footprint Compressed by
Staggering HPGRs and Stacking LIMS
13
* Bankable Feasibility Study complete by Lycopodium Minerals Canada Ltd.
TSX: BKI
14
Conventional Flowsheet
Producing High Quality Iron Ore Products
Fe 68.0%
SiO2 4.5%
P 0.02%
S 0.05%
Al2O3 0.43%
Mn 0.03%
P80 32 µm
B.F. Concentrate
Fe 65.5%
SiO2 4.5%
S <0.01%
CaO/SiO2 0.15%
SiO2+Al2 O3 5.1%
CaO+MgO 1.0%
Compress. 318kg/pel
B.F. Pellets
Fe 69.5%
SiO2 1.3%
P 0.02%
S 0.05%
Al2O3 0.28%
Mn 0.03%
P80 32 µm
D.R. Concentrate
Fe 67.4%
SiO2 2.0%
S <0.01%
CaO/SiO2 0.34%
SiO2+Al2 O3 2.4%
CaO+MgO 1.2%
Compress. 283g/pel
D.R. Pellets
CoreProduct
Value-Add
Alternative
Products
TSX: BKI
15
Secured Infrastructure Access
(Rail, Port Power) Key to a Successful Iron Ore Project
• Letters of Intent in place for Electricity (140MW) and
Natural Gas (900m3/hr @85kPa)
• Paved roads to site, located 35km away from the
major city of Kryvyi Rih which has a highly skilled work
force
• Letter of Intent in place for up to 20 million tonnes
per year of rail capacity from site to Port Yuchniy
• Black Iron’s Shymanivske Project is ~2 km from main
state-owned rail line
• Letter of Intent in place with a private operator at Port
Yuzniy for 9.5 million tonnes per year +/- 15%
• Port Yuzniy is located ~430 km away and provides
access to the Black Sea and global seaborne iron ore
markets
** See Black Iron’s website at www.blackiron.com for a Corporate Video highlighting the project location and infrastructure **
TSX: BKI
16
Strategic Global Location
Close Proximity to Target Markets with Abundant Port and Rail Access
• Project is surrounded by steel mills in Europe, Turkey
and the Middle East
• River barge & rail access to Western Europe.
• Five dry bulk tonnage ports accessible using railway
running beside properties
• Approx 20% to 25% shorter transport distance to
growth markets of India and China compared to
North and South American producers
• Excellent Ukrainian logistical
advantages
• Densely populated
roadway infrastructure
• 468 million tonnes of
cargo transported via rail
• 155 million tonnes of
cargo transported via ship
TSX: BKI
17
Ukraine: A Mining Friendly Country in
Transition
• S&P Sovereign Risk rating of B
− Next Presidential election to occur in Q1-2015
(5 year term)
− GDP growth of 4.2% in 2010; 5.2% in 2011; 0.2%
in 2012 (impacted by slowdown in global economy
and steel production)
− Member of WTO
− Strong desire by citizens and business for European
integration (and further separation from Russia)
but government has delayed signing “Trade
Agreement” over concerns of increased cost for
Russian gas and trade restrictions
• Joining the “Trade Agreement” with Europe would
benefit Black Iron due to lower construction costs via
reduced duties. However not joining is neutral for
Black Iron, as the Bankable Feasibility Study was
completed without those cost savings assumptions
• Economy dominated by agriculture & commodities
― Steel production is Ukraine’s largest industry
― 60% of Ukraine’s total exports are commodity-
related (the majority of which is steel)
• Large, highly skilled labour force (pop. 45.4 million)
− GDP per capita only $7600/yr
− Literacy rate >99%
• Mining friendly jurisdiction with strong local and
national support
― ArcelorMittal and Ferrexpo plc have operated
in-country for over 7 years
• Legislated yearly corporate tax rate reductions to
16% in January 2016 from the current 18% rate
• Favourable mining royalties of $0.09 per tonne of ore
mined (<1%) payable to the Government
$5Bn Investment
in Integrated Iron
Mine/Steel Mill
$3.2Bn Market Cap Iron
Ore and Steel Production
in Ukraine
$1.8Bn Investment
in Shale Gas
Development
$10Bn Investment
in Shale Gas
Development
Major Foreign Corporate Investors
TSX: BKI
18
Source: Based on know production and reserves as listed in the USGS
2012 Iron Ore report
Globally Significant Iron Ore District
4th largest iron ore producer & 2nd largest reserve base
Global Distribution of Fe Reserves &
Fe Production
• Black Iron’s projects are located in the heart of
Ukraine’s iron ore belt
– 35km from Kryvyi Rih, city of 750,000 people
• Iron ore district trends 300 km with sedimentary rock
hosted banded iron formations (Dnenpovskog complex)
• Historically well explored resource base but
substantially under-exploited due to historic Soviet
policy
• 15 iron ore mines in Ukraine produced 88 million
tonnes in 2012
Kiev
Yeristovskoye
Poltavsky GOK
TsentralnyKryviy Rih Iron Ore Complex
Ingulestky GOK
Yuzhny GOK
Kryviv Rih Ordzhonikize Gok
Shymanivske
Zelenivske
C Gok
YuGok
0%
10%
20%
30%
40%
50%
60%
Asia
Australia
S.America
FSU
N.America
Other
Africa
%ofWorldProductionandReserves
Production Reserves
Production Reserves
7%
21%
TSX: BKI
19
Permit Process for Shymanivske Deposit
Black Iron Remains on Track
Exploration
Permit
Extraction
Permit
Land
Allotment
Construction
Approval
Operations
Approval
Deem deposit
economical
• Complete
Ukraine version
of scoping study
including
evaluation of
various mining
methods & high
level
environmental
impact
Pit shell reserves
& environmental
impact Gov
approval
• Complete field
environmental
(OVOS) &
archeological
studies for Gov
approval
• Submit pit shell
design &
mapped ground
surface project
for Gov. approval
Obtain surface
rights for mine,
refinery &
tailings
• Land use analysis
based on plot
plan showing
major buildings &
agreed
connections to
utilities, rail and
roads (Proekt)
• Approval of the
project location
• Approval from all
land owners &
finalize lease
Start mine
overburden
removal & plant
construction
• Detailed design
approved
(Expertisa)
• Obtaining the
construction
permit
• Commissioning
of the facility
• Registration of
the ownership to
the facility
Explore
resource
potential
• Conduct
geophysical
program
• Drill ore body
• State approval
of explored
deposit
Operate mine &
refinery
• Ensure
compliance with
Ukraine Safety,
Environment,
Health and
Employment
laws as check by
regular Gov
inspections
• Finalize
environmental
permits
Mining
Allotment
Completed
TSX: BKI
Annual Production: 9.9 Mt
Iron Content: 68.0%
Estimated Capital Investment:
(capital intensity, includes 15% contingency)
US$1,097 million
US$111/t
Estimated Operating Expenses:
(average FOB)
(average at Mine Gate)
US$44.54/t
US$29.64/t
Long-Term CFR Benchmark Price(62%): US$95/t
Net Present Value (8%):
(pre-tax)
(after-tax)
US$3.3 billion
US$2.6 billion
Internal Rate of Return:
(pre-tax)
(after-tax)
48%
39%
Annual Average Cash Flow:
(pre-tax)
(after-tax)
US$630 million
US$536 million
Projected Payback (8%):
(pre-tax)
(after-tax)
2.0 years
2.5 years
Estimated Mine Life:
modelled reserve
total defined resource
14 years
~19 years
Projected Plant Start-Up Q4 2016
Projected Revenue Commencement Q1 2017
BFS Highlights – High Grade Concentrate
High Value, Low Net Cost Iron Ore Development Project
20
** See Disclaimer on page 2 *** Bankable Feasibility Study completed by Lycopodium
TSX: BKI
Black Iron’s Operating Cost Competitiveness
Shymanivske: First Quartile to Local Markets; Second Quartile to China
21** See Disclaimer on page 2 **
Source: Company data; Wood Mackenzie; BMO Capital Markets
* Adjusted for iron content and shipping distance
2013E Iron Ore Cost Curve
BKI delivered to
Europe/Middle East
Markets
BKI delivered
to China
World Cumulative Production (%)
Spot: $116/t
TotalCashCost(US$/tCFRChina)
TSX: BKI
** See Disclaimer on page 2 **
Black Iron’s Capital Cost Advantage
Shymanivske Relative to Other Iron Ore Projects
22
Vale(Shimandou1)
AfricanMinerals(phase2)
Xstrata(Askaf)
AfricanMinerals(DSO)
ArcelorMittal(Western…
Fortescue(Expansion)
BlackIron
RioTinto(IOC)
Sundance
Kumba
Ferrexpo(Yeristovo)
IRC(Kuranakh)
LondonMining
IRC(K&S)
Alderon
Auila(Hardey)
Xstrata(Zanaga)
AtlasIron(Ridley)
RioTinto(Pilbara)
Gindalbie(Karara)
AngloAmerican(MinasRio)
BHP(RGP5&6)
Aquila(WestPilbara)
ArcelorMittal(Western…
BHP(Samarco)
AtlasIron(BallaBalla)
CITICPacific(Sino)
Baffinland
Xstrata(GeulbelAouj)
GrangeResources…
84 87 90 92
109 109 111 122 134 135 141 142
157 159 159 160 167
180 186 188 189 190 192 200 211 217 221 222
236
258
CAPEX Forecast
(US$/t of capacity)
Source: Company data; Renaissance Capital estimates
Average = 162
0%
25%
50%
75%
100%
TSX: BKI
Disclaimer: Post-tax and royalty graphs are for illustrative purposes only using simple math. These numbers have not been reported, nor are they substantiated by a financial model. 1 Super-Profits tax >A$75
million profit. 2 Includes Brazil mining tax of $4 / tonne of iron ore. 3 Legislated Corp tax rate as at Jan 1, 2016. 4 Royalties of $0.09 per tonne of ore mined. 5 LabMag Project Quoted for New Millenium
Macarthur
Centaurus
IronRoad
Northland
Brockman
Gindalbie
Alderon
BlackIron
0.1 0.3
0.6
1.0
1.8 1.8 1.9
2.6 2.8
Post-Tax & Royalty NPV8
(US$ billions)
Source: Company data; Press Release; Research Estimates
New
Millenium
Alderon
Northland
Gindalbie
Brockman
BlackIron
18.2
29.3 32.0 35.0 38.0
48.0
Pre-Tax & Royalty IRR
(%)
New
Millenium
Gindalbie
Brockman
Northland
Alderon
BlackIron
14.1 18.9 20.5 22.7 23.1
39.1
Post-Tax & Royalty IRR
(%)
Tax Regime
Royalties
30%
+30%1
39%2
29%
16%3
5%
2%
5-8%
<0.1%4
New
Millenium
New
Millenium
Macarthur
Centaurus
IronRoad
Northland
Alderon
Brockman
BlackIron
Gindalbie
0.3 0.5
1.1 1.5
3.2 3.3 3.3 3.4
5.8
Pre-Tax & Royalty NPV8
(US$ billions)
Black Iron Stacks Up Relative to Competition
Strong Economics Reinforced by Favourable Tax and Royalties
23
TSX: BKI
Black Iron’s Target Capital Funding Strategy
49% of Equity Capital Solidified with Metinvest Transaction;
100% of Off-Take Still Available
** See Disclaimer on page 2 **
Estimated Capital Investment
US$1.1 billion
Equity Investment Debt Investment
Black Iron Inc.
(TSX: BKI)
Metinvest
9.9Mtpa
Off-take
Export Credit Agencies
Bank Debt /
High-Yield Bonds
Capital Markets
60%40%
49%51%
(US$250-300 million)
(US$0-50 million)
(US$300-400 million)
(US$250-350 million)
Significant Off-take Opportunity with Equity Funding Support from Metinvest
** % and $ amounts are indicative only and subject to negotiation **
(US$250-300 million)
24
TSX: BKI
Black Iron Continues to Deliver
Shymanivske Project Development Timeline
2011-2012 2013
Scoping Study/PEA
Bankable Feasibility Study
Off-take
Construction
Drill metallurgical holes
Definition Drilling
Land Acquisition
Detailed Engineering
Production
Future
** See Disclaimer on page 2 **
Pilot Plant Test Work
2014
Permitting
Milestone Achieved 2014 Milestone
25



 


TSX: BKI
26
Black Iron Value Proposition
Close to Steel Mills in: W.Europe, Turkey, Russia, Asia and Middle East
Close to
Target Markets
Large iron ore deposit with NI 43-101 compliant resource*
• 646 Mt Measured & Indicated resource @ 31.6% iron; additional 188 Mt of
Inferred resource @ 30.1% iron, which will be concentrated to ~68% iron
• Potential for resource expansion to 1.1-1.8 Bt
Sizable
Resource
Excellent access to skilled labour, power, rail & ports
Exceptional
Infrastructure
Experienced management team and Board with history of creating value
for shareholders of RioTinto and Ferrexpo
Skilled
Leadership
High margins due to close proximity to multiple steel mills, skilled labour
cost advantage and favourable corporate tax rate of 16%
• Bankable Feasibility Study for 9.9Mt of high-grade 68% iron ore concentrate
– NPV of US$3.3 billion and 48% IRR (US$2.6 billion and 39% after-tax)
Compelling
Economics
* Please see note on Page 2 26
Strategic
Partners
Metinvest: Largest company in Ukraine; committed to half of project financing
TSX: BKITSX: BKI
Shymanivske Project Site
Paved Road
High voltage
power linesState-owned
rail line
CONTACT INFORMATION
65 Queen Street West
Suite 805, P.O. Box 71
Toronto, Ontario, Canada
M5H 2M5
www.blackiron.com
TSX: BKI
Investor Relations
Toronto: +1 (416) 309-2134 - Michael McAllister, IR Manager
Ukraine: +380 (56) 409-2536
info@blackiron.com Follow us:

Más contenido relacionado

La actualidad más candente

20140203 bki corp_pres
20140203 bki corp_pres20140203 bki corp_pres
20140203 bki corp_presblackiron
 
20140123 bki corp_pres
20140123 bki corp_pres20140123 bki corp_pres
20140123 bki corp_presblackiron
 
20140301 bki corp_pres
20140301 bki corp_pres20140301 bki corp_pres
20140301 bki corp_presblackiron
 
Corporate Presentation - May 2013
Corporate Presentation - May 2013Corporate Presentation - May 2013
Corporate Presentation - May 2013blackiron
 
Corporate Presentation - June 5, 2013
Corporate Presentation - June 5, 2013Corporate Presentation - June 5, 2013
Corporate Presentation - June 5, 2013blackiron
 
201505 bki corp_pres
201505 bki corp_pres201505 bki corp_pres
201505 bki corp_presblackiron
 
Corporate Presentation 2017
Corporate Presentation 2017Corporate Presentation 2017
Corporate Presentation 2017blackiron
 
20140603 bki corp_pres
20140603 bki corp_pres20140603 bki corp_pres
20140603 bki corp_presblackiron
 
201705 bki corp_pres v2
201705 bki corp_pres v2201705 bki corp_pres v2
201705 bki corp_pres v2blackiron
 
Black Iron February 2017 Corporate Presentation
Black Iron February 2017 Corporate PresentationBlack Iron February 2017 Corporate Presentation
Black Iron February 2017 Corporate Presentationblackiron
 
201703 bki corp_pres
201703 bki corp_pres201703 bki corp_pres
201703 bki corp_presblackiron
 
Bki presentation july_2011
Bki presentation july_2011Bki presentation july_2011
Bki presentation july_2011blackiron
 
20110601 BKI Corp Presentation
20110601 BKI Corp Presentation20110601 BKI Corp Presentation
20110601 BKI Corp Presentationblackiron
 
Plateau Energy Metals Corp Presentation (July 2019)
Plateau Energy Metals Corp Presentation (July 2019)Plateau Energy Metals Corp Presentation (July 2019)
Plateau Energy Metals Corp Presentation (July 2019)Bianca Pisciola
 
20110901 bki corp_pres
20110901 bki corp_pres20110901 bki corp_pres
20110901 bki corp_presblackiron
 
20110405 bki corp_pres
20110405 bki corp_pres20110405 bki corp_pres
20110405 bki corp_presblackiron
 

La actualidad más candente (17)

20140203 bki corp_pres
20140203 bki corp_pres20140203 bki corp_pres
20140203 bki corp_pres
 
20140123 bki corp_pres
20140123 bki corp_pres20140123 bki corp_pres
20140123 bki corp_pres
 
20140301 bki corp_pres
20140301 bki corp_pres20140301 bki corp_pres
20140301 bki corp_pres
 
Corporate Presentation - May 2013
Corporate Presentation - May 2013Corporate Presentation - May 2013
Corporate Presentation - May 2013
 
Corporate Presentation - June 5, 2013
Corporate Presentation - June 5, 2013Corporate Presentation - June 5, 2013
Corporate Presentation - June 5, 2013
 
201505 bki corp_pres
201505 bki corp_pres201505 bki corp_pres
201505 bki corp_pres
 
Corporate Presentation 2017
Corporate Presentation 2017Corporate Presentation 2017
Corporate Presentation 2017
 
20140603 bki corp_pres
20140603 bki corp_pres20140603 bki corp_pres
20140603 bki corp_pres
 
201705 bki corp_pres v2
201705 bki corp_pres v2201705 bki corp_pres v2
201705 bki corp_pres v2
 
Black Iron February 2017 Corporate Presentation
Black Iron February 2017 Corporate PresentationBlack Iron February 2017 Corporate Presentation
Black Iron February 2017 Corporate Presentation
 
201703 bki corp_pres
201703 bki corp_pres201703 bki corp_pres
201703 bki corp_pres
 
Bki presentation july_2011
Bki presentation july_2011Bki presentation july_2011
Bki presentation july_2011
 
20110601 BKI Corp Presentation
20110601 BKI Corp Presentation20110601 BKI Corp Presentation
20110601 BKI Corp Presentation
 
Plateau Energy Metals Corp Presentation (July 2019)
Plateau Energy Metals Corp Presentation (July 2019)Plateau Energy Metals Corp Presentation (July 2019)
Plateau Energy Metals Corp Presentation (July 2019)
 
20110901 bki corp_pres
20110901 bki corp_pres20110901 bki corp_pres
20110901 bki corp_pres
 
20110405 bki corp_pres
20110405 bki corp_pres20110405 bki corp_pres
20110405 bki corp_pres
 
Temas powerpoint final-20210527
Temas powerpoint final-20210527Temas powerpoint final-20210527
Temas powerpoint final-20210527
 

Destacado

F&M Corporate Presentation_June 2012
F&M Corporate Presentation_June 2012F&M Corporate Presentation_June 2012
F&M Corporate Presentation_June 2012ForbesandManhattan
 
Corporate Presentation November 2014
Corporate Presentation November 2014Corporate Presentation November 2014
Corporate Presentation November 2014blackiron
 
2015084 bki corp_pres
2015084 bki corp_pres2015084 bki corp_pres
2015084 bki corp_presblackiron
 
Forbes & Manhattan Corporate Presentation
Forbes & Manhattan Corporate PresentationForbes & Manhattan Corporate Presentation
Forbes & Manhattan Corporate PresentationForbesandManhattan
 
Corporate Presentation August 2014
Corporate Presentation August 2014Corporate Presentation August 2014
Corporate Presentation August 2014blackiron
 
Fmc corporate presentationjune 2013
Fmc corporate presentationjune 2013Fmc corporate presentationjune 2013
Fmc corporate presentationjune 2013forbescoal
 
20140401 bki corp_pres
20140401 bki corp_pres20140401 bki corp_pres
20140401 bki corp_presblackiron
 
Black Iron 2016 Corporate Presentation
Black Iron 2016 Corporate PresentationBlack Iron 2016 Corporate Presentation
Black Iron 2016 Corporate Presentationblackiron
 
Fm corp presentation update september
Fm corp presentation update septemberFm corp presentation update september
Fm corp presentation update septemberForbesandManhattan
 
Forbes & Manhattan Corporate Presentation
Forbes & Manhattan Corporate PresentationForbes & Manhattan Corporate Presentation
Forbes & Manhattan Corporate PresentationForbesandManhattan
 
Corporate Presentation August 2013
Corporate Presentation August 2013Corporate Presentation August 2013
Corporate Presentation August 2013ForbesandManhattan
 

Destacado (20)

F&M Corporate Presentation_June 2012
F&M Corporate Presentation_June 2012F&M Corporate Presentation_June 2012
F&M Corporate Presentation_June 2012
 
Corporate Presentation November 2014
Corporate Presentation November 2014Corporate Presentation November 2014
Corporate Presentation November 2014
 
F&M Corporate Presentation
F&M Corporate PresentationF&M Corporate Presentation
F&M Corporate Presentation
 
2015084 bki corp_pres
2015084 bki corp_pres2015084 bki corp_pres
2015084 bki corp_pres
 
Forbes & Manhattan Corporate Presentation
Forbes & Manhattan Corporate PresentationForbes & Manhattan Corporate Presentation
Forbes & Manhattan Corporate Presentation
 
Corporate Presentation August 2014
Corporate Presentation August 2014Corporate Presentation August 2014
Corporate Presentation August 2014
 
Fmc corporate presentationjune 2013
Fmc corporate presentationjune 2013Fmc corporate presentationjune 2013
Fmc corporate presentationjune 2013
 
20140401 bki corp_pres
20140401 bki corp_pres20140401 bki corp_pres
20140401 bki corp_pres
 
F&M Corporate Presentation
F&M Corporate PresentationF&M Corporate Presentation
F&M Corporate Presentation
 
F&M Corporate Presentation
F&M Corporate PresentationF&M Corporate Presentation
F&M Corporate Presentation
 
F&M Corporate Presentation
F&M Corporate PresentationF&M Corporate Presentation
F&M Corporate Presentation
 
FM Manhattan August 2014
FM Manhattan August 2014FM Manhattan August 2014
FM Manhattan August 2014
 
Black Iron 2016 Corporate Presentation
Black Iron 2016 Corporate PresentationBlack Iron 2016 Corporate Presentation
Black Iron 2016 Corporate Presentation
 
Fm corp presentation update september
Fm corp presentation update septemberFm corp presentation update september
Fm corp presentation update september
 
Forbes & Manhattan Corporate Presentation
Forbes & Manhattan Corporate PresentationForbes & Manhattan Corporate Presentation
Forbes & Manhattan Corporate Presentation
 
F&M Corporate Presentation
F&M Corporate PresentationF&M Corporate Presentation
F&M Corporate Presentation
 
March 2012
March 2012March 2012
March 2012
 
F&M Presentation
F&M PresentationF&M Presentation
F&M Presentation
 
FM Presentation
FM Presentation FM Presentation
FM Presentation
 
Corporate Presentation August 2013
Corporate Presentation August 2013Corporate Presentation August 2013
Corporate Presentation August 2013
 

Similar a 20140401 bki corp_pres

Corporate Presentation - September 1, 2013
Corporate Presentation - September 1, 2013Corporate Presentation - September 1, 2013
Corporate Presentation - September 1, 2013blackiron
 
Corporate Presentation - September 1, 2013
Corporate Presentation - September 1, 2013Corporate Presentation - September 1, 2013
Corporate Presentation - September 1, 2013blackiron
 
Corporate Presentation December 2014
Corporate Presentation December 2014Corporate Presentation December 2014
Corporate Presentation December 2014blackiron
 
201610 bki corp_pres
201610 bki corp_pres201610 bki corp_pres
201610 bki corp_presblackiron
 
20110614 BKI Corp Presentation
20110614 BKI Corp Presentation20110614 BKI Corp Presentation
20110614 BKI Corp Presentationblackiron
 
Bki presentation july_2011
Bki presentation july_2011Bki presentation july_2011
Bki presentation july_2011blackiron
 
BeMetals Presentation_May 2022.pdf
BeMetals Presentation_May 2022.pdfBeMetals Presentation_May 2022.pdf
BeMetals Presentation_May 2022.pdfDerek Iwanaka
 
BeMetals Presentation_June 1, 2022.pdf
BeMetals Presentation_June 1, 2022.pdfBeMetals Presentation_June 1, 2022.pdf
BeMetals Presentation_June 1, 2022.pdfDerek Iwanaka
 
BeMetals Presentation_November 8, 2022.pdf
BeMetals Presentation_November 8, 2022.pdfBeMetals Presentation_November 8, 2022.pdf
BeMetals Presentation_November 8, 2022.pdfDerekIwanaka2
 
BeMetals Presentation_December 1, 2022.pdf
BeMetals Presentation_December 1, 2022.pdfBeMetals Presentation_December 1, 2022.pdf
BeMetals Presentation_December 1, 2022.pdfDerekIwanaka2
 
BeMetals Presentation_October 4, 2022.pdf
BeMetals Presentation_October 4, 2022.pdfBeMetals Presentation_October 4, 2022.pdf
BeMetals Presentation_October 4, 2022.pdfDerekIwanaka1
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentationblackiron
 

Similar a 20140401 bki corp_pres (12)

Corporate Presentation - September 1, 2013
Corporate Presentation - September 1, 2013Corporate Presentation - September 1, 2013
Corporate Presentation - September 1, 2013
 
Corporate Presentation - September 1, 2013
Corporate Presentation - September 1, 2013Corporate Presentation - September 1, 2013
Corporate Presentation - September 1, 2013
 
Corporate Presentation December 2014
Corporate Presentation December 2014Corporate Presentation December 2014
Corporate Presentation December 2014
 
201610 bki corp_pres
201610 bki corp_pres201610 bki corp_pres
201610 bki corp_pres
 
20110614 BKI Corp Presentation
20110614 BKI Corp Presentation20110614 BKI Corp Presentation
20110614 BKI Corp Presentation
 
Bki presentation july_2011
Bki presentation july_2011Bki presentation july_2011
Bki presentation july_2011
 
BeMetals Presentation_May 2022.pdf
BeMetals Presentation_May 2022.pdfBeMetals Presentation_May 2022.pdf
BeMetals Presentation_May 2022.pdf
 
BeMetals Presentation_June 1, 2022.pdf
BeMetals Presentation_June 1, 2022.pdfBeMetals Presentation_June 1, 2022.pdf
BeMetals Presentation_June 1, 2022.pdf
 
BeMetals Presentation_November 8, 2022.pdf
BeMetals Presentation_November 8, 2022.pdfBeMetals Presentation_November 8, 2022.pdf
BeMetals Presentation_November 8, 2022.pdf
 
BeMetals Presentation_December 1, 2022.pdf
BeMetals Presentation_December 1, 2022.pdfBeMetals Presentation_December 1, 2022.pdf
BeMetals Presentation_December 1, 2022.pdf
 
BeMetals Presentation_October 4, 2022.pdf
BeMetals Presentation_October 4, 2022.pdfBeMetals Presentation_October 4, 2022.pdf
BeMetals Presentation_October 4, 2022.pdf
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 

Último

VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 

Último (20)

VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 

20140401 bki corp_pres

  • 1. A Compelling Iron Ore Investment Opportunity Corporate Presentation April 2014 TSX: BKI
  • 2. TSX: BKI 2 Disclaimer Forward Looking Statement This Presentation contains ‘‘forward-looking information’’ within the meaning of applicable Canadian securities legislation. Forward-looking information is based on what management believes to be reasonable assumptions, opinions and estimates of the date such statements are made based on information available to them at that time, including those factors discussed in the section entitled ‘‘Risk Factors’’ in the Company’s annual information form for the year ended December 31, 2011 (and dated March 26, 2012) or as may be identified in the Company’s public disclosure from time to time, as filed under the Company’s profile on SEDAR at www.sedar.com. Forward-looking information may include, but is not limited to, statements with respect to results of the Feasibility Study (as defined below) and the mineral reserve and resource estimate, the future financial or operating performance of the Company, its subsidiaries and its projects, the development of and the anticipated timing with respect to the Shymanivske project, the ability to obtain financing; and the impact of concerns relating to permitting, regulation, governmental and local community relations. Generally, forward looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Estimates underlying the results of the Feasibility Study arise from engineering, geological and costing work of Lycopodium Minerals Canada Ltd. (“Lycopodium”), Soutex Inc. (“Soutex”), Watts, Griffis and McOuat Limited (“WGM”), Consulting Geologists and Engineers of Toronto, P&E Mining Consultants Inc. (“P&E”) and the Company. See the technical report relating to the feasibility study for a description of all relevant estimates, assumptions and parameters. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including but not limited to: general business, economic, competitive, geopolitical and social uncertainties; the actual results of current exploration activities; other risks of the mining industry and the risks described in the annual information form of the Company. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws. This Presentation does not constitute an offer to sell, or solicitation of an offer to buy, any securities by any person in any jurisdiction in which it is unlawful for such person to make such an offering or solicitation. No representation or warranty, express or implied, is made as to the accuracy or completeness of the information set out herein, and nothing contained herein is, or shall be relied upon, as a promise or representation, whether as to the past or future. Bankable Feasibility Study (the “Feasibility Study”) – For additional information, please see the Company’s press release dated January 23, 2014. *Resource estimate compiled using historic Soviet data by Hugues de Corta, who is an independent qualified person as defined by NI 43-101. Readers should not place undue reliance on historical estimates. *The mineral resource estimate for the Shymanivske Project is based on results from 185 historical drill holes totaling 37,316 meters and 60 Black Iron drill holes, which were drilled during the Company’s Twin Hole drill program and the Definition Drill program, totaling 16,518 meters and is effective as of September 2012. Watts, Griffis and McOuat Limted (“WGM”), Consulting Geologists and Engineers of Toronto, Canada, was retained to audit an in-house mineral resource estimate completed by Black Iron. Mr. Michael Kociumbas, P.Geo, Vice- President of WGM and Mr. Richard Risto, P.Geo, Senior Geological Associate of WGM, were retained by Black Iron as independent technical consultants and are Qualified Persons as defined by NI 43-101 and are responsible for reviewing and approving this mineral resource estimate. The Feasibility Study was prepared in accordance with the guidelines of National Instrument 43-101 by the independent firms of Lycopodium Minerals Canada Ltd.; Soutex Mineral & Metallurgical Consultants; Watts, Griffis and McOuat Limited; and P&E Mining Consultants Inc.. *Matt Simpson President & CEO of Black Iron, a Qualified Person as defined by NI-43-101, has reviewed and approved the scientific and technical information in this presentation.
  • 3. TSX: BKI 3 What Sets Black Iron Apart? Access to Skilled Labour & Infrastructure – Two of the Most Challenging Iron Ore Project Development Risks Key Development Risks Taxes/Royalties Human Resources Access to Infrastructure Community Opposition Licensing/Permitting Access to Water Electricity Supply Canada Brazil Africa Australia Ukraine 3
  • 4. TSX: BKI * Please see note on Page 2 4 Black Iron has ALL the Key Fundamentals for a Successful Low Cost Project in Place Exceptional Infrastructure • Significant infrastructure advantages (power, rail and port) with confirmed access and capacity • Skilled local workforce • Local partnerships Compelling Economics • Bankable Feasibility Study (Shymanivske Project): - 9.9Mtpa of 68% Fe Conc. - Pre-tax NPV8 of US$3.3B - Pre-tax IRR of 48% • Break even price of $54/t (after-tax) Sizeable Resource • Large NI 43-101 Compliant Resource* - Shymanivske 646Mt (M+I) @ 32% Fe 188Mt (Inf) @ 30% Fe - Zelenivske (upside) 1.1 - 1.8Bt potential Skilled Leadership • History of creating value for shareholders • Significant Ukrainian political and iron ore operations experience Close to Target Markets • Located in Kryvyi Rih, Ukraine a major iron ore district, close to Europe, Turkey, Russia, Asia and Middle East Metinvest Development Agreement • Ukraine’s largest company, 9th globally in iron ore, 16th in steel • Committed to half of project construction financing (est. $250-$500M)
  • 5. TSX: BKI Board of DirectorsKey Management Matt Simpson – President & CEO • Former General Manager, Mining for Rio Tinto’s Iron Ore Company of Canada • Worked for Hatch designing global metallurgical refineries George Mover – COO • Former Project General Director of Ferrexpo Yeristovo Mining, Ukraine • Since 1994 worked on numerous mining projects in Former Soviet Union (Ukraine, Russia, Kazakhstan, Armenia) Paul Bozoki – CFO • Former CFO of CD Capital Partners, operating in Former Soviet Union & Ukraine Aaron Wolfe – VP Corp Development • Former investment banker with Macquarie Nikolay Bayrak – VP Gov’t & Community Relations • Former department head, Ukrainian Ministry of Emergencies and Public Protection; Former MP and President of MP’s Parliamentary Social Club Bruce Humphrey – Chairman • Former Chairman of Consolidated Thompson Iron Mines Jaroslav Kinach • Former Advisor to Ukraine Prime Minister and former Ukraine Country Head of EBRD Chris Westdal • Canadian Ambassador to Ukraine (1996-98) and to Russia (2003-06) Pierre Pettigrew • Former Canadian Minister for Foreign Affairs and international Trade John Detmold • Chairman & Founder of Invecture Group, S.A. de C.V. which owns Frontera Copper Corporation Dave Porter • Former VP for Rio Tinto’s Iron Ore Company of Canada and COO of Algoma Steel Matt Simpson – President & CEO 5 A Track Record of Iron Ore Success with Rio Tinto’s Iron Ore Company of Canada, and Ferrexpo
  • 6. TSX: BKI 6 Project Backed by Forbes & Manhattan Success with Consolidated Thompson’s Bloom Lake Iron Mine • World class 8Mtpa iron ore concentrate mine in Quebec • Advanced from exploration stage through development to construction − 8 mtpa capacity (66% Fe concentrate) expanding to 16 mtpa − Completed scoping study, 3 feasibility studies, secured off-take with China’s third largest steel producer (WISCO) • Raised over Cdn$1 bn in capital • Attracted and put in place a qualified management team Recently acquired for $4.9 billion $1 mm market cap First F&M involvement Forbes&ManhattanInvolvement 2005 Q1-2011 Acquired for $4.9 billion
  • 7. TSX: BKI 7 Major Local Development Partner: Metinvest Ukraine’s Largest Company and a Global Iron Ore & Steel Producer • Over 100,000 employees; Generated US$12.6 billion of revenues and a 16% EBITDA margin in 2012 • Metinvest is owned by System Capital Management (SCM) and Smart Holding • SCM has over US$28.4B in assets and operations across 13 different areas including ownership of: • Global Commodity Ranking: • DTEK >18GW of electricity production (~26%) • Leman Trans, ~21% of railway cars • Portinvest, ~13% of Ukraine’s port capacity • 9th in Iron Ore with 33.9 MT • 16th in Steel with 18.4 MT • 33rd in Coal with 2.6 MT
  • 8. TSX: BKI Sound Capital Structure Attractive Valuation with Substantial Upside & Funding Support 8 Corporate StructureCapital Structure (TSX: BKI) Shares Outstanding 159.2 million Stock Options(1) 5.7 million Warrants(2) 17.7 million Fully Diluted Shares 182.6 million Market Cap(3) ~US$23.1 million Current Cash Balance(4) ~US$3.4 million Debt Balance nil 1. 5,713,750 options exercisable at a weighted average price of $0.45 per share. 2. 17,680,000 warrants expire Feb 20, 2017 with strike price of $0.25. 3. As at April 1, 2014, using a closing price of CAD $0.16 per share. 4. As at Dec 31, 2013 per Q4 Audited Financial Statements & Feb 20, 2014 Financing Metinvest Transaction Summary Analyst Coverage • Metinvest acquires 49% of Black Iron Cyprus for a total commitment up to US$535M – US$20M due at closing – Matching of any further equity financed capital • Metinvest option to increase ownership in Black Iron Cyprus to 51% − Option vests after 3 consecutive months of production at nameplate capacity − Option priced at a 30% premium to the fair market value as derived by an independent third party Black Iron Inc. (TSX: BKI) Metinvest B.V. (Ukraine private) Black Iron (Cyprus) Ltd. (Cyprus private) Shymanivske Steel (Ukraine private) Zelenivske Steel (Ukraine private) 51% 49% 100% 100%
  • 9. TSX: BKI 9 Deposits In Mining Friendly Region Adjacent to existing Iron Ore Producers • Two mining and exploration permits covering 5.92 km2 − Mining permit at Shymanivske, which has been extensively explored, covering 2.56 km2 valid until 2024 − Exploration permit at Zelenivske covering 3.36 km2 valid until 2014 • Adjacent to ArcelorMittal’s Kryvyi Rih iron ore complex and Metinvest & Evraz’s YuGOK iron ore mine • Plan to acquire a plot of land from Ukraine Government adjacent to the Shymanivske deposit for project waste dumps, concentrator and tailings Black Iron’s Shymanivske Project M&I: 646Mt @ 31.6% Inferred: 188Mt @ 30.1% Black Iron’s Zelenivske Project ArcelorMittal’s Kryvyi Rih Iron Ore Complex Metinvest & Evraz’s YuGOK Iron Ore Mine Railway lines ** See Black Iron’s website at www.blackiron.com for a Corporate Video highlighting the project location and infrastructure **
  • 10. TSX: BKI 10 Large Ore Deposit with Growth Potential • Banded iron formation consisting primarily of magnetite with some hematite − Iron band thickness ranges from 40-80 m − Only 9.7-21.2 m of overburden with a strip ratio of 1.63:1, life of mine; 1.36:1 for first 8 years − Very clean ore body low in phosphorus, manganese and aluminum • Resource defined by ~54,000 metres of drilling ― Black Iron completed a Twin Hole Drill Program consisting of 6,042 metres and a Phase II Drill Program consisting of 11,435 metres of infill drilling ― Total iron grade and band width align very well with 37,000 metres of historical drilled data • Potential for total combined resource expansion of 1.1 to 1.8BT − Additional drilling of Shymanivske at North end of deposit and to depth − Exploration of the Zelenivske project Shymanivske Resource* Tonnage (Mt) Fe Tot (%) Fe Mag (%) Measured 355.1 32.0 19.5 Indicated 290.7 31.1 17.9 Total Measured and Indicated 645.8 31.6 18.8 Inferred 188.3 30.1 18.4 * Please see note on page 2Tonnage and grade rounded to first decimals. Cut-off grade of 10% Fe Mag
  • 11. TSX: BKI 11 Potential Resource Extension at Shymanivske Ground Gravity Shows Iron Ore Mineralization at North End • Ground gravity and magnetic surveys show potential extension of iron ore mineralization at North end of property as circled in red • This area has not been included in the NI 43-101 resource as it has not yet been sufficiently drilled • The identified area will be a target of a future drill program to allow for a second phase process plant expansion to increase production and project value Potential resource upside to be drilled Drill hole Property boundary Very likely Iron in ground Likely just dirt in ground
  • 12. TSX: BKI Extensive Pit Shell Design and 3D Model Completed (Property Overview) 12 * Bankable Feasibility Study complete by Lycopodium Minerals Canada Ltd.
  • 13. TSX: BKI Concentrator Footprint Compressed by Staggering HPGRs and Stacking LIMS 13 * Bankable Feasibility Study complete by Lycopodium Minerals Canada Ltd.
  • 14. TSX: BKI 14 Conventional Flowsheet Producing High Quality Iron Ore Products Fe 68.0% SiO2 4.5% P 0.02% S 0.05% Al2O3 0.43% Mn 0.03% P80 32 µm B.F. Concentrate Fe 65.5% SiO2 4.5% S <0.01% CaO/SiO2 0.15% SiO2+Al2 O3 5.1% CaO+MgO 1.0% Compress. 318kg/pel B.F. Pellets Fe 69.5% SiO2 1.3% P 0.02% S 0.05% Al2O3 0.28% Mn 0.03% P80 32 µm D.R. Concentrate Fe 67.4% SiO2 2.0% S <0.01% CaO/SiO2 0.34% SiO2+Al2 O3 2.4% CaO+MgO 1.2% Compress. 283g/pel D.R. Pellets CoreProduct Value-Add Alternative Products
  • 15. TSX: BKI 15 Secured Infrastructure Access (Rail, Port Power) Key to a Successful Iron Ore Project • Letters of Intent in place for Electricity (140MW) and Natural Gas (900m3/hr @85kPa) • Paved roads to site, located 35km away from the major city of Kryvyi Rih which has a highly skilled work force • Letter of Intent in place for up to 20 million tonnes per year of rail capacity from site to Port Yuchniy • Black Iron’s Shymanivske Project is ~2 km from main state-owned rail line • Letter of Intent in place with a private operator at Port Yuzniy for 9.5 million tonnes per year +/- 15% • Port Yuzniy is located ~430 km away and provides access to the Black Sea and global seaborne iron ore markets ** See Black Iron’s website at www.blackiron.com for a Corporate Video highlighting the project location and infrastructure **
  • 16. TSX: BKI 16 Strategic Global Location Close Proximity to Target Markets with Abundant Port and Rail Access • Project is surrounded by steel mills in Europe, Turkey and the Middle East • River barge & rail access to Western Europe. • Five dry bulk tonnage ports accessible using railway running beside properties • Approx 20% to 25% shorter transport distance to growth markets of India and China compared to North and South American producers • Excellent Ukrainian logistical advantages • Densely populated roadway infrastructure • 468 million tonnes of cargo transported via rail • 155 million tonnes of cargo transported via ship
  • 17. TSX: BKI 17 Ukraine: A Mining Friendly Country in Transition • S&P Sovereign Risk rating of B − Next Presidential election to occur in Q1-2015 (5 year term) − GDP growth of 4.2% in 2010; 5.2% in 2011; 0.2% in 2012 (impacted by slowdown in global economy and steel production) − Member of WTO − Strong desire by citizens and business for European integration (and further separation from Russia) but government has delayed signing “Trade Agreement” over concerns of increased cost for Russian gas and trade restrictions • Joining the “Trade Agreement” with Europe would benefit Black Iron due to lower construction costs via reduced duties. However not joining is neutral for Black Iron, as the Bankable Feasibility Study was completed without those cost savings assumptions • Economy dominated by agriculture & commodities ― Steel production is Ukraine’s largest industry ― 60% of Ukraine’s total exports are commodity- related (the majority of which is steel) • Large, highly skilled labour force (pop. 45.4 million) − GDP per capita only $7600/yr − Literacy rate >99% • Mining friendly jurisdiction with strong local and national support ― ArcelorMittal and Ferrexpo plc have operated in-country for over 7 years • Legislated yearly corporate tax rate reductions to 16% in January 2016 from the current 18% rate • Favourable mining royalties of $0.09 per tonne of ore mined (<1%) payable to the Government $5Bn Investment in Integrated Iron Mine/Steel Mill $3.2Bn Market Cap Iron Ore and Steel Production in Ukraine $1.8Bn Investment in Shale Gas Development $10Bn Investment in Shale Gas Development Major Foreign Corporate Investors
  • 18. TSX: BKI 18 Source: Based on know production and reserves as listed in the USGS 2012 Iron Ore report Globally Significant Iron Ore District 4th largest iron ore producer & 2nd largest reserve base Global Distribution of Fe Reserves & Fe Production • Black Iron’s projects are located in the heart of Ukraine’s iron ore belt – 35km from Kryvyi Rih, city of 750,000 people • Iron ore district trends 300 km with sedimentary rock hosted banded iron formations (Dnenpovskog complex) • Historically well explored resource base but substantially under-exploited due to historic Soviet policy • 15 iron ore mines in Ukraine produced 88 million tonnes in 2012 Kiev Yeristovskoye Poltavsky GOK TsentralnyKryviy Rih Iron Ore Complex Ingulestky GOK Yuzhny GOK Kryviv Rih Ordzhonikize Gok Shymanivske Zelenivske C Gok YuGok 0% 10% 20% 30% 40% 50% 60% Asia Australia S.America FSU N.America Other Africa %ofWorldProductionandReserves Production Reserves Production Reserves 7% 21%
  • 19. TSX: BKI 19 Permit Process for Shymanivske Deposit Black Iron Remains on Track Exploration Permit Extraction Permit Land Allotment Construction Approval Operations Approval Deem deposit economical • Complete Ukraine version of scoping study including evaluation of various mining methods & high level environmental impact Pit shell reserves & environmental impact Gov approval • Complete field environmental (OVOS) & archeological studies for Gov approval • Submit pit shell design & mapped ground surface project for Gov. approval Obtain surface rights for mine, refinery & tailings • Land use analysis based on plot plan showing major buildings & agreed connections to utilities, rail and roads (Proekt) • Approval of the project location • Approval from all land owners & finalize lease Start mine overburden removal & plant construction • Detailed design approved (Expertisa) • Obtaining the construction permit • Commissioning of the facility • Registration of the ownership to the facility Explore resource potential • Conduct geophysical program • Drill ore body • State approval of explored deposit Operate mine & refinery • Ensure compliance with Ukraine Safety, Environment, Health and Employment laws as check by regular Gov inspections • Finalize environmental permits Mining Allotment Completed
  • 20. TSX: BKI Annual Production: 9.9 Mt Iron Content: 68.0% Estimated Capital Investment: (capital intensity, includes 15% contingency) US$1,097 million US$111/t Estimated Operating Expenses: (average FOB) (average at Mine Gate) US$44.54/t US$29.64/t Long-Term CFR Benchmark Price(62%): US$95/t Net Present Value (8%): (pre-tax) (after-tax) US$3.3 billion US$2.6 billion Internal Rate of Return: (pre-tax) (after-tax) 48% 39% Annual Average Cash Flow: (pre-tax) (after-tax) US$630 million US$536 million Projected Payback (8%): (pre-tax) (after-tax) 2.0 years 2.5 years Estimated Mine Life: modelled reserve total defined resource 14 years ~19 years Projected Plant Start-Up Q4 2016 Projected Revenue Commencement Q1 2017 BFS Highlights – High Grade Concentrate High Value, Low Net Cost Iron Ore Development Project 20 ** See Disclaimer on page 2 *** Bankable Feasibility Study completed by Lycopodium
  • 21. TSX: BKI Black Iron’s Operating Cost Competitiveness Shymanivske: First Quartile to Local Markets; Second Quartile to China 21** See Disclaimer on page 2 ** Source: Company data; Wood Mackenzie; BMO Capital Markets * Adjusted for iron content and shipping distance 2013E Iron Ore Cost Curve BKI delivered to Europe/Middle East Markets BKI delivered to China World Cumulative Production (%) Spot: $116/t TotalCashCost(US$/tCFRChina)
  • 22. TSX: BKI ** See Disclaimer on page 2 ** Black Iron’s Capital Cost Advantage Shymanivske Relative to Other Iron Ore Projects 22 Vale(Shimandou1) AfricanMinerals(phase2) Xstrata(Askaf) AfricanMinerals(DSO) ArcelorMittal(Western… Fortescue(Expansion) BlackIron RioTinto(IOC) Sundance Kumba Ferrexpo(Yeristovo) IRC(Kuranakh) LondonMining IRC(K&S) Alderon Auila(Hardey) Xstrata(Zanaga) AtlasIron(Ridley) RioTinto(Pilbara) Gindalbie(Karara) AngloAmerican(MinasRio) BHP(RGP5&6) Aquila(WestPilbara) ArcelorMittal(Western… BHP(Samarco) AtlasIron(BallaBalla) CITICPacific(Sino) Baffinland Xstrata(GeulbelAouj) GrangeResources… 84 87 90 92 109 109 111 122 134 135 141 142 157 159 159 160 167 180 186 188 189 190 192 200 211 217 221 222 236 258 CAPEX Forecast (US$/t of capacity) Source: Company data; Renaissance Capital estimates Average = 162 0% 25% 50% 75% 100%
  • 23. TSX: BKI Disclaimer: Post-tax and royalty graphs are for illustrative purposes only using simple math. These numbers have not been reported, nor are they substantiated by a financial model. 1 Super-Profits tax >A$75 million profit. 2 Includes Brazil mining tax of $4 / tonne of iron ore. 3 Legislated Corp tax rate as at Jan 1, 2016. 4 Royalties of $0.09 per tonne of ore mined. 5 LabMag Project Quoted for New Millenium Macarthur Centaurus IronRoad Northland Brockman Gindalbie Alderon BlackIron 0.1 0.3 0.6 1.0 1.8 1.8 1.9 2.6 2.8 Post-Tax & Royalty NPV8 (US$ billions) Source: Company data; Press Release; Research Estimates New Millenium Alderon Northland Gindalbie Brockman BlackIron 18.2 29.3 32.0 35.0 38.0 48.0 Pre-Tax & Royalty IRR (%) New Millenium Gindalbie Brockman Northland Alderon BlackIron 14.1 18.9 20.5 22.7 23.1 39.1 Post-Tax & Royalty IRR (%) Tax Regime Royalties 30% +30%1 39%2 29% 16%3 5% 2% 5-8% <0.1%4 New Millenium New Millenium Macarthur Centaurus IronRoad Northland Alderon Brockman BlackIron Gindalbie 0.3 0.5 1.1 1.5 3.2 3.3 3.3 3.4 5.8 Pre-Tax & Royalty NPV8 (US$ billions) Black Iron Stacks Up Relative to Competition Strong Economics Reinforced by Favourable Tax and Royalties 23
  • 24. TSX: BKI Black Iron’s Target Capital Funding Strategy 49% of Equity Capital Solidified with Metinvest Transaction; 100% of Off-Take Still Available ** See Disclaimer on page 2 ** Estimated Capital Investment US$1.1 billion Equity Investment Debt Investment Black Iron Inc. (TSX: BKI) Metinvest 9.9Mtpa Off-take Export Credit Agencies Bank Debt / High-Yield Bonds Capital Markets 60%40% 49%51% (US$250-300 million) (US$0-50 million) (US$300-400 million) (US$250-350 million) Significant Off-take Opportunity with Equity Funding Support from Metinvest ** % and $ amounts are indicative only and subject to negotiation ** (US$250-300 million) 24
  • 25. TSX: BKI Black Iron Continues to Deliver Shymanivske Project Development Timeline 2011-2012 2013 Scoping Study/PEA Bankable Feasibility Study Off-take Construction Drill metallurgical holes Definition Drilling Land Acquisition Detailed Engineering Production Future ** See Disclaimer on page 2 ** Pilot Plant Test Work 2014 Permitting Milestone Achieved 2014 Milestone 25       
  • 26. TSX: BKI 26 Black Iron Value Proposition Close to Steel Mills in: W.Europe, Turkey, Russia, Asia and Middle East Close to Target Markets Large iron ore deposit with NI 43-101 compliant resource* • 646 Mt Measured & Indicated resource @ 31.6% iron; additional 188 Mt of Inferred resource @ 30.1% iron, which will be concentrated to ~68% iron • Potential for resource expansion to 1.1-1.8 Bt Sizable Resource Excellent access to skilled labour, power, rail & ports Exceptional Infrastructure Experienced management team and Board with history of creating value for shareholders of RioTinto and Ferrexpo Skilled Leadership High margins due to close proximity to multiple steel mills, skilled labour cost advantage and favourable corporate tax rate of 16% • Bankable Feasibility Study for 9.9Mt of high-grade 68% iron ore concentrate – NPV of US$3.3 billion and 48% IRR (US$2.6 billion and 39% after-tax) Compelling Economics * Please see note on Page 2 26 Strategic Partners Metinvest: Largest company in Ukraine; committed to half of project financing
  • 27. TSX: BKITSX: BKI Shymanivske Project Site Paved Road High voltage power linesState-owned rail line
  • 28. CONTACT INFORMATION 65 Queen Street West Suite 805, P.O. Box 71 Toronto, Ontario, Canada M5H 2M5 www.blackiron.com TSX: BKI Investor Relations Toronto: +1 (416) 309-2134 - Michael McAllister, IR Manager Ukraine: +380 (56) 409-2536 info@blackiron.com Follow us: