The 2014 master budget for total costs was $293,250, with variable costs of $104,760, fixed costs of $181,700, and a production level of 10,800 units. The 2014 flexible budget for total costs was $304,980, calculated using actual production of 11,500 units, variable costs of $111,550 and fixed costs of $193,430.