4. PRELIMINARY DATA REQUIRED IN
DECISION MAKING
Product requirements
Quality Specifications
Volume (Total Schedule)
Availability of Facilities
Economic Factors
Longevity of Product
Cost Estimate
Capacity
Safety Requirements
Others…
5. DESIGN OF PRODUCT
Size
Shape
Handling Care
Weight
Material
Ultimate Use
6. DESIGN OF PROCESS
Operations Required
Operation Sequence
Location Points
Dimensions and Tolerances
Machines, Tools, Gages and
Equipment Required
7. DESIGN OF OPERATOR METHOD
Establishment of Man-Job
Relationship by determining:
How the Operator is to perform the
operation
Workspace
Flow
Economic Evaluation
Coordination of Information with
other Planning functions to be sure,
all pieces fit together and are
workable as related to Control of
Operator Method
8. DESIGN OF TOOLS AND
EQUIPMENT
Jigs
Fixtures
Dies
Gages
Tools
Machines
9. DESIGN OF PLANT LAYOUT
Location of Tooling and
Equipment
Location of Stock Supply
Location of Services
(Utilities)
Workspace
Material Handling
Equipment
Man Machine Relationship
10.
11. DETERMINATION OF TIME
Establish Time for:
Mechanical Activity
Operator Activity
oCyclic
oNon Cyclic
Cost Estimates
Overall Labour Controls
13. Installation
of Facilities
Tryout of
Facilities &
Materials
(Test Runs)
Release of
Routing for
Labour
Control
Assignment
of
Operators
Installation
of Specified
Operator
Method
through
Training of
Operators
Verification
of Method
Time
Relationship
15. SYSTEMATIC FOLLOWUP TO
COMPARE
Record of
Specified
Method
Vs
Actual Operator
Method
Improvement
Possibilities
Deteriorated
Method
Incorporation of
Desirable
Features
Deteriorated
Method
Improved
Method