The TheodoliteCivil Engineer Sergio Andres Gonzalez Barrera    Section “M”         ID: 201114078 TechnicalEnglish
The importance of the theodolite The importance of the theodolite is that is necessary use  this instrument to determine angles, distances, depths, etc. To know how the ground is  and how to construct there.
What is it? The theodolite is an useful tool by the surveys. The instrument is capable of finding both vertical and horizontal angles, and when is combined with technical studies also can determinate horizontal distances and a differentiation elevations.
Setup of the theodolite! First, the survey team puts a mark in the floor, this point will be the vertex of the angle that will be determined and this point will be the station “A”. Then, the survey team places the tripod over the station “A”, opening the feet and secure them.
Setup of the theodolite! Next, the survey team takes out the theodolite of its case and adapts it over the tripod with the screw and then elevates the theodolite up to survey’s eyes.  The theodolite has to stay exactly over the mark of the floor; this can be possible putting a plumb tied with a fine wire below the theodolite and stays on the point.
The survey must observe through the optical plummet to make sure the mark is centered. To end the leveling of the theodolite is necessary to be leveled the tree bubble levels with the level’s screws. Setup of the theodolite!
 Turning on! First put the batteries in its place, then turn on the theodolite and last, take the cover of the lens.
Make a survey  First, measure the height between the floor and the mark that is in one side of the theodolite with a rod or a tape measure. This point will be a reference to the other stations.      Next, place a person with the rod at the station “B” to determine the angle. This take place when the surveyor moves the theodolite horizontally and the vertical axis, for lower movements is necessary to use the vertical tangent screw and the horizontal tangent screw.
Make a survey Then, when the angle appears in the screen write the number, then press the button         twice and the screen will show 0’00’00’’. Note: write the upper stadia and the lower stadia to make studies latter.
This will be our initial point, and then the survey determinates point “C” in the same way, moving the axis focusing the point in the rod. And in the screen will appear the horizontal angle “B”A”C”.      Finally, proceed to turn the vertical and horizontal axis 180 ͦ and make the process again in the points “B” and “C”.   Make a survey
This is the process to determine the horizontal angle. Angles:
The parts of the theodolite ,[object Object]
Vertical Clamp: is used when measuring vertical angles.

Más contenido relacionado

La actualidad más candente

Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital TheodoliteEhab AL-Timimi
 
LEVELLING METHODS AND INSTRUMENTS IN SURVEYING
LEVELLING METHODS AND INSTRUMENTS IN SURVEYINGLEVELLING METHODS AND INSTRUMENTS IN SURVEYING
LEVELLING METHODS AND INSTRUMENTS IN SURVEYINGATHIRA B K
 
Theodolite angle measurement
Theodolite angle measurementTheodolite angle measurement
Theodolite angle measurementMujeeb Muji
 
Surveying practical work book
Surveying practical work bookSurveying practical work book
Surveying practical work bookTalha Hussain
 
คู่มือการใช้งานโปรแกรม Photoshop cs
คู่มือการใช้งานโปรแกรม Photoshop csคู่มือการใช้งานโปรแกรม Photoshop cs
คู่มือการใช้งานโปรแกรม Photoshop cssamnaknit
 

La actualidad más candente (7)

Surveying by using Digital Theodolite
Surveying by using Digital TheodoliteSurveying by using Digital Theodolite
Surveying by using Digital Theodolite
 
Theodolite
TheodoliteTheodolite
Theodolite
 
LEVELLING METHODS AND INSTRUMENTS IN SURVEYING
LEVELLING METHODS AND INSTRUMENTS IN SURVEYINGLEVELLING METHODS AND INSTRUMENTS IN SURVEYING
LEVELLING METHODS AND INSTRUMENTS IN SURVEYING
 
Theodolite angle measurement
Theodolite angle measurementTheodolite angle measurement
Theodolite angle measurement
 
Surveying practical work book
Surveying practical work bookSurveying practical work book
Surveying practical work book
 
คู่มือการใช้งานโปรแกรม Photoshop cs
คู่มือการใช้งานโปรแกรม Photoshop csคู่มือการใช้งานโปรแกรม Photoshop cs
คู่มือการใช้งานโปรแกรม Photoshop cs
 
Theodolite
TheodoliteTheodolite
Theodolite
 

Similar a The theodolite

Surveying and leveling-2
Surveying and leveling-2Surveying and leveling-2
Surveying and leveling-2Gulfam Akram
 
Theodolite ppt in 7
Theodolite ppt in 7Theodolite ppt in 7
Theodolite ppt in 7Arun Kama
 
ASU(CE4G)-Theodolite (1).ppt
ASU(CE4G)-Theodolite (1).pptASU(CE4G)-Theodolite (1).ppt
ASU(CE4G)-Theodolite (1).pptRESHMAFEGADE
 
Lecture 7 topographic related documents Survey
Lecture 7 topographic related documents  SurveyLecture 7 topographic related documents  Survey
Lecture 7 topographic related documents Survey40023ce
 
Guide about Theodolite Calibration Service which used in Surveying
Guide  about Theodolite Calibration Service which used in SurveyingGuide  about Theodolite Calibration Service which used in Surveying
Guide about Theodolite Calibration Service which used in SurveyingFalcon Geomatics LLC
 
2 AS LECTURE (28-09-22).pptx
2 AS LECTURE (28-09-22).pptx2 AS LECTURE (28-09-22).pptx
2 AS LECTURE (28-09-22).pptxaashrayKawalkar
 
Theodolite surveying part 1 (I scheme MSBTE)
Theodolite surveying part 1 (I scheme MSBTE)Theodolite surveying part 1 (I scheme MSBTE)
Theodolite surveying part 1 (I scheme MSBTE)Naufil Sayyad
 
WHAT IS DUMPY LEVEL IN SURVEYING
WHAT IS DUMPY LEVEL IN SURVEYINGWHAT IS DUMPY LEVEL IN SURVEYING
WHAT IS DUMPY LEVEL IN SURVEYINGpwhite91
 
2 AS LECTURE (03-10-22).pptx
2 AS LECTURE (03-10-22).pptx2 AS LECTURE (03-10-22).pptx
2 AS LECTURE (03-10-22).pptxaashrayKawalkar
 
Theodolite_surveying.ppt
Theodolite_surveying.pptTheodolite_surveying.ppt
Theodolite_surveying.pptsivaganesan23
 
Theodolite and measurement of angles
Theodolite and measurement of anglesTheodolite and measurement of angles
Theodolite and measurement of anglesRajendra Prasad
 
Unit No 2 Theodolite Surveying and Traversing.pptx
Unit No 2  Theodolite Surveying and Traversing.pptxUnit No 2  Theodolite Surveying and Traversing.pptx
Unit No 2 Theodolite Surveying and Traversing.pptxADCET, Ashta
 
Theodolite Survey basic in civil engineering.ppt
Theodolite Survey basic in civil engineering.pptTheodolite Survey basic in civil engineering.ppt
Theodolite Survey basic in civil engineering.pptUjasPandya2
 
Introduction About Theodolite Instrument Theoretical part
Introduction About Theodolite Instrument Theoretical part Introduction About Theodolite Instrument Theoretical part
Introduction About Theodolite Instrument Theoretical part Bahzad5
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying neharajpl
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying neharajpl
 

Similar a The theodolite (20)

Surveying and leveling-2
Surveying and leveling-2Surveying and leveling-2
Surveying and leveling-2
 
Theodolite ppt in 7
Theodolite ppt in 7Theodolite ppt in 7
Theodolite ppt in 7
 
ADS .pptx
ADS .pptxADS .pptx
ADS .pptx
 
ASU(CE4G)-Theodolite (1).ppt
ASU(CE4G)-Theodolite (1).pptASU(CE4G)-Theodolite (1).ppt
ASU(CE4G)-Theodolite (1).ppt
 
Lecture 7 topographic related documents Survey
Lecture 7 topographic related documents  SurveyLecture 7 topographic related documents  Survey
Lecture 7 topographic related documents Survey
 
Surveying Lab II Manual
Surveying Lab II ManualSurveying Lab II Manual
Surveying Lab II Manual
 
Guide about Theodolite Calibration Service which used in Surveying
Guide  about Theodolite Calibration Service which used in SurveyingGuide  about Theodolite Calibration Service which used in Surveying
Guide about Theodolite Calibration Service which used in Surveying
 
2 AS LECTURE (28-09-22).pptx
2 AS LECTURE (28-09-22).pptx2 AS LECTURE (28-09-22).pptx
2 AS LECTURE (28-09-22).pptx
 
Theodolite surveying part 1 (I scheme MSBTE)
Theodolite surveying part 1 (I scheme MSBTE)Theodolite surveying part 1 (I scheme MSBTE)
Theodolite surveying part 1 (I scheme MSBTE)
 
WHAT IS DUMPY LEVEL IN SURVEYING
WHAT IS DUMPY LEVEL IN SURVEYINGWHAT IS DUMPY LEVEL IN SURVEYING
WHAT IS DUMPY LEVEL IN SURVEYING
 
2 AS LECTURE (03-10-22).pptx
2 AS LECTURE (03-10-22).pptx2 AS LECTURE (03-10-22).pptx
2 AS LECTURE (03-10-22).pptx
 
Theodolite_surveying.ppt
Theodolite_surveying.pptTheodolite_surveying.ppt
Theodolite_surveying.ppt
 
Theodolite and measurement of angles
Theodolite and measurement of anglesTheodolite and measurement of angles
Theodolite and measurement of angles
 
Theodolite lecture 1 1
Theodolite lecture 1 1Theodolite lecture 1 1
Theodolite lecture 1 1
 
Unit No 2 Theodolite Surveying and Traversing.pptx
Unit No 2  Theodolite Surveying and Traversing.pptxUnit No 2  Theodolite Surveying and Traversing.pptx
Unit No 2 Theodolite Surveying and Traversing.pptx
 
Theodolite Survey basic in civil engineering.ppt
Theodolite Survey basic in civil engineering.pptTheodolite Survey basic in civil engineering.ppt
Theodolite Survey basic in civil engineering.ppt
 
Introduction About Theodolite Instrument Theoretical part
Introduction About Theodolite Instrument Theoretical part Introduction About Theodolite Instrument Theoretical part
Introduction About Theodolite Instrument Theoretical part
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
 

The theodolite

  • 1. The TheodoliteCivil Engineer Sergio Andres Gonzalez Barrera Section “M” ID: 201114078 TechnicalEnglish
  • 2. The importance of the theodolite The importance of the theodolite is that is necessary use this instrument to determine angles, distances, depths, etc. To know how the ground is and how to construct there.
  • 3. What is it? The theodolite is an useful tool by the surveys. The instrument is capable of finding both vertical and horizontal angles, and when is combined with technical studies also can determinate horizontal distances and a differentiation elevations.
  • 4. Setup of the theodolite! First, the survey team puts a mark in the floor, this point will be the vertex of the angle that will be determined and this point will be the station “A”. Then, the survey team places the tripod over the station “A”, opening the feet and secure them.
  • 5. Setup of the theodolite! Next, the survey team takes out the theodolite of its case and adapts it over the tripod with the screw and then elevates the theodolite up to survey’s eyes. The theodolite has to stay exactly over the mark of the floor; this can be possible putting a plumb tied with a fine wire below the theodolite and stays on the point.
  • 6. The survey must observe through the optical plummet to make sure the mark is centered. To end the leveling of the theodolite is necessary to be leveled the tree bubble levels with the level’s screws. Setup of the theodolite!
  • 7.  Turning on! First put the batteries in its place, then turn on the theodolite and last, take the cover of the lens.
  • 8. Make a survey First, measure the height between the floor and the mark that is in one side of the theodolite with a rod or a tape measure. This point will be a reference to the other stations. Next, place a person with the rod at the station “B” to determine the angle. This take place when the surveyor moves the theodolite horizontally and the vertical axis, for lower movements is necessary to use the vertical tangent screw and the horizontal tangent screw.
  • 9. Make a survey Then, when the angle appears in the screen write the number, then press the button twice and the screen will show 0’00’00’’. Note: write the upper stadia and the lower stadia to make studies latter.
  • 10. This will be our initial point, and then the survey determinates point “C” in the same way, moving the axis focusing the point in the rod. And in the screen will appear the horizontal angle “B”A”C”. Finally, proceed to turn the vertical and horizontal axis 180 ͦ and make the process again in the points “B” and “C”.   Make a survey
  • 11. This is the process to determine the horizontal angle. Angles:
  • 12.
  • 13. Vertical Clamp: is used when measuring vertical angles.
  • 14. Optical Sight: is used to observe a particular point.
  • 15. Vertical Tangent screw: is used to make very slow movements in the vertical circle.
  • 16. Internal Switch Port: is used to add a particular piece of the theodolite.
  • 17.
  • 18. Power Switch: is used to turn on the theodolite.
  • 19. Plate Level: is used: the purpose of the plate level adjustment is to make the vertical axis of the theodolite truly vertical when the bubble of the plate level is centered in the vial.
  • 20. Horizontal Tangent screw: is used to make very slow movements in the horizontal circle.
  • 21. Leveling Screws: are used in the leveling of the plate level.
  • 22. Base Plate: is where the theodolite is adapted with the tripod.