CONSTRUCTION SITE REPORT 
INDIVIDUAL ASSIGNMENT 
Chin Tze Wei-0315767
TABLE OF CONTENT 
No Title Pages 
1. Cover page 1 
2. Table of content 2 
3. Introduction and objectives of the assignment 3-4 
4. Content/ Technical observation 5-8 
5. Photos and descriptions 9-13 
6. Learning outcome/ Conclusion 14
INTRODUCTION 
This assignment involved a combination of Building Materials, Construction Technology 
and measurement, in which each student are required to write down a report regarding 
the site visit to the construction site. Since there are about 45 students in our course, we 
were to be divided into two groups on the day of the site visit. As for me, I was among 
those in group 1. In fact the site visit was organized by Miss Ang Fuey Lin to be held on 
the 21 November 2014. 
The site called D'Latour, developed by the Penang-based DK-MY Properties SDN BHD 
was located at the following address: 
No.4, Jalan PPU 3, Taman Perindustrian Puchong Utama, 47100 Puchong, Selangor 
Darul Ehsan. 
It is actually at a walking distance from our school, Taylor's Lakeside University 
Campus. So it is convenient for us to walk to the site directly from Taylors. On the 
eventful day, those who are in group 1 are to be there on time at 9:00am sharp. We 
must also comply to the rule and regulations that we must wear our helmet, long pants 
and safety boots when entering the site. Then we are given a tour of the place by a few 
site contractors who are nice enough to give us a thorough explanation of of the 
materials, technologies and structures involved. Accompanying us are a few of our 
lecturers. 
D'latour comprises of two 23-storey towers with 332 serviced suites in one and 629 
SoHo duplexes in the other. It occupies three acres and has a total built-up area of 1.7 
million sq. ft. Curving gracefully up into the Bandar Sunway skyline, it is built to master-class 
quality and infused with the most demanding standards. Comprising two designer 
towers( D'Latour SoHo and D'Latour Residence),D'Latour is set to become the next big 
thing in terms of residential landmark in Bandar Sunway. 
It one of the kind design features includes: 
 Vertical garden city concept 
 Internal void area for better natural ventilation 
 Elevated infinty swimming pool with waterfall feature 
 Environmental friendly Sky Garden at various at various floors 
 Roof Top Sky Hub 
 Distinctive 'Welcome Home' lobby
 The designer of D'Latour was the world-class architecture company RDA Harris 
Architects Sdn Bhd which is responsible for the design of multiple award winning 
developments around the world. 
OBJECTIVE 
The objectives of the site visit are as followed: 
 To enable us to get firsthand experience on the actual working environment of 
the life of a quantity surveyor on site. 
 To further enhance our knowledge on the step by step involvement of the 
construction process. 
 To allow us to have a deeper understanding on the types of building materials 
and construction technologies on site. 
 To raise awareness on the importance of taking care of our personal safety as 
well as taking the precautionary steps to prevent accidents from arising. 
 To be able to gather new construction knowledge that we have never learnt in 
class. 
 To allow us to have a better grasp of how importance teamwork and 
communication skills are to construction team such as engineering, project 
managers, contractors and workers. 
 To able to get first -hand knowledge on the functions of the usage of machineries 
on site 
 Able to get a clearer image on the structures that we are unable to see.
CONTENT 
Once we have arrived at the site, the first thing that caught my eyes is the precautionary 
sign board outside the entrance the site. This is to make sure that we are following the 
proper rules and safety regulations required of us. Along the outside surrounding area 
of the site fenced by vertical hording lies the project information board. It clearly give me 
a clearer picture of the architects, quantity surveyors, developer involved and the 
estimated time it takes for the project to finish. The usage of the vertical hoarding is to 
stop unauthorized person access into the site. 
Not a far distant away, we can find a guard house to guard against unauthorized person 
access into the site. The guard house is made of plywood and zinc roofing. Then we are 
guided into the site by a few of our lecturers accompanied by some site contractors. 
Along the way, we are able to get a glimpse of some of the workers inside their 
temporary houses resting themselves and temporary toilets for them to do their 
business. 
Along the surrounding area of the structural buildings lied a few independent scaffolding 
with safety net casts around it to prevent workers from falling down. Each scaffolding 
has stair like structures built to allow workers easy to move about. The material used for 
the scaffolding is steel. The scaffolding can also be assembled and disassembled. It is 
to provide employees safer access to work locations, level and stable working platforms 
and temporary storage for tools and materials for performing immediate tasks. 
Through the information we gathered from one of the site constructor, the type of piling 
used for the building is micro-pile. It is another type of pile which acts as a supporting 
structure to transfer the load from the building to the ground. Micro-piles are small 
diameter piles constructed by the drilling process and are often keyed into rock. There is 
various diameter of micro-pile that can be found in the market ranging from 100mm to 
250mm. Micro-pile is used to meet the demands for low noise and vibration regulations 
especially in congested environments around the site. 
There are also different types of machineries found on the site like tower crane, the 
normal type crane, saw for cutting the required size of the reinforcement bars and silent 
generators. As in any other site, the tower crane is a common sight to behold. It is 
normally employed in the construction industry for the movement of materials such as 
steel, concrete, large tools and generators. This is because it gives the best 
combination of height and lifting capacity. Meanwhile the silent generators are installed 
to supply electricity to main part of the buildings especially electrical machineries. There 
is also the used of mobile access tower being used for the convenient of the workers 
when continuing their work on the basement of the buildings.
The types of formwork required are: 
 Beam formwork 
 Column formwork 
 Slab formwork 
As we investigated around the vicinity of the area, we have found out from the site 
constructors on the different types of formwork used. Formwork is an artificial support 
provided below and around the precast or cast in-situ concrete work. The types of 
formwork are as followed: 
 Steel formwork 
 Timber formwork 
 Plywood formwork (Table formwork) 
Steel Formwork 
Steel Formwork consists of panels fabricated out of thin steel plates stiffened along the 
edges by small steel angles. The panel units are held together through the use of 
suitable clamps, bolts and nuts. Steel forms are mainly used on the site where large 
number of reuses of the shuttering is possible. This type of shuttering is considered 
most suitable for circular or curved structures. 
ADVANTAGES 
It is reusable for a number of times 
 Smooth finishes are obtainable 
 Easy to fixed 
 Uniform size and surface 
 Very strong and able to withstand heavy loads 
 More durable than timber formwork 
DISADVANTAGES 
 More expensive than wood formwork
TIMBER FORMWORK 
ADVANTAGES 
 Easy to handle because of it light-weight 
 Easy to disassemble 
 Damaged parts can be replaced with new ones 
 Very flexible 
 Easy to produce 
 Easily available 
DISADVANTAGES 
 Have limited reusability 
TABLE FORMWORK 
It is a table form that is a large pre-assembled formwork and false work unit to form a 
complete bay of suspended floor slab. This type of formwork offers mobility and quick 
installation that is highly suitable for flat slab, beam and slab layouts. It is a simple 
structure which is easy to assemble and disassemble and be reused. 
Once the assembled table formwork units are placed into position and the joints sealed, 
reinforcement is then fixed and the concrete for the slab is cast. After the concrete has 
achieved sufficient strength, the complete table is lowered from under slab before 
moving to the next position by crane. 
ADVANTAGES 
 Fast construction for large floor layouts. 
 Fully assembled units can be manoeuvred quickly into place. 
 Using appropriate quality control, high quality surface finishes can be achieved. 
 Reduced long-term workforce requirement on site. 
 The need for infill areas and decking joints is minimized. 
 Individual components of the formwork system can be precisely adjusted. 
 Repetitive nature of the work makes it easier to plan construction activities. 
DISADVANTAGES 
 Cost of materials and use of cranes are expensive
As we walk in and out of the building, I managed to spot some building materials like 
starter bars, PVC pipes, Stirrups, linkers, flat anchorage, telescopic props, concrete and 
many more either lying in a heap to be used later or already installed in place for its 
specific function. This does shows for that specific type of buildings, it involves a lot of 
materials just to construct it. Material storage can also be found in one part of the 
corner. That is used to store materials and be used for future purposes. Further inside 
of the construction building, there will be a few independent scaffolding in placed for the 
workers to climb above to continue on with the progression of their works. 
Moreover, the concrete used for almost all part of structural building is grade 40. As the 
concrete grade increases it strength will also increase. However grade 35 concrete can 
also be acted as another alternative. Meanwhile concrete grade 15 and grade 20 is 
used for column and slab respectively. Due to the increased in strength in concrete, it is 
more than enough to withstand fire and forces. As the duration of the one hour spent 
have concluded, I managed to take some useful pictures of the stuffs that caught my 
eyes. Not only that I was able to identify the types of materials and technologies 
involved in the entire site.
CONCLUSION 
After the site visit, I was able to gain countless of valuable information and knowledge 
from the construction site. It is to give us an idea of how our line of work will be when we 
eventually graduate and started working as a qualified quantity surveyor. 
Through this visit, I was able to expand my knowledge by exploring the different types of 
building materials found on site. This same type of building materials are going to be 
used for the construction of the building. All of this is going to enhance my theory 
knowledge in relation to notes given by the lecturer by applying practical knowledge as 
to how the materials are being applied on site. The constructors also give a thorough 
explanation on the usage and functions of the types of construction technologies 
available to them on site. 
Furthermore I have witness how important it is for communication to exist between the 
construction team. For if there is communication between the construction committee, 
they tend to work in according to plan to try finish the construction within the duration of 
the time limit given. So as a result of that the whole entire operation will be run smoothly 
without any incidents. 
Other than that, there is the importance of safety that we need to bear in mind when 
entering the premises of a construction site. We were given a brief talk on the 
importance of safety by the safety officer before we continue on with our visit. From then 
I realized how importance safety is not only to us visitors but also to workers involved in 
the construction site. So to abide to the rules, we are required to wear a safety helmet 
and safety boots at all times on site. To put further practice of awareness among us, 
there will be safety precautions signboards placed around the buildings to remind of 
there will be dangers looming around the corner if we are abide to the safety rules and 
regulations 
In conclusion, I believe that this site visit is a very worthwhile one to be in. Since this site 
visit is the first chance I have to visit a construction site, I really hope to be given a 
similar chance in the near distant future as it not only enhances my knowledge on the 
materials and technologies it also is beneficial to my future.

Más contenido relacionado

La actualidad más candente

PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
Amritpal Singh
 
PROJECT 1 (BUILDING CONSTRUCTION 1)
PROJECT 1 (BUILDING CONSTRUCTION 1)PROJECT 1 (BUILDING CONSTRUCTION 1)
PROJECT 1 (BUILDING CONSTRUCTION 1)
Crysmond Goh
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
w ss
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
Nabeel Rajpoot
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
Yap Xin
 

La actualidad más candente (20)

National mosque
National mosqueNational mosque
National mosque
 
Construction site report
Construction site reportConstruction site report
Construction site report
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
 
PROJECT 1 (BUILDING CONSTRUCTION 1)
PROJECT 1 (BUILDING CONSTRUCTION 1)PROJECT 1 (BUILDING CONSTRUCTION 1)
PROJECT 1 (BUILDING CONSTRUCTION 1)
 
Building Construction Report
Building Construction ReportBuilding Construction Report
Building Construction Report
 
Ct assignment
Ct assignmentCt assignment
Ct assignment
 
Building Construction Details
Building Construction DetailsBuilding Construction Details
Building Construction Details
 
Steel framing system report
Steel framing system reportSteel framing system report
Steel framing system report
 
Construction of Brick Wall
Construction of Brick WallConstruction of Brick Wall
Construction of Brick Wall
 
Site report
Site reportSite report
Site report
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
 
Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...Building Construction 1 : Experience construction; a building construction re...
Building Construction 1 : Experience construction; a building construction re...
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
 
Construction process''column,beam,slab''
Construction process''column,beam,slab''Construction process''column,beam,slab''
Construction process''column,beam,slab''
 
Isolated footing Site report
Isolated footing Site reportIsolated footing Site report
Isolated footing Site report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
 
Slab site report
Slab site reportSlab site report
Slab site report
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
 

Destacado (7)

Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Site visit report
Site visit report Site visit report
Site visit report
 
Internal Controls at Construction Site
Internal Controls at Construction SiteInternal Controls at Construction Site
Internal Controls at Construction Site
 
Visit to a construction site
Visit to a construction siteVisit to a construction site
Visit to a construction site
 
Assignment 1 Site Visit Report
Assignment 1 Site Visit ReportAssignment 1 Site Visit Report
Assignment 1 Site Visit Report
 
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
 
Internship Report on Building Construction
Internship Report on Building ConstructionInternship Report on Building Construction
Internship Report on Building Construction
 

Similar a Ctw site report(pg 1 to 8, 14) (20)

Site report
Site reportSite report
Site report
 
Technical site visit report
Technical site visit reportTechnical site visit report
Technical site visit report
 
MCB Final report
MCB Final reportMCB Final report
MCB Final report
 
Site report
Site reportSite report
Site report
 
Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visit
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site report
Site reportSite report
Site report
 
Ez
EzEz
Ez
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
Integrated assignment site report
Integrated assignment site reportIntegrated assignment site report
Integrated assignment site report
 
Site report
Site reportSite report
Site report
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 
Assignment of Site Report
Assignment of Site Report Assignment of Site Report
Assignment of Site Report
 
Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2
 
Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site report algel
Site report algelSite report algel
Site report algel
 

Más de Chin Tze Wei

Presenting basilica-st.-peter
Presenting basilica-st.-peterPresenting basilica-st.-peter
Presenting basilica-st.-peter
Chin Tze Wei
 
Ctw(pic) pg 9 to 13
Ctw(pic) pg 9 to 13Ctw(pic) pg 9 to 13
Ctw(pic) pg 9 to 13
Chin Tze Wei
 
Calculation for mitsubishi motors
Calculation for mitsubishi motorsCalculation for mitsubishi motors
Calculation for mitsubishi motors
Chin Tze Wei
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
Chin Tze Wei
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
Chin Tze Wei
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
Chin Tze Wei
 
No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)
Chin Tze Wei
 
No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)
Chin Tze Wei
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
Chin Tze Wei
 
Mural art slide show (idj idj)
Mural art slide show (idj idj)Mural art slide show (idj idj)
Mural art slide show (idj idj)
Chin Tze Wei
 
No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)
Chin Tze Wei
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
Chin Tze Wei
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
Chin Tze Wei
 
English compare contrast essay
English compare contrast essayEnglish compare contrast essay
English compare contrast essay
Chin Tze Wei
 
Social psychology video assignment report
Social psychology video assignment reportSocial psychology video assignment report
Social psychology video assignment report
Chin Tze Wei
 
http://prezi.com/t0zqcss_lg8g/untitled-prezi/?utm_campaign=share&utm_medium=copy
http://prezi.com/t0zqcss_lg8g/untitled-prezi/?utm_campaign=share&utm_medium=copyhttp://prezi.com/t0zqcss_lg8g/untitled-prezi/?utm_campaign=share&utm_medium=copy
http://prezi.com/t0zqcss_lg8g/untitled-prezi/?utm_campaign=share&utm_medium=copy
Chin Tze Wei
 
Psychology individual journal
Psychology individual journalPsychology individual journal
Psychology individual journal
Chin Tze Wei
 

Más de Chin Tze Wei (20)

Presenting basilica-st.-peter
Presenting basilica-st.-peterPresenting basilica-st.-peter
Presenting basilica-st.-peter
 
Bs presentation
Bs presentationBs presentation
Bs presentation
 
Bs report-final
Bs report-finalBs report-final
Bs report-final
 
Ctw(pic) pg 9 to 13
Ctw(pic) pg 9 to 13Ctw(pic) pg 9 to 13
Ctw(pic) pg 9 to 13
 
Charity finalized
Charity finalizedCharity finalized
Charity finalized
 
Calculation for mitsubishi motors
Calculation for mitsubishi motorsCalculation for mitsubishi motors
Calculation for mitsubishi motors
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
 
No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)
 
No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
 
Mural art slide show (idj idj)
Mural art slide show (idj idj)Mural art slide show (idj idj)
Mural art slide show (idj idj)
 
No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
 
English compare contrast essay
English compare contrast essayEnglish compare contrast essay
English compare contrast essay
 
Social psychology video assignment report
Social psychology video assignment reportSocial psychology video assignment report
Social psychology video assignment report
 
http://prezi.com/t0zqcss_lg8g/untitled-prezi/?utm_campaign=share&utm_medium=copy
http://prezi.com/t0zqcss_lg8g/untitled-prezi/?utm_campaign=share&utm_medium=copyhttp://prezi.com/t0zqcss_lg8g/untitled-prezi/?utm_campaign=share&utm_medium=copy
http://prezi.com/t0zqcss_lg8g/untitled-prezi/?utm_campaign=share&utm_medium=copy
 
Psychology individual journal
Psychology individual journalPsychology individual journal
Psychology individual journal
 

Ctw site report(pg 1 to 8, 14)

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) AUGUST INTAKE 2014 SEMESTER 1 [QSB 60104] MEASUREMENT 1 -Sr. Ang Fuey Lin [BLD 60104] CONSTRUCTION TECHNOLOGY 1 -Pn. Azrina Md Yaakob [BLD 62003] BUILDING MATERIALS -Pn. Myzatul Aishah Kamarazaly CONSTRUCTION SITE REPORT INDIVIDUAL ASSIGNMENT Chin Tze Wei-0315767
  • 2. TABLE OF CONTENT No Title Pages 1. Cover page 1 2. Table of content 2 3. Introduction and objectives of the assignment 3-4 4. Content/ Technical observation 5-8 5. Photos and descriptions 9-13 6. Learning outcome/ Conclusion 14
  • 3. INTRODUCTION This assignment involved a combination of Building Materials, Construction Technology and measurement, in which each student are required to write down a report regarding the site visit to the construction site. Since there are about 45 students in our course, we were to be divided into two groups on the day of the site visit. As for me, I was among those in group 1. In fact the site visit was organized by Miss Ang Fuey Lin to be held on the 21 November 2014. The site called D'Latour, developed by the Penang-based DK-MY Properties SDN BHD was located at the following address: No.4, Jalan PPU 3, Taman Perindustrian Puchong Utama, 47100 Puchong, Selangor Darul Ehsan. It is actually at a walking distance from our school, Taylor's Lakeside University Campus. So it is convenient for us to walk to the site directly from Taylors. On the eventful day, those who are in group 1 are to be there on time at 9:00am sharp. We must also comply to the rule and regulations that we must wear our helmet, long pants and safety boots when entering the site. Then we are given a tour of the place by a few site contractors who are nice enough to give us a thorough explanation of of the materials, technologies and structures involved. Accompanying us are a few of our lecturers. D'latour comprises of two 23-storey towers with 332 serviced suites in one and 629 SoHo duplexes in the other. It occupies three acres and has a total built-up area of 1.7 million sq. ft. Curving gracefully up into the Bandar Sunway skyline, it is built to master-class quality and infused with the most demanding standards. Comprising two designer towers( D'Latour SoHo and D'Latour Residence),D'Latour is set to become the next big thing in terms of residential landmark in Bandar Sunway. It one of the kind design features includes:  Vertical garden city concept  Internal void area for better natural ventilation  Elevated infinty swimming pool with waterfall feature  Environmental friendly Sky Garden at various at various floors  Roof Top Sky Hub  Distinctive 'Welcome Home' lobby
  • 4.  The designer of D'Latour was the world-class architecture company RDA Harris Architects Sdn Bhd which is responsible for the design of multiple award winning developments around the world. OBJECTIVE The objectives of the site visit are as followed:  To enable us to get firsthand experience on the actual working environment of the life of a quantity surveyor on site.  To further enhance our knowledge on the step by step involvement of the construction process.  To allow us to have a deeper understanding on the types of building materials and construction technologies on site.  To raise awareness on the importance of taking care of our personal safety as well as taking the precautionary steps to prevent accidents from arising.  To be able to gather new construction knowledge that we have never learnt in class.  To allow us to have a better grasp of how importance teamwork and communication skills are to construction team such as engineering, project managers, contractors and workers.  To able to get first -hand knowledge on the functions of the usage of machineries on site  Able to get a clearer image on the structures that we are unable to see.
  • 5. CONTENT Once we have arrived at the site, the first thing that caught my eyes is the precautionary sign board outside the entrance the site. This is to make sure that we are following the proper rules and safety regulations required of us. Along the outside surrounding area of the site fenced by vertical hording lies the project information board. It clearly give me a clearer picture of the architects, quantity surveyors, developer involved and the estimated time it takes for the project to finish. The usage of the vertical hoarding is to stop unauthorized person access into the site. Not a far distant away, we can find a guard house to guard against unauthorized person access into the site. The guard house is made of plywood and zinc roofing. Then we are guided into the site by a few of our lecturers accompanied by some site contractors. Along the way, we are able to get a glimpse of some of the workers inside their temporary houses resting themselves and temporary toilets for them to do their business. Along the surrounding area of the structural buildings lied a few independent scaffolding with safety net casts around it to prevent workers from falling down. Each scaffolding has stair like structures built to allow workers easy to move about. The material used for the scaffolding is steel. The scaffolding can also be assembled and disassembled. It is to provide employees safer access to work locations, level and stable working platforms and temporary storage for tools and materials for performing immediate tasks. Through the information we gathered from one of the site constructor, the type of piling used for the building is micro-pile. It is another type of pile which acts as a supporting structure to transfer the load from the building to the ground. Micro-piles are small diameter piles constructed by the drilling process and are often keyed into rock. There is various diameter of micro-pile that can be found in the market ranging from 100mm to 250mm. Micro-pile is used to meet the demands for low noise and vibration regulations especially in congested environments around the site. There are also different types of machineries found on the site like tower crane, the normal type crane, saw for cutting the required size of the reinforcement bars and silent generators. As in any other site, the tower crane is a common sight to behold. It is normally employed in the construction industry for the movement of materials such as steel, concrete, large tools and generators. This is because it gives the best combination of height and lifting capacity. Meanwhile the silent generators are installed to supply electricity to main part of the buildings especially electrical machineries. There is also the used of mobile access tower being used for the convenient of the workers when continuing their work on the basement of the buildings.
  • 6. The types of formwork required are:  Beam formwork  Column formwork  Slab formwork As we investigated around the vicinity of the area, we have found out from the site constructors on the different types of formwork used. Formwork is an artificial support provided below and around the precast or cast in-situ concrete work. The types of formwork are as followed:  Steel formwork  Timber formwork  Plywood formwork (Table formwork) Steel Formwork Steel Formwork consists of panels fabricated out of thin steel plates stiffened along the edges by small steel angles. The panel units are held together through the use of suitable clamps, bolts and nuts. Steel forms are mainly used on the site where large number of reuses of the shuttering is possible. This type of shuttering is considered most suitable for circular or curved structures. ADVANTAGES It is reusable for a number of times  Smooth finishes are obtainable  Easy to fixed  Uniform size and surface  Very strong and able to withstand heavy loads  More durable than timber formwork DISADVANTAGES  More expensive than wood formwork
  • 7. TIMBER FORMWORK ADVANTAGES  Easy to handle because of it light-weight  Easy to disassemble  Damaged parts can be replaced with new ones  Very flexible  Easy to produce  Easily available DISADVANTAGES  Have limited reusability TABLE FORMWORK It is a table form that is a large pre-assembled formwork and false work unit to form a complete bay of suspended floor slab. This type of formwork offers mobility and quick installation that is highly suitable for flat slab, beam and slab layouts. It is a simple structure which is easy to assemble and disassemble and be reused. Once the assembled table formwork units are placed into position and the joints sealed, reinforcement is then fixed and the concrete for the slab is cast. After the concrete has achieved sufficient strength, the complete table is lowered from under slab before moving to the next position by crane. ADVANTAGES  Fast construction for large floor layouts.  Fully assembled units can be manoeuvred quickly into place.  Using appropriate quality control, high quality surface finishes can be achieved.  Reduced long-term workforce requirement on site.  The need for infill areas and decking joints is minimized.  Individual components of the formwork system can be precisely adjusted.  Repetitive nature of the work makes it easier to plan construction activities. DISADVANTAGES  Cost of materials and use of cranes are expensive
  • 8. As we walk in and out of the building, I managed to spot some building materials like starter bars, PVC pipes, Stirrups, linkers, flat anchorage, telescopic props, concrete and many more either lying in a heap to be used later or already installed in place for its specific function. This does shows for that specific type of buildings, it involves a lot of materials just to construct it. Material storage can also be found in one part of the corner. That is used to store materials and be used for future purposes. Further inside of the construction building, there will be a few independent scaffolding in placed for the workers to climb above to continue on with the progression of their works. Moreover, the concrete used for almost all part of structural building is grade 40. As the concrete grade increases it strength will also increase. However grade 35 concrete can also be acted as another alternative. Meanwhile concrete grade 15 and grade 20 is used for column and slab respectively. Due to the increased in strength in concrete, it is more than enough to withstand fire and forces. As the duration of the one hour spent have concluded, I managed to take some useful pictures of the stuffs that caught my eyes. Not only that I was able to identify the types of materials and technologies involved in the entire site.
  • 9. CONCLUSION After the site visit, I was able to gain countless of valuable information and knowledge from the construction site. It is to give us an idea of how our line of work will be when we eventually graduate and started working as a qualified quantity surveyor. Through this visit, I was able to expand my knowledge by exploring the different types of building materials found on site. This same type of building materials are going to be used for the construction of the building. All of this is going to enhance my theory knowledge in relation to notes given by the lecturer by applying practical knowledge as to how the materials are being applied on site. The constructors also give a thorough explanation on the usage and functions of the types of construction technologies available to them on site. Furthermore I have witness how important it is for communication to exist between the construction team. For if there is communication between the construction committee, they tend to work in according to plan to try finish the construction within the duration of the time limit given. So as a result of that the whole entire operation will be run smoothly without any incidents. Other than that, there is the importance of safety that we need to bear in mind when entering the premises of a construction site. We were given a brief talk on the importance of safety by the safety officer before we continue on with our visit. From then I realized how importance safety is not only to us visitors but also to workers involved in the construction site. So to abide to the rules, we are required to wear a safety helmet and safety boots at all times on site. To put further practice of awareness among us, there will be safety precautions signboards placed around the buildings to remind of there will be dangers looming around the corner if we are abide to the safety rules and regulations In conclusion, I believe that this site visit is a very worthwhile one to be in. Since this site visit is the first chance I have to visit a construction site, I really hope to be given a similar chance in the near distant future as it not only enhances my knowledge on the materials and technologies it also is beneficial to my future.