Temporary work – 
Accommodation for workers 
Safety rules and regulation 
Vertical fencing hoarding set at 
the entrance of the site 
Temporary work- security – to 
prevent unauthorized access to the 
site
Information sign board 
Independent scaffolding - It is to 
provide employees safer access to 
work locations 
Tower crane 
Starter bar
Reinforcement bar 
Uninstalled Reinforcement bar 
which is found on site 
We are listening about the safety rules and 
regulations before we enter into the 
basement 
Polymix – White plaster finish
Telescopic steel prop – it is use to 
support the upper floor 
Sand brick 
Various type of PVC pipe 
Reinforcement bar and stirrup - to 
form a beam
Crane – it is used to lift up heavy 
objects 
Post tensioning 
Table formwork - A table form/flying 
form is a large pre-assembled 
formwork and false work unit, often 
forming a complete bay of suspended 
floor slab 
Stirrup – it is a light frame or ring that 
holds the foot of a rider
Ctw(pic) pg 9 to 13

Más contenido relacionado

Destacado

P12 boort site establishment plan revised 21 10-10
P12 boort site establishment plan revised 21 10-10P12 boort site establishment plan revised 21 10-10
P12 boort site establishment plan revised 21 10-10
mrrobbo
 
ERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTERECTION METHOD STATEMENT
ERECTION METHOD STATEMENT
mustafa hussain
 
Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0
Minh Bui Si
 
Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
Surya Kant
 

Destacado (6)

P12 boort site establishment plan revised 21 10-10
P12 boort site establishment plan revised 21 10-10P12 boort site establishment plan revised 21 10-10
P12 boort site establishment plan revised 21 10-10
 
ERECTION METHOD STATEMENT
ERECTION METHOD STATEMENTERECTION METHOD STATEMENT
ERECTION METHOD STATEMENT
 
Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0Method statement for structural concrete repair rev.0
Method statement for structural concrete repair rev.0
 
Method statement painting
Method statement painting Method statement painting
Method statement painting
 
Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
 
Hse Action Plan
Hse Action PlanHse Action Plan
Hse Action Plan
 

Más de Chin Tze Wei

Presenting basilica-st.-peter
Presenting basilica-st.-peterPresenting basilica-st.-peter
Presenting basilica-st.-peter
Chin Tze Wei
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
Chin Tze Wei
 
Calculation for mitsubishi motors
Calculation for mitsubishi motorsCalculation for mitsubishi motors
Calculation for mitsubishi motors
Chin Tze Wei
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
Chin Tze Wei
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
Chin Tze Wei
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
Chin Tze Wei
 
No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)
Chin Tze Wei
 
No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)
Chin Tze Wei
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
Chin Tze Wei
 
Mural art slide show (idj idj)
Mural art slide show (idj idj)Mural art slide show (idj idj)
Mural art slide show (idj idj)
Chin Tze Wei
 
No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)
Chin Tze Wei
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
Chin Tze Wei
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
Chin Tze Wei
 
English compare contrast essay
English compare contrast essayEnglish compare contrast essay
English compare contrast essay
Chin Tze Wei
 
Social psychology video assignment report
Social psychology video assignment reportSocial psychology video assignment report
Social psychology video assignment report
Chin Tze Wei
 
http://prezi.com/t0zqcss_lg8g/untitled-prezi/?utm_campaign=share&utm_medium=copy
http://prezi.com/t0zqcss_lg8g/untitled-prezi/?utm_campaign=share&utm_medium=copyhttp://prezi.com/t0zqcss_lg8g/untitled-prezi/?utm_campaign=share&utm_medium=copy
http://prezi.com/t0zqcss_lg8g/untitled-prezi/?utm_campaign=share&utm_medium=copy
Chin Tze Wei
 

Más de Chin Tze Wei (20)

Presenting basilica-st.-peter
Presenting basilica-st.-peterPresenting basilica-st.-peter
Presenting basilica-st.-peter
 
Bs presentation
Bs presentationBs presentation
Bs presentation
 
Bs report-final
Bs report-finalBs report-final
Bs report-final
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Ct assignment
Ct assignmentCt assignment
Ct assignment
 
Charity finalized
Charity finalizedCharity finalized
Charity finalized
 
Calculation for mitsubishi motors
Calculation for mitsubishi motorsCalculation for mitsubishi motors
Calculation for mitsubishi motors
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
 
No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)
 
No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
 
Mural art slide show (idj idj)
Mural art slide show (idj idj)Mural art slide show (idj idj)
Mural art slide show (idj idj)
 
No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)No more changes (if not i will make you do your idj)
No more changes (if not i will make you do your idj)
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
 
Overall report (1)
Overall report (1)Overall report (1)
Overall report (1)
 
English compare contrast essay
English compare contrast essayEnglish compare contrast essay
English compare contrast essay
 
Social psychology video assignment report
Social psychology video assignment reportSocial psychology video assignment report
Social psychology video assignment report
 
http://prezi.com/t0zqcss_lg8g/untitled-prezi/?utm_campaign=share&utm_medium=copy
http://prezi.com/t0zqcss_lg8g/untitled-prezi/?utm_campaign=share&utm_medium=copyhttp://prezi.com/t0zqcss_lg8g/untitled-prezi/?utm_campaign=share&utm_medium=copy
http://prezi.com/t0zqcss_lg8g/untitled-prezi/?utm_campaign=share&utm_medium=copy
 

Ctw(pic) pg 9 to 13

  • 1. Temporary work – Accommodation for workers Safety rules and regulation Vertical fencing hoarding set at the entrance of the site Temporary work- security – to prevent unauthorized access to the site
  • 2. Information sign board Independent scaffolding - It is to provide employees safer access to work locations Tower crane Starter bar
  • 3. Reinforcement bar Uninstalled Reinforcement bar which is found on site We are listening about the safety rules and regulations before we enter into the basement Polymix – White plaster finish
  • 4. Telescopic steel prop – it is use to support the upper floor Sand brick Various type of PVC pipe Reinforcement bar and stirrup - to form a beam
  • 5. Crane – it is used to lift up heavy objects Post tensioning Table formwork - A table form/flying form is a large pre-assembled formwork and false work unit, often forming a complete bay of suspended floor slab Stirrup – it is a light frame or ring that holds the foot of a rider