SlideShare una empresa de Scribd logo
1 de 31
Open Risk Analysis Software Data and Methodologies ,[object Object],[object Object],[object Object],[object Object],[object Object]
Presentation Outline ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Introduction
Introduction
Open Risk Analysis Motivation Currently, researchers and practitioners in the  Disaster Risk Management  field lack  transparent methodologies , tools (e.g.  Software ) and  open data . A lot of research is being contacted in academic as well as non-profit and for-profit organizations, resulting in the creation of software and methodologies.  A  replication of effort  exists, though, due to the lack of  open and unified standards and a  common platform  to co-ordinate the efforts. In addition to that, open and easily accessible data are hard to found thus causing a  slow down  in the research progress.
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Open Risk Analysis Motivation
The F/OSS* Paradigm * F/OSS: Free/Open Source Software
AGORA* Promote and coordinate  open risk analysis  of natural and technological hazards. Development of open-source risk software and methodologies to perform  end-to-end * risk modeling. *  End-to-end  refers to the modeling of hazardous events and their impacts, from the event occurrence through site effects, physical damage to the built environment, to economic and human impacts. Kyoto University   (Japan) California Institute of Technology (USA)  Cambridge University (UK) Imperial College (UK) University of California, Berkeley (USA) University of Pavia (Italy) Virginia Tech (USA) Kandili Observatory of Bogazici University (Turkey) Extreme Situations Research Center (Russia) US Geological Survey MAE - Mid-America Earthquake Center NEES - Network for Earthquake Engineering Simulation Russian Academy of Sciences Southern California Earthquake Center Lloyd’s of London Flagstone Re SPA Risk LLC * www.risk-agora.org
AGORA ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
AGORA
Open Risk Analysis Example
MIRISK - Project Organization CLIENT STEERING COMMITEE METHODS PROGRAMMING GROUP FUNDING EXTERNAL REVIEWING
MIRISK - Purpose Provide a user friendly tool to aid decision makers in considering Natural Hazards in funded projects Increase awareness and provide guidance for Natural Hazards risk analysis and mitigation
MIRISK - Goals Provide information for Natural Hazards  design guidelines ,  norms  and  good practices  – a  reference tool  for use by decision makers. Enable  assessment  of infrastructure  risk and  vulnerability  of damage and  losses in past disasters Be a  user-friendly tool  for risk assessment of critical infrastructure Be developed within a non-proprietary ( open source ) software package subscribing to the AGORA framework
MIRISK – Potential Uses Determine what  hazards  might potentially impact a region What  impacts  might these hazards have on a specific project Quantitatively assess  direct impacts Quantitatively assess  indirect impacts  Determine what sorts of structural, locational, operational and  risk transfer alternatives  are available to reduce the direct and indirect impacts Determine which of the available alternatives are  most  cost-beneficial What are the  design parameters  and  best practices  to actualize these alternatives within the overall project
MIRISK – System Structure
MIRISK – Database Contents Hazard data Global HotSpots Project GSHAP Project GIS data NASA earth observatory GSHAP Project UNEP/GRID-Geneva Preview NGDC Dartmouth Flood Observatory Atlas of Large Flood Events Global Volcanism Program
MIRISK – Global HotSpots* 2005 assessment of natural disaster risk innovative, high impact first such global analysis employed ‘off-the-shelf’ data “ 1st order” analysis – “crude” (authors’ term) data freely available Global distribution of flood mortality risk * Dilley, M., Chen, R. S., Deichmann, U., Lerner-Lam, A. L., and Arnold, M. (2005) "Natural Disaster Hotspots: A Global Risk Analysis.”, The World Bank, Washington ,D.C.
MIRISK – Loss Estimation Objective To provide a  quantitative  estimate of incremental cost given  project design level ,  cost of repair ,  duration of disruption , and  benefit cost . Loss Metric Expected Annualized Loss ( EAL ), i.e. the average loss per year due to the occurrence of a natural hazard. Assumptions
MIRISK – Cost Benefit Analysis Objective Determine most cost-effective project design level considering natural  hazard impacts. Procedure
MIRISK – Example Case Study
MIRISK – Example Case Study Tabbed structure for easy access
MIRISK – Example Case Study
MIRISK – Example Case Study
MIRISK – Example Case Study
MIRISK – Example Case Study
MIRISK – Example Case Study
MIRISK – Example Case Study
MIRISK - Future
AGORA - Future
Summary and Discussion

Más contenido relacionado

Destacado

Robotics: Modelling, Planning and Control
Robotics: Modelling, Planning and ControlRobotics: Modelling, Planning and Control
Robotics: Modelling, Planning and Control
Cody Ray
 
Metrics for project size estimation
Metrics for project size estimationMetrics for project size estimation
Metrics for project size estimation
Nur Islam
 
Digital Team Structure: The Foundation for Innovation
Digital Team Structure: The Foundation for InnovationDigital Team Structure: The Foundation for Innovation
Digital Team Structure: The Foundation for Innovation
NTEN
 
Software Engg. process models
Software Engg. process modelsSoftware Engg. process models
Software Engg. process models
Tauseef Ahmad
 
Project Management Foundations Series Course 104 - Agile Project Management C...
Project Management Foundations Series Course 104 - Agile Project Management C...Project Management Foundations Series Course 104 - Agile Project Management C...
Project Management Foundations Series Course 104 - Agile Project Management C...
Think For A Change
 
Regression analysis ppt
Regression analysis pptRegression analysis ppt
Regression analysis ppt
Elkana Rorio
 
CAPA, Root Cause Analysis and Risk Management
CAPA, Root Cause Analysis and Risk ManagementCAPA, Root Cause Analysis and Risk Management
CAPA, Root Cause Analysis and Risk Management
Joseph Tarsio
 

Destacado (20)

Sample data analysis_elmaddah
Sample data analysis_elmaddahSample data analysis_elmaddah
Sample data analysis_elmaddah
 
Robotics: Modelling, Planning and Control
Robotics: Modelling, Planning and ControlRobotics: Modelling, Planning and Control
Robotics: Modelling, Planning and Control
 
structural equation modeling
structural equation modelingstructural equation modeling
structural equation modeling
 
C2.5
C2.5C2.5
C2.5
 
Introduction to Supervised ML Concepts and Algorithms
Introduction to Supervised ML Concepts and AlgorithmsIntroduction to Supervised ML Concepts and Algorithms
Introduction to Supervised ML Concepts and Algorithms
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
Metrics for project size estimation
Metrics for project size estimationMetrics for project size estimation
Metrics for project size estimation
 
Linear regression and correlation analysis ppt @ bec doms
Linear regression and correlation analysis ppt @ bec domsLinear regression and correlation analysis ppt @ bec doms
Linear regression and correlation analysis ppt @ bec doms
 
Chap 5 Estimating Project Times
Chap 5 Estimating Project TimesChap 5 Estimating Project Times
Chap 5 Estimating Project Times
 
Software process and project metrics
Software process and project metricsSoftware process and project metrics
Software process and project metrics
 
Digital Team Structure: The Foundation for Innovation
Digital Team Structure: The Foundation for InnovationDigital Team Structure: The Foundation for Innovation
Digital Team Structure: The Foundation for Innovation
 
Project Scheduling & Controls
Project Scheduling & ControlsProject Scheduling & Controls
Project Scheduling & Controls
 
Project scheduling and control techniques
Project scheduling and control techniquesProject scheduling and control techniques
Project scheduling and control techniques
 
Risk analysis
Risk analysisRisk analysis
Risk analysis
 
Software Engg. process models
Software Engg. process modelsSoftware Engg. process models
Software Engg. process models
 
Staffing,estmn,scheduling
Staffing,estmn,schedulingStaffing,estmn,scheduling
Staffing,estmn,scheduling
 
Software Process Models
Software Process ModelsSoftware Process Models
Software Process Models
 
Project Management Foundations Series Course 104 - Agile Project Management C...
Project Management Foundations Series Course 104 - Agile Project Management C...Project Management Foundations Series Course 104 - Agile Project Management C...
Project Management Foundations Series Course 104 - Agile Project Management C...
 
Regression analysis ppt
Regression analysis pptRegression analysis ppt
Regression analysis ppt
 
CAPA, Root Cause Analysis and Risk Management
CAPA, Root Cause Analysis and Risk ManagementCAPA, Root Cause Analysis and Risk Management
CAPA, Root Cause Analysis and Risk Management
 

Similar a Open Risk Analysis Software - Data And Methodologies

Res_shorter_15_2_LinkedIn
Res_shorter_15_2_LinkedInRes_shorter_15_2_LinkedIn
Res_shorter_15_2_LinkedIn
Adrian Miron
 
A gis based flood risk assessment tool supporting flood incident management a...
A gis based flood risk assessment tool supporting flood incident management a...A gis based flood risk assessment tool supporting flood incident management a...
A gis based flood risk assessment tool supporting flood incident management a...
angela131313
 
2004-07-28 Fast Aerosol Sensing Tools for Natural Event Tracking FASTNET
2004-07-28 Fast Aerosol Sensing Tools for Natural Event Tracking FASTNET2004-07-28 Fast Aerosol Sensing Tools for Natural Event Tracking FASTNET
2004-07-28 Fast Aerosol Sensing Tools for Natural Event Tracking FASTNET
Rudolf Husar
 

Similar a Open Risk Analysis Software - Data And Methodologies (20)

UNISDR Scientific and Technical Advisory Group (STAG) Platform and Network Su...
UNISDR Scientific and Technical Advisory Group (STAG) Platform and Network Su...UNISDR Scientific and Technical Advisory Group (STAG) Platform and Network Su...
UNISDR Scientific and Technical Advisory Group (STAG) Platform and Network Su...
 
Minimization of Risks in Construction projects
Minimization of Risks in Construction projectsMinimization of Risks in Construction projects
Minimization of Risks in Construction projects
 
Angelo Susi' s presentation at PMI Academic Workshop 2016
Angelo Susi' s presentation at PMI Academic Workshop 2016Angelo Susi' s presentation at PMI Academic Workshop 2016
Angelo Susi' s presentation at PMI Academic Workshop 2016
 
RISCOSS platform: evaluation results
RISCOSS platform: evaluation resultsRISCOSS platform: evaluation results
RISCOSS platform: evaluation results
 
RISCOSS platform: evaluation results
RISCOSS platform: evaluation resultsRISCOSS platform: evaluation results
RISCOSS platform: evaluation results
 
The Global Earthquake Model by John Schneider, Vice Chair, GEM Governing Boar...
The Global Earthquake Model by John Schneider, Vice Chair, GEM Governing Boar...The Global Earthquake Model by John Schneider, Vice Chair, GEM Governing Boar...
The Global Earthquake Model by John Schneider, Vice Chair, GEM Governing Boar...
 
R.Klein_IRDRConference2014_Davos
R.Klein_IRDRConference2014_DavosR.Klein_IRDRConference2014_Davos
R.Klein_IRDRConference2014_Davos
 
Software Sustainability Institute
Software Sustainability InstituteSoftware Sustainability Institute
Software Sustainability Institute
 
A Comprehensive Literature Review On Construction Project Risk Analysis
A Comprehensive Literature Review On Construction Project Risk AnalysisA Comprehensive Literature Review On Construction Project Risk Analysis
A Comprehensive Literature Review On Construction Project Risk Analysis
 
Climate Change & Africa
Climate Change & AfricaClimate Change & Africa
Climate Change & Africa
 
Riscoss models u-qasar meeting
Riscoss models u-qasar meetingRiscoss models u-qasar meeting
Riscoss models u-qasar meeting
 
InfraRIsk EPA FACT SHEET
InfraRIsk EPA FACT SHEETInfraRIsk EPA FACT SHEET
InfraRIsk EPA FACT SHEET
 
InfraRisk EU FACT SHEET
InfraRisk EU FACT SHEETInfraRisk EU FACT SHEET
InfraRisk EU FACT SHEET
 
Modeling and Simulation White Paper by Carole Cameron Inge, et al.
Modeling and Simulation White Paper by Carole Cameron Inge, et al.Modeling and Simulation White Paper by Carole Cameron Inge, et al.
Modeling and Simulation White Paper by Carole Cameron Inge, et al.
 
Res_shorter_15_2_LinkedIn
Res_shorter_15_2_LinkedInRes_shorter_15_2_LinkedIn
Res_shorter_15_2_LinkedIn
 
EDDY-IDRCDavos-RASORv1
EDDY-IDRCDavos-RASORv1EDDY-IDRCDavos-RASORv1
EDDY-IDRCDavos-RASORv1
 
A gis based flood risk assessment tool supporting flood incident management a...
A gis based flood risk assessment tool supporting flood incident management a...A gis based flood risk assessment tool supporting flood incident management a...
A gis based flood risk assessment tool supporting flood incident management a...
 
InfraRisk Newsletter 1
InfraRisk Newsletter 1InfraRisk Newsletter 1
InfraRisk Newsletter 1
 
2004-07-28 Fast Aerosol Sensing Tools for Natural Event Tracking FASTNET
2004-07-28 Fast Aerosol Sensing Tools for Natural Event Tracking FASTNET2004-07-28 Fast Aerosol Sensing Tools for Natural Event Tracking FASTNET
2004-07-28 Fast Aerosol Sensing Tools for Natural Event Tracking FASTNET
 
10120140506004 2
10120140506004 210120140506004 2
10120140506004 2
 

Último

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 

Último (20)

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 

Open Risk Analysis Software - Data And Methodologies

  • 1.
  • 2.
  • 5. Open Risk Analysis Motivation Currently, researchers and practitioners in the Disaster Risk Management field lack transparent methodologies , tools (e.g. Software ) and open data . A lot of research is being contacted in academic as well as non-profit and for-profit organizations, resulting in the creation of software and methodologies. A replication of effort exists, though, due to the lack of open and unified standards and a common platform to co-ordinate the efforts. In addition to that, open and easily accessible data are hard to found thus causing a slow down in the research progress.
  • 6.
  • 7. The F/OSS* Paradigm * F/OSS: Free/Open Source Software
  • 8. AGORA* Promote and coordinate open risk analysis of natural and technological hazards. Development of open-source risk software and methodologies to perform end-to-end * risk modeling. * End-to-end refers to the modeling of hazardous events and their impacts, from the event occurrence through site effects, physical damage to the built environment, to economic and human impacts. Kyoto University (Japan) California Institute of Technology (USA) Cambridge University (UK) Imperial College (UK) University of California, Berkeley (USA) University of Pavia (Italy) Virginia Tech (USA) Kandili Observatory of Bogazici University (Turkey) Extreme Situations Research Center (Russia) US Geological Survey MAE - Mid-America Earthquake Center NEES - Network for Earthquake Engineering Simulation Russian Academy of Sciences Southern California Earthquake Center Lloyd’s of London Flagstone Re SPA Risk LLC * www.risk-agora.org
  • 9.
  • 10. AGORA
  • 12. MIRISK - Project Organization CLIENT STEERING COMMITEE METHODS PROGRAMMING GROUP FUNDING EXTERNAL REVIEWING
  • 13. MIRISK - Purpose Provide a user friendly tool to aid decision makers in considering Natural Hazards in funded projects Increase awareness and provide guidance for Natural Hazards risk analysis and mitigation
  • 14. MIRISK - Goals Provide information for Natural Hazards design guidelines , norms and good practices – a reference tool for use by decision makers. Enable assessment of infrastructure risk and vulnerability of damage and losses in past disasters Be a user-friendly tool for risk assessment of critical infrastructure Be developed within a non-proprietary ( open source ) software package subscribing to the AGORA framework
  • 15. MIRISK – Potential Uses Determine what hazards might potentially impact a region What impacts might these hazards have on a specific project Quantitatively assess direct impacts Quantitatively assess indirect impacts Determine what sorts of structural, locational, operational and risk transfer alternatives are available to reduce the direct and indirect impacts Determine which of the available alternatives are most cost-beneficial What are the design parameters and best practices to actualize these alternatives within the overall project
  • 16. MIRISK – System Structure
  • 17. MIRISK – Database Contents Hazard data Global HotSpots Project GSHAP Project GIS data NASA earth observatory GSHAP Project UNEP/GRID-Geneva Preview NGDC Dartmouth Flood Observatory Atlas of Large Flood Events Global Volcanism Program
  • 18. MIRISK – Global HotSpots* 2005 assessment of natural disaster risk innovative, high impact first such global analysis employed ‘off-the-shelf’ data “ 1st order” analysis – “crude” (authors’ term) data freely available Global distribution of flood mortality risk * Dilley, M., Chen, R. S., Deichmann, U., Lerner-Lam, A. L., and Arnold, M. (2005) "Natural Disaster Hotspots: A Global Risk Analysis.”, The World Bank, Washington ,D.C.
  • 19. MIRISK – Loss Estimation Objective To provide a quantitative estimate of incremental cost given project design level , cost of repair , duration of disruption , and benefit cost . Loss Metric Expected Annualized Loss ( EAL ), i.e. the average loss per year due to the occurrence of a natural hazard. Assumptions
  • 20. MIRISK – Cost Benefit Analysis Objective Determine most cost-effective project design level considering natural hazard impacts. Procedure
  • 21. MIRISK – Example Case Study
  • 22. MIRISK – Example Case Study Tabbed structure for easy access
  • 23. MIRISK – Example Case Study
  • 24. MIRISK – Example Case Study
  • 25. MIRISK – Example Case Study
  • 26. MIRISK – Example Case Study
  • 27. MIRISK – Example Case Study
  • 28. MIRISK – Example Case Study