SCRUM OVERVIEW
PRESENTED BY: Scott Inman
Scrum Practitioner/Coach
CARDINAL SOLUTIONS - AGILE ADVISORY SERVICES
How effective are your current
processes and practices?
Not Very
1 2 3 4 5 6 7 8 9 10
How familiar are you with Scrum?
Not Very
1 2 3 4 5 6 7 8 9 10
0
1
2
3
4
5
6
7
8
9
10
0 1 2 3 4 5 6 7 8 9 10
ScrumFamiliarity
Current Process Effectiveness
Living
the dream
Things are just fine
without Scrum
Learning
and improving
We know what to do,
and we aren’t doing it
This hurts.
Help.
Where are you located on this graph?
TRUTHS ABOUT TEAM MOTIVATION
• People are most productive when they manage
themselves
• People take their commitments more seriously
than other people’s commitments for them
TRUTHS ABOUT TEAM PERFORMANCE
• Teams and people do their best work when
they aren’t interrupted
• Teams improve most when they solve their
own problems
• Face to Face communication is the most
productive way for teams to work together
• Teams are more productive than the same
number of individuals
Scrum in a Nutshell
Product Owner Scrum MasterDevelopment Team
Product Backlog Sprint Backlog
Daily Scrum
Increment
Scrum Team
Sprint
Sprint
Planning
Sprint
Review
Sprint
Retrospective
SCRUM: ORIGINATION
• The term Scrum is borrowed from a rugby play
where everyone stays focused on the ball
• A way to restart the game when the ball has
gone out of play
• Players connect together
as a team to compete for
the ball
SCRUM: THE FRAMEWORK
• Scrum is not a methodology
• Scrum is a tool used to create agility
• A framework within which people can address
complex problems and deliver products of the
highest possible value
Progress = Value Delivered (not effort expended)
Value = Potentially Deployable Software
• Requirements 90% Complete doesn’t deliver value
• Design 20% Complete doesn’t deliver value
The sole measure of progress is
“Potentially Deployable Software”
DELIVERING VALUE
MANAGEMENT NO LONGER NEEDS TO…
• Make commitments on behalf of the team
• Give direction to the team on how to meet
commitments
• Monitor teams progress to keep it on schedule
• Step in and fix problems if encountered
• Push team to work harder
• Decide work assignments and follow up to ensure
they are done
SCRUM LIFECYCLE
PLAN ANALYZE DESIGN CODE TEST RELEASEWaterfall:
Scrum:
P
L
A
N
ANALYZE
DESIGN
CODE
TEST
RELEASE
R
E
V
I
E
W
The same work, but
organized differently and
on fewer requirements,
Waste becomes visible and
can be quickly removed
Short, high
value
iterations that
deliver
functionality
Scrum Team Roles
Product Owner
Development Team
Scrum Master
Service flows
this way
PRODUCT OWNER
• Maximizes the Return on Investment
• Creates and orders Product Backlog
• Chooses what and when to release
• Single voice of the Customer
• Represents interests of stakeholders and
customers
PRODUCT BACKLOG
• A prioritized and complete list of desirements
• Potential features of the product
• Managed and groomed by Product Owner
• 10% of each sprint is spent discussing and
analyzing the backlog
• Single source of truth for what is planned for the product
• Public and available
PRODUCT BACKLOG ITEM
• A unit of deliverable work
• Contains clear acceptance criteria (criteria for
successful completion)
• May reference other artifacts like Specifications, Use
Cases, Wireframes, etc.
• Must be sized appropriately
• Small enough to be completed within a single Sprint
• PBIs are estimated and ordered for
about 3 Sprints at all times
• The current sprint is detailed
 Broken into tasks
 Very granular detail
• PBI’s for next 2 sprints are groomed
 Understood by the entire team
 Ordered
 Estimated
 User Stories with acceptance
criteria
Current Sprint
Next Sprint
Next, Next Sprint
ROLLING PRODUCT BACKLOG PROJECTION
USER STORIES – COMMON EXPRESSION OF PBIs
• High level desires of your product backlog are
incrementally decomposed into Detailed
requirements in the form of User Stories with
Acceptance Criteria
WHAT IS A USER STORY?
• Represents the basic unit of work for a Scrum team
• Cross-functional team members hold conversations to
flush out the detailed requirements
User Stories contain two main components:
1. Value Story: As a <Role> I Need <Goal> So That
<Reason>
2. Acceptance Criteria: Detailed requirements
(Functional, Non-Functional, Data, etc)
USER STORY EXAMPLE
Value Story:
As an online banking customer, I need the Overview page
in a 1024 x 768 screen resolution so that I can view more
information on the page.
Acceptance Criteria:
Given a PC that has the screen resolution set at 1024 x 768:
1. Customer sees the screen without any horizontal scroll bar
2. Customer sees the honeycomb background on the right and
left side of the page
3. Customer sees the page centered in the browser
THE DEVELOPMENT TEAM
• Cross-functional
• Jointly owns and commits to product backlog
items
• Ideally collocated, dedicated resources
• 6 members, +/- 3 (recommended not required)
• Highly collaborative
• Empowered and self-managed
• Everyone pitches in regardless of individual skill
or specialty
• Held accountable as a Unit
The Development Team should have every
competency it needs to deliver an
increment of “done” functionality
THE DEVELOPMENT TEAM
ESTIMATING
• Relative estimates are assigned to Product Backlog
items
• Fibonacci Set of Numbers (1,2,3,5,8,13 or 21)
• Medium size effort is 8
• Team votes on the relative size of the effort to do the
product backlog item
 Discuss if large discrepancies in voting occur
 If close, use the higher number
• Do not count on estimates by people who will not be
doing the work
FOUNDATION OF SCRUM
We all know what
Is going on.
Check your work
as you do it.
OK to change
tactical direction.
EMPIRICAL PROCESS
• Knowledge comes through experience
• Just in time planning and re-planning based on
frequent inspection
• Based on actuals rather than predictions
• Requires transparency
• Information is neither good nor bad only used to
make decisions
• Does not try to predict the future, only adapts to
the current
Scrum makes everything Transparent all the time so
that they can be quickly fixed
EMPIRICAL PROCESSES PLAN FREQUENTLY
P DPlanning Doing
Predictive Empirical
• All planning is
done at beginning
• Just-in-time
planning and re-
planning based on
frequent
inspection
P D P D P D P D P D
SPRINT
• Time-boxed at 30 days
• Contains the work necessary for the increment of
functionality and other events
• Functionality is potentially shippable
• Consistent durations
• Conducted in a vacuum, team is totally protected from
outside noise and interference
SPRINT PLANNING
• Time-boxed at 8 hours for 4 week sprints,
proportionately less for shorter Sprints
• Product Owner reviews top priority items with
Development Team
• Development Team determines how much they can do
and tasks necessary to complete items (Sprint Backlog)
• Sprint Goal is created
SPRINT GOALS
An objective to be met in the Sprint
Allows flexibility in delivering the increment of functionality
No changes may affect the Sprint goal during the Sprint
As team works, this goal is kept in mind
Each Daily Scrum assess the teams progress towards the goal
DEFINITION OF DONE
• Should include all steps necessary to make that PBI
potentially shippable
• Adhere to “done” every Sprint
• “Done” is for the entire product not just for one scrum
team’s increment
• All Scrum teams working on a product must have the
same definition of done
• Should be inspected at the end of each sprint
• Must be transparent
DONE MIGHT INCLUDE…
• Performance Testing
• Code Refactoring
• Integration with other teams (syncing, integration of
code, etc.)
• Release notes
• User Acceptance testing
• Regression testing
• Code reviews
INS and OUTS of SPRINT PLANNING
INPUTS OUTPUTS
• The Product Backlog
• The latest increment
• The number of hours the
Development Team has
available to work
(Capacity)
• Past performance of the
development team
(Velocity)
• Definition of Done
• The Sprint Goal
• Sprint Backlog
• 60% - 70% known
and accurate
• Some work emerges
later
SPRINT BACKLOG
• Created by Development Team during Sprint Planning
• Includes PBI’s committed to and tasks necessary to
complete each PBI selected
• Each task must be granular enough to be completed in
1 day or less
• Development team members sign up for tasks, they
aren't assigned
• Any development team member can add, delete or
change the Sprint backlog
• Work for Sprint emerges over time
• If work is unclear, update work remaining as more is
known and tasks are worked
CREATING THE SPRINT BACKLOG
Team selects a PBI
based on product
backlog order
Team identifies all
tasks necessary to
complete PBI
Team estimates
PBI via Story
Points
Add PBI to Sprint
Backlog
Negotiate what
can be delivered
from PBI or place
item back in
Product Backlog
Does PBI fit into
Sprint?
YES
NO
SPRINT AS A “DEAL”
The Development Team Clients
“Every Sprint you can have us
develop something new as
you see fit”
FLEXIBILITY
“We will leave you alone for
two weeks (or more) and will
not interfere while you work.”
STABILITY
SPRINT TASK BOARD
• A way to track the tasks necessary to complete
PBI’s
• Can be in a scrum room (physical, manual tracking),
can be virtual or both
The development team has decided how much it
can accomplish during the upcoming sprint. It now
sprints to accomplish the sprint goal as it sees fit,
adapting to the circumstances, technology and
organizational terrain as best it can
SPRINT REVIEW
• Time-boxed at 4 hours for 4 week sprints;
proportionately less for shorter Sprints
• Team demonstrates the increment of functionality
• Stakeholders provide feedback
• Product Increment and Product Backlog are inspected
and adapted
• Discuss what can be worked on next
SPRINT RETROSPECTIVE
• Time-boxed at 3 hours for 4 week sprints; proportionately
less for shorter Sprints
• Opportunity for Scrum team to inspect & adapt their
development process, tools and definition of done
• Develop plan for actionable improvements (to be
implemented in next Sprint)
EMPIRICAL PROCESSES REQUIRE COURAGE
Conversation will not take place unless people feel safe!
Goal
realization
Crucial
Conversation
Transparency
Inspection &
Adaptation
INCREMENT
• Working functionality
• Is potentially shippable and usable by
customer
• An output of the Sprint
• Must be DONE with no work remaining
SCRUM MASTER
• A servant leader
• Educates the Product Owner on their role
• Ensures the Scrum framework is followed
• Facilitates time boxed events
• Empowers team to self-organize
• Removes impediments
SCRUM MASTER
May Be May Not Be
• Anyone with the appropriate
servant-leader skills
• A member of the
Development team
• Fired by the team
• A Product Owner
• This is a direct conflict of
interest
Executives
Managers
Anyone on another team
Scrum Master
Product Owner
Development Team
Chicken Pigs
THE CHICKEN AND THE PIG
DAILY SCRUM
• Time-boxed at 15 minutes
• Development Team is required to attend
• NOT a status meeting, team creates a plan for the
next 24 hours
• Three questions:
1. What have you accomplished?
2. What do you plan to accomplish?
3. What is impeding or slowing your progress?
How will the Development team achieve its forecast based on the
inspection?
BURNDOWN CHARTS
• Measurement for the Development team
• Used to see how they are progressing towards
the goal in the sprint
• May change abruptly when
 New SBIs are added or removed during the
Sprint
 Scope is renegotiated with the Product Owner
• Burndown charts can also be used by the
Product Owner to see how they are progressing
towards the release
0
10
20
30
40
50
60
Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day
10
Work Remaining
SPRINT BURNDOWN CHART
VELOCITY
• A measure of delivered value per sprint
• Used by the Product Owner to provide
forecasts
• Used by the Development Team to gauge how
much work to pull into the Sprint
VELOCITY FROM THE LAST RELEASE
0
5
10
15
20
25
30
35
40
45
50
1 2 3 4 5 6 7
Sprints
Velocity = 37
SP’s per sprint
Last Sprint = 47
SELF MANAGING TEAMS
• Who does what & when
• Who is needed on the team and not
• What customer input is needed and when
• When it needs help resolving Impediments
• What process improvements are needed
The Team Determines…
FEWER SPECIALISTS
• In a multi-disciplinary team of appropriate size,
specialization is simply not possible
• Task pairing and sharing grows everyone on the
team
• Team members focus shifts from fulfillment of
their own duties to the overall success of the
team
ARE YOU THE RIGHT SCRUM MASTER?
• Good Scrum Masters are fit via temperament
and facilitation skills NOT job title
• Good Scrum Masters are ferocious advocates
for their teams
WORKING WITH DEPENDENCIES
• Prioritization of the Product Backlog should be
used to synchronize dependencies
• When there are multiple scrum teams working
on 1 product, all teams must have a shared
definition of done
• Work should not be considered done until it is
integrated and tested
ROLES, ARTIFACTS, & EVENTS
ROLES ARTIFACTS
• Product Owner
• Scrum Master
• The Development
Team
• Increment
• Product Backlog
• Sprint Backlog
EVENTS
• Sprint
• Sprint Planning
• Daily Scrum
• Sprint Review
• Sprint
Retrospective
CARDINAL AGILE TRAINING
Delivery Partner of:
• Next Agile Leadership Series: The Definition of Done: August 1, 2013
• Professional Scrum Foundations Course: August 15-16 in Charlotte!
• A successful Agile implementation begins with comprehensive training Contact us
to register for our Scrum training today!
Contact Information
Jim Milam/ Nick Bourdon/ Matt Brookshire
210 East Trade Street
Suite C-440
Charlotte, NC 28202
(704) 936-4444
Cardinal Solutions Group

Más contenido relacionado

La actualidad más candente

Introduction to Scrum.ppt
Introduction to Scrum.pptIntroduction to Scrum.ppt
Introduction to Scrum.ppt
Mohan Late
 

La actualidad más candente (20)

Introduction To Scrum
Introduction To ScrumIntroduction To Scrum
Introduction To Scrum
 
Agile project management
Agile project managementAgile project management
Agile project management
 
Scrum Process
Scrum ProcessScrum Process
Scrum Process
 
Agile-overview: Agile Manifesto, Agile principles and Agile Methodologies
Agile-overview: Agile Manifesto, Agile principles and Agile MethodologiesAgile-overview: Agile Manifesto, Agile principles and Agile Methodologies
Agile-overview: Agile Manifesto, Agile principles and Agile Methodologies
 
Advanced Scrum master workshop
Advanced Scrum master workshopAdvanced Scrum master workshop
Advanced Scrum master workshop
 
Scrum Master (SM) - Practical Approach
Scrum Master (SM) - Practical ApproachScrum Master (SM) - Practical Approach
Scrum Master (SM) - Practical Approach
 
Scrum
ScrumScrum
Scrum
 
Scrum In 15 Minutes
Scrum In 15 MinutesScrum In 15 Minutes
Scrum In 15 Minutes
 
2017 Scrum by Picture
2017 Scrum by Picture2017 Scrum by Picture
2017 Scrum by Picture
 
Scrum 101
Scrum 101Scrum 101
Scrum 101
 
Agile Scrum Training Process
Agile Scrum Training ProcessAgile Scrum Training Process
Agile Scrum Training Process
 
Introduction to Scrum.ppt
Introduction to Scrum.pptIntroduction to Scrum.ppt
Introduction to Scrum.ppt
 
SCRUM – Agile Methodology
SCRUM – Agile MethodologySCRUM – Agile Methodology
SCRUM – Agile Methodology
 
A Gentle Introduction To Agile
A Gentle Introduction To AgileA Gentle Introduction To Agile
A Gentle Introduction To Agile
 
What is Scrum? SlideShare
What is Scrum? SlideShareWhat is Scrum? SlideShare
What is Scrum? SlideShare
 
Agile & SCRUM basics
Agile & SCRUM basicsAgile & SCRUM basics
Agile & SCRUM basics
 
The Principles of product development flow - a summary
The Principles of product development flow - a summary The Principles of product development flow - a summary
The Principles of product development flow - a summary
 
Scrum 101: Introduction to Scrum
Scrum 101: Introduction to ScrumScrum 101: Introduction to Scrum
Scrum 101: Introduction to Scrum
 
Scrum refinement
Scrum refinementScrum refinement
Scrum refinement
 
Agile Scrum Quick Reference Card
Agile Scrum Quick Reference CardAgile Scrum Quick Reference Card
Agile Scrum Quick Reference Card
 

Destacado

Bpma contextual inquiry
Bpma contextual inquiryBpma contextual inquiry
Bpma contextual inquiry
Bermon Painter
 
Agile User Stories
Agile User StoriesAgile User Stories
Agile User Stories
kahgeh75
 

Destacado (20)

Agile Introduction - Scrum Framework
Agile Introduction - Scrum FrameworkAgile Introduction - Scrum Framework
Agile Introduction - Scrum Framework
 
Bpma contextual inquiry
Bpma contextual inquiryBpma contextual inquiry
Bpma contextual inquiry
 
Agile metrics - Agile KC Meeting 9/26/13
Agile metrics - Agile KC Meeting 9/26/13Agile metrics - Agile KC Meeting 9/26/13
Agile metrics - Agile KC Meeting 9/26/13
 
Approaching Quality in Digital Era
Approaching Quality in Digital EraApproaching Quality in Digital Era
Approaching Quality in Digital Era
 
How We Became World Leaders in Agile Data Warehousing - Teradata Partners - O...
How We Became World Leaders in Agile Data Warehousing - Teradata Partners - O...How We Became World Leaders in Agile Data Warehousing - Teradata Partners - O...
How We Became World Leaders in Agile Data Warehousing - Teradata Partners - O...
 
Mission Impossible: Banking on a SAFe QuickStart
Mission Impossible: Banking on a SAFe QuickStartMission Impossible: Banking on a SAFe QuickStart
Mission Impossible: Banking on a SAFe QuickStart
 
Scrum Day 2013 - Co-Innovation and Intrapreneurship
Scrum Day 2013 - Co-Innovation and IntrapreneurshipScrum Day 2013 - Co-Innovation and Intrapreneurship
Scrum Day 2013 - Co-Innovation and Intrapreneurship
 
The Key to the SAFe: Principles over Practices
The Key to the SAFe: Principles over PracticesThe Key to the SAFe: Principles over Practices
The Key to the SAFe: Principles over Practices
 
IT Operations Management with OpManager
IT Operations Management with OpManagerIT Operations Management with OpManager
IT Operations Management with OpManager
 
Scrum ausserhalb der IT
Scrum ausserhalb der ITScrum ausserhalb der IT
Scrum ausserhalb der IT
 
Introduction Professional Scrum Developer for Java
Introduction Professional Scrum Developer for JavaIntroduction Professional Scrum Developer for Java
Introduction Professional Scrum Developer for Java
 
Scrum einführen, oder: Die Erlaubnis zum Anders-Sein
Scrum einführen, oder: Die Erlaubnis zum Anders-SeinScrum einführen, oder: Die Erlaubnis zum Anders-Sein
Scrum einführen, oder: Die Erlaubnis zum Anders-Sein
 
Epics and User Stories
Epics and User StoriesEpics and User Stories
Epics and User Stories
 
Writing GREAT Agile User Stories
Writing GREAT Agile User StoriesWriting GREAT Agile User Stories
Writing GREAT Agile User Stories
 
The World of Agile/Lean Product Development and Delivery with Scrum Made Easy
The World of Agile/Lean Product Development and Delivery with Scrum Made EasyThe World of Agile/Lean Product Development and Delivery with Scrum Made Easy
The World of Agile/Lean Product Development and Delivery with Scrum Made Easy
 
Agile User Stories
Agile User StoriesAgile User Stories
Agile User Stories
 
User stories in agile software development
User stories in agile software developmentUser stories in agile software development
User stories in agile software development
 
Agile Breakthroughs: Better Agile Adoption Through Change Management
Agile Breakthroughs: Better Agile Adoption Through Change ManagementAgile Breakthroughs: Better Agile Adoption Through Change Management
Agile Breakthroughs: Better Agile Adoption Through Change Management
 
Using Storytelling in Change Management
Using Storytelling in Change ManagementUsing Storytelling in Change Management
Using Storytelling in Change Management
 
Mit Scrum zur agilen Organisation
Mit Scrum zur agilen OrganisationMit Scrum zur agilen Organisation
Mit Scrum zur agilen Organisation
 

Similar a SCRUM Intro

Agile Truths and Misconceptions
Agile Truths and MisconceptionsAgile Truths and Misconceptions
Agile Truths and Misconceptions
Richard Cheng
 

Similar a SCRUM Intro (20)

Practicing Agile through Scrum
Practicing Agile through ScrumPracticing Agile through Scrum
Practicing Agile through Scrum
 
Agile tutorial
Agile tutorialAgile tutorial
Agile tutorial
 
Agile.pptx
Agile.pptxAgile.pptx
Agile.pptx
 
Overview of Agile methodology & Scrum
Overview of Agile methodology & ScrumOverview of Agile methodology & Scrum
Overview of Agile methodology & Scrum
 
Roadmap to Scrum Master ( CSM )
Roadmap to Scrum Master ( CSM ) Roadmap to Scrum Master ( CSM )
Roadmap to Scrum Master ( CSM )
 
Scrum
ScrumScrum
Scrum
 
aa.pdf
aa.pdfaa.pdf
aa.pdf
 
Scrum 101
Scrum 101 Scrum 101
Scrum 101
 
Scrum Overview
Scrum OverviewScrum Overview
Scrum Overview
 
Agile Modeling & Scrum Development.pptx
Agile Modeling & Scrum Development.pptxAgile Modeling & Scrum Development.pptx
Agile Modeling & Scrum Development.pptx
 
Scrum Guidelines
Scrum GuidelinesScrum Guidelines
Scrum Guidelines
 
Scrum at a Glance
Scrum at a GlanceScrum at a Glance
Scrum at a Glance
 
CampusSDN2017 - Jawdat: Product Management and Agile Development
CampusSDN2017 - Jawdat: Product Management and Agile DevelopmentCampusSDN2017 - Jawdat: Product Management and Agile Development
CampusSDN2017 - Jawdat: Product Management and Agile Development
 
Agile Efficacy Presentation
Agile Efficacy PresentationAgile Efficacy Presentation
Agile Efficacy Presentation
 
Agile Truths and Misconceptions
Agile Truths and MisconceptionsAgile Truths and Misconceptions
Agile Truths and Misconceptions
 
Introduction to Scrum
Introduction to ScrumIntroduction to Scrum
Introduction to Scrum
 
Scrum and Devops - Workshop & Handson
Scrum and Devops - Workshop & HandsonScrum and Devops - Workshop & Handson
Scrum and Devops - Workshop & Handson
 
Introduction to Agile Software Development
Introduction to Agile Software DevelopmentIntroduction to Agile Software Development
Introduction to Agile Software Development
 
T1dbpcgirhu9afyr9fgf signature-e1e8931182a0dcf02346befbfa9f0fcf644737855bed1e...
T1dbpcgirhu9afyr9fgf signature-e1e8931182a0dcf02346befbfa9f0fcf644737855bed1e...T1dbpcgirhu9afyr9fgf signature-e1e8931182a0dcf02346befbfa9f0fcf644737855bed1e...
T1dbpcgirhu9afyr9fgf signature-e1e8931182a0dcf02346befbfa9f0fcf644737855bed1e...
 
Lean and agile in a chestnut
Lean and agile in a chestnutLean and agile in a chestnut
Lean and agile in a chestnut
 

Último

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Último (20)

Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 

SCRUM Intro

  • 1. SCRUM OVERVIEW PRESENTED BY: Scott Inman Scrum Practitioner/Coach CARDINAL SOLUTIONS - AGILE ADVISORY SERVICES
  • 2. How effective are your current processes and practices? Not Very 1 2 3 4 5 6 7 8 9 10
  • 3. How familiar are you with Scrum? Not Very 1 2 3 4 5 6 7 8 9 10
  • 4. 0 1 2 3 4 5 6 7 8 9 10 0 1 2 3 4 5 6 7 8 9 10 ScrumFamiliarity Current Process Effectiveness Living the dream Things are just fine without Scrum Learning and improving We know what to do, and we aren’t doing it This hurts. Help. Where are you located on this graph?
  • 5. TRUTHS ABOUT TEAM MOTIVATION • People are most productive when they manage themselves • People take their commitments more seriously than other people’s commitments for them
  • 6. TRUTHS ABOUT TEAM PERFORMANCE • Teams and people do their best work when they aren’t interrupted • Teams improve most when they solve their own problems • Face to Face communication is the most productive way for teams to work together • Teams are more productive than the same number of individuals
  • 7. Scrum in a Nutshell Product Owner Scrum MasterDevelopment Team Product Backlog Sprint Backlog Daily Scrum Increment Scrum Team Sprint Sprint Planning Sprint Review Sprint Retrospective
  • 8. SCRUM: ORIGINATION • The term Scrum is borrowed from a rugby play where everyone stays focused on the ball • A way to restart the game when the ball has gone out of play • Players connect together as a team to compete for the ball
  • 9. SCRUM: THE FRAMEWORK • Scrum is not a methodology • Scrum is a tool used to create agility • A framework within which people can address complex problems and deliver products of the highest possible value
  • 10. Progress = Value Delivered (not effort expended) Value = Potentially Deployable Software • Requirements 90% Complete doesn’t deliver value • Design 20% Complete doesn’t deliver value The sole measure of progress is “Potentially Deployable Software” DELIVERING VALUE
  • 11. MANAGEMENT NO LONGER NEEDS TO… • Make commitments on behalf of the team • Give direction to the team on how to meet commitments • Monitor teams progress to keep it on schedule • Step in and fix problems if encountered • Push team to work harder • Decide work assignments and follow up to ensure they are done
  • 12. SCRUM LIFECYCLE PLAN ANALYZE DESIGN CODE TEST RELEASEWaterfall: Scrum: P L A N ANALYZE DESIGN CODE TEST RELEASE R E V I E W The same work, but organized differently and on fewer requirements, Waste becomes visible and can be quickly removed Short, high value iterations that deliver functionality
  • 13. Scrum Team Roles Product Owner Development Team Scrum Master Service flows this way
  • 14. PRODUCT OWNER • Maximizes the Return on Investment • Creates and orders Product Backlog • Chooses what and when to release • Single voice of the Customer • Represents interests of stakeholders and customers
  • 15. PRODUCT BACKLOG • A prioritized and complete list of desirements • Potential features of the product • Managed and groomed by Product Owner • 10% of each sprint is spent discussing and analyzing the backlog • Single source of truth for what is planned for the product • Public and available
  • 16. PRODUCT BACKLOG ITEM • A unit of deliverable work • Contains clear acceptance criteria (criteria for successful completion) • May reference other artifacts like Specifications, Use Cases, Wireframes, etc. • Must be sized appropriately • Small enough to be completed within a single Sprint
  • 17. • PBIs are estimated and ordered for about 3 Sprints at all times • The current sprint is detailed  Broken into tasks  Very granular detail • PBI’s for next 2 sprints are groomed  Understood by the entire team  Ordered  Estimated  User Stories with acceptance criteria Current Sprint Next Sprint Next, Next Sprint ROLLING PRODUCT BACKLOG PROJECTION
  • 18. USER STORIES – COMMON EXPRESSION OF PBIs • High level desires of your product backlog are incrementally decomposed into Detailed requirements in the form of User Stories with Acceptance Criteria
  • 19. WHAT IS A USER STORY? • Represents the basic unit of work for a Scrum team • Cross-functional team members hold conversations to flush out the detailed requirements User Stories contain two main components: 1. Value Story: As a <Role> I Need <Goal> So That <Reason> 2. Acceptance Criteria: Detailed requirements (Functional, Non-Functional, Data, etc)
  • 20. USER STORY EXAMPLE Value Story: As an online banking customer, I need the Overview page in a 1024 x 768 screen resolution so that I can view more information on the page. Acceptance Criteria: Given a PC that has the screen resolution set at 1024 x 768: 1. Customer sees the screen without any horizontal scroll bar 2. Customer sees the honeycomb background on the right and left side of the page 3. Customer sees the page centered in the browser
  • 21. THE DEVELOPMENT TEAM • Cross-functional • Jointly owns and commits to product backlog items • Ideally collocated, dedicated resources • 6 members, +/- 3 (recommended not required) • Highly collaborative • Empowered and self-managed • Everyone pitches in regardless of individual skill or specialty • Held accountable as a Unit
  • 22. The Development Team should have every competency it needs to deliver an increment of “done” functionality THE DEVELOPMENT TEAM
  • 23. ESTIMATING • Relative estimates are assigned to Product Backlog items • Fibonacci Set of Numbers (1,2,3,5,8,13 or 21) • Medium size effort is 8 • Team votes on the relative size of the effort to do the product backlog item  Discuss if large discrepancies in voting occur  If close, use the higher number • Do not count on estimates by people who will not be doing the work
  • 24. FOUNDATION OF SCRUM We all know what Is going on. Check your work as you do it. OK to change tactical direction.
  • 25. EMPIRICAL PROCESS • Knowledge comes through experience • Just in time planning and re-planning based on frequent inspection • Based on actuals rather than predictions • Requires transparency • Information is neither good nor bad only used to make decisions • Does not try to predict the future, only adapts to the current Scrum makes everything Transparent all the time so that they can be quickly fixed
  • 26. EMPIRICAL PROCESSES PLAN FREQUENTLY P DPlanning Doing Predictive Empirical • All planning is done at beginning • Just-in-time planning and re- planning based on frequent inspection P D P D P D P D P D
  • 27. SPRINT • Time-boxed at 30 days • Contains the work necessary for the increment of functionality and other events • Functionality is potentially shippable • Consistent durations • Conducted in a vacuum, team is totally protected from outside noise and interference
  • 28. SPRINT PLANNING • Time-boxed at 8 hours for 4 week sprints, proportionately less for shorter Sprints • Product Owner reviews top priority items with Development Team • Development Team determines how much they can do and tasks necessary to complete items (Sprint Backlog) • Sprint Goal is created
  • 29. SPRINT GOALS An objective to be met in the Sprint Allows flexibility in delivering the increment of functionality No changes may affect the Sprint goal during the Sprint As team works, this goal is kept in mind Each Daily Scrum assess the teams progress towards the goal
  • 30. DEFINITION OF DONE • Should include all steps necessary to make that PBI potentially shippable • Adhere to “done” every Sprint • “Done” is for the entire product not just for one scrum team’s increment • All Scrum teams working on a product must have the same definition of done • Should be inspected at the end of each sprint • Must be transparent
  • 31. DONE MIGHT INCLUDE… • Performance Testing • Code Refactoring • Integration with other teams (syncing, integration of code, etc.) • Release notes • User Acceptance testing • Regression testing • Code reviews
  • 32. INS and OUTS of SPRINT PLANNING INPUTS OUTPUTS • The Product Backlog • The latest increment • The number of hours the Development Team has available to work (Capacity) • Past performance of the development team (Velocity) • Definition of Done • The Sprint Goal • Sprint Backlog • 60% - 70% known and accurate • Some work emerges later
  • 33. SPRINT BACKLOG • Created by Development Team during Sprint Planning • Includes PBI’s committed to and tasks necessary to complete each PBI selected • Each task must be granular enough to be completed in 1 day or less • Development team members sign up for tasks, they aren't assigned • Any development team member can add, delete or change the Sprint backlog • Work for Sprint emerges over time • If work is unclear, update work remaining as more is known and tasks are worked
  • 34. CREATING THE SPRINT BACKLOG Team selects a PBI based on product backlog order Team identifies all tasks necessary to complete PBI Team estimates PBI via Story Points Add PBI to Sprint Backlog Negotiate what can be delivered from PBI or place item back in Product Backlog Does PBI fit into Sprint? YES NO
  • 35. SPRINT AS A “DEAL” The Development Team Clients “Every Sprint you can have us develop something new as you see fit” FLEXIBILITY “We will leave you alone for two weeks (or more) and will not interfere while you work.” STABILITY
  • 36. SPRINT TASK BOARD • A way to track the tasks necessary to complete PBI’s • Can be in a scrum room (physical, manual tracking), can be virtual or both
  • 37. The development team has decided how much it can accomplish during the upcoming sprint. It now sprints to accomplish the sprint goal as it sees fit, adapting to the circumstances, technology and organizational terrain as best it can
  • 38. SPRINT REVIEW • Time-boxed at 4 hours for 4 week sprints; proportionately less for shorter Sprints • Team demonstrates the increment of functionality • Stakeholders provide feedback • Product Increment and Product Backlog are inspected and adapted • Discuss what can be worked on next
  • 39. SPRINT RETROSPECTIVE • Time-boxed at 3 hours for 4 week sprints; proportionately less for shorter Sprints • Opportunity for Scrum team to inspect & adapt their development process, tools and definition of done • Develop plan for actionable improvements (to be implemented in next Sprint)
  • 40. EMPIRICAL PROCESSES REQUIRE COURAGE Conversation will not take place unless people feel safe! Goal realization Crucial Conversation Transparency Inspection & Adaptation
  • 41. INCREMENT • Working functionality • Is potentially shippable and usable by customer • An output of the Sprint • Must be DONE with no work remaining
  • 42. SCRUM MASTER • A servant leader • Educates the Product Owner on their role • Ensures the Scrum framework is followed • Facilitates time boxed events • Empowers team to self-organize • Removes impediments
  • 43. SCRUM MASTER May Be May Not Be • Anyone with the appropriate servant-leader skills • A member of the Development team • Fired by the team • A Product Owner • This is a direct conflict of interest
  • 44. Executives Managers Anyone on another team Scrum Master Product Owner Development Team Chicken Pigs THE CHICKEN AND THE PIG
  • 45. DAILY SCRUM • Time-boxed at 15 minutes • Development Team is required to attend • NOT a status meeting, team creates a plan for the next 24 hours • Three questions: 1. What have you accomplished? 2. What do you plan to accomplish? 3. What is impeding or slowing your progress? How will the Development team achieve its forecast based on the inspection?
  • 46. BURNDOWN CHARTS • Measurement for the Development team • Used to see how they are progressing towards the goal in the sprint • May change abruptly when  New SBIs are added or removed during the Sprint  Scope is renegotiated with the Product Owner • Burndown charts can also be used by the Product Owner to see how they are progressing towards the release
  • 47. 0 10 20 30 40 50 60 Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day 10 Work Remaining SPRINT BURNDOWN CHART
  • 48. VELOCITY • A measure of delivered value per sprint • Used by the Product Owner to provide forecasts • Used by the Development Team to gauge how much work to pull into the Sprint
  • 49. VELOCITY FROM THE LAST RELEASE 0 5 10 15 20 25 30 35 40 45 50 1 2 3 4 5 6 7 Sprints Velocity = 37 SP’s per sprint Last Sprint = 47
  • 50. SELF MANAGING TEAMS • Who does what & when • Who is needed on the team and not • What customer input is needed and when • When it needs help resolving Impediments • What process improvements are needed The Team Determines…
  • 51. FEWER SPECIALISTS • In a multi-disciplinary team of appropriate size, specialization is simply not possible • Task pairing and sharing grows everyone on the team • Team members focus shifts from fulfillment of their own duties to the overall success of the team
  • 52. ARE YOU THE RIGHT SCRUM MASTER? • Good Scrum Masters are fit via temperament and facilitation skills NOT job title • Good Scrum Masters are ferocious advocates for their teams
  • 53. WORKING WITH DEPENDENCIES • Prioritization of the Product Backlog should be used to synchronize dependencies • When there are multiple scrum teams working on 1 product, all teams must have a shared definition of done • Work should not be considered done until it is integrated and tested
  • 54. ROLES, ARTIFACTS, & EVENTS ROLES ARTIFACTS • Product Owner • Scrum Master • The Development Team • Increment • Product Backlog • Sprint Backlog EVENTS • Sprint • Sprint Planning • Daily Scrum • Sprint Review • Sprint Retrospective
  • 56. • Next Agile Leadership Series: The Definition of Done: August 1, 2013 • Professional Scrum Foundations Course: August 15-16 in Charlotte! • A successful Agile implementation begins with comprehensive training Contact us to register for our Scrum training today! Contact Information Jim Milam/ Nick Bourdon/ Matt Brookshire 210 East Trade Street Suite C-440 Charlotte, NC 28202 (704) 936-4444 Cardinal Solutions Group