Running head: ULTRAMAX                                          1




                              UltraMAX Testing Project

                         Keller Graduate School of Management

                            Advanced Project Management
ULTRAMAX                                                                                          2


                                     UltraMAX Testing Project

                                            Introduction

NutroBalance has begun the implementation of a new performance and weight loss pill for

women. The Board of Directors for NutroBalance is set to introduce UltraMAX for women, after

adequate testing and proven results are seen and tested upon. The project started and

immediately was delayed by incomplete tasks. The Board of Directors has given the Project

Manager an opportunity to provide solutions for, and remediate the issue given the pressing

deadlines for the product’s release. The Project Manager has proposed two strategies with

striking differences and associated risks to the Board. Both plans have associated cost

fluctuations; however, the risks of tardy completion can be curtailed in both scenarios.

                                              Section 1

       Alex has requested a response in regards to the UltraMAX product testing from the

appointed Project Manager. The following response was delivered via email:

       The UltraMAX testing and implementation project requires the use of 4 resources;

however, as indicated in the attached Critical Task Report, Robert has been over allocated

between tasks 5 and 6. Overall, the project at completion should take 138 days given the

unaltered critical path analysis. The project is anticipated to start February 22, 2010 and the

scheduled completion date is set for September 1, 2010. The tasks displayed in the critical

analysis figure 1.1, which are significant to completing the project on schedule, are tasks:

1,2,3,4,5,9,11,12, and 13. With the large amount of critical tasks for this project, strict and

cautious planning should be utilized in anticipation of completing the project on time.
ULTRAMAX                               3


Figure 1.1 Critical Task Assessments
ULTRAMAX                                                                                         4




                                            Section 2

       NutroBalance, a weight loss supplement and nutritional snack food company has long

provided athletes and health conscious people numerous products to enhance their goals of

weight loss and physical fitness. A recent investment in a pill-form supplement for weight lifting

and cardiovascular exercising women called UltraMAX has stirred a request from the Board of

Directors for testing and application before forwarding the product to customers. The weight-loss

drug study has a project manager and 4 team members assigned to the tasks of getting the

product market ready. The Board of Directors has given the project manager 140 days to

complete the testing phase inclusive of13 tasks. The project will begin on February 22, 2010.
ULTRAMAX                                                                                             5


       The project manager has analyzed the entire project with Microsoft Project. Currently,

the 13 tasks are scheduled to complete 2 days ahead of schedule on September 1, 2010 with an

initial cost of $41880.00. There is a resource constraint that should be addressed in regards to

tasks 5 and 6 and Robert, the coordinator for those events. Leveling the schedule for Robert to

adequately complete his tasks adjusts the scheduled completion date forward by two days, and

remains intact with the 140 day deadline on September 3, 2010. Since task 6 was not part of the

critical path (essential tasks to complete on time), the assignment dates were moved to April 29

and 30, 2010 with no conflict to the critical tasks.

        The UltraMAX project team must follow the schedule continuously, as any time

alterations will alter the completion of the project as well as expected costs. The team holds the

extraneous risks of extended task periods, product failure or that the product may be need to be

altered before results in test subjects present themselves- which may further the time period

needed for the study. Figure 2.1 shows the over-allocation of Robert before resolving leveling

the project. Figure 2.2 and 2.3display resource usage before leveling the resources and after.
ULTRAMAX                      6


Figure 2.1 Before Leveling:
ULTRAMAX                      7


Figure 2.2 Before Leveling:
ULTRAMAX   8
ULTRAMAX   9
ULTRAMAX                     10


Figure 2.3 After Leveling:
ULTRAMAX   11
ULTRAMAX   12
ULTRAMAX                                                                                         13


                                  Section 3: Executive Summary

       The UltraMAX testing project commenced on February 22, 2010 with a 5 member

project team inclusive of the project manager. Aligning with the required 140 day limitation set

by the Board of Directors, the scheduling and resources were matched and configured

appropriately. Maintaining some risk of task completion requirements, the project manager made

clear to the Board that an extension of time and/or increased expected costs may be needed in

order to align with NutroBalance’s expectations for the product in the marketplace.

       As of April, 21 2010, the project has changed the course of the schedule and has pushed

the date of completion (given all other elements remain time efficient) to September 17, 2010.

The project schedule reveals that the time constraint for testing became apparent after task 3

(Screening the Test Subjects) took 10 days longer to complete than expected. Unfortunately, task

3 is a critical task, thus pushing the remainder of the project back 10 days.

       There are currently 10 remaining tasks to complete. Decisive maneuvering must take

place to ensure the 140 day deadline if the Board of Directors is unwilling to add time to the

testing of UltraMAX. Resolving the time constraint and ensuring adequate completion efficiency

of future tasks may add costs as well.

       There are ways to resolve this issue with minimum alteration of cost and schedule. As

mentioned, if the Board decides to stay with the 140 day limitation, then costs will increase.

Increasing the maximum capacities of the project team, and modifying the work task

assignments may prove to be efficient ways to get the project back on track, and possibly finish

earlier. Two different plans of remediation will be displayed and explained for the consideration

of the Board of Directors. If no course of action takes place, than the expected project

completion date will tentatively be set back to September 17, 2010.
ULTRAMAX                                                                                           14


                                             Plan A

       Plan A requires the cooperation and focus of the project team as they will be asked to be

more productive than average on a daily basis and work overtime hours as needed. By increasing

the capacities of the individual team members to a maximum of 140 percent, the 140 day

completion can be attained. By increasing the percentage of work done per day, the team

members will finish tasks in less amounts of time. In other words, they will have to pick up the

slack and work harder to make up lost time. This plan entails the most risk because the results

cannot be guaranteed to be successful, and the additional need of funding. By strategically

placing time decreases in the identified tasks, cost increases from overtime hours are minimized;

however, the approval of cost estimations from the Board as well as the approval and willingness

of the team for overtime hours will be needed.

       This alternative plan entails the following features as shown in the attached Figures 3.1-2:

              56 hour work variance

              $3360.00 cost variance

              Task 7 increase of max units to 133%, shortening the task by 3 days

              Task 9 increase of max units to 108%, shortening the task by 5 days

              Task 11increase of max units to 140%, shortening the task by 2 days

              Task 13 increase of max units to 125%, shortening the task by 2 days
ULTRAMAX                          15


     Figure 3.1 Overview Report
ULTRAMAX                                 16


     Figure 3.2 Unstarted Task Report:
ULTRAMAX   17
ULTRAMAX                                                                                            18


                                                  Plan B

       Utilizing resources to their max potential will aid in getting the UltraMAX testing

completed within time limitations. Another method to get the project schedule back in line is to

pair up resources to complete tasks sooner. If additional task assignments to team members are

strategically placed and the Board approves the slight cost increase, the entire project could be

completed earlier than expected. An anticipated two day buffer and an early deliverable can be

created with this sequence of changes. Since other projects have utilized partners in completing

tasks, and the project is currently running behind schedule, team members are willing to work

together to complete the project on time. This alternative is highly recommended by the Project

Manager over the previously mentioned Plan A due to its cost effectiveness, and schedule

modifications. The following figures 3.3-5 display the features of Plan B.

       Features of Plan B include:

      Task 11 decrease to 3.5 days, addition of Tony to the task team, increased cost of $60.00

      Task 12 decrease to 4 days, addition of Robert to the task team, increased cost of $320.00

      Task 13 decrease to 5 days, addition of Robert to the task team, increased cost of $400.00

      Total project cost increase of only $780.00

      Project completion date of 9/1/2010, two day decrease to a 138 day total project time

      Two days to buffer any incomplete tasks

      All team members can fulfill the capacities of the additional tasks assigned
ULTRAMAX                     19


Figure 3.3 Plan B Overview
ULTRAMAX                      20


Figure 3.4 Task Assignments
ULTRAMAX                                21


     Figure 3.5 Unstarted Task Report
ULTRAMAX   22
ULTRAMAX   23

Más contenido relacionado

Destacado

American Born Chinese pecha
American Born Chinese pechaAmerican Born Chinese pecha
American Born Chinese pecha
huefdaddy
 
Working with Difficult Customers
Working with Difficult CustomersWorking with Difficult Customers
Working with Difficult Customers
Alejandro Ortega
 
Sma intro lecture 31 jan
Sma   intro lecture 31 janSma   intro lecture 31 jan
Sma intro lecture 31 jan
gcrashpdx
 
Visual Resume
Visual ResumeVisual Resume
Visual Resume
MaxxClark
 
Branded info sess november 6 2012
Branded info sess november 6 2012Branded info sess november 6 2012
Branded info sess november 6 2012
domgslisevents
 
Focus group-1202277256405728-5 (1)
Focus group-1202277256405728-5 (1)Focus group-1202277256405728-5 (1)
Focus group-1202277256405728-5 (1)
J Gonzalez
 
Daftar Harga Tabung Pemadam Api | Alat Pemadam Api
Daftar Harga Tabung Pemadam Api | Alat Pemadam ApiDaftar Harga Tabung Pemadam Api | Alat Pemadam Api
Daftar Harga Tabung Pemadam Api | Alat Pemadam Api
PT. MUTIARA SAFETYNDO
 
Perkoperasian penyuluhan
Perkoperasian penyuluhanPerkoperasian penyuluhan
Perkoperasian penyuluhan
gito1000
 
Alat Pemadam Api Ringan | Isi Ulang Tabung Apar
Alat Pemadam Api Ringan | Isi Ulang Tabung AparAlat Pemadam Api Ringan | Isi Ulang Tabung Apar
Alat Pemadam Api Ringan | Isi Ulang Tabung Apar
PT. MUTIARA SAFETYNDO
 

Destacado (16)

American Born Chinese pecha
American Born Chinese pechaAmerican Born Chinese pecha
American Born Chinese pecha
 
Working with Difficult Customers
Working with Difficult CustomersWorking with Difficult Customers
Working with Difficult Customers
 
Sma intro lecture 31 jan
Sma   intro lecture 31 janSma   intro lecture 31 jan
Sma intro lecture 31 jan
 
Cghjkfkfhk
CghjkfkfhkCghjkfkfhk
Cghjkfkfhk
 
Visual Resume
Visual ResumeVisual Resume
Visual Resume
 
Branded info sess november 6 2012
Branded info sess november 6 2012Branded info sess november 6 2012
Branded info sess november 6 2012
 
Focus group-1202277256405728-5 (1)
Focus group-1202277256405728-5 (1)Focus group-1202277256405728-5 (1)
Focus group-1202277256405728-5 (1)
 
Daftar Harga Tabung Pemadam Api | Alat Pemadam Api
Daftar Harga Tabung Pemadam Api | Alat Pemadam ApiDaftar Harga Tabung Pemadam Api | Alat Pemadam Api
Daftar Harga Tabung Pemadam Api | Alat Pemadam Api
 
Quality in conversation new 11 2012
Quality in conversation new 11 2012Quality in conversation new 11 2012
Quality in conversation new 11 2012
 
Alat Pemadam Api | Tabung Pemadam Api
Alat Pemadam Api | Tabung Pemadam ApiAlat Pemadam Api | Tabung Pemadam Api
Alat Pemadam Api | Tabung Pemadam Api
 
Report reti
Report retiReport reti
Report reti
 
Perkoperasian penyuluhan
Perkoperasian penyuluhanPerkoperasian penyuluhan
Perkoperasian penyuluhan
 
Stryker
StrykerStryker
Stryker
 
Alat Pemadam Api Ringan | Isi Ulang Tabung Apar
Alat Pemadam Api Ringan | Isi Ulang Tabung AparAlat Pemadam Api Ringan | Isi Ulang Tabung Apar
Alat Pemadam Api Ringan | Isi Ulang Tabung Apar
 
Descubrimos las vocales
Descubrimos las vocalesDescubrimos las vocales
Descubrimos las vocales
 
Sign and symptom in general surgery history taking
Sign and symptom in general surgery history takingSign and symptom in general surgery history taking
Sign and symptom in general surgery history taking
 

Similar a Case study 1

Project Plan - Risk Management & Integration
Project Plan - Risk Management & IntegrationProject Plan - Risk Management & Integration
Project Plan - Risk Management & Integration
Prachi Dikshit
 
DescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxDescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docx
carolinef5
 
DescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxDescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docx
donaldp2
 
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docxThe Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
todd771
 

Similar a Case study 1 (20)

APM_AEB_FINAL
APM_AEB_FINALAPM_AEB_FINAL
APM_AEB_FINAL
 
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
 
Improving Project Performance in the DOE
Improving Project Performance in the DOEImproving Project Performance in the DOE
Improving Project Performance in the DOE
 
Project Plan - Risk Management & Integration
Project Plan - Risk Management & IntegrationProject Plan - Risk Management & Integration
Project Plan - Risk Management & Integration
 
CPM-Updating
CPM-UpdatingCPM-Updating
CPM-Updating
 
Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project Report
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
SE18_Lec 13_ Project Planning
SE18_Lec 13_ Project PlanningSE18_Lec 13_ Project Planning
SE18_Lec 13_ Project Planning
 
Resource-Allocation.ppt
Resource-Allocation.pptResource-Allocation.ppt
Resource-Allocation.ppt
 
DescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxDescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docx
 
DescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxDescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docx
 
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docxThe Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
The Federal Open Market Committee (FOMC) will meet on Sept. 25th a.docx
 
PROJECT PLANNING METHODOLOGIES.pdf
PROJECT  PLANNING METHODOLOGIES.pdfPROJECT  PLANNING METHODOLOGIES.pdf
PROJECT PLANNING METHODOLOGIES.pdf
 
062613 Rufran's Primavera Scheduling Tips & Tricks 01-13
062613 Rufran's Primavera Scheduling Tips & Tricks 01-13062613 Rufran's Primavera Scheduling Tips & Tricks 01-13
062613 Rufran's Primavera Scheduling Tips & Tricks 01-13
 
IRJET- Quality Matrices of Project Schedule
IRJET- Quality Matrices of Project ScheduleIRJET- Quality Matrices of Project Schedule
IRJET- Quality Matrices of Project Schedule
 
Performance Testing Checklists
Performance Testing ChecklistsPerformance Testing Checklists
Performance Testing Checklists
 
PERT
PERTPERT
PERT
 
Communication 1
Communication 1Communication 1
Communication 1
 
Improving DOE Project Performance Using the DOD Integrated Master Plan
Improving DOE Project Performance Using the DOD Integrated Master PlanImproving DOE Project Performance Using the DOD Integrated Master Plan
Improving DOE Project Performance Using the DOD Integrated Master Plan
 
Session 5 gdas pmp study group presentation
Session 5   gdas pmp study group presentationSession 5   gdas pmp study group presentation
Session 5 gdas pmp study group presentation
 

Último

Último (20)

Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Fostering Friendships - Enhancing Social Bonds in the Classroom
Fostering Friendships - Enhancing Social Bonds  in the ClassroomFostering Friendships - Enhancing Social Bonds  in the Classroom
Fostering Friendships - Enhancing Social Bonds in the Classroom
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 

Case study 1

  • 1. Running head: ULTRAMAX 1 UltraMAX Testing Project Keller Graduate School of Management Advanced Project Management
  • 2. ULTRAMAX 2 UltraMAX Testing Project Introduction NutroBalance has begun the implementation of a new performance and weight loss pill for women. The Board of Directors for NutroBalance is set to introduce UltraMAX for women, after adequate testing and proven results are seen and tested upon. The project started and immediately was delayed by incomplete tasks. The Board of Directors has given the Project Manager an opportunity to provide solutions for, and remediate the issue given the pressing deadlines for the product’s release. The Project Manager has proposed two strategies with striking differences and associated risks to the Board. Both plans have associated cost fluctuations; however, the risks of tardy completion can be curtailed in both scenarios. Section 1 Alex has requested a response in regards to the UltraMAX product testing from the appointed Project Manager. The following response was delivered via email: The UltraMAX testing and implementation project requires the use of 4 resources; however, as indicated in the attached Critical Task Report, Robert has been over allocated between tasks 5 and 6. Overall, the project at completion should take 138 days given the unaltered critical path analysis. The project is anticipated to start February 22, 2010 and the scheduled completion date is set for September 1, 2010. The tasks displayed in the critical analysis figure 1.1, which are significant to completing the project on schedule, are tasks: 1,2,3,4,5,9,11,12, and 13. With the large amount of critical tasks for this project, strict and cautious planning should be utilized in anticipation of completing the project on time.
  • 3. ULTRAMAX 3 Figure 1.1 Critical Task Assessments
  • 4. ULTRAMAX 4 Section 2 NutroBalance, a weight loss supplement and nutritional snack food company has long provided athletes and health conscious people numerous products to enhance their goals of weight loss and physical fitness. A recent investment in a pill-form supplement for weight lifting and cardiovascular exercising women called UltraMAX has stirred a request from the Board of Directors for testing and application before forwarding the product to customers. The weight-loss drug study has a project manager and 4 team members assigned to the tasks of getting the product market ready. The Board of Directors has given the project manager 140 days to complete the testing phase inclusive of13 tasks. The project will begin on February 22, 2010.
  • 5. ULTRAMAX 5 The project manager has analyzed the entire project with Microsoft Project. Currently, the 13 tasks are scheduled to complete 2 days ahead of schedule on September 1, 2010 with an initial cost of $41880.00. There is a resource constraint that should be addressed in regards to tasks 5 and 6 and Robert, the coordinator for those events. Leveling the schedule for Robert to adequately complete his tasks adjusts the scheduled completion date forward by two days, and remains intact with the 140 day deadline on September 3, 2010. Since task 6 was not part of the critical path (essential tasks to complete on time), the assignment dates were moved to April 29 and 30, 2010 with no conflict to the critical tasks. The UltraMAX project team must follow the schedule continuously, as any time alterations will alter the completion of the project as well as expected costs. The team holds the extraneous risks of extended task periods, product failure or that the product may be need to be altered before results in test subjects present themselves- which may further the time period needed for the study. Figure 2.1 shows the over-allocation of Robert before resolving leveling the project. Figure 2.2 and 2.3display resource usage before leveling the resources and after.
  • 6. ULTRAMAX 6 Figure 2.1 Before Leveling:
  • 7. ULTRAMAX 7 Figure 2.2 Before Leveling:
  • 10. ULTRAMAX 10 Figure 2.3 After Leveling:
  • 11. ULTRAMAX 11
  • 12. ULTRAMAX 12
  • 13. ULTRAMAX 13 Section 3: Executive Summary The UltraMAX testing project commenced on February 22, 2010 with a 5 member project team inclusive of the project manager. Aligning with the required 140 day limitation set by the Board of Directors, the scheduling and resources were matched and configured appropriately. Maintaining some risk of task completion requirements, the project manager made clear to the Board that an extension of time and/or increased expected costs may be needed in order to align with NutroBalance’s expectations for the product in the marketplace. As of April, 21 2010, the project has changed the course of the schedule and has pushed the date of completion (given all other elements remain time efficient) to September 17, 2010. The project schedule reveals that the time constraint for testing became apparent after task 3 (Screening the Test Subjects) took 10 days longer to complete than expected. Unfortunately, task 3 is a critical task, thus pushing the remainder of the project back 10 days. There are currently 10 remaining tasks to complete. Decisive maneuvering must take place to ensure the 140 day deadline if the Board of Directors is unwilling to add time to the testing of UltraMAX. Resolving the time constraint and ensuring adequate completion efficiency of future tasks may add costs as well. There are ways to resolve this issue with minimum alteration of cost and schedule. As mentioned, if the Board decides to stay with the 140 day limitation, then costs will increase. Increasing the maximum capacities of the project team, and modifying the work task assignments may prove to be efficient ways to get the project back on track, and possibly finish earlier. Two different plans of remediation will be displayed and explained for the consideration of the Board of Directors. If no course of action takes place, than the expected project completion date will tentatively be set back to September 17, 2010.
  • 14. ULTRAMAX 14 Plan A Plan A requires the cooperation and focus of the project team as they will be asked to be more productive than average on a daily basis and work overtime hours as needed. By increasing the capacities of the individual team members to a maximum of 140 percent, the 140 day completion can be attained. By increasing the percentage of work done per day, the team members will finish tasks in less amounts of time. In other words, they will have to pick up the slack and work harder to make up lost time. This plan entails the most risk because the results cannot be guaranteed to be successful, and the additional need of funding. By strategically placing time decreases in the identified tasks, cost increases from overtime hours are minimized; however, the approval of cost estimations from the Board as well as the approval and willingness of the team for overtime hours will be needed. This alternative plan entails the following features as shown in the attached Figures 3.1-2:  56 hour work variance  $3360.00 cost variance  Task 7 increase of max units to 133%, shortening the task by 3 days  Task 9 increase of max units to 108%, shortening the task by 5 days  Task 11increase of max units to 140%, shortening the task by 2 days  Task 13 increase of max units to 125%, shortening the task by 2 days
  • 15. ULTRAMAX 15 Figure 3.1 Overview Report
  • 16. ULTRAMAX 16 Figure 3.2 Unstarted Task Report:
  • 17. ULTRAMAX 17
  • 18. ULTRAMAX 18 Plan B Utilizing resources to their max potential will aid in getting the UltraMAX testing completed within time limitations. Another method to get the project schedule back in line is to pair up resources to complete tasks sooner. If additional task assignments to team members are strategically placed and the Board approves the slight cost increase, the entire project could be completed earlier than expected. An anticipated two day buffer and an early deliverable can be created with this sequence of changes. Since other projects have utilized partners in completing tasks, and the project is currently running behind schedule, team members are willing to work together to complete the project on time. This alternative is highly recommended by the Project Manager over the previously mentioned Plan A due to its cost effectiveness, and schedule modifications. The following figures 3.3-5 display the features of Plan B. Features of Plan B include:  Task 11 decrease to 3.5 days, addition of Tony to the task team, increased cost of $60.00  Task 12 decrease to 4 days, addition of Robert to the task team, increased cost of $320.00  Task 13 decrease to 5 days, addition of Robert to the task team, increased cost of $400.00  Total project cost increase of only $780.00  Project completion date of 9/1/2010, two day decrease to a 138 day total project time  Two days to buffer any incomplete tasks  All team members can fulfill the capacities of the additional tasks assigned
  • 19. ULTRAMAX 19 Figure 3.3 Plan B Overview
  • 20. ULTRAMAX 20 Figure 3.4 Task Assignments
  • 21. ULTRAMAX 21 Figure 3.5 Unstarted Task Report
  • 22. ULTRAMAX 22
  • 23. ULTRAMAX 23