SlideShare una empresa de Scribd logo
1 de 4
© Canberra Institute of Technology Page 1 of 4 Date created: 29/07/2021
CRICOS No. 00001K | RTO Code 0101 Date updated: 5/10/2022
Subject Guide: CPCCSF2004
Place and Fix Reinforcement (elective )
Year & Semester: As per this Ready Skills course
Prerequisites: CPCCWHS2001 Apply WHS requirements, policies and procedures in the construction
industry.
eLearn: My Profiling: https://app.mytrainingplan.com.au
Teacher Name(s)
& Contact Details:
CIT acknowledges the United Ngunnawal Elders Council as the representative body of the Ngunnawal community; the
traditional owners of the ACT and region. We pay respect to their Elders, both past and present, and acknowledge the
ongoing contribution they make to the life of this city and this region.
Subject Summary:
This unit of competency specifies the skills and knowledge required to place and fix reinforcement for
concrete work as part of construction processes.
It includes:
 Planning and preparing for the work
 Final preparation for placement
 Placing and fixing reinforcement
 Checking the reinforcement
 Completing clean-up activities.
It applies to carpenters working as members of a team.
No licensing, legislative or certification requirements apply to this unit at the time of publication.
Assessment:
You Will need to complete the following assessment
To demonstrate competency in this unit, a person must place and fix reinforcement materials on a
minimum of three different jobs, each including deformed bars, rods and mesh sheets.
You will need to complete the following assessment items to be successful in this subject. Further
details regarding assessment items will be provided by your teacher.
© Canberra Institute of Technology Page 2 of 4 Date created: 29/07/2021
CRICOS No. 00001K | RTO Code 0101 Date updated: 5/10/2022
No. Assessment Name — brief description of assessment Dates
(not required for flexible
delivery)
On site profiling with employers sign off using the My Profiling app.
1 Theory/Knowledge Assessment on the Ready Skills platform-
 Quiz 1 introduction and tools.
 Quiz 1a Operational Diagnostic and maintenance procedures
cold cut saw
 Quiz 2 Australian standards.
 Quiz 3 NCC quiz.
Class based Practical activities-
 Mesh Calculations
 Trench mesh calculations
 Cut and bend fitments cogs and cranks
2
Practical assessments-
 Place and fix trench mesh.
 Place and fix reinforcement to a footing slab.
 Place and fix reinforcement to a footing slab to include vertical
reinforcement.
What you will need:
To be successful in this subject you will need the following resources:
 Access to My Profiling Online and App
 Pencils, pens, eraser, drawing instruments, scientific calculator, notebook.
 You must select, provide and correctly use the required PPE for the tasks that you are
performing
 PPE is mandatory. If you fail to comply with instructions concerning PPE you will not be able
to continue to undertake the assessment.
Schedule:
© Canberra Institute of Technology Page 3 of 4 Date created: 29/07/2021
CRICOS No. 00001K | RTO Code 0101 Date updated: 5/10/2022
To be successful in this subject you are expected to engage in a range of activities. It is recommended
that, in addition to scheduled classes, you will require between 2-6 hours per week for additional
learning.
Session
(Date optional)
What's on this session
Day 1/1 Introduction to topic, policies, subject guide, and assessment
criteria. PowerPoints, videos, calculations, class discussion.
Day 1/2 My Profiling, WHS, PowerPoints, videos, eLearn quizzes, drawings and calculations and
practical activities (formative assessment) drawings and calculations.
Day 2/1
My Profiling, WHS, PowerPoints, videos, eLearn quizzes, drawings and calculations and
practical activities (formative assessment) drawings and calculations.
Practical activity , cut & bend fitments, cogs and cranks
Practical assessment 1 - Place and fix trench mesh
Day 2/2 Practical assessment 2 - Place and fix footing slab reinforcement.
Day 3/1 My Profiling, WHS, PowerPoints, videos, eLearn quizzes, drawings and calculations and
practical activities (formative assessment) drawings and calculations.
Day 3/2 Practical assessment 3 - Place and fix footing slab reinforcement to include vertical
reinforcement
Additional Information
Requests for Extensions - If required, you may apply for an extension to the assessment completion date and/or special
consideration based on negotiation between you and your teacher. Your application should occur no less than 48 hours
prior to an assessment task due date.
Re-assessment - If your assessment work is deemed ‘not-yet-satisfactory’ you will be given one opportunity to re-sit the
assessment task or resubmit your assessment work taking into account feedback received from your teacher. For graded
subjects, you will be entitled to no higher than a pass for any re-assessed work. See your assessment coversheet for more
information.
Assessment Feedback - You will receive assessment results and feedback within two weeks of submitting or completing
the assessment tasks. Your teacher will advise you how feedback will be given.
Plagiarism - You have a responsibility to complete all assessment tasks honestly without any form of plagiarism while
studying at CIT. Plagiarism is copying someone else’s work without acknowledgement. For more information see the
plagiarism and referencing Lib Guides or contact staff in the CIT Library for assistance.
http://libguides.cit.edu.au/plagiarism http://libguides.cit.edu.au/referencing
The CIT Library provides a range of learning resources and services to support your study at all CIT Locations.
Go to https://cit.edu.au/library for more information or Lib Guides for subject specific resources.
© Canberra Institute of Technology Page 4 of 4 Date created: 29/07/2021
CRICOS No. 00001K | RTO Code 0101 Date updated: 5/10/2022
Additional Information - https://cit.edu.au/current/my_study/student_information_guide

Más contenido relacionado

Más de Canberra Institute of technology

Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxCanberra Institute of technology
 
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxWork Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxCanberra Institute of technology
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfCanberra Institute of technology
 
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerPractical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerCanberra Institute of technology
 
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Canberra Institute of technology
 

Más de Canberra Institute of technology (20)

Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptxPlace and Fix Reinforcement Materials Intro (2023 Edit).pptx
Place and Fix Reinforcement Materials Intro (2023 Edit).pptx
 
Demolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptxDemolition - 7 Process' of demolition Scenarios.pptx
Demolition - 7 Process' of demolition Scenarios.pptx
 
Practical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docxPractical Assessment_ Repair wall and floor tiling.docx
Practical Assessment_ Repair wall and floor tiling.docx
 
Hansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdfHansens Lodge Take-off.pdf
Hansens Lodge Take-off.pdf
 
Small House Plans & Calculations.pdf
Small House Plans & Calculations.pdfSmall House Plans & Calculations.pdf
Small House Plans & Calculations.pdf
 
Deck and Screen plans & Calculations
Deck and Screen plans & CalculationsDeck and Screen plans & Calculations
Deck and Screen plans & Calculations
 
Example Site Induction Map .pdf
Example Site Induction Map .pdfExample Site Induction Map .pdf
Example Site Induction Map .pdf
 
Hansens Lodge for Plan and Organise
Hansens Lodge for Plan and OrganiseHansens Lodge for Plan and Organise
Hansens Lodge for Plan and Organise
 
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxWork Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docx
 
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdfHansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
Hansens Lodge version 1.2 updated Layout for Ready skills updated on 171022.pdf
 
Axon Cladding Installation Guide
Axon Cladding Installation GuideAxon Cladding Installation Guide
Axon Cladding Installation Guide
 
Woodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boardsWoodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boards
 
Optical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docxOptical Dumpy Enlarge staff reading.docx
Optical Dumpy Enlarge staff reading.docx
 
Cladding introduction class presentation
Cladding introduction class presentationCladding introduction class presentation
Cladding introduction class presentation
 
Practical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal cornerPractical assessment 2 - Install horizontal weatherboards to internal corner
Practical assessment 2 - Install horizontal weatherboards to internal corner
 
Practical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboardsPractical Assessment 1 - Install horizontal weatherboards
Practical Assessment 1 - Install horizontal weatherboards
 
Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels Practical assessment 3 - Install horizontal and vertical sheet panels
Practical assessment 3 - Install horizontal and vertical sheet panels
 
Makita cold cut manual
Makita cold cut manualMakita cold cut manual
Makita cold cut manual
 
Small House Calculations
Small House CalculationsSmall House Calculations
Small House Calculations
 
3. Practical Assessment Skillion roof.docx
3. Practical Assessment Skillion roof.docx3. Practical Assessment Skillion roof.docx
3. Practical Assessment Skillion roof.docx
 

Último

Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Pooja Bhuva
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...Nguyen Thanh Tu Collection
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfDr Vijay Vishwakarma
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 

Último (20)

Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 

CPCCSF2004 Place and fix reinforcement materials- Subject guide

  • 1. © Canberra Institute of Technology Page 1 of 4 Date created: 29/07/2021 CRICOS No. 00001K | RTO Code 0101 Date updated: 5/10/2022 Subject Guide: CPCCSF2004 Place and Fix Reinforcement (elective ) Year & Semester: As per this Ready Skills course Prerequisites: CPCCWHS2001 Apply WHS requirements, policies and procedures in the construction industry. eLearn: My Profiling: https://app.mytrainingplan.com.au Teacher Name(s) & Contact Details: CIT acknowledges the United Ngunnawal Elders Council as the representative body of the Ngunnawal community; the traditional owners of the ACT and region. We pay respect to their Elders, both past and present, and acknowledge the ongoing contribution they make to the life of this city and this region. Subject Summary: This unit of competency specifies the skills and knowledge required to place and fix reinforcement for concrete work as part of construction processes. It includes:  Planning and preparing for the work  Final preparation for placement  Placing and fixing reinforcement  Checking the reinforcement  Completing clean-up activities. It applies to carpenters working as members of a team. No licensing, legislative or certification requirements apply to this unit at the time of publication. Assessment: You Will need to complete the following assessment To demonstrate competency in this unit, a person must place and fix reinforcement materials on a minimum of three different jobs, each including deformed bars, rods and mesh sheets. You will need to complete the following assessment items to be successful in this subject. Further details regarding assessment items will be provided by your teacher.
  • 2. © Canberra Institute of Technology Page 2 of 4 Date created: 29/07/2021 CRICOS No. 00001K | RTO Code 0101 Date updated: 5/10/2022 No. Assessment Name — brief description of assessment Dates (not required for flexible delivery) On site profiling with employers sign off using the My Profiling app. 1 Theory/Knowledge Assessment on the Ready Skills platform-  Quiz 1 introduction and tools.  Quiz 1a Operational Diagnostic and maintenance procedures cold cut saw  Quiz 2 Australian standards.  Quiz 3 NCC quiz. Class based Practical activities-  Mesh Calculations  Trench mesh calculations  Cut and bend fitments cogs and cranks 2 Practical assessments-  Place and fix trench mesh.  Place and fix reinforcement to a footing slab.  Place and fix reinforcement to a footing slab to include vertical reinforcement. What you will need: To be successful in this subject you will need the following resources:  Access to My Profiling Online and App  Pencils, pens, eraser, drawing instruments, scientific calculator, notebook.  You must select, provide and correctly use the required PPE for the tasks that you are performing  PPE is mandatory. If you fail to comply with instructions concerning PPE you will not be able to continue to undertake the assessment. Schedule:
  • 3. © Canberra Institute of Technology Page 3 of 4 Date created: 29/07/2021 CRICOS No. 00001K | RTO Code 0101 Date updated: 5/10/2022 To be successful in this subject you are expected to engage in a range of activities. It is recommended that, in addition to scheduled classes, you will require between 2-6 hours per week for additional learning. Session (Date optional) What's on this session Day 1/1 Introduction to topic, policies, subject guide, and assessment criteria. PowerPoints, videos, calculations, class discussion. Day 1/2 My Profiling, WHS, PowerPoints, videos, eLearn quizzes, drawings and calculations and practical activities (formative assessment) drawings and calculations. Day 2/1 My Profiling, WHS, PowerPoints, videos, eLearn quizzes, drawings and calculations and practical activities (formative assessment) drawings and calculations. Practical activity , cut & bend fitments, cogs and cranks Practical assessment 1 - Place and fix trench mesh Day 2/2 Practical assessment 2 - Place and fix footing slab reinforcement. Day 3/1 My Profiling, WHS, PowerPoints, videos, eLearn quizzes, drawings and calculations and practical activities (formative assessment) drawings and calculations. Day 3/2 Practical assessment 3 - Place and fix footing slab reinforcement to include vertical reinforcement Additional Information Requests for Extensions - If required, you may apply for an extension to the assessment completion date and/or special consideration based on negotiation between you and your teacher. Your application should occur no less than 48 hours prior to an assessment task due date. Re-assessment - If your assessment work is deemed ‘not-yet-satisfactory’ you will be given one opportunity to re-sit the assessment task or resubmit your assessment work taking into account feedback received from your teacher. For graded subjects, you will be entitled to no higher than a pass for any re-assessed work. See your assessment coversheet for more information. Assessment Feedback - You will receive assessment results and feedback within two weeks of submitting or completing the assessment tasks. Your teacher will advise you how feedback will be given. Plagiarism - You have a responsibility to complete all assessment tasks honestly without any form of plagiarism while studying at CIT. Plagiarism is copying someone else’s work without acknowledgement. For more information see the plagiarism and referencing Lib Guides or contact staff in the CIT Library for assistance. http://libguides.cit.edu.au/plagiarism http://libguides.cit.edu.au/referencing The CIT Library provides a range of learning resources and services to support your study at all CIT Locations. Go to https://cit.edu.au/library for more information or Lib Guides for subject specific resources.
  • 4. © Canberra Institute of Technology Page 4 of 4 Date created: 29/07/2021 CRICOS No. 00001K | RTO Code 0101 Date updated: 5/10/2022 Additional Information - https://cit.edu.au/current/my_study/student_information_guide