SlideShare una empresa de Scribd logo
1 de 25
Descargar para leer sin conexión
RETROFIT SYSTEMS AND
RETROFIT STRATEGIES
INVESTIGATED ON THE MODEL
OF TYPICAL MID-RISE INTERWAR
BUILDINGS IN BUCHAREST,
ROMANIA
Maria BOSTENARU DAN
ROSE School / IUSS di Pavia
Overview
 Introduction
 The Charter of Athens
 The Model Building
 Seismic Assessment
 The Concept of Retrofit Elements
 Discussion of Retrofit Strategies and Systems
 Conclusions
Introduction
 Retrofit measure; retrofit strategy
 Retrofit strategy; retrofit systems
 Interest groups
 Technical strategies, management
strategies
 Retrofit elements
The Charter of Athens
 1933
 Organisation of cities in functional zones
 Bucharest Master Plan 1934 > design of
buildings in the interwar time
 Ground occupancy > planimetric irregularity
 Raised permitted height to define streets by their
fronts > set-back floors
 Encouraged mixed use in central zone
The Model Building
 What is a cybernetic model?
 Design in „interwar style“ (student project)
 Irregular parcel
 Basement, GF and 5 upper floors, 2 recessed
 Mixed use with Kindergarten and luxury flats
 Reinforced concrete frame structure
 3D beam-column elements, non-linear confined
concrete model, elastic elements for slab models
Set-back floors
Seismic Assessment
 P100-92
 Pure residential: good behaviour
 No secondary beams in the model
 higher generality – Greece;
 more stable in software)
 Higher importance class (Kindergarten):
needs retrofit
The Concept of Retrofit Elements
 Spatial elements which
 Are characteristic bearers in architectural survey
 Are characteristic bearers in engineering
simulations
 Are characteristic bearers in costs estimation
 Present typical earthquake damages
 Are decisive for better behaviour in case of
retrofitting
 Define the realms perceived by the inhabitants
Seismic features
Element Seismic
Deficiency
Earthquake
Resilient Features
Earthquake Damage
Patterns
Infill
panels
consoles Increasing stiffness rifts
Columns No moment resisting
frames
Low reinforcement
- Plastic hinges at soft storey
Concrete spalling
Beams No moment resisting
frames
Well reinforced Plastic hinge in long beams
Oblique rifts in short beams
Roof and
Floors
too elastic Alternative solutions
with embeded bricks
More rifts at stair flights
Seismic retrofit provisions
Structural Deficiency Seismic strengthening provision
1. Damaged RC columns Local repairing after
(fracture)+crush+spall+(yield)+crack
2. Deeply damaged RC beams See above
3. Superficially damaged RC beams Repairing with plating with glass wraps
embedded in epoxy resins
4. Rifts in masonry infill walls Injecting masonry walls
5. Reduced column section Column jacketing
Side walls
6. Reduced beam section Beam jacketing in different ways
7. Insuficient stiffness Adding structural walls
Discussion of Retrofit Strategies and
Systems
 Systems investigated
 FRP wrapping of existing elements
 Replacement with new elements of higher
strength provided with FRP wrapping
 Jacketing with higher strength concrete with FRP
wrapping
Discussion of Retrofit Strategies and
Systems
 Pushover analysis + P100-92
 Main deficiency is at yield, not at ultimate
 Retrofit strategy: strength increase, rather
than ductility increase
 Rebuilding elements with higher strength
concrete (30MPa instead 15 MPa)
 Alternative: jacketing, but increase section
Discussion of Retrofit Strategies and
Systems
 Technical strategy: strength increase
 Retrofit system: vertical elements
 Management strategy:
 First: soft storey eliminated
 Second: Elements in alternate directions at
corners strengthened – large flats affected
 Third: Smaller vertical elements strengthened in
the interior – relocation within apartments
pushover X
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
0 50 100 150 200 250
Displacement N6206 (mm)
Baseshear(kN)
Base Shear X
Base Shear X retrofit2
Base Shear X retrofit 3
pushover Y
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
-15 35 85 135 185 235 285 335
Displacement N6206
Baseshear(N)
Base Shear Y
Base Shear Y retrofit2
Base Shear Y retrofit3
Discussion of Retrofit Strategies and
Systems
 A phase-wise management retrofit strategy
is not an option since the first phase brings
a worsening of the seismic behaviour
Conclusions
 ‚retrofit elements‘ useful for determining best
retrofit elements and strategies
 Retrofit strategy for a building, which for its
importance category does not resist in yeidl is
system strengthening
 Two retrofit systems:
 Element replacement (with higher strength concrete) –
chosen, for architectural reasons
 Element retrofit (jacketing with higher strength concrete)
Conclusions
 Phased retrofit proved unsuitable: the
retrofit elements have to be rebuilt all
simultaneously in order to reach an efficient
seismic retrofit system
 For a complete view on actors‘ preferences
a decision tree is necessary – subject of
another study
Acknowledgements
CA‘REDIVIVUS project
MEIF-CT-2005-009765
supervisor: Dr. Rui Pinho
Thank you!
Questions?

Más contenido relacionado

Similar a 30 years V

Use of flat slabs in multi storey commercial building situated in high seismi...
Use of flat slabs in multi storey commercial building situated in high seismi...Use of flat slabs in multi storey commercial building situated in high seismi...
Use of flat slabs in multi storey commercial building situated in high seismi...
eSAT Publishing House
 
Aeons
AeonsAeons
Aeons
Pixel
 
Related Course Work Summary
Related  Course Work Summary Related  Course Work Summary
Related Course Work Summary
fearghal walshe
 

Similar a 30 years V (20)

Retrofitting
Retrofitting Retrofitting
Retrofitting
 
Restoration of monuments
Restoration of monumentsRestoration of monuments
Restoration of monuments
 
Ottimizzazione di Strutture per Edifici Alti
Ottimizzazione di Strutture per Edifici AltiOttimizzazione di Strutture per Edifici Alti
Ottimizzazione di Strutture per Edifici Alti
 
A3 report
A3 reportA3 report
A3 report
 
C046401422
C046401422C046401422
C046401422
 
Btech
BtechBtech
Btech
 
Comparison of performance of lateral load resisting systems in multi storey f...
Comparison of performance of lateral load resisting systems in multi storey f...Comparison of performance of lateral load resisting systems in multi storey f...
Comparison of performance of lateral load resisting systems in multi storey f...
 
Use of flat slabs in multi storey commercial building situated in high seismi...
Use of flat slabs in multi storey commercial building situated in high seismi...Use of flat slabs in multi storey commercial building situated in high seismi...
Use of flat slabs in multi storey commercial building situated in high seismi...
 
Economics and retrofit
Economics and retrofitEconomics and retrofit
Economics and retrofit
 
CCTV Building, A Structural Design Overview
CCTV Building, A Structural Design OverviewCCTV Building, A Structural Design Overview
CCTV Building, A Structural Design Overview
 
RETROFITTING OF CONCRETE STRUCTURE
RETROFITTING OFCONCRETE STRUCTURERETROFITTING OFCONCRETE STRUCTURE
RETROFITTING OF CONCRETE STRUCTURE
 
Aeons
AeonsAeons
Aeons
 
ACE special structures
ACE special structuresACE special structures
ACE special structures
 
Aerodynamic Modification and Shape Optimization of Tall Buildings
Aerodynamic Modification and Shape Optimization of Tall BuildingsAerodynamic Modification and Shape Optimization of Tall Buildings
Aerodynamic Modification and Shape Optimization of Tall Buildings
 
Harshitha_Presentation-3.pptx
Harshitha_Presentation-3.pptxHarshitha_Presentation-3.pptx
Harshitha_Presentation-3.pptx
 
Related Course Work Summary
Related  Course Work Summary Related  Course Work Summary
Related Course Work Summary
 
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
COMPARATIVE STUDY ON SEISMIC ANALYSIS OF CONVENTIONAL SLAB AND FLAT SLAB STRU...
 
IRJET - Study on Lateral Structural System on Different Height on Asymmet...
IRJET -  	  Study on Lateral Structural System on Different Height on Asymmet...IRJET -  	  Study on Lateral Structural System on Different Height on Asymmet...
IRJET - Study on Lateral Structural System on Different Height on Asymmet...
 
Seismic retrofitting techniques of rcc
Seismic retrofitting techniques of rccSeismic retrofitting techniques of rcc
Seismic retrofitting techniques of rcc
 
SEISMIC RETROFITTING
SEISMIC RETROFITTINGSEISMIC RETROFITTING
SEISMIC RETROFITTING
 

Más de Maria Bostenaru

Más de Maria Bostenaru (20)

INCD presentation
INCD presentationINCD presentation
INCD presentation
 
KAB MTA presentation
KAB MTA presentationKAB MTA presentation
KAB MTA presentation
 
New concepts of mobility to foster career development
New concepts of mobility to foster career developmentNew concepts of mobility to foster career development
New concepts of mobility to foster career development
 
Egu 1689
Egu 1689Egu 1689
Egu 1689
 
Women bostenaru
Women bostenaruWomen bostenaru
Women bostenaru
 
Becominglocal
BecominglocalBecominglocal
Becominglocal
 
Bostenaru Sibiu 2014
Bostenaru Sibiu 2014Bostenaru Sibiu 2014
Bostenaru Sibiu 2014
 
Simpozion CSAU bostenaru
Simpozion CSAU bostenaruSimpozion CSAU bostenaru
Simpozion CSAU bostenaru
 
Budapest eurodoc
Budapest eurodocBudapest eurodoc
Budapest eurodoc
 
The beginnings of reinforced concrete
The beginnings of reinforced concreteThe beginnings of reinforced concrete
The beginnings of reinforced concrete
 
Padurea din oras Carei si Karlsruhe
Padurea din oras Carei si KarlsruhePadurea din oras Carei si Karlsruhe
Padurea din oras Carei si Karlsruhe
 
COST Madrid
COST MadridCOST Madrid
COST Madrid
 
PIANO final report
PIANO final reportPIANO final report
PIANO final report
 
Hamburg 2012
Hamburg 2012Hamburg 2012
Hamburg 2012
 
Architecture and urban planning (3 d) representation
Architecture and urban planning (3 d) representationArchitecture and urban planning (3 d) representation
Architecture and urban planning (3 d) representation
 
Uzina de apa Suceava
Uzina de apa SuceavaUzina de apa Suceava
Uzina de apa Suceava
 
Water Junior sumitt Stresa
Water Junior sumitt StresaWater Junior sumitt Stresa
Water Junior sumitt Stresa
 
Living walls - romana
Living walls - romanaLiving walls - romana
Living walls - romana
 
NED COST IS1104
NED COST IS1104NED COST IS1104
NED COST IS1104
 
Historical network research
Historical network researchHistorical network research
Historical network research
 

Último

Último (20)

Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 

30 years V

  • 1. RETROFIT SYSTEMS AND RETROFIT STRATEGIES INVESTIGATED ON THE MODEL OF TYPICAL MID-RISE INTERWAR BUILDINGS IN BUCHAREST, ROMANIA Maria BOSTENARU DAN ROSE School / IUSS di Pavia
  • 2. Overview  Introduction  The Charter of Athens  The Model Building  Seismic Assessment  The Concept of Retrofit Elements  Discussion of Retrofit Strategies and Systems  Conclusions
  • 3. Introduction  Retrofit measure; retrofit strategy  Retrofit strategy; retrofit systems  Interest groups  Technical strategies, management strategies  Retrofit elements
  • 4. The Charter of Athens  1933  Organisation of cities in functional zones  Bucharest Master Plan 1934 > design of buildings in the interwar time  Ground occupancy > planimetric irregularity  Raised permitted height to define streets by their fronts > set-back floors  Encouraged mixed use in central zone
  • 5. The Model Building  What is a cybernetic model?  Design in „interwar style“ (student project)  Irregular parcel  Basement, GF and 5 upper floors, 2 recessed  Mixed use with Kindergarten and luxury flats  Reinforced concrete frame structure  3D beam-column elements, non-linear confined concrete model, elastic elements for slab models
  • 6.
  • 8.
  • 9.
  • 10.
  • 11. Seismic Assessment  P100-92  Pure residential: good behaviour  No secondary beams in the model  higher generality – Greece;  more stable in software)  Higher importance class (Kindergarten): needs retrofit
  • 12. The Concept of Retrofit Elements  Spatial elements which  Are characteristic bearers in architectural survey  Are characteristic bearers in engineering simulations  Are characteristic bearers in costs estimation  Present typical earthquake damages  Are decisive for better behaviour in case of retrofitting  Define the realms perceived by the inhabitants
  • 13. Seismic features Element Seismic Deficiency Earthquake Resilient Features Earthquake Damage Patterns Infill panels consoles Increasing stiffness rifts Columns No moment resisting frames Low reinforcement - Plastic hinges at soft storey Concrete spalling Beams No moment resisting frames Well reinforced Plastic hinge in long beams Oblique rifts in short beams Roof and Floors too elastic Alternative solutions with embeded bricks More rifts at stair flights
  • 14. Seismic retrofit provisions Structural Deficiency Seismic strengthening provision 1. Damaged RC columns Local repairing after (fracture)+crush+spall+(yield)+crack 2. Deeply damaged RC beams See above 3. Superficially damaged RC beams Repairing with plating with glass wraps embedded in epoxy resins 4. Rifts in masonry infill walls Injecting masonry walls 5. Reduced column section Column jacketing Side walls 6. Reduced beam section Beam jacketing in different ways 7. Insuficient stiffness Adding structural walls
  • 15. Discussion of Retrofit Strategies and Systems  Systems investigated  FRP wrapping of existing elements  Replacement with new elements of higher strength provided with FRP wrapping  Jacketing with higher strength concrete with FRP wrapping
  • 16. Discussion of Retrofit Strategies and Systems  Pushover analysis + P100-92  Main deficiency is at yield, not at ultimate  Retrofit strategy: strength increase, rather than ductility increase  Rebuilding elements with higher strength concrete (30MPa instead 15 MPa)  Alternative: jacketing, but increase section
  • 17. Discussion of Retrofit Strategies and Systems  Technical strategy: strength increase  Retrofit system: vertical elements  Management strategy:  First: soft storey eliminated  Second: Elements in alternate directions at corners strengthened – large flats affected  Third: Smaller vertical elements strengthened in the interior – relocation within apartments
  • 18.
  • 19. pushover X 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 0 50 100 150 200 250 Displacement N6206 (mm) Baseshear(kN) Base Shear X Base Shear X retrofit2 Base Shear X retrofit 3
  • 20. pushover Y 0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 -15 35 85 135 185 235 285 335 Displacement N6206 Baseshear(N) Base Shear Y Base Shear Y retrofit2 Base Shear Y retrofit3
  • 21. Discussion of Retrofit Strategies and Systems  A phase-wise management retrofit strategy is not an option since the first phase brings a worsening of the seismic behaviour
  • 22. Conclusions  ‚retrofit elements‘ useful for determining best retrofit elements and strategies  Retrofit strategy for a building, which for its importance category does not resist in yeidl is system strengthening  Two retrofit systems:  Element replacement (with higher strength concrete) – chosen, for architectural reasons  Element retrofit (jacketing with higher strength concrete)
  • 23. Conclusions  Phased retrofit proved unsuitable: the retrofit elements have to be rebuilt all simultaneously in order to reach an efficient seismic retrofit system  For a complete view on actors‘ preferences a decision tree is necessary – subject of another study