Retrocommissioning Lessons from the Field
Eveline Killian, CEM
Cx Associates, LLC
AIA Quality Assurance
The Building Commissioning Association is a Registered Provider
with The American Institute of Architects Continuing Education
Systems (AIA/CES). Credit(s) earned on completion of this program
will be reported to AIA/CES for AIA members. Certificates of the
Completion for both AIA members and non-AIA members are
available upon request.
This program is registered with AIA/CES for continuing professional
education. As such, it does not include content that may be deemed
or construed to be an approval or endorsement by the AIA of any
material of construction or any method or manner of handling, using,
distributing, or dealing in any material or product.
Questions related to specific materials, methods, and services will
be addressed at the conclusion of this presentation.
2
3
At the end of this session participants will be
able to:
See the benefits of:
• Retrocommissioning small commercial buildings
• Developing a collaborative team
• Staying flexible with expectations
• Choosing the measures carefully
And…be forewarned of some stumbling blocks
Learning Objectives
4
Presentation Overview
Example Projects
Lessons Learned
5
Howard Opera House
6
Problem Statement
• Constant speed pumps
• Manual diverter valve
• Failing controls
• Open ductwork to MEP
7
RCx Solutions
• VSDs on cooling tower
and main pumps
• Removal of diverter
valve
• Boiler circulating pump
• Central Plant controls
• Controlled OA dampers
8
Realized Savings
-
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
Apr-13
May-13
Jun-13
Jul-13
Aug-13
Sep-13
Oct-13
Nov-13
Dec-13
Jan-14
Feb-14
Mar-14
kWh
Pre- and Post-Installation Monthly kWh
Pre kWh Post kWh
9
Fletcher Free Library
10
Controls Upgrade Savings
Average annual utility bill savings of 18%.
11
Operational Performance Support
Services Contract
• Monitor HVAC system operation & utility bills
• Maintenance program definition & oversight
• Assessment of unplanned maintenance
items
• Further energy savings identification
• Long-term capital planning for HVAC system
costs
12
Performance Monitoring Successes
• Chiller compressor failure Early
cooling tower failure warning.
• HVAC-1 economizer/fan speed control.
• Exhaust fan failure discoveries.
• Resolution of draft issues at circulation
desk.
• Freezestat failure discoveries.
13
Typical RCx Measures
• VSDs on pumps
• Controls
• Setpoint changes
• Pipe insulation
• Economizer
• System harmonizing
14
Stumbling Blocks
• Scope increases during
project
• Narrow our attention…
and then… refer to first
bullet
• Contractor schedule
pushed out
• Plans were incomplete,
took long to piece
together
15
What Went Right
The people!
• Quality
contractors
• Flexible team
• Collaborative
team
• Good
communication
16
Lessons Learned
17
Lesson #1: Gauge the Owner
Determine:
• their version of the problem
• their openness to new
efficiency ideas
• if there are others who
could influence the project
and involve them early
Hear and address their
concerns immediately
18
Lesson #2: Good Contractors
Create a team you can trust and then listen to their
ideas throughout the project
19
Lesson #3: Stay Flexible
If it’s an old building,
things WILL come up
unexpectedly – stay
flexible and creative, and
convey this mindset to the
owner.
However
Don’t necessarily promote
this attitude to the
contractors – you’ll be
bombarded with
suggestions and change
orders!
20
Lesson #4: Choose Measures Wisely
• Present at least two tiers in the
proposal:
• Tier 1: conservative approach
that addresses their concerns
• Tier 2: deeper cost-effective
opportunities
• Tier 3: long term opportunities
• Don’t push – they’ll balk
• Don’t try to do it all – they’ll balk
21
Lesson #5: Choose Owners Wisely
If you can, pick owners
that:
• care about their
building, not just their
bottom line
• have the support they
need to make it happen
• will potentially lead to
more projects
22
Why It’s Worth Doing
• Commercial Buildings consume nearly 20% of
all energy used in the United States.
• We spend more than $200 billion each year to
power our country's commercial buildings.
• “A typical commercial building could save 20%
on its energy bills simply by commissioning
existing systems so they operate as intended.”
Source: U.S. DOE - http://www4.eere.energy.gov/alliance/node/9
Company Name
Website
Email Address
Eveline Killian, CEM
Senior Engineer
www. cx-associates.com
eveline@cx-assoc.com
802-861-2715 ext. 15

Más contenido relacionado

Similar a Retrocommissioning Lessons From the Field by Eveline Killian

New Microsoft PowerPoint Presentation-1.pptx
New Microsoft PowerPoint Presentation-1.pptxNew Microsoft PowerPoint Presentation-1.pptx
New Microsoft PowerPoint Presentation-1.pptx
SimranBurman3
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
Lisa Cooley, LEED AP
 

Similar a Retrocommissioning Lessons From the Field by Eveline Killian (20)

Everything You Need to Know About Planning and Executing Your Next Laboratory...
Everything You Need to Know About Planning and Executing Your Next Laboratory...Everything You Need to Know About Planning and Executing Your Next Laboratory...
Everything You Need to Know About Planning and Executing Your Next Laboratory...
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
 
New Microsoft PowerPoint Presentation-1.pptx
New Microsoft PowerPoint Presentation-1.pptxNew Microsoft PowerPoint Presentation-1.pptx
New Microsoft PowerPoint Presentation-1.pptx
 
Project Delivery Education Program
Project Delivery Education ProgramProject Delivery Education Program
Project Delivery Education Program
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
 
Agile enterprise architecture
Agile enterprise architectureAgile enterprise architecture
Agile enterprise architecture
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studies
 
Agile Project Management
Agile Project ManagementAgile Project Management
Agile Project Management
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
 
EPA Presentation - Andy Smith
EPA Presentation - Andy SmithEPA Presentation - Andy Smith
EPA Presentation - Andy Smith
 
Accent on Accessibility Planning
Accent on Accessibility PlanningAccent on Accessibility Planning
Accent on Accessibility Planning
 
Introduction to Agile Project Management
Introduction to Agile Project ManagementIntroduction to Agile Project Management
Introduction to Agile Project Management
 
Julianne Kurdilla, ArcelorMittal, When to Hire an Environmental Consultant, M...
Julianne Kurdilla, ArcelorMittal, When to Hire an Environmental Consultant, M...Julianne Kurdilla, ArcelorMittal, When to Hire an Environmental Consultant, M...
Julianne Kurdilla, ArcelorMittal, When to Hire an Environmental Consultant, M...
 
Let's Talk… AGILE
Let's Talk… AGILELet's Talk… AGILE
Let's Talk… AGILE
 
Maintenance Plans, Reserve Studies, & Project Management
Maintenance Plans, Reserve Studies, & Project ManagementMaintenance Plans, Reserve Studies, & Project Management
Maintenance Plans, Reserve Studies, & Project Management
 
Maintaining Business Continuity During Your Lab Relocation
Maintaining Business Continuity During Your Lab RelocationMaintaining Business Continuity During Your Lab Relocation
Maintaining Business Continuity During Your Lab Relocation
 
Session 2 mod 2 proj mgt
Session 2 mod 2 proj mgtSession 2 mod 2 proj mgt
Session 2 mod 2 proj mgt
 
IES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance GapIES Faculty - Closing the Performance Gap
IES Faculty - Closing the Performance Gap
 
Akhilesh Jain folio
Akhilesh Jain folioAkhilesh Jain folio
Akhilesh Jain folio
 
Olena Grygorchuk - Refactor your understandings about Agile development
Olena Grygorchuk - Refactor your understandings about Agile developmentOlena Grygorchuk - Refactor your understandings about Agile development
Olena Grygorchuk - Refactor your understandings about Agile development
 

Más de Cx Associates

Demand Reduction in the Forward Capacity Market
Demand Reduction in the Forward Capacity MarketDemand Reduction in the Forward Capacity Market
Demand Reduction in the Forward Capacity Market
Cx Associates
 

Más de Cx Associates (8)

Cx Associates - A Retrospective of Early Adoption of ASHRAE Guideline 36
Cx Associates - A Retrospective of Early Adoption of ASHRAE Guideline 36Cx Associates - A Retrospective of Early Adoption of ASHRAE Guideline 36
Cx Associates - A Retrospective of Early Adoption of ASHRAE Guideline 36
 
Retrocommissioning Works
Retrocommissioning WorksRetrocommissioning Works
Retrocommissioning Works
 
Inherent Environmental Advantages of Town Living and the Role of the Burlingt...
Inherent Environmental Advantages of Town Living and the Role of the Burlingt...Inherent Environmental Advantages of Town Living and the Role of the Burlingt...
Inherent Environmental Advantages of Town Living and the Role of the Burlingt...
 
Establishing a Solid Project Foundation - The Inclusive OPR Process
Establishing a Solid Project Foundation - The Inclusive OPR ProcessEstablishing a Solid Project Foundation - The Inclusive OPR Process
Establishing a Solid Project Foundation - The Inclusive OPR Process
 
Opportunities for Increased Utilization of Geothermal Resources in the United...
Opportunities for Increased Utilization of Geothermal Resources in the United...Opportunities for Increased Utilization of Geothermal Resources in the United...
Opportunities for Increased Utilization of Geothermal Resources in the United...
 
Maximizing the Efficiency of Condensing Boilers - Cx Associates
Maximizing the Efficiency of Condensing Boilers - Cx AssociatesMaximizing the Efficiency of Condensing Boilers - Cx Associates
Maximizing the Efficiency of Condensing Boilers - Cx Associates
 
Performance Monitoring for Efficiency
Performance Monitoring for EfficiencyPerformance Monitoring for Efficiency
Performance Monitoring for Efficiency
 
Demand Reduction in the Forward Capacity Market
Demand Reduction in the Forward Capacity MarketDemand Reduction in the Forward Capacity Market
Demand Reduction in the Forward Capacity Market
 

Último

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 

Último (20)

Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 

Retrocommissioning Lessons From the Field by Eveline Killian

  • 1. Retrocommissioning Lessons from the Field Eveline Killian, CEM Cx Associates, LLC
  • 2. AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES for AIA members. Certificates of the Completion for both AIA members and non-AIA members are available upon request. This program is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation. 2
  • 3. 3 At the end of this session participants will be able to: See the benefits of: • Retrocommissioning small commercial buildings • Developing a collaborative team • Staying flexible with expectations • Choosing the measures carefully And…be forewarned of some stumbling blocks Learning Objectives
  • 6. 6 Problem Statement • Constant speed pumps • Manual diverter valve • Failing controls • Open ductwork to MEP
  • 7. 7 RCx Solutions • VSDs on cooling tower and main pumps • Removal of diverter valve • Boiler circulating pump • Central Plant controls • Controlled OA dampers
  • 10. 10 Controls Upgrade Savings Average annual utility bill savings of 18%.
  • 11. 11 Operational Performance Support Services Contract • Monitor HVAC system operation & utility bills • Maintenance program definition & oversight • Assessment of unplanned maintenance items • Further energy savings identification • Long-term capital planning for HVAC system costs
  • 12. 12 Performance Monitoring Successes • Chiller compressor failure Early cooling tower failure warning. • HVAC-1 economizer/fan speed control. • Exhaust fan failure discoveries. • Resolution of draft issues at circulation desk. • Freezestat failure discoveries.
  • 13. 13 Typical RCx Measures • VSDs on pumps • Controls • Setpoint changes • Pipe insulation • Economizer • System harmonizing
  • 14. 14 Stumbling Blocks • Scope increases during project • Narrow our attention… and then… refer to first bullet • Contractor schedule pushed out • Plans were incomplete, took long to piece together
  • 15. 15 What Went Right The people! • Quality contractors • Flexible team • Collaborative team • Good communication
  • 17. 17 Lesson #1: Gauge the Owner Determine: • their version of the problem • their openness to new efficiency ideas • if there are others who could influence the project and involve them early Hear and address their concerns immediately
  • 18. 18 Lesson #2: Good Contractors Create a team you can trust and then listen to their ideas throughout the project
  • 19. 19 Lesson #3: Stay Flexible If it’s an old building, things WILL come up unexpectedly – stay flexible and creative, and convey this mindset to the owner. However Don’t necessarily promote this attitude to the contractors – you’ll be bombarded with suggestions and change orders!
  • 20. 20 Lesson #4: Choose Measures Wisely • Present at least two tiers in the proposal: • Tier 1: conservative approach that addresses their concerns • Tier 2: deeper cost-effective opportunities • Tier 3: long term opportunities • Don’t push – they’ll balk • Don’t try to do it all – they’ll balk
  • 21. 21 Lesson #5: Choose Owners Wisely If you can, pick owners that: • care about their building, not just their bottom line • have the support they need to make it happen • will potentially lead to more projects
  • 22. 22 Why It’s Worth Doing • Commercial Buildings consume nearly 20% of all energy used in the United States. • We spend more than $200 billion each year to power our country's commercial buildings. • “A typical commercial building could save 20% on its energy bills simply by commissioning existing systems so they operate as intended.” Source: U.S. DOE - http://www4.eere.energy.gov/alliance/node/9