Sustainable Economic Development of the Sudurnes
       region, Iceland : Project Prioritisation




             JOSE MATEOS MORENO

            Ásbrú, 25 November 2011
AN INTRODUCTION TO PROJECT
     PRIORITISATION CRITERIA AND
             TECHNIQUES

• The Need for Prioritisation
• Approach to Prioritisation
• Outline Selection Procedures




                      2
PRIORITISATION CRITERIA
• Accession Criteria
• Competitiveness Criteria (e.g.. Relation with
  priority, effectiveness)
• Financial & Economic Criteria (efficiency,
  financial sustainability)
• Technical Criteria (e.g. maturity of proposals)
• Social & Political Criteria (e.g. commitment)
• Commercial & Institutional Criteria (e.g. quality
  of implementing institution)

Focus on a Limited Number of Key Criteria

                            3
APPROACH TO PRIORITISATION
• Select the prioritisation team
• Identify criteria that could be used for
  homogeneous projects.
• Select & Weight the most relevant criteria
• Agree how each selected criterion will be
  applied
• Obtain project data that will allow this to be
  done
• Apply the criteria to each project
• Calculate scores and apply weightings

   Make Sure the Approach is Consistent

                            4
Example Prioritisation Criteria – OP COMP
Priority Axis: Strenghtening Cooperation for R&D

• Durability of project effects: The result of project
  implementation will contribute to resolution of definite problems
  (e.g., technological ones)?
• Experience: Beneficiary’s experience in implementation of
  research projects
• Project’s innovative nature:The project relates to the problem
  not resolved?
• Project’s impact on increasing enterprises’ competitiv.: The
  future new product will enable the enterprise an effective
  competition in the market?
• Market demand for a given product: local, national,
  international?
• Number of new jobs: Project implementation will contribute to
  emergence of new jobs?
• EU horizontal policies implementation: environmental
  protection, IS, etc.
                                    5
Project Selection Procedures (1)

• Project selection procedures shall be
  outlined during OP preparation
  –   Responsible bodies (intermediate)
  –   Decision making process
  –   Potential final beneficiaries
  –   Main priorities and selection criteria
  –   Documentation
  –   Publicity

                           6
Project Selection Procedures (2)


• Intermediate bodies responsible for
  selection of projects for assistance
  within individual OP measures
• OP objectives and targets should be
  translated into project selection criteria.
  In the case of EU cofinanced projects,
  the objectives of IPA Fund should also
  be translated into selection criteria.
                        7
Selection of Project Proposals
Through Application Procedure

• Call for proposals – public or restricted
• A) Queue-based approval systems
• B) Competitive:
  – Regular intake of proposals (2-4 times per
    year)
  – One application round



                       8
EVALUATION PROCEDURE (2)
Consists of two elements:
• a) formal evaluation (is the application
  complete?)
• b) technical and economical Appraisal:
        –   Compatibility with the objective of the Priority Axis
        –   Economic analysis of feasibility
        –   financial evaluation
        –   analysis of the business plan (cost-effectiveness)




                                  9
Project Selection
– Transparency Issues
•   Public promotion
•   Eligibility criteria published
•   Criteria for selection available
•   Weightings for criteria available
•   Decisions made by Committee
•   Information given to unsuccessful applicants
•   Competitive or queuing basis
•   Appeals system in place




                              10
Principal Appraisal Techniques
  •   Financial Analysis
  •   Cost Benefit Analysis (CBA)
  •   Cost Effectiveness
  •   Scoring, Weighting, Ranking (SWR)
  •   Multi Criteria Analysis (MCA)

  Cost Benefit Analysis
  • Mandatory for projects €50m+
  • Recommended for other large infrastructural
    projects

                          11                      (
Project Appraisal – Scoring, Weighting,
Ranking (SWR)
• Identification of project appraisal criteria
• Weighting is assigned to each criteria based
  on importance (no weighting = equal value)
• Each project receives numerical score against
  different criteria
• Different project applications ranked against
  each other


                         12
Evaluation Grid (see example)

           Scoring Sheet
          1     Very Poor
          2    Poor
          3    Adequate
          4    Good
          5    Very Good


                  13
Eligibility in EU Funds
• Constraints at National Level:
   –   Urban Planning
   –   Environmental Legislation
   –   Regional Development Plans /Strategies, etc.
   –   Operational Programmes
   –   Call for Proposal

• Constraints at EU Level:
   – Specific regulations of the Funds
   – Eligibility Rules for type of expenditure: VAT, Land
     acquisition, etc.
   – Size of the Project: Major Projects.
   – Distortion of the Internal Market: State aid regulations
   – Public procurement
   – Environmental Constraints: NATURA 2000
Checklist for Quality Appraisal of
project proposals (1)
QUALITY ASSESSMENT PARAMETERS

1. Relevance
    – Are the beneficiaries clearly identified?
    – Are the problems of the beneficiaries described
       sufficiently?
1.3 Is the problem analysis sufficiently comprehensive?
1.4 Do the Overall Objectives explain why the project is
   important for society?
1.5 Is the Project Purpose defined in terms of benefits to the
   beneficiaries?
1.6 Has the need for the results been demonstrated?

                                15
Checklist for Quality Appraisal of
project proposals (2)
2. Feasibility

2.1 Will the Project Purpose contribute to the Overall Objectives (if
   the assumptions hold)?
2.2 Are the Results described as services to be delivered to the
   target group?
2.3 Will the Project Purpose be achieved if the Results were
   delivered?
2.4 Are the means sufficiently justified by quantified objectives

2.5 Have important external conditions been identified?
2.6 Is the probability of realisation of the assumptions acceptable?
2.7 Will implementing agencies be able to implement the project?


                                   16
Checklist for Quality Appraisal of
project proposals (3)
3. Sustainability

3.1 Will the relevant authorities have a supportive policy after the
   project has ended?
3.2 Is the technology appropriate for the local conditions?
3.3 Will the ecological environment be preserved during and after
   the project?
3.4 Will there be adequate ownership of the project by the
   beneficiaries?
3.5 Will women (and other groups) have adequate access to
   benefits and production factors during and after the project?
3.6 Will the implementing agencies be able to provide follow-up
   after the project?
3.7 Does the financial and economic analysis confirm that the
   ‘incremental project’ is efficient, effective, viable and relevant?


                                    17

Más contenido relacionado

La actualidad más candente

Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter Template
william hartin
 

La actualidad más candente (18)

Chap012
Chap012Chap012
Chap012
 
Logical framework guide
Logical framework guideLogical framework guide
Logical framework guide
 
Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter Template
 
Critical Success Factors in Software Projects
Critical Success Factors in Software ProjectsCritical Success Factors in Software Projects
Critical Success Factors in Software Projects
 
Chap007
Chap007Chap007
Chap007
 
Chap010
Chap010Chap010
Chap010
 
Chap004
Chap004Chap004
Chap004
 
Developing a Logical Framework Guide, Developmental Public Administration, De...
Developing a Logical Framework Guide, Developmental Public Administration, De...Developing a Logical Framework Guide, Developmental Public Administration, De...
Developing a Logical Framework Guide, Developmental Public Administration, De...
 
Chap005
Chap005Chap005
Chap005
 
Chap002
Chap002Chap002
Chap002
 
Zmitrowicz SQA DAYS EU Riga
Zmitrowicz SQA DAYS EU RigaZmitrowicz SQA DAYS EU Riga
Zmitrowicz SQA DAYS EU Riga
 
Test automation and beyond developing an effective continuous test strategy d...
Test automation and beyond developing an effective continuous test strategy d...Test automation and beyond developing an effective continuous test strategy d...
Test automation and beyond developing an effective continuous test strategy d...
 
Product project design
Product project designProduct project design
Product project design
 
4 Project Pre-Planning & Stakeholder Analysis
4 Project Pre-Planning & Stakeholder Analysis4 Project Pre-Planning & Stakeholder Analysis
4 Project Pre-Planning & Stakeholder Analysis
 
Chap001
Chap001Chap001
Chap001
 
SPM Evaluation
SPM EvaluationSPM Evaluation
SPM Evaluation
 
Chap005
Chap005Chap005
Chap005
 
PMP Exam Sample Questions
PMP Exam Sample QuestionsPMP Exam Sample Questions
PMP Exam Sample Questions
 

Similar a 5 project prioritization

Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
rexcris
 
CompTIA Project+ Objectives
CompTIA Project+ ObjectivesCompTIA Project+ Objectives
CompTIA Project+ Objectives
sombat nirund
 

Similar a 5 project prioritization (20)

Ppt on project appraisal
Ppt on project appraisalPpt on project appraisal
Ppt on project appraisal
 
3.4 project level lfa and quality
3.4 project level lfa and quality3.4 project level lfa and quality
3.4 project level lfa and quality
 
2.requirements management
2.requirements management2.requirements management
2.requirements management
 
3.3 project fiche
3.3 project fiche3.3 project fiche
3.3 project fiche
 
Project Life Cycle and Phases
Project Life Cycle and PhasesProject Life Cycle and Phases
Project Life Cycle and Phases
 
H2020 Infoday Proposals Submission
H2020 Infoday Proposals SubmissionH2020 Infoday Proposals Submission
H2020 Infoday Proposals Submission
 
Introduction to project evaluations for SLOGA / Trialog
Introduction to project evaluations for SLOGA / TrialogIntroduction to project evaluations for SLOGA / Trialog
Introduction to project evaluations for SLOGA / Trialog
 
Project Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussionProject Life Cycle and Phases with Risk Management discussion
Project Life Cycle and Phases with Risk Management discussion
 
The Role of the Business Case in Public Investment Management and Project Por...
The Role of the Business Case in Public Investment Management and Project Por...The Role of the Business Case in Public Investment Management and Project Por...
The Role of the Business Case in Public Investment Management and Project Por...
 
Project Sustainability workshop session; Anna Lindh Foundation
Project Sustainability workshop session; Anna Lindh FoundationProject Sustainability workshop session; Anna Lindh Foundation
Project Sustainability workshop session; Anna Lindh Foundation
 
project analysis and management for the masters students.
project analysis and management for the masters students.project analysis and management for the masters students.
project analysis and management for the masters students.
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
CompTIA Project+ Objectives
CompTIA Project+ ObjectivesCompTIA Project+ Objectives
CompTIA Project+ Objectives
 
Enhancing quality of research 4 development: Initial ideas for design and imp...
Enhancing quality of research 4 development: Initial ideas for design and imp...Enhancing quality of research 4 development: Initial ideas for design and imp...
Enhancing quality of research 4 development: Initial ideas for design and imp...
 
Re sakss presentation on project management mburu 2
Re sakss presentation on project management mburu 2Re sakss presentation on project management mburu 2
Re sakss presentation on project management mburu 2
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
 
6 sept project fiche
6 sept project fiche6 sept project fiche
6 sept project fiche
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
 
Horizon 2020 proposal writing tips
Horizon 2020 proposal writing tipsHorizon 2020 proposal writing tips
Horizon 2020 proposal writing tips
 

Más de Dagný Gísladóttir (13)

3.1 procurement and prag rules
3.1 procurement and prag rules3.1 procurement and prag rules
3.1 procurement and prag rules
 
2.2 programming and tools swot & lfa
2.2 programming and tools swot & lfa2.2 programming and tools swot & lfa
2.2 programming and tools swot & lfa
 
2.1 pcm
2.1 pcm2.1 pcm
2.1 pcm
 
1.4 swot and needs assessment
1.4 swot and needs assessment1.4 swot and needs assessment
1.4 swot and needs assessment
 
1.3 contents and processes
1.3 contents and processes1.3 contents and processes
1.3 contents and processes
 
1.2 ipa overview
1.2 ipa overview1.2 ipa overview
1.2 ipa overview
 
Presentation workshop111208 ssg
Presentation workshop111208 ssgPresentation workshop111208 ssg
Presentation workshop111208 ssg
 
3 aspects of the eu methodology 19 october 2011
3   aspects of the eu methodology 19 october 20113   aspects of the eu methodology 19 october 2011
3 aspects of the eu methodology 19 october 2011
 
1 the national and regional perspectives seminar workshop 19 october-2011
1   the national and regional perspectives seminar workshop 19 october-20111   the national and regional perspectives seminar workshop 19 october-2011
1 the national and regional perspectives seminar workshop 19 october-2011
 
4 sept pcm
4 sept pcm4 sept pcm
4 sept pcm
 
3 programming and tools swot & lfa
3 programming and tools swot & lfa3 programming and tools swot & lfa
3 programming and tools swot & lfa
 
2 ipa overview
2 ipa overview2 ipa overview
2 ipa overview
 
1 content working group iii
1 content working group iii1 content working group iii
1 content working group iii
 

Último

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Último (20)

Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 

5 project prioritization

  • 1. Sustainable Economic Development of the Sudurnes region, Iceland : Project Prioritisation JOSE MATEOS MORENO Ásbrú, 25 November 2011
  • 2. AN INTRODUCTION TO PROJECT PRIORITISATION CRITERIA AND TECHNIQUES • The Need for Prioritisation • Approach to Prioritisation • Outline Selection Procedures 2
  • 3. PRIORITISATION CRITERIA • Accession Criteria • Competitiveness Criteria (e.g.. Relation with priority, effectiveness) • Financial & Economic Criteria (efficiency, financial sustainability) • Technical Criteria (e.g. maturity of proposals) • Social & Political Criteria (e.g. commitment) • Commercial & Institutional Criteria (e.g. quality of implementing institution) Focus on a Limited Number of Key Criteria 3
  • 4. APPROACH TO PRIORITISATION • Select the prioritisation team • Identify criteria that could be used for homogeneous projects. • Select & Weight the most relevant criteria • Agree how each selected criterion will be applied • Obtain project data that will allow this to be done • Apply the criteria to each project • Calculate scores and apply weightings Make Sure the Approach is Consistent 4
  • 5. Example Prioritisation Criteria – OP COMP Priority Axis: Strenghtening Cooperation for R&D • Durability of project effects: The result of project implementation will contribute to resolution of definite problems (e.g., technological ones)? • Experience: Beneficiary’s experience in implementation of research projects • Project’s innovative nature:The project relates to the problem not resolved? • Project’s impact on increasing enterprises’ competitiv.: The future new product will enable the enterprise an effective competition in the market? • Market demand for a given product: local, national, international? • Number of new jobs: Project implementation will contribute to emergence of new jobs? • EU horizontal policies implementation: environmental protection, IS, etc. 5
  • 6. Project Selection Procedures (1) • Project selection procedures shall be outlined during OP preparation – Responsible bodies (intermediate) – Decision making process – Potential final beneficiaries – Main priorities and selection criteria – Documentation – Publicity 6
  • 7. Project Selection Procedures (2) • Intermediate bodies responsible for selection of projects for assistance within individual OP measures • OP objectives and targets should be translated into project selection criteria. In the case of EU cofinanced projects, the objectives of IPA Fund should also be translated into selection criteria. 7
  • 8. Selection of Project Proposals Through Application Procedure • Call for proposals – public or restricted • A) Queue-based approval systems • B) Competitive: – Regular intake of proposals (2-4 times per year) – One application round 8
  • 9. EVALUATION PROCEDURE (2) Consists of two elements: • a) formal evaluation (is the application complete?) • b) technical and economical Appraisal: – Compatibility with the objective of the Priority Axis – Economic analysis of feasibility – financial evaluation – analysis of the business plan (cost-effectiveness) 9
  • 10. Project Selection – Transparency Issues • Public promotion • Eligibility criteria published • Criteria for selection available • Weightings for criteria available • Decisions made by Committee • Information given to unsuccessful applicants • Competitive or queuing basis • Appeals system in place 10
  • 11. Principal Appraisal Techniques • Financial Analysis • Cost Benefit Analysis (CBA) • Cost Effectiveness • Scoring, Weighting, Ranking (SWR) • Multi Criteria Analysis (MCA) Cost Benefit Analysis • Mandatory for projects €50m+ • Recommended for other large infrastructural projects 11 (
  • 12. Project Appraisal – Scoring, Weighting, Ranking (SWR) • Identification of project appraisal criteria • Weighting is assigned to each criteria based on importance (no weighting = equal value) • Each project receives numerical score against different criteria • Different project applications ranked against each other 12
  • 13. Evaluation Grid (see example) Scoring Sheet 1 Very Poor 2 Poor 3 Adequate 4 Good 5 Very Good 13
  • 14. Eligibility in EU Funds • Constraints at National Level: – Urban Planning – Environmental Legislation – Regional Development Plans /Strategies, etc. – Operational Programmes – Call for Proposal • Constraints at EU Level: – Specific regulations of the Funds – Eligibility Rules for type of expenditure: VAT, Land acquisition, etc. – Size of the Project: Major Projects. – Distortion of the Internal Market: State aid regulations – Public procurement – Environmental Constraints: NATURA 2000
  • 15. Checklist for Quality Appraisal of project proposals (1) QUALITY ASSESSMENT PARAMETERS 1. Relevance – Are the beneficiaries clearly identified? – Are the problems of the beneficiaries described sufficiently? 1.3 Is the problem analysis sufficiently comprehensive? 1.4 Do the Overall Objectives explain why the project is important for society? 1.5 Is the Project Purpose defined in terms of benefits to the beneficiaries? 1.6 Has the need for the results been demonstrated? 15
  • 16. Checklist for Quality Appraisal of project proposals (2) 2. Feasibility 2.1 Will the Project Purpose contribute to the Overall Objectives (if the assumptions hold)? 2.2 Are the Results described as services to be delivered to the target group? 2.3 Will the Project Purpose be achieved if the Results were delivered? 2.4 Are the means sufficiently justified by quantified objectives 2.5 Have important external conditions been identified? 2.6 Is the probability of realisation of the assumptions acceptable? 2.7 Will implementing agencies be able to implement the project? 16
  • 17. Checklist for Quality Appraisal of project proposals (3) 3. Sustainability 3.1 Will the relevant authorities have a supportive policy after the project has ended? 3.2 Is the technology appropriate for the local conditions? 3.3 Will the ecological environment be preserved during and after the project? 3.4 Will there be adequate ownership of the project by the beneficiaries? 3.5 Will women (and other groups) have adequate access to benefits and production factors during and after the project? 3.6 Will the implementing agencies be able to provide follow-up after the project? 3.7 Does the financial and economic analysis confirm that the ‘incremental project’ is efficient, effective, viable and relevant? 17