KEY PROJECTS                                                                 Page

    Tar ge t Fi el d: MN T wins’ Ballp ark                                       (1)

    TCF B an k S ta di um : MN G o p hers’ Stad ium                              (2)

    V o l k sw agen Dea l ership Exp ansio n                                     (3)

    P r i v at e Orthodox C hurc h                                               (4)

    St. P au l ’ s Upper La nd ing Re-Develo p ment                              (5)

    P r i v at e Condom i ni ums - G reen R o o f System                         (6)

    P r i v at e Fi rm ’s C orpo rate Head q uarters                             (7)

    Tw i n C it i es Arm y Ammunition Plant (TCAAP ) (8)




                350 Saint Peter Street, Suite 220         Phone: (651)294.0038
                Saint Paul, MN 55102                    www.SolutionBlue.com




©2010 Solution Blue, Inc.   ©2010 Solution Blue, Inc.
Key Projects


TARGET FIELD: MINNESOTA TWINS’ BALLPARK (TARGET PLAZA)
Location: Minneapolis, MN                    Client: M.A. Mortenson Construction, MN Ballpark Authority




Completed Plaza After Installation of Plants & Sod              Completed Plaza After Installation of Plants & Sod




Graphic Rendering (Courtesy of HOK Sport, Inc.)                 Under Construction: Stormwater Management System in Plaza

PROJECT SCOPE:
The Minnesota Twins’ baseball team was developing an open-air 40,000-seat ballpark in the Warehouse District of Downtown
Minneapolis. Our Solution Blue team members worked with the MN Twins organization, MN Ballpark Authority, Metropolitan
Council, HOK Sport and Mortenson Construction to facilitate the planning, design, development and implementation of an
innovative stormwater management system for the Twins’ new ballpark facility.

CHALLENGES:
• Ballpark located within a dense, urban setting in Downtown Minneapolis.
• Complex network of buildings, streets, major highways and infrastructure surrounds the facility.
• Minimal space available on-site for traditional stormwater management systems.
• Realignment of major roadways to accommodate the stadium added to project’s overall complexity.

SOLUTION:
Our Solution Blue team members engineered and implemented an innovative stormwater management system within
Target Plaza. Our team designed, provided information to receive regulatory approval, produced construction documents
and managed the construction process for this stormwater system.
• Implemented a cutting-edge system that provides stormwater storage, filtration and re-use via passive irrigation.
• Reinforced the soils below turfgrass to endure excessive foot traffic and withstand vibrations from I-394 bridge.
• Provided an economical and environmental solution to efficiently achieve the stormwater management objectives.

                                  ©2010 Solution Blue, Inc.              www.SolutionBlue.com                                  (1)
Key Projects


TCF BANK STADIUM: MINNESOTA GOPHERS’ STADIUM (PLAZA SPACE)
Location: University of MN (Minneapolis, MN)                   Client: M.A. Mortenson Construction, Veit Companies

                            Football Field




                             Bleachers


                   3.75 Acre Watershed
    Un
      ive
         rsi
            ty
               Av
                 en                       Multi-Functional
                   ue
                                           Green Space
                                              (0.50 Acres)

PLAN: 3.75-Acre Watershed Directing Runoff to 0.50-Acre Plaza Space     Completed Multi-Functional Plaza Space




Aerial View: Installation of Sand Profile as Part of Stormwater System   Installation of Liner & Chambers as Part of Stormwater System

PROJECT SCOPE:
The University of Minnesota was developing a new football stadium on the University’s East-Bank campus in Minneapolis,
MN. Mortenson Construction was the general contractor that worked with various designers, engineers, University officials,
the City of Minneapolis and our Solution Blue team members to successfully execute the planning, financing, design and
construction of this state-of-the-art, LEED® certified athletic facility.

CHALLENGES:
• Located within a highly developed urban setting with minimal space available for stormwater management features.
• Difficult to achieve stormwater management (quality & quantity) objectives due to lack of available green space.
• University needed to establish an economically and environmentally viable solution to manage stormwater on-site.

SOLUTION:
Solution Blue team members designed and implemented an innovative stormwater management system along University
Avenue. Our team designed, engineered and managed the installation of this cutting-edge stormwater system.
•    Employed an all-in-one system that provides superior drainage, storage, water re-use and complete stormwater mgmt.
•    0.50-acre green space accommodates 3.75-acre watershed and efficiently manages 5-year rainfall event (3.5” in 24 hours).
•    0.50-acre green space provides 120,000-gallon storage capacity (within soil profile and temporary storage above turfgrass).
•    System’s pollutant removal rates: 90% TSS (Total Suspended Solids), 80% Phosphorus, 60% Nitrates.
•    Incorporated mesh materials in soil profile so turfgrass can effectively support heavy broadcasting and emergency vehicles.
•    Stadium was designated as the first ever LEED® certified collegiate football stadium in the country.
                                  ©2010 Solution Blue, Inc.                www.SolutionBlue.com                                         (2)
Key Projects


VOLKSWAGEN DEALERSHIP EXPANSION
Location: Maplewood, MN               Client: General Contractor




Permeable Paver Parking & Storage Area




Intersection of Open-Grid & Permeable Concrete Pavers              Permeable Concrete Pavers with Modular Retaining Wall

PROJECT SCOPE:
An existing dealership acquired additional land (adjacent to their site) to accommodate a building expansion and extra
space for vehicle parking and storage. Solution Blue team members worked with the dealership owners, City of Maplewood,
Ramsey-Washington Metro Watershed District and the general contractor throughout this project. We provided complete
design, water modeling, civil engineering and construction management services to successfully implement a network of
permeable paving and water storage technologies, which properly achieved the stormwater management objectives.

CHALLENGES:
• Located in an urban setting with minimal space available for stormwater management features.
• Conventional design/engineering would incorporate a retention pond for stormwater storage, which decreases the
  amount of space available for vehicle parking and storage.
• Integrating the landscape plan with stormwater management objectives was difficult due to the owner’s aesthetic
  expectations and having to meet the City’s building code requirements.

SOLUTION:
Our Solution Blue team members provided the initial site assessment, stormwater modeling, design development,
construction documents and managed the installation of this stormwater management solution. The design incorporates
two permeable paving technologies with an aggregate profile that provides sufficient stormwater storage and filtration.

• Provided an alternative solution to a traditional retention pond (which provides no space to store vehicles).
• Created a multi-functional system that meets stormwater management objectives, but also accommodates 100
  additional stalls for vehicle parking and storage.
• Provided support to help obtain a $25,000 grant from the Watershed District for implementing an innovative,
  cutting-edge solution that achieved stormwater management objectives.

                                 ©2010 Solution Blue, Inc.            www.SolutionBlue.com                                 (3)
Key Projects


PRIVATE ORTHODOX CHURCH
Location: Minneapolis, MN           Client: Church




Location of Proposed Infiltration Trench                              Existing Slopes Along Rear of Church (Impaired Lake in Distance)
                                                                                                                        Water Diversion
                                                                                                                        Mechanism


                                                                                                                        EPIC Planting Beds



                                                                                                                        Concrete Pavers




                                                                                                                     PERENNIALS
                                                                                                                        False Forget-me-not
                                                                                                                        Masterwort
                                                                                                                        Foxglove
                                                                                                                        Feather Reed Grass
                                                                                                                        Dwarf Joe Pye Weed
                                                                                                                        Sedum
                                                                                                                        Black-Eyed Susan
                                                                                                                        Red Switch Grass

                                                                                                                     SHRUBS
                                                                                                                        Taunton Yew

                                                                                                                        Annabelle Hydrangea

                                                                                                                        Dwarf Ninebark

                                                                                                                        Arctic Fire Dogwood

                                                                                                                        Fire Ball Euonymus

                                                                                                                        Black Lace Elderberry


LANDSCAPE PLAN: Location of Proposed Stormwater Features & Landscape Plants

PROJECT SCOPE:
The Church hired Solution Blue to provide solutions to help the Church achieve three (3) main objectives:
(1) Provide a drainage solution for flood prone areas adjacent to the sanctuary.
(2) Eliminate or drastically reduce the City of Minneapolis’ monthly Stormwater Utility Fee (quality & quantity credits).
(3) Incorporate the proposed landscape plan (shown above) with innovative stormwater management applications.

CHALLENGES:
• Building located near steep slopes and is adjacent to an impaired water body.
• Because of site constraints, additional review by the City is required for approval and construction will be complicated.
• Existing infrastructure must be connected to the proposed drainage and stormwater management systems.
• Topography restricts how stormwater can be managed because portions of the site are too flat to effectively drain by
  traditional methods and specific areas direct stormwater off-site prior to collection and/or treatment.

SOLUTION:
Our team provided the initial site analysis, design development, water modeling and engineering services and have been
working with the City of Minneapolis to receive final approval prior to construction (scheduled for May-June of 2010).
Our design incorporates several stormwater management techniques such as roof top detention, infiltration trenches,
permeable paver patios and sidewalks, bio-retention basins and large infiltration tanks.
•   Designed various stormwater management features to effectively manage stormwater on-site.
•   Engineered stormwater systems to properly accommodate the 10-year (4.1” in 24 hours) rainfall event.
•   Directed excess water to large infiltration tanks where it can recharge groundwater and manage the next rainfall event.
•   Selected the appropriate native and hybrid plant species for landscape areas and stormwater features.
                                  ©2010 Solution Blue, Inc.              www.SolutionBlue.com                                                   (4)
Key Projects


ST. PAUL’S UPPER LANDING RE-DEVELOPMENT
Location: St. Paul, MN                  Client: CENTEX Multi-Family Homes




H.S. Kaplan Scrap Yard Site (Prior to Re-Development)                            Importing Soil to Raise Elevation (Along with Remediation)




Completed Multi-Use Development: Housing, Retail, Restaurants & Public Park      Public Park Along Mississippi Riverfront


PROJECT SCOPE:
This 20-acre former Superfund site exists along the Mississippi River in Downtown St. Paul. CENTEX Multi-Family Homes
was the primary developer that worked with the City of St. Paul, Riverfront Corporation, State of Minnesota and our
development team to coordinate the remediation, planning, design and financing efforts for this re-development project.

CHALLENGES:
• Highly contaminated site because it was home to the H.S. Kaplan Scrap Iron & Metal Company from 1950’s to 1989.
• Site flooded often due to its location within Mississippi River floodplain and lack of control structures along the River.
• Coordination of the planning, remediation, financing and development efforts was incredibly challenging because
  several local, state and federal organizations were involved throughout the project.

SOLUTION:
Solution Blue team members guided the development team in the overall planning, funding, regulatory compliance and
implementation efforts from conception through final construction. Upon completion in 2002, this former brownfield site
was re-developed into a successful housing, retail, restaurant and public park facility valued at over $173 Million dollars.

• Developed the site’s environmental clean-up plan, which was approved by the MN Pollution Control Agency (MPCA).
• Spent 2 years mitigating several significant environmental issues related to the H.S. Kaplan Scrap Yard operation.
• Worked with the City of St. Paul and CENTEX Multi-Family Homes to obtain a $3 Million clean-up grant from the MN
  Department of Trade & Economic Development and a $702,000 tax-based revitalization grant from the Met Council.

                                 ©2010 Solution Blue, Inc.                    www.SolutionBlue.com                                        (5)
Key Projects


PRIVATE CONDOMINIUMS - INTENSIVE GREEN ROOF
Location: Minneapolis, MN                           Client: Private Developer & Owner




                                                                     Completed Green Roof: (4) Separate Zones Divided by Sidewalks




Completed Green Roof: Native Grasses, Decorative Trees & Turfgrass   Under Construction: Installation of Lightweight Growing Soil

PROJECT SCOPE:
A private developer was creating a multi-story condominium structure in Downtown Minneapolis. Our Solution Blue team
members worked with the owner, landscape architect, watershed district and City of Minneapolis to successfully design and
implement an intensive green roof system.

CHALLENGES:
• Building exists within an urban setting with minimal space available for stormwater management features.
• Green roof had to exist above a parking ramp with limited capacity to support an intensive-profile (12”+) green roof.
• Reducing the City’s monthly stormwater utility fee required inventive solutions to efficiently manage, store and
  re-use stormwater on-site.

SOLUTION:
Solution Blue team members provided site assessment, design development, water modeling and civil engineering services
in order to receive approval from the City of Minneapolis and local watershed district. Our design incorporates a state-of-
the-art system that captures, filters and re-uses stormwater within an intensive green roof profile.

• Employed a lightweight green roof system (12” deep) that provides stormwater storage, filtration and water re-use.
• Installed a 10,000-gallon reservoir tank for supplemental storage that supplies water to irrigate plants and turfgrass.
• Implemented a functional, usable green space in an urban setting that provides recreational opportunities, achieves
  stormwater management objectives and improves the building’s aesthetic appeal.
                                 ©2010 Solution Blue, Inc.                www.SolutionBlue.com                                       (6)
Key Projects


PRIVATE FIRM’S CORPORATE HEADQUARTERS
Location: Roseville, MN                            Client: Private Corporation




Completed Permeable Paver Parking Stalls




Bio-Retention Basin (Plants to be Installed May 2010)          PLAN: Final Grading, Drainage & Erosion Control Plan

PROJECT SCOPE:
A private firm was expanding their headquarters facility that exists within a corporate business park. Our Solution Blue
team worked with the ownership group, construction manager, architect, City of Roseville and the Rice Creek Watershed
District throughout the project. We provided complete design, water modeling, engineering and construction management
services to implement a network of sustainable stormwater management systems.

CHALLENGES:
• Facility exists within an urbanized business park with strict guidelines regarding stormwater runoff control.
• 4,000 square foot building expansion generates more stormwater runoff, which must be properly managed on-site.
• Receiving regulatory approval and obtaining the building permit was challenging due to the stormwater restrictions.

SOLUTION:
Our Solution Blue team members provided the original site assessment, stormwater modeling, design development,
construction documents and managed the complete installation (plants scheduled for installation in May-June of 2010).
Our design incorporates various sustainable stormwater management techniques including bio-retention basins, permeable
parking stalls, and innovative stormwater management technologies.

• Implemented an all-in-one system for drainage, storage, filtration and water re-use via sub-surface irrigation.
• Selected native plant species to increase the uptake of water and enhance drought resistance.
• Through our cooperation with the City and watershed district, the owners obtained their building permit and
  implemented innovative stormwater management features that achieved the stormwater requirements.
                                  ©2010 Solution Blue, Inc.               www.SolutionBlue.com                                 (7)
Key Projects


TWIN CITIES ARMY AMMUNITION PLANT (TCAAP)
Location: Arden Hills, MN                              Client: City of Arden Hills




                                                                                                                                         Schutta Rd.
                                                                                                         Rice Creek
                                                                                                         Parkway
                                                                            MOUNDS                                                                     SHOREVIEW
                                                                             VIEW
                                                                                                                      Co. Rd. I




                                                                    Rice Creek
                                                                    Park Reserve

                                                                                                                                                       Potential Athletic
                                                                                                                                                            Fields

                                                                    High
                                                                    Density
                                                                    Offic e
                                                                                                                                  Wildlife Corridor
                                                                    Hotel




                                                                                                 I-35W
                                                                    Mixed Use

                                                                    Community                                                                                               Structured
                                                                    Scale Retail                                                                                            Parking

                                                                                   Co. Rd. H
Ammunitions Manufacturing Facility                                  Potential
                                                                    Transit
                                                                    Center         Co. Rd. H                                                                                Urban
                                                                    Low to Mid                                                                                              Residential
                                                                    Rise Office                                                                                             12+ u/ac
                                                                    2-6 stories
                                                                   Potential
                                                                   Community/                                                                                               Medium
                                                                   Civic Use                                                                                                Density
                                                                   -Remnant of                                                                                              Residential
                                                                   Building 101                                                                                             4-12 u/ac
                                                                    Community
                                                                    Park                                                                                                    Water
                                                                                                                                                                            Amenity/
                                                                                                                                                                            Stormwater
                                                                                                                                                                            Treatment
                                                                                     NEW
                                                                                   BRIGHTON                                                                                 Low
                                                                                                                        Hw                                                  Density
                                                                                                                          y.                                                Residential
                                                                       LEGEND                                                                                               0-4 u/ac
                                                                                                                            01

                                                                            Mixed Use: Retail and Office
                                                                            Community Scale Retail 60,000-75,000sf
                                                                            Low to Mid Rise Office 2-6 stories
                                                                            Transit Center
                                                                            Structured Parking
                                                                            Office Showroom
                                                                            Urban Residential 12+ u/ac
                                                                            Medium Density Residential 4-12 u/ac
                                                                            Low Density Residential 0-4 u/ac
                                                                            Public/Private Open Space                    Hwy. 96
                                                                            Water Amenity/ Stormwater Treatment
                                                                                                                                  ARDEN HILLS

Wetlands Surrounding the TCAAP Facilities                          Concept Master Plan

PROJECT SCOPE:
TCAAP’s 2,370-acre site is the largest and most significant tract of undeveloped land in the Twin Cites Metropolitan Area.
771 acres of this site is slated for re-development into mixed-use residential, commercial and institutional functions. The
General Service Administration (GSA), Army Pentagon, State of Minnesota, City of Arden Hills and our development team
are working together to coordinate the overall planning, remediation, financing and development efforts.

CHALLENGES:
• Site was used for the manufacturing of small arms ammunitions by the U.S. Army for nearly 4 decades.
• Soils contain extremely high levels of contamination and pollutants.
• Coordination of the remediation, financing and development efforts is very complex due to the City of Arden Hills,
  State of Minnesota, U.S. Government and a multitude of community stakeholders being involved.

SOLUTION:
From 2001 to 2007, Solution Blue team members played a key role in the comprehensive design, development, remediation
and financial planning efforts. Our team worked with the GSA and the Army Pentagon on the land transfer from federal
control; simultaneously leading the re-development planning efforts in cooperation with the City of Arden Hills.
• Directed the remediation efforts to test soils, quantify contamination and design an extensive clean-up plan.
• Negotiated both pollution liability and cost-cap insurance for the developer, City of Arden Hills and Government
  of the United States.
                                 ©2010 Solution Blue, Inc.                  www.SolutionBlue.com                                                                                          (8)

Más contenido relacionado

La actualidad más candente

Brimo Gerard - CSR in the Heavy Footprint - Mining Industry
Brimo Gerard - CSR in the Heavy Footprint - Mining IndustryBrimo Gerard - CSR in the Heavy Footprint - Mining Industry
Brimo Gerard - CSR in the Heavy Footprint - Mining IndustryNo to mining in Palawan
 
Sewerage Infrastructure under Greater Kuala Lumpur / Klang Valley Initiatives
Sewerage Infrastructure under Greater Kuala Lumpur / Klang Valley InitiativesSewerage Infrastructure under Greater Kuala Lumpur / Klang Valley Initiatives
Sewerage Infrastructure under Greater Kuala Lumpur / Klang Valley Initiativesinfosanitasi
 
Mike Ritacco Portfolio
Mike Ritacco PortfolioMike Ritacco Portfolio
Mike Ritacco Portfolioritacco_mike
 
CA: Bay-Friendly Landscapes Case Studies - Union City Firestation #3
CA: Bay-Friendly Landscapes Case Studies - Union City Firestation #3CA: Bay-Friendly Landscapes Case Studies - Union City Firestation #3
CA: Bay-Friendly Landscapes Case Studies - Union City Firestation #3Sotirakou964
 
SB10 conference 2010, Maastricht
SB10 conference 2010, MaastrichtSB10 conference 2010, Maastricht
SB10 conference 2010, Maastrichtwouterleduc
 
Point Dillon Landscape Concept - Dillon, CO
Point Dillon Landscape Concept - Dillon, COPoint Dillon Landscape Concept - Dillon, CO
Point Dillon Landscape Concept - Dillon, CODan Skinner
 
Project Management Profile
Project Management ProfileProject Management Profile
Project Management ProfileColin Harrop
 
Olympic Park Legacy Company: Duncan Innes
Olympic Park Legacy Company: Duncan InnesOlympic Park Legacy Company: Duncan Innes
Olympic Park Legacy Company: Duncan InnesThink London
 
Connect magazine essex courts buildings 2011
Connect magazine essex courts buildings 2011Connect magazine essex courts buildings 2011
Connect magazine essex courts buildings 2011rgaskill
 
Load Support Access Roads & Pipeline Protection For Gazprom, Russia
Load Support   Access Roads & Pipeline Protection For Gazprom, RussiaLoad Support   Access Roads & Pipeline Protection For Gazprom, Russia
Load Support Access Roads & Pipeline Protection For Gazprom, Russiafionaniddam
 
Marc McIntire Resume_2015 general
Marc McIntire Resume_2015 generalMarc McIntire Resume_2015 general
Marc McIntire Resume_2015 generalMarc McIntire
 
Work Samples
Work SamplesWork Samples
Work Sampleskatfoose
 
HOLOSCENE: high-performance landscape systems
HOLOSCENE: high-performance landscape systemsHOLOSCENE: high-performance landscape systems
HOLOSCENE: high-performance landscape systemsVc Hefti
 
Studio - Recycling a Landfill - Dunsink Landfill, Dublin, Ireland
Studio - Recycling a Landfill  - Dunsink Landfill, Dublin, IrelandStudio - Recycling a Landfill  - Dunsink Landfill, Dublin, Ireland
Studio - Recycling a Landfill - Dunsink Landfill, Dublin, Irelandchris.mcanneny
 

La actualidad más candente (20)

Brimo Gerard - CSR in the Heavy Footprint - Mining Industry
Brimo Gerard - CSR in the Heavy Footprint - Mining IndustryBrimo Gerard - CSR in the Heavy Footprint - Mining Industry
Brimo Gerard - CSR in the Heavy Footprint - Mining Industry
 
Sewerage Infrastructure under Greater Kuala Lumpur / Klang Valley Initiatives
Sewerage Infrastructure under Greater Kuala Lumpur / Klang Valley InitiativesSewerage Infrastructure under Greater Kuala Lumpur / Klang Valley Initiatives
Sewerage Infrastructure under Greater Kuala Lumpur / Klang Valley Initiatives
 
Mike Ritacco Portfolio
Mike Ritacco PortfolioMike Ritacco Portfolio
Mike Ritacco Portfolio
 
гюнтер шмитт
гюнтер шмиттгюнтер шмитт
гюнтер шмитт
 
CA: Bay-Friendly Landscapes Case Studies - Union City Firestation #3
CA: Bay-Friendly Landscapes Case Studies - Union City Firestation #3CA: Bay-Friendly Landscapes Case Studies - Union City Firestation #3
CA: Bay-Friendly Landscapes Case Studies - Union City Firestation #3
 
SB10 conference 2010, Maastricht
SB10 conference 2010, MaastrichtSB10 conference 2010, Maastricht
SB10 conference 2010, Maastricht
 
Nisqually Thin Project
Nisqually Thin ProjectNisqually Thin Project
Nisqually Thin Project
 
Point Dillon Landscape Concept - Dillon, CO
Point Dillon Landscape Concept - Dillon, COPoint Dillon Landscape Concept - Dillon, CO
Point Dillon Landscape Concept - Dillon, CO
 
Project Management Profile
Project Management ProfileProject Management Profile
Project Management Profile
 
Olympic Park Legacy Company: Duncan Innes
Olympic Park Legacy Company: Duncan InnesOlympic Park Legacy Company: Duncan Innes
Olympic Park Legacy Company: Duncan Innes
 
The Solution
The SolutionThe Solution
The Solution
 
Impact of roads on deforestation levels across Latin America
Impact of roads on deforestation levels across Latin AmericaImpact of roads on deforestation levels across Latin America
Impact of roads on deforestation levels across Latin America
 
Connect magazine essex courts buildings 2011
Connect magazine essex courts buildings 2011Connect magazine essex courts buildings 2011
Connect magazine essex courts buildings 2011
 
Load Support Access Roads & Pipeline Protection For Gazprom, Russia
Load Support   Access Roads & Pipeline Protection For Gazprom, RussiaLoad Support   Access Roads & Pipeline Protection For Gazprom, Russia
Load Support Access Roads & Pipeline Protection For Gazprom, Russia
 
Local Supply Development
Local Supply DevelopmentLocal Supply Development
Local Supply Development
 
Marc McIntire Resume_2015 general
Marc McIntire Resume_2015 generalMarc McIntire Resume_2015 general
Marc McIntire Resume_2015 general
 
Caravanesi
CaravanesiCaravanesi
Caravanesi
 
Work Samples
Work SamplesWork Samples
Work Samples
 
HOLOSCENE: high-performance landscape systems
HOLOSCENE: high-performance landscape systemsHOLOSCENE: high-performance landscape systems
HOLOSCENE: high-performance landscape systems
 
Studio - Recycling a Landfill - Dunsink Landfill, Dublin, Ireland
Studio - Recycling a Landfill  - Dunsink Landfill, Dublin, IrelandStudio - Recycling a Landfill  - Dunsink Landfill, Dublin, Ireland
Studio - Recycling a Landfill - Dunsink Landfill, Dublin, Ireland
 

Destacado

Aoc saq a
Aoc saq aAoc saq a
Aoc saq ahaoge26
 
02. cicada online-performance-review
02. cicada online-performance-review02. cicada online-performance-review
02. cicada online-performance-reviewCicada Consulting
 
Mathematical models
Mathematical  modelsMathematical  models
Mathematical modelsguest73fbbe
 
Mathematical models
Mathematical  modelsMathematical  models
Mathematical modelsguest73fbbe
 
The Underground Railroad
The Underground RailroadThe Underground Railroad
The Underground RailroadJason Flom
 

Destacado (6)

Aoc saq a
Aoc saq aAoc saq a
Aoc saq a
 
02. cicada online-performance-review
02. cicada online-performance-review02. cicada online-performance-review
02. cicada online-performance-review
 
Mathematical models
Mathematical  modelsMathematical  models
Mathematical models
 
Ansiad
AnsiadAnsiad
Ansiad
 
Mathematical models
Mathematical  modelsMathematical  models
Mathematical models
 
The Underground Railroad
The Underground RailroadThe Underground Railroad
The Underground Railroad
 

Similar a Solution Blue Projects (4)

Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...
Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...
Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...Sam Stribling
 
Sept 2012 Covert Park APF Grant Request
Sept 2012 Covert Park APF Grant Request Sept 2012 Covert Park APF Grant Request
Sept 2012 Covert Park APF Grant Request Fred Bothwell
 
Underground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinUnderground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinContech Engineered Solutions
 
Projects(Nov 17 2010)
Projects(Nov 17 2010)Projects(Nov 17 2010)
Projects(Nov 17 2010)Ora Berman
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Adam Berry
 
Australia: Knox: Rain garden design
Australia: Knox: Rain garden designAustralia: Knox: Rain garden design
Australia: Knox: Rain garden designSotirakou964
 
NJFuture Redevelopment Forum 2016 Hochreiter
NJFuture Redevelopment Forum 2016 HochreiterNJFuture Redevelopment Forum 2016 Hochreiter
NJFuture Redevelopment Forum 2016 HochreiterNew Jersey Future
 
Clean Rivers, Clean Lake 8 -- Menomonee Valley 2012 -- Laura Bray
Clean Rivers, Clean Lake 8 -- Menomonee Valley 2012 -- Laura BrayClean Rivers, Clean Lake 8 -- Menomonee Valley 2012 -- Laura Bray
Clean Rivers, Clean Lake 8 -- Menomonee Valley 2012 -- Laura BraySweet Water
 
Stormwater Management Using State Revolving Funds
Stormwater Management Using State Revolving FundsStormwater Management Using State Revolving Funds
Stormwater Management Using State Revolving FundsOHM Advisors
 
Nuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeeNuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeedignagni
 
Municipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesMunicipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesSMRPC
 
OR: Portland: Multnomah Building Green Roof
OR: Portland: Multnomah Building Green RoofOR: Portland: Multnomah Building Green Roof
OR: Portland: Multnomah Building Green RoofSotirakou964
 
K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103Kenneth Horner
 

Similar a Solution Blue Projects (4) (20)

Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...
Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...
Environmental Connection - January 2013 - Vol. 7 - Issue 1 - cover plus pages...
 
Portfolio
PortfolioPortfolio
Portfolio
 
Sept 2012 Covert Park APF Grant Request
Sept 2012 Covert Park APF Grant Request Sept 2012 Covert Park APF Grant Request
Sept 2012 Covert Park APF Grant Request
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
 
MAPD 2010 - Creating the box
MAPD 2010 - Creating the boxMAPD 2010 - Creating the box
MAPD 2010 - Creating the box
 
Using Rain Gardens as a Storm Water Runoff Bioretention Technique
Using Rain Gardens as a Storm Water Runoff Bioretention TechniqueUsing Rain Gardens as a Storm Water Runoff Bioretention Technique
Using Rain Gardens as a Storm Water Runoff Bioretention Technique
 
Underground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinUnderground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in Wisconsin
 
Projects(Nov 17 2010)
Projects(Nov 17 2010)Projects(Nov 17 2010)
Projects(Nov 17 2010)
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
 
COMPANY PROFILE
COMPANY PROFILECOMPANY PROFILE
COMPANY PROFILE
 
Australia: Knox: Rain garden design
Australia: Knox: Rain garden designAustralia: Knox: Rain garden design
Australia: Knox: Rain garden design
 
Maintaining Rain Gardens: Lessons Learned from Kansas State University
Maintaining Rain Gardens: Lessons Learned from Kansas State UniversityMaintaining Rain Gardens: Lessons Learned from Kansas State University
Maintaining Rain Gardens: Lessons Learned from Kansas State University
 
NJFuture Redevelopment Forum 2016 Hochreiter
NJFuture Redevelopment Forum 2016 HochreiterNJFuture Redevelopment Forum 2016 Hochreiter
NJFuture Redevelopment Forum 2016 Hochreiter
 
Clean Rivers, Clean Lake 8 -- Menomonee Valley 2012 -- Laura Bray
Clean Rivers, Clean Lake 8 -- Menomonee Valley 2012 -- Laura BrayClean Rivers, Clean Lake 8 -- Menomonee Valley 2012 -- Laura Bray
Clean Rivers, Clean Lake 8 -- Menomonee Valley 2012 -- Laura Bray
 
Stormwater Management Using State Revolving Funds
Stormwater Management Using State Revolving FundsStormwater Management Using State Revolving Funds
Stormwater Management Using State Revolving Funds
 
Project List 1
Project List 1Project List 1
Project List 1
 
Nuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKeeNuprecon - Presentation I gave at Camp Dresser McKee
Nuprecon - Presentation I gave at Camp Dresser McKee
 
Municipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesMunicipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach Communities
 
OR: Portland: Multnomah Building Green Roof
OR: Portland: Multnomah Building Green RoofOR: Portland: Multnomah Building Green Roof
OR: Portland: Multnomah Building Green Roof
 
K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103
 

Solution Blue Projects (4)

  • 1. KEY PROJECTS Page Tar ge t Fi el d: MN T wins’ Ballp ark (1) TCF B an k S ta di um : MN G o p hers’ Stad ium (2) V o l k sw agen Dea l ership Exp ansio n (3) P r i v at e Orthodox C hurc h (4) St. P au l ’ s Upper La nd ing Re-Develo p ment (5) P r i v at e Condom i ni ums - G reen R o o f System (6) P r i v at e Fi rm ’s C orpo rate Head q uarters (7) Tw i n C it i es Arm y Ammunition Plant (TCAAP ) (8) 350 Saint Peter Street, Suite 220 Phone: (651)294.0038 Saint Paul, MN 55102 www.SolutionBlue.com ©2010 Solution Blue, Inc. ©2010 Solution Blue, Inc.
  • 2. Key Projects TARGET FIELD: MINNESOTA TWINS’ BALLPARK (TARGET PLAZA) Location: Minneapolis, MN Client: M.A. Mortenson Construction, MN Ballpark Authority Completed Plaza After Installation of Plants & Sod Completed Plaza After Installation of Plants & Sod Graphic Rendering (Courtesy of HOK Sport, Inc.) Under Construction: Stormwater Management System in Plaza PROJECT SCOPE: The Minnesota Twins’ baseball team was developing an open-air 40,000-seat ballpark in the Warehouse District of Downtown Minneapolis. Our Solution Blue team members worked with the MN Twins organization, MN Ballpark Authority, Metropolitan Council, HOK Sport and Mortenson Construction to facilitate the planning, design, development and implementation of an innovative stormwater management system for the Twins’ new ballpark facility. CHALLENGES: • Ballpark located within a dense, urban setting in Downtown Minneapolis. • Complex network of buildings, streets, major highways and infrastructure surrounds the facility. • Minimal space available on-site for traditional stormwater management systems. • Realignment of major roadways to accommodate the stadium added to project’s overall complexity. SOLUTION: Our Solution Blue team members engineered and implemented an innovative stormwater management system within Target Plaza. Our team designed, provided information to receive regulatory approval, produced construction documents and managed the construction process for this stormwater system. • Implemented a cutting-edge system that provides stormwater storage, filtration and re-use via passive irrigation. • Reinforced the soils below turfgrass to endure excessive foot traffic and withstand vibrations from I-394 bridge. • Provided an economical and environmental solution to efficiently achieve the stormwater management objectives. ©2010 Solution Blue, Inc. www.SolutionBlue.com (1)
  • 3. Key Projects TCF BANK STADIUM: MINNESOTA GOPHERS’ STADIUM (PLAZA SPACE) Location: University of MN (Minneapolis, MN) Client: M.A. Mortenson Construction, Veit Companies Football Field Bleachers 3.75 Acre Watershed Un ive rsi ty Av en Multi-Functional ue Green Space (0.50 Acres) PLAN: 3.75-Acre Watershed Directing Runoff to 0.50-Acre Plaza Space Completed Multi-Functional Plaza Space Aerial View: Installation of Sand Profile as Part of Stormwater System Installation of Liner & Chambers as Part of Stormwater System PROJECT SCOPE: The University of Minnesota was developing a new football stadium on the University’s East-Bank campus in Minneapolis, MN. Mortenson Construction was the general contractor that worked with various designers, engineers, University officials, the City of Minneapolis and our Solution Blue team members to successfully execute the planning, financing, design and construction of this state-of-the-art, LEED® certified athletic facility. CHALLENGES: • Located within a highly developed urban setting with minimal space available for stormwater management features. • Difficult to achieve stormwater management (quality & quantity) objectives due to lack of available green space. • University needed to establish an economically and environmentally viable solution to manage stormwater on-site. SOLUTION: Solution Blue team members designed and implemented an innovative stormwater management system along University Avenue. Our team designed, engineered and managed the installation of this cutting-edge stormwater system. • Employed an all-in-one system that provides superior drainage, storage, water re-use and complete stormwater mgmt. • 0.50-acre green space accommodates 3.75-acre watershed and efficiently manages 5-year rainfall event (3.5” in 24 hours). • 0.50-acre green space provides 120,000-gallon storage capacity (within soil profile and temporary storage above turfgrass). • System’s pollutant removal rates: 90% TSS (Total Suspended Solids), 80% Phosphorus, 60% Nitrates. • Incorporated mesh materials in soil profile so turfgrass can effectively support heavy broadcasting and emergency vehicles. • Stadium was designated as the first ever LEED® certified collegiate football stadium in the country. ©2010 Solution Blue, Inc. www.SolutionBlue.com (2)
  • 4. Key Projects VOLKSWAGEN DEALERSHIP EXPANSION Location: Maplewood, MN Client: General Contractor Permeable Paver Parking & Storage Area Intersection of Open-Grid & Permeable Concrete Pavers Permeable Concrete Pavers with Modular Retaining Wall PROJECT SCOPE: An existing dealership acquired additional land (adjacent to their site) to accommodate a building expansion and extra space for vehicle parking and storage. Solution Blue team members worked with the dealership owners, City of Maplewood, Ramsey-Washington Metro Watershed District and the general contractor throughout this project. We provided complete design, water modeling, civil engineering and construction management services to successfully implement a network of permeable paving and water storage technologies, which properly achieved the stormwater management objectives. CHALLENGES: • Located in an urban setting with minimal space available for stormwater management features. • Conventional design/engineering would incorporate a retention pond for stormwater storage, which decreases the amount of space available for vehicle parking and storage. • Integrating the landscape plan with stormwater management objectives was difficult due to the owner’s aesthetic expectations and having to meet the City’s building code requirements. SOLUTION: Our Solution Blue team members provided the initial site assessment, stormwater modeling, design development, construction documents and managed the installation of this stormwater management solution. The design incorporates two permeable paving technologies with an aggregate profile that provides sufficient stormwater storage and filtration. • Provided an alternative solution to a traditional retention pond (which provides no space to store vehicles). • Created a multi-functional system that meets stormwater management objectives, but also accommodates 100 additional stalls for vehicle parking and storage. • Provided support to help obtain a $25,000 grant from the Watershed District for implementing an innovative, cutting-edge solution that achieved stormwater management objectives. ©2010 Solution Blue, Inc. www.SolutionBlue.com (3)
  • 5. Key Projects PRIVATE ORTHODOX CHURCH Location: Minneapolis, MN Client: Church Location of Proposed Infiltration Trench Existing Slopes Along Rear of Church (Impaired Lake in Distance) Water Diversion Mechanism EPIC Planting Beds Concrete Pavers PERENNIALS False Forget-me-not Masterwort Foxglove Feather Reed Grass Dwarf Joe Pye Weed Sedum Black-Eyed Susan Red Switch Grass SHRUBS Taunton Yew Annabelle Hydrangea Dwarf Ninebark Arctic Fire Dogwood Fire Ball Euonymus Black Lace Elderberry LANDSCAPE PLAN: Location of Proposed Stormwater Features & Landscape Plants PROJECT SCOPE: The Church hired Solution Blue to provide solutions to help the Church achieve three (3) main objectives: (1) Provide a drainage solution for flood prone areas adjacent to the sanctuary. (2) Eliminate or drastically reduce the City of Minneapolis’ monthly Stormwater Utility Fee (quality & quantity credits). (3) Incorporate the proposed landscape plan (shown above) with innovative stormwater management applications. CHALLENGES: • Building located near steep slopes and is adjacent to an impaired water body. • Because of site constraints, additional review by the City is required for approval and construction will be complicated. • Existing infrastructure must be connected to the proposed drainage and stormwater management systems. • Topography restricts how stormwater can be managed because portions of the site are too flat to effectively drain by traditional methods and specific areas direct stormwater off-site prior to collection and/or treatment. SOLUTION: Our team provided the initial site analysis, design development, water modeling and engineering services and have been working with the City of Minneapolis to receive final approval prior to construction (scheduled for May-June of 2010). Our design incorporates several stormwater management techniques such as roof top detention, infiltration trenches, permeable paver patios and sidewalks, bio-retention basins and large infiltration tanks. • Designed various stormwater management features to effectively manage stormwater on-site. • Engineered stormwater systems to properly accommodate the 10-year (4.1” in 24 hours) rainfall event. • Directed excess water to large infiltration tanks where it can recharge groundwater and manage the next rainfall event. • Selected the appropriate native and hybrid plant species for landscape areas and stormwater features. ©2010 Solution Blue, Inc. www.SolutionBlue.com (4)
  • 6. Key Projects ST. PAUL’S UPPER LANDING RE-DEVELOPMENT Location: St. Paul, MN Client: CENTEX Multi-Family Homes H.S. Kaplan Scrap Yard Site (Prior to Re-Development) Importing Soil to Raise Elevation (Along with Remediation) Completed Multi-Use Development: Housing, Retail, Restaurants & Public Park Public Park Along Mississippi Riverfront PROJECT SCOPE: This 20-acre former Superfund site exists along the Mississippi River in Downtown St. Paul. CENTEX Multi-Family Homes was the primary developer that worked with the City of St. Paul, Riverfront Corporation, State of Minnesota and our development team to coordinate the remediation, planning, design and financing efforts for this re-development project. CHALLENGES: • Highly contaminated site because it was home to the H.S. Kaplan Scrap Iron & Metal Company from 1950’s to 1989. • Site flooded often due to its location within Mississippi River floodplain and lack of control structures along the River. • Coordination of the planning, remediation, financing and development efforts was incredibly challenging because several local, state and federal organizations were involved throughout the project. SOLUTION: Solution Blue team members guided the development team in the overall planning, funding, regulatory compliance and implementation efforts from conception through final construction. Upon completion in 2002, this former brownfield site was re-developed into a successful housing, retail, restaurant and public park facility valued at over $173 Million dollars. • Developed the site’s environmental clean-up plan, which was approved by the MN Pollution Control Agency (MPCA). • Spent 2 years mitigating several significant environmental issues related to the H.S. Kaplan Scrap Yard operation. • Worked with the City of St. Paul and CENTEX Multi-Family Homes to obtain a $3 Million clean-up grant from the MN Department of Trade & Economic Development and a $702,000 tax-based revitalization grant from the Met Council. ©2010 Solution Blue, Inc. www.SolutionBlue.com (5)
  • 7. Key Projects PRIVATE CONDOMINIUMS - INTENSIVE GREEN ROOF Location: Minneapolis, MN Client: Private Developer & Owner Completed Green Roof: (4) Separate Zones Divided by Sidewalks Completed Green Roof: Native Grasses, Decorative Trees & Turfgrass Under Construction: Installation of Lightweight Growing Soil PROJECT SCOPE: A private developer was creating a multi-story condominium structure in Downtown Minneapolis. Our Solution Blue team members worked with the owner, landscape architect, watershed district and City of Minneapolis to successfully design and implement an intensive green roof system. CHALLENGES: • Building exists within an urban setting with minimal space available for stormwater management features. • Green roof had to exist above a parking ramp with limited capacity to support an intensive-profile (12”+) green roof. • Reducing the City’s monthly stormwater utility fee required inventive solutions to efficiently manage, store and re-use stormwater on-site. SOLUTION: Solution Blue team members provided site assessment, design development, water modeling and civil engineering services in order to receive approval from the City of Minneapolis and local watershed district. Our design incorporates a state-of- the-art system that captures, filters and re-uses stormwater within an intensive green roof profile. • Employed a lightweight green roof system (12” deep) that provides stormwater storage, filtration and water re-use. • Installed a 10,000-gallon reservoir tank for supplemental storage that supplies water to irrigate plants and turfgrass. • Implemented a functional, usable green space in an urban setting that provides recreational opportunities, achieves stormwater management objectives and improves the building’s aesthetic appeal. ©2010 Solution Blue, Inc. www.SolutionBlue.com (6)
  • 8. Key Projects PRIVATE FIRM’S CORPORATE HEADQUARTERS Location: Roseville, MN Client: Private Corporation Completed Permeable Paver Parking Stalls Bio-Retention Basin (Plants to be Installed May 2010) PLAN: Final Grading, Drainage & Erosion Control Plan PROJECT SCOPE: A private firm was expanding their headquarters facility that exists within a corporate business park. Our Solution Blue team worked with the ownership group, construction manager, architect, City of Roseville and the Rice Creek Watershed District throughout the project. We provided complete design, water modeling, engineering and construction management services to implement a network of sustainable stormwater management systems. CHALLENGES: • Facility exists within an urbanized business park with strict guidelines regarding stormwater runoff control. • 4,000 square foot building expansion generates more stormwater runoff, which must be properly managed on-site. • Receiving regulatory approval and obtaining the building permit was challenging due to the stormwater restrictions. SOLUTION: Our Solution Blue team members provided the original site assessment, stormwater modeling, design development, construction documents and managed the complete installation (plants scheduled for installation in May-June of 2010). Our design incorporates various sustainable stormwater management techniques including bio-retention basins, permeable parking stalls, and innovative stormwater management technologies. • Implemented an all-in-one system for drainage, storage, filtration and water re-use via sub-surface irrigation. • Selected native plant species to increase the uptake of water and enhance drought resistance. • Through our cooperation with the City and watershed district, the owners obtained their building permit and implemented innovative stormwater management features that achieved the stormwater requirements. ©2010 Solution Blue, Inc. www.SolutionBlue.com (7)
  • 9. Key Projects TWIN CITIES ARMY AMMUNITION PLANT (TCAAP) Location: Arden Hills, MN Client: City of Arden Hills Schutta Rd. Rice Creek Parkway MOUNDS SHOREVIEW VIEW Co. Rd. I Rice Creek Park Reserve Potential Athletic Fields High Density Offic e Wildlife Corridor Hotel I-35W Mixed Use Community Structured Scale Retail Parking Co. Rd. H Ammunitions Manufacturing Facility Potential Transit Center Co. Rd. H Urban Low to Mid Residential Rise Office 12+ u/ac 2-6 stories Potential Community/ Medium Civic Use Density -Remnant of Residential Building 101 4-12 u/ac Community Park Water Amenity/ Stormwater Treatment NEW BRIGHTON Low Hw Density y. Residential LEGEND 0-4 u/ac 01 Mixed Use: Retail and Office Community Scale Retail 60,000-75,000sf Low to Mid Rise Office 2-6 stories Transit Center Structured Parking Office Showroom Urban Residential 12+ u/ac Medium Density Residential 4-12 u/ac Low Density Residential 0-4 u/ac Public/Private Open Space Hwy. 96 Water Amenity/ Stormwater Treatment ARDEN HILLS Wetlands Surrounding the TCAAP Facilities Concept Master Plan PROJECT SCOPE: TCAAP’s 2,370-acre site is the largest and most significant tract of undeveloped land in the Twin Cites Metropolitan Area. 771 acres of this site is slated for re-development into mixed-use residential, commercial and institutional functions. The General Service Administration (GSA), Army Pentagon, State of Minnesota, City of Arden Hills and our development team are working together to coordinate the overall planning, remediation, financing and development efforts. CHALLENGES: • Site was used for the manufacturing of small arms ammunitions by the U.S. Army for nearly 4 decades. • Soils contain extremely high levels of contamination and pollutants. • Coordination of the remediation, financing and development efforts is very complex due to the City of Arden Hills, State of Minnesota, U.S. Government and a multitude of community stakeholders being involved. SOLUTION: From 2001 to 2007, Solution Blue team members played a key role in the comprehensive design, development, remediation and financial planning efforts. Our team worked with the GSA and the Army Pentagon on the land transfer from federal control; simultaneously leading the re-development planning efforts in cooperation with the City of Arden Hills. • Directed the remediation efforts to test soils, quantify contamination and design an extensive clean-up plan. • Negotiated both pollution liability and cost-cap insurance for the developer, City of Arden Hills and Government of the United States. ©2010 Solution Blue, Inc. www.SolutionBlue.com (8)