Project Work Breakdown Structure
Purpose

The purpose of this tool is to provide guidance with breaking down the project into
manageable components called tasks. For each Task, estimate how long the activity will take
to complete; document which resources will be responsible for doing the work; and determine
the costs involved.


Scope

This tool will provide a framework for organizing tasks into the 5 project stages:

       1.   INITIATION – involves all pre-project activities such as getting approval.
       2.   PLANNING – developing Project Charter, and lining up required resources.
       3.   EXECUTION – working through each task to achieve agreed deliverables.
       4.   CONTROL – ensuing requirements are being met as the project progresses.
       5.   CLOSURE – completing Post-Project Evaluation to document lessons learned.




Project Information

Project Title:                           Date:



Project Manager:                         Project Sponsor:
Project Work Breakdown Structure

Stage   Task                Time (hours)   Responsibility       Costs


  1.0   Initiation



  1.1   Project Request            2       Project Sponsor



  1.2   Project Approval           .5      Steering Committee




  2.0   Planning



  2.1   Project Charter            2       Project Manager
3.0   Execution
4.0   Control




5.0   Closure



5.1   Post-Project Evaluation   4   Project Team
Totals

Más contenido relacionado

La actualidad más candente

2.02 project kick off_meeting (1)
2.02 project kick off_meeting (1)2.02 project kick off_meeting (1)
2.02 project kick off_meeting (1)Nguyen Toan
 
Master schedule and milestone schedule
Master schedule and milestone scheduleMaster schedule and milestone schedule
Master schedule and milestone scheduleMudassir Iqbal
 
20140311 final report
20140311 final report20140311 final report
20140311 final reportEUAlpineSpace
 
integration management
 integration management integration management
integration managementsaiftahlawi1
 
Project Closure Report
Project Closure ReportProject Closure Report
Project Closure ReportAdam Edwards
 
Project management closing & reflecting
Project management   closing & reflectingProject management   closing & reflecting
Project management closing & reflectingSuzanne Chapman
 
Project-Scope-Statement
Project-Scope-StatementProject-Scope-Statement
Project-Scope-StatementJeremy Heady
 
Project Scope Managemen Final Megat
Project Scope Managemen Final MegatProject Scope Managemen Final Megat
Project Scope Managemen Final Megatmegat zainurul anuar
 
Project Status Report With Budget Estimation And Milestones Printable Report ...
Project Status Report With Budget Estimation And Milestones Printable Report ...Project Status Report With Budget Estimation And Milestones Printable Report ...
Project Status Report With Budget Estimation And Milestones Printable Report ...SlideTeam
 
How to do Project Work and Administration Process correctly - Sameer Mitter
How to do Project Work and Administration Process correctly - Sameer MitterHow to do Project Work and Administration Process correctly - Sameer Mitter
How to do Project Work and Administration Process correctly - Sameer MitterSameer Mitter
 
3 project charter template
3 project charter template3 project charter template
3 project charter templatePaulinaBP56
 
Project Management Training in Indonesia - Module 05 Project Closing Process
Project Management Training in Indonesia - Module 05 Project Closing ProcessProject Management Training in Indonesia - Module 05 Project Closing Process
Project Management Training in Indonesia - Module 05 Project Closing ProcessAlin Veronika
 
The Project Charter
The Project CharterThe Project Charter
The Project Charterdmdk12
 
One Page Project Plan With Objectives And Cost Presentation Report Infographi...
One Page Project Plan With Objectives And Cost Presentation Report Infographi...One Page Project Plan With Objectives And Cost Presentation Report Infographi...
One Page Project Plan With Objectives And Cost Presentation Report Infographi...SlideTeam
 
Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter TemplateNaseer Muhammud
 

La actualidad más candente (20)

Final Project Closing
Final Project ClosingFinal Project Closing
Final Project Closing
 
Pmtg410 intro
Pmtg410   introPmtg410   intro
Pmtg410 intro
 
2.02 project kick off_meeting (1)
2.02 project kick off_meeting (1)2.02 project kick off_meeting (1)
2.02 project kick off_meeting (1)
 
Master schedule and milestone schedule
Master schedule and milestone scheduleMaster schedule and milestone schedule
Master schedule and milestone schedule
 
20140311 final report
20140311 final report20140311 final report
20140311 final report
 
integration management
 integration management integration management
integration management
 
Project Closure Report
Project Closure ReportProject Closure Report
Project Closure Report
 
Project Plan - Docweb
Project Plan - DocwebProject Plan - Docweb
Project Plan - Docweb
 
Project management closing & reflecting
Project management   closing & reflectingProject management   closing & reflecting
Project management closing & reflecting
 
Project-Scope-Statement
Project-Scope-StatementProject-Scope-Statement
Project-Scope-Statement
 
Project Scope Managemen Final Megat
Project Scope Managemen Final MegatProject Scope Managemen Final Megat
Project Scope Managemen Final Megat
 
Project closeout transition checklist
Project closeout transition checklistProject closeout transition checklist
Project closeout transition checklist
 
PM-Project Closing-UiTM Project
PM-Project Closing-UiTM ProjectPM-Project Closing-UiTM Project
PM-Project Closing-UiTM Project
 
Project Status Report With Budget Estimation And Milestones Printable Report ...
Project Status Report With Budget Estimation And Milestones Printable Report ...Project Status Report With Budget Estimation And Milestones Printable Report ...
Project Status Report With Budget Estimation And Milestones Printable Report ...
 
How to do Project Work and Administration Process correctly - Sameer Mitter
How to do Project Work and Administration Process correctly - Sameer MitterHow to do Project Work and Administration Process correctly - Sameer Mitter
How to do Project Work and Administration Process correctly - Sameer Mitter
 
3 project charter template
3 project charter template3 project charter template
3 project charter template
 
Project Management Training in Indonesia - Module 05 Project Closing Process
Project Management Training in Indonesia - Module 05 Project Closing ProcessProject Management Training in Indonesia - Module 05 Project Closing Process
Project Management Training in Indonesia - Module 05 Project Closing Process
 
The Project Charter
The Project CharterThe Project Charter
The Project Charter
 
One Page Project Plan With Objectives And Cost Presentation Report Infographi...
One Page Project Plan With Objectives And Cost Presentation Report Infographi...One Page Project Plan With Objectives And Cost Presentation Report Infographi...
One Page Project Plan With Objectives And Cost Presentation Report Infographi...
 
Project Charter Template
Project Charter TemplateProject Charter Template
Project Charter Template
 

Destacado

Project Management Policy
Project Management PolicyProject Management Policy
Project Management PolicyDemand Metric
 
Marketing Communications Planning Guide
Marketing Communications Planning GuideMarketing Communications Planning Guide
Marketing Communications Planning GuideDemand Metric
 
Terms of Use Policy Template
Terms of Use Policy TemplateTerms of Use Policy Template
Terms of Use Policy TemplateDemand Metric
 
Privacy Policy Template
Privacy Policy TemplatePrivacy Policy Template
Privacy Policy TemplateDemand Metric
 
Sales Productivity Metrics (Daily)
Sales Productivity Metrics (Daily)Sales Productivity Metrics (Daily)
Sales Productivity Metrics (Daily)Demand Metric
 
Sustainability Report Template
Sustainability Report TemplateSustainability Report Template
Sustainability Report TemplateDemand Metric
 
Web Metrics Reporting Tool
Web Metrics Reporting ToolWeb Metrics Reporting Tool
Web Metrics Reporting ToolDemand Metric
 
Customer Satisfaction Survey
Customer Satisfaction SurveyCustomer Satisfaction Survey
Customer Satisfaction SurveyDemand Metric
 
How-To Guide - Agile Marketing
How-To Guide - Agile MarketingHow-To Guide - Agile Marketing
How-To Guide - Agile MarketingDemand Metric
 
Shopper Marketing Program Strategies
Shopper Marketing Program StrategiesShopper Marketing Program Strategies
Shopper Marketing Program StrategiesDemand Metric
 
Shopper Marketing Maturity Model
Shopper Marketing Maturity ModelShopper Marketing Maturity Model
Shopper Marketing Maturity ModelDemand Metric
 
Account-Based Marketing - January 2017
Account-Based Marketing - January 2017Account-Based Marketing - January 2017
Account-Based Marketing - January 2017Demand Metric
 
Vendor Consolidation Checklist
Vendor Consolidation ChecklistVendor Consolidation Checklist
Vendor Consolidation ChecklistDemand Metric
 
Office Opening Checklist
Office Opening ChecklistOffice Opening Checklist
Office Opening ChecklistDemand Metric
 
Web Infrastructure Checklist
Web Infrastructure ChecklistWeb Infrastructure Checklist
Web Infrastructure ChecklistDemand Metric
 
Sales Support Checklist
Sales Support ChecklistSales Support Checklist
Sales Support ChecklistDemand Metric
 
Interview Questions Tool
Interview Questions ToolInterview Questions Tool
Interview Questions ToolDemand Metric
 
Exit Interview Questions Tool
Exit Interview Questions ToolExit Interview Questions Tool
Exit Interview Questions ToolDemand Metric
 
Employee Satisfaction Survey
Employee Satisfaction SurveyEmployee Satisfaction Survey
Employee Satisfaction SurveyDemand Metric
 

Destacado (20)

Project Management Policy
Project Management PolicyProject Management Policy
Project Management Policy
 
Marketing Communications Planning Guide
Marketing Communications Planning GuideMarketing Communications Planning Guide
Marketing Communications Planning Guide
 
Graphic Use Policy
Graphic Use PolicyGraphic Use Policy
Graphic Use Policy
 
Terms of Use Policy Template
Terms of Use Policy TemplateTerms of Use Policy Template
Terms of Use Policy Template
 
Privacy Policy Template
Privacy Policy TemplatePrivacy Policy Template
Privacy Policy Template
 
Sales Productivity Metrics (Daily)
Sales Productivity Metrics (Daily)Sales Productivity Metrics (Daily)
Sales Productivity Metrics (Daily)
 
Sustainability Report Template
Sustainability Report TemplateSustainability Report Template
Sustainability Report Template
 
Web Metrics Reporting Tool
Web Metrics Reporting ToolWeb Metrics Reporting Tool
Web Metrics Reporting Tool
 
Customer Satisfaction Survey
Customer Satisfaction SurveyCustomer Satisfaction Survey
Customer Satisfaction Survey
 
How-To Guide - Agile Marketing
How-To Guide - Agile MarketingHow-To Guide - Agile Marketing
How-To Guide - Agile Marketing
 
Shopper Marketing Program Strategies
Shopper Marketing Program StrategiesShopper Marketing Program Strategies
Shopper Marketing Program Strategies
 
Shopper Marketing Maturity Model
Shopper Marketing Maturity ModelShopper Marketing Maturity Model
Shopper Marketing Maturity Model
 
Account-Based Marketing - January 2017
Account-Based Marketing - January 2017Account-Based Marketing - January 2017
Account-Based Marketing - January 2017
 
Vendor Consolidation Checklist
Vendor Consolidation ChecklistVendor Consolidation Checklist
Vendor Consolidation Checklist
 
Office Opening Checklist
Office Opening ChecklistOffice Opening Checklist
Office Opening Checklist
 
Web Infrastructure Checklist
Web Infrastructure ChecklistWeb Infrastructure Checklist
Web Infrastructure Checklist
 
Sales Support Checklist
Sales Support ChecklistSales Support Checklist
Sales Support Checklist
 
Interview Questions Tool
Interview Questions ToolInterview Questions Tool
Interview Questions Tool
 
Exit Interview Questions Tool
Exit Interview Questions ToolExit Interview Questions Tool
Exit Interview Questions Tool
 
Employee Satisfaction Survey
Employee Satisfaction SurveyEmployee Satisfaction Survey
Employee Satisfaction Survey
 

Similar a Project Work Breakdown Structure

PECB Webinar: Aligning ISO 21500 and PRINCE2
PECB Webinar: Aligning ISO 21500 and PRINCE2PECB Webinar: Aligning ISO 21500 and PRINCE2
PECB Webinar: Aligning ISO 21500 and PRINCE2PECB
 
Making Rules Project Management
Making Rules  Project ManagementMaking Rules  Project Management
Making Rules Project ManagementUday Sharma
 
Project Management Execution Training
Project Management Execution TrainingProject Management Execution Training
Project Management Execution TrainingAminuddin Seth
 
Project mgmt life cycle origination
Project mgmt life cycle originationProject mgmt life cycle origination
Project mgmt life cycle originationMujtaba Masood
 
Project Management
Project ManagementProject Management
Project ManagementAtif Rehmat
 
Information technology project management
Information technology project managementInformation technology project management
Information technology project managementSeredup Maya
 
Project typed
Project typedProject typed
Project typedRahul
 
Work breakdown structure WBS Columbia Southe.docx
Work breakdown structure WBS Columbia Southe.docxWork breakdown structure WBS Columbia Southe.docx
Work breakdown structure WBS Columbia Southe.docxericbrooks84875
 
PMI Project Management Framework
PMI Project Management FrameworkPMI Project Management Framework
PMI Project Management FrameworkAarti Dahiya PMP
 
Organizational influences and project life cycle
Organizational influences and project life cycleOrganizational influences and project life cycle
Organizational influences and project life cycleAli Adil
 
Scenario - Project Management Processes | 1 of 2
Scenario - Project Management Processes | 1 of 2Scenario - Project Management Processes | 1 of 2
Scenario - Project Management Processes | 1 of 2DavidMcLachlan1
 
Work BreakDown Structure
Work BreakDown StructureWork BreakDown Structure
Work BreakDown StructureAbdul Aslam
 
Software project planning
Software project planningSoftware project planning
Software project planningrajvir_kaur
 

Similar a Project Work Breakdown Structure (20)

lecture 8 (1).ppt
lecture 8 (1).pptlecture 8 (1).ppt
lecture 8 (1).ppt
 
PECB Webinar: Aligning ISO 21500 and PRINCE2
PECB Webinar: Aligning ISO 21500 and PRINCE2PECB Webinar: Aligning ISO 21500 and PRINCE2
PECB Webinar: Aligning ISO 21500 and PRINCE2
 
Making Rules Project Management
Making Rules  Project ManagementMaking Rules  Project Management
Making Rules Project Management
 
Project Management Execution Training
Project Management Execution TrainingProject Management Execution Training
Project Management Execution Training
 
SPM Unit 1.pptx
SPM Unit 1.pptxSPM Unit 1.pptx
SPM Unit 1.pptx
 
Project mgmt life cycle origination
Project mgmt life cycle originationProject mgmt life cycle origination
Project mgmt life cycle origination
 
Project Management
Project ManagementProject Management
Project Management
 
Information technology project management
Information technology project managementInformation technology project management
Information technology project management
 
Project typed
Project typedProject typed
Project typed
 
Project management and project life cycle
Project management and project life cycleProject management and project life cycle
Project management and project life cycle
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Work breakdown structure WBS Columbia Southe.docx
Work breakdown structure WBS Columbia Southe.docxWork breakdown structure WBS Columbia Southe.docx
Work breakdown structure WBS Columbia Southe.docx
 
PMI Project Management Framework
PMI Project Management FrameworkPMI Project Management Framework
PMI Project Management Framework
 
project life cycle
project life cycleproject life cycle
project life cycle
 
Chap04
Chap04Chap04
Chap04
 
Organizational influences and project life cycle
Organizational influences and project life cycleOrganizational influences and project life cycle
Organizational influences and project life cycle
 
Project managment 2
Project managment 2Project managment 2
Project managment 2
 
Scenario - Project Management Processes | 1 of 2
Scenario - Project Management Processes | 1 of 2Scenario - Project Management Processes | 1 of 2
Scenario - Project Management Processes | 1 of 2
 
Work BreakDown Structure
Work BreakDown StructureWork BreakDown Structure
Work BreakDown Structure
 
Software project planning
Software project planningSoftware project planning
Software project planning
 

Más de Demand Metric

The Impact of COVID-19 in B2B Marketing
The Impact of COVID-19 in B2B MarketingThe Impact of COVID-19 in B2B Marketing
The Impact of COVID-19 in B2B MarketingDemand Metric
 
Infographic Return Path Email Engagement
Infographic Return Path Email EngagementInfographic Return Path Email Engagement
Infographic Return Path Email EngagementDemand Metric
 
Infographic Vidyard Video Marketing 2018
Infographic Vidyard Video Marketing 2018Infographic Vidyard Video Marketing 2018
Infographic Vidyard Video Marketing 2018Demand Metric
 
Digital Marketing Best Practices Guide
Digital Marketing Best Practices GuideDigital Marketing Best Practices Guide
Digital Marketing Best Practices GuideDemand Metric
 
Content Marketing Solution Study
Content Marketing Solution StudyContent Marketing Solution Study
Content Marketing Solution StudyDemand Metric
 
SEO Technology Overview
SEO Technology OverviewSEO Technology Overview
SEO Technology OverviewDemand Metric
 
State of Video Marketing 2017
State of Video Marketing 2017State of Video Marketing 2017
State of Video Marketing 2017Demand Metric
 
Sales Enablement Maturity Model
Sales Enablement Maturity ModelSales Enablement Maturity Model
Sales Enablement Maturity ModelDemand Metric
 
Public Relations Maturity Model
Public Relations Maturity ModelPublic Relations Maturity Model
Public Relations Maturity ModelDemand Metric
 
Email Marketing Maturity Model
Email Marketing Maturity ModelEmail Marketing Maturity Model
Email Marketing Maturity ModelDemand Metric
 
Customer Engagement Maturity Model
Customer Engagement Maturity ModelCustomer Engagement Maturity Model
Customer Engagement Maturity ModelDemand Metric
 
Formalizing the Sales Support Function How-To Guide
Formalizing the Sales Support Function How-To GuideFormalizing the Sales Support Function How-To Guide
Formalizing the Sales Support Function How-To GuideDemand Metric
 
How to Launch a Mobile App Guide How-To Guide
How to Launch a Mobile App Guide How-To GuideHow to Launch a Mobile App Guide How-To Guide
How to Launch a Mobile App Guide How-To GuideDemand Metric
 
Getting Started with Agile Marketing How-To Guide
Getting Started with Agile Marketing How-To GuideGetting Started with Agile Marketing How-To Guide
Getting Started with Agile Marketing How-To GuideDemand Metric
 
Entering the European Market Successfully How-To Guide
Entering the European Market Successfully How-To GuideEntering the European Market Successfully How-To Guide
Entering the European Market Successfully How-To GuideDemand Metric
 
Driving SEO with Press Releases How-To Guide
Driving SEO with Press Releases How-To GuideDriving SEO with Press Releases How-To Guide
Driving SEO with Press Releases How-To GuideDemand Metric
 
Calculating Customer Lifetime Value How-To Guide
Calculating Customer Lifetime Value How-To GuideCalculating Customer Lifetime Value How-To Guide
Calculating Customer Lifetime Value How-To GuideDemand Metric
 
Lead Scoring: Five Steps to Getting Started How-To Guide
Lead Scoring: Five Steps to Getting Started How-To GuideLead Scoring: Five Steps to Getting Started How-To Guide
Lead Scoring: Five Steps to Getting Started How-To GuideDemand Metric
 
Social CRM Best Practices How-To Guide
Social CRM Best Practices How-To GuideSocial CRM Best Practices How-To Guide
Social CRM Best Practices How-To GuideDemand Metric
 
Marketing Resource Management How-To Guide
Marketing Resource Management How-To GuideMarketing Resource Management How-To Guide
Marketing Resource Management How-To GuideDemand Metric
 

Más de Demand Metric (20)

The Impact of COVID-19 in B2B Marketing
The Impact of COVID-19 in B2B MarketingThe Impact of COVID-19 in B2B Marketing
The Impact of COVID-19 in B2B Marketing
 
Infographic Return Path Email Engagement
Infographic Return Path Email EngagementInfographic Return Path Email Engagement
Infographic Return Path Email Engagement
 
Infographic Vidyard Video Marketing 2018
Infographic Vidyard Video Marketing 2018Infographic Vidyard Video Marketing 2018
Infographic Vidyard Video Marketing 2018
 
Digital Marketing Best Practices Guide
Digital Marketing Best Practices GuideDigital Marketing Best Practices Guide
Digital Marketing Best Practices Guide
 
Content Marketing Solution Study
Content Marketing Solution StudyContent Marketing Solution Study
Content Marketing Solution Study
 
SEO Technology Overview
SEO Technology OverviewSEO Technology Overview
SEO Technology Overview
 
State of Video Marketing 2017
State of Video Marketing 2017State of Video Marketing 2017
State of Video Marketing 2017
 
Sales Enablement Maturity Model
Sales Enablement Maturity ModelSales Enablement Maturity Model
Sales Enablement Maturity Model
 
Public Relations Maturity Model
Public Relations Maturity ModelPublic Relations Maturity Model
Public Relations Maturity Model
 
Email Marketing Maturity Model
Email Marketing Maturity ModelEmail Marketing Maturity Model
Email Marketing Maturity Model
 
Customer Engagement Maturity Model
Customer Engagement Maturity ModelCustomer Engagement Maturity Model
Customer Engagement Maturity Model
 
Formalizing the Sales Support Function How-To Guide
Formalizing the Sales Support Function How-To GuideFormalizing the Sales Support Function How-To Guide
Formalizing the Sales Support Function How-To Guide
 
How to Launch a Mobile App Guide How-To Guide
How to Launch a Mobile App Guide How-To GuideHow to Launch a Mobile App Guide How-To Guide
How to Launch a Mobile App Guide How-To Guide
 
Getting Started with Agile Marketing How-To Guide
Getting Started with Agile Marketing How-To GuideGetting Started with Agile Marketing How-To Guide
Getting Started with Agile Marketing How-To Guide
 
Entering the European Market Successfully How-To Guide
Entering the European Market Successfully How-To GuideEntering the European Market Successfully How-To Guide
Entering the European Market Successfully How-To Guide
 
Driving SEO with Press Releases How-To Guide
Driving SEO with Press Releases How-To GuideDriving SEO with Press Releases How-To Guide
Driving SEO with Press Releases How-To Guide
 
Calculating Customer Lifetime Value How-To Guide
Calculating Customer Lifetime Value How-To GuideCalculating Customer Lifetime Value How-To Guide
Calculating Customer Lifetime Value How-To Guide
 
Lead Scoring: Five Steps to Getting Started How-To Guide
Lead Scoring: Five Steps to Getting Started How-To GuideLead Scoring: Five Steps to Getting Started How-To Guide
Lead Scoring: Five Steps to Getting Started How-To Guide
 
Social CRM Best Practices How-To Guide
Social CRM Best Practices How-To GuideSocial CRM Best Practices How-To Guide
Social CRM Best Practices How-To Guide
 
Marketing Resource Management How-To Guide
Marketing Resource Management How-To GuideMarketing Resource Management How-To Guide
Marketing Resource Management How-To Guide
 

Último

Lilac Illustrated Social Psychology Presentation.pptx
Lilac Illustrated Social Psychology Presentation.pptxLilac Illustrated Social Psychology Presentation.pptx
Lilac Illustrated Social Psychology Presentation.pptxABMWeaklings
 
8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,
8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,
8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,dollysharma2066
 
LC_YouSaidYes_NewBelieverBookletDone.pdf
LC_YouSaidYes_NewBelieverBookletDone.pdfLC_YouSaidYes_NewBelieverBookletDone.pdf
LC_YouSaidYes_NewBelieverBookletDone.pdfpastor83
 
CALL ON ➥8923113531 🔝Call Girls Adil Nagar Lucknow best Female service
CALL ON ➥8923113531 🔝Call Girls Adil Nagar Lucknow best Female serviceCALL ON ➥8923113531 🔝Call Girls Adil Nagar Lucknow best Female service
CALL ON ➥8923113531 🔝Call Girls Adil Nagar Lucknow best Female serviceanilsa9823
 
CALL ON ➥8923113531 🔝Call Girls Jankipuram Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Jankipuram Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Jankipuram Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Jankipuram Lucknow best sexual serviceanilsa9823
 
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...PsychicRuben LoveSpells
 
Call Girls Anjuna beach Mariott Resort ₰8588052666
Call Girls Anjuna beach Mariott Resort ₰8588052666Call Girls Anjuna beach Mariott Resort ₰8588052666
Call Girls Anjuna beach Mariott Resort ₰8588052666nishakur201
 
CALL ON ➥8923113531 🔝Call Girls Aliganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Aliganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Aliganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Aliganj Lucknow best sexual serviceanilsa9823
 
Top Rated Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Introducing to billionaire brain wave.pdf
Introducing to billionaire brain wave.pdfIntroducing to billionaire brain wave.pdf
Introducing to billionaire brain wave.pdfnoumannajam04
 
The Selfspace Journal Preview by Mindbrush
The Selfspace Journal Preview by MindbrushThe Selfspace Journal Preview by Mindbrush
The Selfspace Journal Preview by MindbrushShivain97
 
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)Delhi Call girls
 
Lucknow 💋 High Class Call Girls Lucknow 10k @ I'm VIP Independent Escorts Gir...
Lucknow 💋 High Class Call Girls Lucknow 10k @ I'm VIP Independent Escorts Gir...Lucknow 💋 High Class Call Girls Lucknow 10k @ I'm VIP Independent Escorts Gir...
Lucknow 💋 High Class Call Girls Lucknow 10k @ I'm VIP Independent Escorts Gir...anilsa9823
 
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)Delhi Call girls
 
9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls
9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls
9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girlsPooja Nehwal
 
CALL ON ➥8923113531 🔝Call Girls Mahanagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Mahanagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Mahanagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Mahanagar Lucknow best sexual serviceanilsa9823
 
CALL ON ➥8923113531 🔝Call Girls Rajajipuram Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Rajajipuram Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Rajajipuram Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Rajajipuram Lucknow best sexual serviceanilsa9823
 
call girls in candolim beach 9870370636] NORTH GOA ..
call girls in candolim beach 9870370636] NORTH GOA ..call girls in candolim beach 9870370636] NORTH GOA ..
call girls in candolim beach 9870370636] NORTH GOA ..nishakur201
 

Último (20)

Lilac Illustrated Social Psychology Presentation.pptx
Lilac Illustrated Social Psychology Presentation.pptxLilac Illustrated Social Psychology Presentation.pptx
Lilac Illustrated Social Psychology Presentation.pptx
 
8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,
8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,
8377087607 Full Enjoy @24/7-CLEAN-Call Girls In Chhatarpur,
 
LC_YouSaidYes_NewBelieverBookletDone.pdf
LC_YouSaidYes_NewBelieverBookletDone.pdfLC_YouSaidYes_NewBelieverBookletDone.pdf
LC_YouSaidYes_NewBelieverBookletDone.pdf
 
CALL ON ➥8923113531 🔝Call Girls Adil Nagar Lucknow best Female service
CALL ON ➥8923113531 🔝Call Girls Adil Nagar Lucknow best Female serviceCALL ON ➥8923113531 🔝Call Girls Adil Nagar Lucknow best Female service
CALL ON ➥8923113531 🔝Call Girls Adil Nagar Lucknow best Female service
 
CALL ON ➥8923113531 🔝Call Girls Jankipuram Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Jankipuram Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Jankipuram Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Jankipuram Lucknow best sexual service
 
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
 
Call Girls Anjuna beach Mariott Resort ₰8588052666
Call Girls Anjuna beach Mariott Resort ₰8588052666Call Girls Anjuna beach Mariott Resort ₰8588052666
Call Girls Anjuna beach Mariott Resort ₰8588052666
 
CALL ON ➥8923113531 🔝Call Girls Aliganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Aliganj Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Aliganj Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Aliganj Lucknow best sexual service
 
Top Rated Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Introducing to billionaire brain wave.pdf
Introducing to billionaire brain wave.pdfIntroducing to billionaire brain wave.pdf
Introducing to billionaire brain wave.pdf
 
(Aarini) Russian Call Girls Surat Call Now 8250077686 Surat Escorts 24x7
(Aarini) Russian Call Girls Surat Call Now 8250077686 Surat Escorts 24x7(Aarini) Russian Call Girls Surat Call Now 8250077686 Surat Escorts 24x7
(Aarini) Russian Call Girls Surat Call Now 8250077686 Surat Escorts 24x7
 
The Selfspace Journal Preview by Mindbrush
The Selfspace Journal Preview by MindbrushThe Selfspace Journal Preview by Mindbrush
The Selfspace Journal Preview by Mindbrush
 
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
 
(Anamika) VIP Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts ...
(Anamika) VIP Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts ...(Anamika) VIP Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts ...
(Anamika) VIP Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts ...
 
Lucknow 💋 High Class Call Girls Lucknow 10k @ I'm VIP Independent Escorts Gir...
Lucknow 💋 High Class Call Girls Lucknow 10k @ I'm VIP Independent Escorts Gir...Lucknow 💋 High Class Call Girls Lucknow 10k @ I'm VIP Independent Escorts Gir...
Lucknow 💋 High Class Call Girls Lucknow 10k @ I'm VIP Independent Escorts Gir...
 
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
 
9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls
9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls
9892124323, Call Girls in mumbai, Vashi Call Girls , Kurla Call girls
 
CALL ON ➥8923113531 🔝Call Girls Mahanagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Mahanagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Mahanagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Mahanagar Lucknow best sexual service
 
CALL ON ➥8923113531 🔝Call Girls Rajajipuram Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Rajajipuram Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Rajajipuram Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Rajajipuram Lucknow best sexual service
 
call girls in candolim beach 9870370636] NORTH GOA ..
call girls in candolim beach 9870370636] NORTH GOA ..call girls in candolim beach 9870370636] NORTH GOA ..
call girls in candolim beach 9870370636] NORTH GOA ..
 

Project Work Breakdown Structure

  • 1. Project Work Breakdown Structure Purpose The purpose of this tool is to provide guidance with breaking down the project into manageable components called tasks. For each Task, estimate how long the activity will take to complete; document which resources will be responsible for doing the work; and determine the costs involved. Scope This tool will provide a framework for organizing tasks into the 5 project stages: 1. INITIATION – involves all pre-project activities such as getting approval. 2. PLANNING – developing Project Charter, and lining up required resources. 3. EXECUTION – working through each task to achieve agreed deliverables. 4. CONTROL – ensuing requirements are being met as the project progresses. 5. CLOSURE – completing Post-Project Evaluation to document lessons learned. Project Information Project Title: Date: Project Manager: Project Sponsor:
  • 2. Project Work Breakdown Structure Stage Task Time (hours) Responsibility Costs 1.0 Initiation 1.1 Project Request 2 Project Sponsor 1.2 Project Approval .5 Steering Committee 2.0 Planning 2.1 Project Charter 2 Project Manager
  • 3. 3.0 Execution
  • 4. 4.0 Control 5.0 Closure 5.1 Post-Project Evaluation 4 Project Team