1. DON L. EARLY
Project Engineer
Project Responsibilities Years Experience
37
• Control, processing, and distribution of all project
Areas of Expertise
documentation (contract drawings, submittals, contract
• Subcontractor Management
documents, other technical data) • Project Documentation
• Records and distributes any changes • Schedule Adherence
• Reviews shop drawings for conformance to specifications • Cost Control
• Prepares or reviews as-built drawings • Project Closeout
• Construction Supervision
• Assembles equipment operation and maintenance manuals
• Hospitality
• Assists the project manager with cost control, verification of
trade/sub contractors invoices and monitors the schedule Education
• Assists the project manager with coordination of the trade/sub • A.A., Business
contractors South Coast College, Costa Mesa,
California
•
• Coursework in Computer Science
National University, Sacramento,
Project Experience California
W Scottsdale Hotel & Residences Licensing/Training/
A 300,000 SF, seven-story hotel/residential building featuring 225 guestrooms, 18 Professional Affiliations
luxury condominiums, ballrooms, spa, pool, restaurant and two bars. • California Licensed General
Scottsdale, AZ Contractor 1977
• California State Licensed
Na Hale O’Makena Asbestos Abatement Contractor
A four-story, 150,000 SF ocean front condominium complex featuring 30 high • Hawaii Licensed General
end units. Contractor 1998
Maui, HI • Hawaii Licensed Electrical
Contractor 2000
Westin Ka’anapali Ocean Resort Villas North • Hawaii Licensed Plumbing
A six-story, 500,000 SF, 508-room ocean front resort. Contractor 2000
Maui, HI • Certified Plant Engineer - AFE
1985
Westin Ka’anapali Ocean Resort Villas • Medic First Aid Instructor -
A six-story, 400,000 SF, 354-room ocean front resort. PADI 1985
Maui, HI • Master SCUBA Instructor - PADI
1980
Maynard H. Jackson Jr. International Terminal • Cost Management with Prolog
A 1,430,000 SF terminal that includes new gates, custom offices, APM station, Manager
baggage handling system, parking structure, elevated roadways and APM train/ • Purchasing with Prolog Manager
utility connector to existing Concourse E. Gate, baggage, fuel pit and jet bridge
modifications at existing Concourse E.
Atlanta, GA
2. DON L. EARLY
Project Engineer
1 pt. black frame
(continued)
with rounded
corners
Maynard H. Jackson Jr. International Terminal • LEED Accredited Professional -
A 1,430,000 SF terminal that includes new gates, custom offices, APM station, U.S. Green Building Council
baggage handling system, parking structure, elevated roadways and APM train/
utility connector to existing Concourse E. Gate, baggage, fuel pit and jet bridge Awards
modifications at existing Concourse E. •
Atlanta, GA
Custom Homes
Constructed multiple million dollar plus custom homes.
Maui, HI
Quantum Group
Managed complete facility engineering requirements and administered safety
programs for expansive scientific laboratories and production facilities.
San Diego, CA
Idaho State Capitol Restoration
A 257,000 SF restoration and renovation of historic State Capitol building
originally constructed in 1920. Major elements of the scope of work included
restoration of exterior windows, historic restoration of spaces, structural
modifications, installation of new HVAC, installation of new sprinkler and fire
alarm systems, installation of advanced technology infrastructure, upgrade
of electrical and power systems and correction of life safety and accessibility
deficiencies.
Boise, ID