Preliminary Findings and Conclusions of the Mid-term Project Evaluation by
Christian Bugnion, Subur Consulting S.L., Team Leader
Dr. Nizam Al-Husainy, National consultant
www.suburconsulting.es
Dhaka, 16 August 2014
AID EFFECTIVENESS PROJECT
Mid-term Evaluation Preliminary Findings
Implemented by the ERD, MoF
With technical and financial support by UNDP
and co-funded by DFID, DANIDA, Australia
• Feedback and accountability to stakeholders: Findings, conclusions and
recommendations;
• Inform about programme performance: relevance, efficiency,
performance, effectiveness, ownership, and sustainability;
• Identify good practice and lessons, looking at the achievements to date;
• Make forward-looking recommendations taking into consideration the
remaining two years time-frame of the Project, but also the wider
Development Effectiveness Agenda
Presentation objectives
Mix-methods but primarily qualitative analysis based on the following:
• Documentary review of project documents and updates received during the in-
country mission
• Semi-structured individual interviews with (20) key informants from the following
stakeholder groups:
A. GoB (4 ERD, 1 Cabinet, 1 MP, 1 Planning Commission)
B. UNDP (2 ACD, 1 CD, 1 AE specialist)
C. AE Unit (1 NPM, 1 DPM, M&E specialist, ICT Specialist, Aid Specialist) and a group
discussion jointly with UNDP
D. Development Partners: DFID (1), DANIDA (1)
E. Civil society (2), Ernst and Young (1)
• One field visit to interview participants from AE awareness workshop given at
district level (Moulvbazar) by a member of the evaluation team
METHODOLOGY :
• Relevance in responding to identified needs
• Efficiency of the project (use of resources)
• Performance of the project including design issues and implementation
• Effectiveness in achieving project results
• Ownership (degree to which ERD is committed to the process)
• Sustainability after the end of the project
EVALUATION CRITERIA:
• Sunday 3rd August 2013 : Start review of documents for the MTE and
consultations between the AE team and the national consultant and field
visit
• Sunday 10 August 2014: arrival of Evaluation Team leader and start of
formal key informant interviews, including joint AE team and UNDP joint
meetings.
• Key informant interviews from 10th to 14th August 2014
• 15th August 2014: review and analysis of data and notes and preparation
of the presentation
• 16th August 2014: presentation to primary stakeholders of the preliminary
findings, conclusions and recommendations
• End August 2014: submission of draft evaluation report
Evaluation Agenda
Evaluation Preliminary Findings, Conclusions
and Recommendations
• The project addresses the issue of Aid Effectiveness, a wider unit
of analysis that cannot be achieved by a limited intervention such
as the AE project in its limited time-frame. However as the AE
project stems from the highest level of ERD authority, it is clearly
responsive to the needs of the government and in line with the
current debate on what is now called Development Effectiveness.
• GoB planning is based on the current 6th 5-year plan (p. 239) and
AE contributes to shaping future planning and partnership
processes (such as JCS 2010-2014)
Relevance
• The project has known a number of delays both linked to procurement
and human resource constraints and limitations from both UNDP and
GoB’s side. In addition the year prior to the election more than half a
year of work was lost given political unrest and violent strikes.
• The project is not particularly efficient as delivery rates varied per year
and some activities had to be postponed or cancelled or changed in
light of the context. Late start also means low initial delivery : 47,5% of
expenditures (US$ 1.46 mio or 32.6% of initial budget and 47.5% of
current funds available). BUT delivery ≠ effectiveness!!
Efficiency
BUDGET AND DELIVERY
Need to understand the context and environment of the Project – a
number of factors led to delay – enabling factor JCS 2010-2014
• 2011 – late recruitment and start of the project delayed to 2012
• Feb. 2012: change of NPD (15 Feb. 2012) – staffing and international staffing
gradually falling in place – TOR for studies/assessment - Holding of awareness
raising activities at Dhaka and Division levels – support to LCG/WG -
Cambodia Aid database identified as model – Development of AIMS
• 213 – part of the year lost strikes and security situation - Visit to VN for aid
policy, capacity assessment of ERD
• 2014 – Beta version of AIMS, final E&Y report ERD capacity assessment, aid
policy outline established, IMC set-up
Performance
• Reasonable performance given the constraints – could have been
better, but could also have been worse
• Essential characteristics: low efficiency in part cause no clear road map
to guide the vision of the AE (insufficient coord. and information sharing
between GoB and UNDP on modalities and incremental approach and
theory of change missing in the design) by also by lack of an enabling
environment (e.g. initially low awareness of the AE, purpose of AE, no
clear understanding of AE, no previous preparation within ERD or GoB
except for 5 YP and JCS, so AE new and not streamlined)
• Better reporting on results necessary, low RBM
Performance
• Despite average performance, project rating from the key informant interviews is: 4 out of 5
(1 being lowest, 5 being highest) regarding the effectiveness = Good.
• This is based on the following:
A. Awareness within GoB (high-level) of the importance of the AE agenda
B. Development of the AIMS Database (win/win for GoB and DPs) essential to provide
quality data on aid flows
C. On-going process to develop an aid policy (outline ready and objective to finalize the
policy by end of 2014)
D. Revitalisation of the LCG and WGs
E. Participation in international events (feeds national ownership and 5YP and JCS so
multiplier effect)
F. Ownership trough creation of ERD AE Wing and announced co-funding from GoB (leading
to sustainability)
G. Inclusiveness of the consultation process (NGOs) but more can be done (Parliament,
media, etc.)
Effectiveness
• Rating Grid (1 lowest to 5 highest)
Effectiveness
E
R
D
2UNDP3 UNDP4ERD5 CS6 DP7 DP8 AE9 GoB12 AE14 CS15 AVG
4 4 4 4 3,5 4 4 4 4 4,5 4 4
• The development of an AIMS database is a key achievement. Actually
not yet live on line, but potential for win/win provided GoB and DPs are
committed to its use
• Will contribute to aid transparency and provide credible evidence and
management information regarding aid flows to all authorized
stakeholders
• Slow in its shaping as no clear technical specs set out from the onset
(tweaking of Cambodia’s model based on cost-effectiveness
considerations)
RESULTS PER PROJECT COMPONENT – 1 AIMS
• Many awareness raising activities undertaken but wider inclusiveness and
participation required (civil society, NGO, Parliament, South-South Coop)
• Established a capacity assessment ERD wide but will not be able to generate
evidence by the end of the project: at best some recommendations will be
implemented but remains too soon to affect overall ERD aid management
capacity
• Questionable if this is correct entry-point (ERD-wide assessment) rather than
more limited but incremental approach to capacity development (e.g.
selected wings and future AE Wing)
• Other LM capacity development envisaged but not materialised (although CA
are being foreseen over the rest of the project – TOR developed)
COMPONENT 2 : ERD Aid management capacity
• Very positive feedback on the dynamics and revitalisation of the
structures and positive appraisal of its performance – of course varies
from WG to WG.
• Unclear follow-up of key findings and recommendations stemming from
WGs
• More monitoring efforts and RBM into facilitating the process, and also
should be under ownership of ERD when project ends (LCG Secretariat
within ERD Wing? Currently all done by AE Unit – substitution?)
COMPONENT 3 : LCG/WG mechanisms
• Slow process and back-and-forth movement to the process. Initially unclear
level of commitment to developing an AP – current process now based on VN
experience requires technical support (int. and nat. consultants hired) and
wide consultations with civil society, parliament, private sector, etc.
• Draft outline ready
• Inter-ministerial committee tasked with follow-up
• Again initial lack of reference or preparation for taking up the aid policy
development process (hence visits and examples from other countries)
• Seen as critical to demonstrate ownership and leadership from GoB and
create a coherent framework for DP assistance
COMPONENT 4: AID POLICY
• Participation in international events and support of DPs fuels national
ownership
• ERD S and CS and other high-level officials committed to AE agenda and
the development of AE/DE Wing in ERD
• Ownership ≠ Leadership – GoB committed to both but technical support
from DPs necessary (such as UNDP)
• Long-term process that requires a WoG approach beyond the life of the
project
Ownership
• Seems guaranteed through ERD AE/DE Wing creation
• Considering also GoB co-funding to the Project (last SC)
• Full operational AIMS (likely by end of project)
• Approval and implementation of the Aid Policy (likely by end of the
project)
• Gradual merging of AEU into ERD AE Wing with hand-over and training
Sustainability
1. The project has still two years to complete its objectives (June 2016)
2. Important milestones have been achieved so far (AIMS, Draft outline of AP,
support to LCG/WG, develop capacity assessment). Project outputs are
nonetheless an essential contribution to the outcomes, but the outcomes are yet
to be appraised.
3.AE agenda (or DE agenda) cannot be accomplished over the short time-frame
with a single small project. The AE project is the initial building block from which
AE (or DE) efforts must be mainstreamed in GoB with the support of DP. Long-
term planning and commitment from both GoB and DPs to this effect is essential
(incremental approach of 15 years or more).
4. Opportunity for synergies and linkages exist within the AE agenda that are
unexploited. Capacity Development should be a harmonized programme for GoB
under the leadership of a DP (UNDP) and inclusive of all DP to work across sectors
CONCLUSIONS
5. Capacity of other LM not yet started, could be envisaged outside of the
project (under a Capacity Development Programme, see point 4.
6. ERD personnel capacity development needs to be given priority with
adequate hand-over from AEU to new ERD wing over the next two years
7. Longer-term support requires a long-term roadmap for how and where
support will be ensured from DPs over the next fifteen years as it is needed
to ensure mainstreaming of leadership and ownership of AE into GoB
8. More attention needed to show results and RBM value – trainings to ERD
CONCLUSIONS
• Importance of giving sufficient time to create enabling conditions for any change
process. Given that AE is a long-time process, the creation of a critical mass of
knowledgeable and committed partners is a pre-condition for success (e.g.
importance of awareness raising and dissemination)
• AE requires a specific communication strategy to enable to engage the various
partners and visualize stakeholders’ buy-in and gains.
• Difficulty to report on achievements given untangible nature of some processes.
Hence the importance of a robust RBM in the Project design to inform proper
Monitoring and Evaluation and a proper Results Framework mindful of the hierarchy
of results.
• Importance of leveraging national leadership and ownership through international
exposure and participation in regional initiatives (Post Busan Conference, APD,
etc.) – so capacity to grasp emerging opportunities beyond the prodoc.
Lessons Learnt
1. Continue and consolidate the project achievements, particularly:
▫ Consolidate and roll-out functional AIMS to be used by GoB and all DP including
UNDP in the first phase to show commitment to the process
▫ Continue the process and provision of support to the development of the Aid
Policy and ensure its finalisation
▫ Continue providing support to ERD capacity development and ensure hand-
over, training and coaching of the ERD new DE Wing
▫ Continue to support participation in LCG/WG structure and participation in
international events
2. Capacity development for development effectiveness is not limited to ERD or
specific LM. A harmonized approach amongst DPs is required for an effective
WoG capacity development programme under the aegis of the UNDP. This
global and harmonized CD programme should be inclusive of all CD projects and
initiatives but provide an overall framework for actual results of the CD
process.
RECOMMENDATIONS
3. The value of the inclusion of the Capacity Assessment foreseen amongst
now 5 LM under the AE project is not evident for this project and should be
dropped and included in the wider CD programme mentioned in the
previous point to ensure no duplication of other DP efforts.
4. Develop a fifteen year road-map and strategy for achieving mainstreaming
of AE/DE into WoG with commitment and support from DPs and
incremental approach from ERD to WoG.
5. Plan incremental developments on the basis of achievements and
synchronized with the National FYPs
6. Improve RBM knowledge and capacity through commissioning JOINT
EVALUATIONS of future AE/DE interventions
RECOMMENDATIONS (cont.)
7. Develop a monitoring mechanism for LCG/WG to ensure that key issues are
being addressed (high number of issues do not appear to be followed up or
no evidence of referral). Important issues raised in LCG and WG should lead
to action. The ERD owned LCG Secretariat needs to be properly staffed and
equipped for this function.
8. UNDP and ERD need to develop jointly a comprehensive communication
strategy for AE/DE that can be used for addressing various stakeholders
(media, CS, Parliament) based on a shared understanding of the AE/DE
agenda, including at field level (sub-district).
9. High visibility needs to be given to achievements (when AIMS will be used
and the first analytical report prepared, when the NAP will be officially
adopted, etc.) to contribute to leadership and ownership.
RECOMMENDATIONS (cont.)
Questions or comments welcome
Thank you very much!
Christian Bugnion de Moreta, Team Leader
Nizam Al-Husainy, National Consultant
www.suburconsulting.es

Más contenido relacionado

La actualidad más candente

Project Planning and Management (Presentation)
Project Planning and Management (Presentation)Project Planning and Management (Presentation)
Project Planning and Management (Presentation)
Trokon Bryant
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
rexcris
 
C8 logical framework approach (lfa)
C8 logical framework approach (lfa)C8 logical framework approach (lfa)
C8 logical framework approach (lfa)
ocasiconference
 
Framework for Analyzing Public Investment Management
Framework for Analyzing Public Investment ManagementFramework for Analyzing Public Investment Management
Framework for Analyzing Public Investment Management
icgfmconference
 
Introduction DM 211 Project Development and Management
Introduction DM 211 Project Development and ManagementIntroduction DM 211 Project Development and Management
Introduction DM 211 Project Development and Management
Jo Balucanag - Bitonio
 
Planning And Project Management
Planning And Project ManagementPlanning And Project Management
Planning And Project Management
ST. JAMES COLLEGE
 
July 2013 strategic projects monthly review
July 2013   strategic projects monthly reviewJuly 2013   strategic projects monthly review
July 2013 strategic projects monthly review
647435
 

La actualidad más candente (20)

Project Planning and Management
Project Planning and Management Project Planning and Management
Project Planning and Management
 
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAKLogical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
 
Introducing the National Adaptation Plans technical guidelines from the UNFCC...
Introducing the National Adaptation Plans technical guidelines from the UNFCC...Introducing the National Adaptation Plans technical guidelines from the UNFCC...
Introducing the National Adaptation Plans technical guidelines from the UNFCC...
 
Assessing progress made towards shared agricultural transformation objectives...
Assessing progress made towards shared agricultural transformation objectives...Assessing progress made towards shared agricultural transformation objectives...
Assessing progress made towards shared agricultural transformation objectives...
 
Project Planning and Management (Presentation)
Project Planning and Management (Presentation)Project Planning and Management (Presentation)
Project Planning and Management (Presentation)
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
 
C8 logical framework approach (lfa)
C8 logical framework approach (lfa)C8 logical framework approach (lfa)
C8 logical framework approach (lfa)
 
Public Investment Management in Brief.
Public Investment Management in Brief.Public Investment Management in Brief.
Public Investment Management in Brief.
 
Framework for Analyzing Public Investment Management
Framework for Analyzing Public Investment ManagementFramework for Analyzing Public Investment Management
Framework for Analyzing Public Investment Management
 
Programme Evaluation training slides Osvaldo Nestor Feinstein
Programme Evaluation training slides Osvaldo Nestor FeinsteinProgramme Evaluation training slides Osvaldo Nestor Feinstein
Programme Evaluation training slides Osvaldo Nestor Feinstein
 
Introduction DM 211 Project Development and Management
Introduction DM 211 Project Development and ManagementIntroduction DM 211 Project Development and Management
Introduction DM 211 Project Development and Management
 
Logical framework
Logical  frameworkLogical  framework
Logical framework
 
Plan Implementation
Plan ImplementationPlan Implementation
Plan Implementation
 
Napolcom SWOT Matrix
Napolcom SWOT MatrixNapolcom SWOT Matrix
Napolcom SWOT Matrix
 
Planning And Project Management
Planning And Project ManagementPlanning And Project Management
Planning And Project Management
 
July 2013 strategic projects monthly review
July 2013   strategic projects monthly reviewJuly 2013   strategic projects monthly review
July 2013 strategic projects monthly review
 
The Logical Framework Matrix Approach
The Logical Framework Matrix ApproachThe Logical Framework Matrix Approach
The Logical Framework Matrix Approach
 
Understanding the Review Criteria and Adaptation Fund Request for Funding Pro...
Understanding the Review Criteria and Adaptation Fund Request for Funding Pro...Understanding the Review Criteria and Adaptation Fund Request for Funding Pro...
Understanding the Review Criteria and Adaptation Fund Request for Funding Pro...
 
PIP overview presentation
PIP overview presentationPIP overview presentation
PIP overview presentation
 
3a.2 GCF Overview
3a.2 GCF Overview3a.2 GCF Overview
3a.2 GCF Overview
 

Destacado

Bangladesh CASE STUDY draft for Bangladesh team review_Nizam
Bangladesh CASE STUDY  draft for Bangladesh team review_NizamBangladesh CASE STUDY  draft for Bangladesh team review_Nizam
Bangladesh CASE STUDY draft for Bangladesh team review_Nizam
Nizam Al-Hussainy
 
mapping of DRR for UN Women, Taj_MU-28 Nov
mapping of DRR for UN Women, Taj_MU-28 Novmapping of DRR for UN Women, Taj_MU-28 Nov
mapping of DRR for UN Women, Taj_MU-28 Nov
Nizam Al-Hussainy
 
Landell Mills Assessment Scoping Mission for DFID B Feb2015 final
Landell Mills Assessment  Scoping Mission for DFID B Feb2015 finalLandell Mills Assessment  Scoping Mission for DFID B Feb2015 final
Landell Mills Assessment Scoping Mission for DFID B Feb2015 final
Nizam Al-Hussainy
 
HS project_evaluation report-DEC
HS project_evaluation report-DECHS project_evaluation report-DEC
HS project_evaluation report-DEC
Nizam Al-Hussainy
 
DRR prodoc -2 for UN women -final draft
DRR prodoc -2 for UN women -final draftDRR prodoc -2 for UN women -final draft
DRR prodoc -2 for UN women -final draft
Nizam Al-Hussainy
 
Juba training report Document
Juba training report DocumentJuba training report Document
Juba training report Document
Nizam Al-Hussainy
 
Gender & DDR _Work plan and implementation Matrix
Gender & DDR _Work plan and implementation MatrixGender & DDR _Work plan and implementation Matrix
Gender & DDR _Work plan and implementation Matrix
Nizam Al-Hussainy
 
Georgia_-_FAO_Report_-_DFD-G-00-08000311-00
Georgia_-_FAO_Report_-_DFD-G-00-08000311-00Georgia_-_FAO_Report_-_DFD-G-00-08000311-00
Georgia_-_FAO_Report_-_DFD-G-00-08000311-00
Nizam Al-Hussainy
 
Final_Report of MTR of CDMP 2013
Final_Report of MTR of CDMP 2013Final_Report of MTR of CDMP 2013
Final_Report of MTR of CDMP 2013
Nizam Al-Hussainy
 
BDG_UNDEF_REVISED_FB 17.01 11
BDG_UNDEF_REVISED_FB 17.01 11BDG_UNDEF_REVISED_FB 17.01 11
BDG_UNDEF_REVISED_FB 17.01 11
Nizam Al-Hussainy
 
PU_EvaluationReport2007Final2
PU_EvaluationReport2007Final2PU_EvaluationReport2007Final2
PU_EvaluationReport2007Final2
Nizam Al-Hussainy
 
TE_CBACCCF_Final EvaluationReport_18022016
TE_CBACCCF_Final EvaluationReport_18022016TE_CBACCCF_Final EvaluationReport_18022016
TE_CBACCCF_Final EvaluationReport_18022016
Nizam Al-Hussainy
 
Final Evaluation of the BNHRC 11 Mar 2015
Final Evaluation of the BNHRC 11 Mar 2015Final Evaluation of the BNHRC 11 Mar 2015
Final Evaluation of the BNHRC 11 Mar 2015
Nizam Al-Hussainy
 
Revised REPORT_Nizam _ 07 March 2016
Revised REPORT_Nizam _ 07 March 2016Revised REPORT_Nizam _ 07 March 2016
Revised REPORT_Nizam _ 07 March 2016
Nizam Al-Hussainy
 
Action Plan for further engendering DRR through REACT operations - re-checked
Action Plan for further engendering DRR through REACT  operations - re-checkedAction Plan for further engendering DRR through REACT  operations - re-checked
Action Plan for further engendering DRR through REACT operations - re-checked
Nizam Al-Hussainy
 
AEP-UNDP_ERD_final MTE report 070914
 AEP-UNDP_ERD_final MTE report 070914 AEP-UNDP_ERD_final MTE report 070914
AEP-UNDP_ERD_final MTE report 070914
Nizam Al-Hussainy
 
Gender Policy for BP- Final-Revised_husainy
Gender Policy  for BP- Final-Revised_husainyGender Policy  for BP- Final-Revised_husainy
Gender Policy for BP- Final-Revised_husainy
Nizam Al-Hussainy
 

Destacado (20)

Bangladesh CASE STUDY draft for Bangladesh team review_Nizam
Bangladesh CASE STUDY  draft for Bangladesh team review_NizamBangladesh CASE STUDY  draft for Bangladesh team review_Nizam
Bangladesh CASE STUDY draft for Bangladesh team review_Nizam
 
mapping of DRR for UN Women, Taj_MU-28 Nov
mapping of DRR for UN Women, Taj_MU-28 Novmapping of DRR for UN Women, Taj_MU-28 Nov
mapping of DRR for UN Women, Taj_MU-28 Nov
 
Landell Mills Assessment Scoping Mission for DFID B Feb2015 final
Landell Mills Assessment  Scoping Mission for DFID B Feb2015 finalLandell Mills Assessment  Scoping Mission for DFID B Feb2015 final
Landell Mills Assessment Scoping Mission for DFID B Feb2015 final
 
HS project_evaluation report-DEC
HS project_evaluation report-DECHS project_evaluation report-DEC
HS project_evaluation report-DEC
 
DRR prodoc -2 for UN women -final draft
DRR prodoc -2 for UN women -final draftDRR prodoc -2 for UN women -final draft
DRR prodoc -2 for UN women -final draft
 
Juba training report Document
Juba training report DocumentJuba training report Document
Juba training report Document
 
Gender & DDR _Work plan and implementation Matrix
Gender & DDR _Work plan and implementation MatrixGender & DDR _Work plan and implementation Matrix
Gender & DDR _Work plan and implementation Matrix
 
Georgia_-_FAO_Report_-_DFD-G-00-08000311-00
Georgia_-_FAO_Report_-_DFD-G-00-08000311-00Georgia_-_FAO_Report_-_DFD-G-00-08000311-00
Georgia_-_FAO_Report_-_DFD-G-00-08000311-00
 
Final_Report of MTR of CDMP 2013
Final_Report of MTR of CDMP 2013Final_Report of MTR of CDMP 2013
Final_Report of MTR of CDMP 2013
 
BDG_UNDEF_REVISED_FB 17.01 11
BDG_UNDEF_REVISED_FB 17.01 11BDG_UNDEF_REVISED_FB 17.01 11
BDG_UNDEF_REVISED_FB 17.01 11
 
PU_EvaluationReport2007Final2
PU_EvaluationReport2007Final2PU_EvaluationReport2007Final2
PU_EvaluationReport2007Final2
 
TE_CBACCCF_Final EvaluationReport_18022016
TE_CBACCCF_Final EvaluationReport_18022016TE_CBACCCF_Final EvaluationReport_18022016
TE_CBACCCF_Final EvaluationReport_18022016
 
CV Nizamuddin Al-Hussainy
CV Nizamuddin Al-HussainyCV Nizamuddin Al-Hussainy
CV Nizamuddin Al-Hussainy
 
Final Evaluation of the BNHRC 11 Mar 2015
Final Evaluation of the BNHRC 11 Mar 2015Final Evaluation of the BNHRC 11 Mar 2015
Final Evaluation of the BNHRC 11 Mar 2015
 
Revised REPORT_Nizam _ 07 March 2016
Revised REPORT_Nizam _ 07 March 2016Revised REPORT_Nizam _ 07 March 2016
Revised REPORT_Nizam _ 07 March 2016
 
Action Plan for further engendering DRR through REACT operations - re-checked
Action Plan for further engendering DRR through REACT  operations - re-checkedAction Plan for further engendering DRR through REACT  operations - re-checked
Action Plan for further engendering DRR through REACT operations - re-checked
 
AEP-UNDP_ERD_final MTE report 070914
 AEP-UNDP_ERD_final MTE report 070914 AEP-UNDP_ERD_final MTE report 070914
AEP-UNDP_ERD_final MTE report 070914
 
Gender Policy for BP- Final-Revised_husainy
Gender Policy  for BP- Final-Revised_husainyGender Policy  for BP- Final-Revised_husainy
Gender Policy for BP- Final-Revised_husainy
 
Gender-Assessment
Gender-AssessmentGender-Assessment
Gender-Assessment
 
ELY-keskuksen kansainvälistymispalvelut
ELY-keskuksen kansainvälistymispalvelut ELY-keskuksen kansainvälistymispalvelut
ELY-keskuksen kansainvälistymispalvelut
 

Similar a Dhaka revpres160814

PA- 210-G5-Preparing of Project Proposal and other Related needs for the Impl...
PA- 210-G5-Preparing of Project Proposal and other Related needs for the Impl...PA- 210-G5-Preparing of Project Proposal and other Related needs for the Impl...
PA- 210-G5-Preparing of Project Proposal and other Related needs for the Impl...
MarivicPenarubia1
 
Cn mo11 2_alt_status_and_planning_final_hessel
Cn mo11 2_alt_status_and_planning_final_hesselCn mo11 2_alt_status_and_planning_final_hessel
Cn mo11 2_alt_status_and_planning_final_hessel
Erik van den Elsen
 
Gfatm 081208 partnership forum arnsa pres v9
Gfatm 081208 partnership forum arnsa pres v9Gfatm 081208 partnership forum arnsa pres v9
Gfatm 081208 partnership forum arnsa pres v9
Mohamed Rafique
 
Final outline plan for webinar evaluation and impact assessment mof 2004
Final outline plan for webinar evaluation and impact assessment mof 2004   Final outline plan for webinar evaluation and impact assessment mof 2004
Final outline plan for webinar evaluation and impact assessment mof 2004
EricaPackingtonIOD
 
2014.11.28 - NAEC Group Meeting_Lamia Kamal-Chaoui
2014.11.28 - NAEC Group Meeting_Lamia Kamal-Chaoui2014.11.28 - NAEC Group Meeting_Lamia Kamal-Chaoui
2014.11.28 - NAEC Group Meeting_Lamia Kamal-Chaoui
OECD_NAEC
 

Similar a Dhaka revpres160814 (20)

E-PASS Inception Project Management and Oversight
E-PASS Inception Project Management and OversightE-PASS Inception Project Management and Oversight
E-PASS Inception Project Management and Oversight
 
TOR for EBA MTR 2014.pdf
TOR for EBA MTR 2014.pdfTOR for EBA MTR 2014.pdf
TOR for EBA MTR 2014.pdf
 
PA- 210-G5-Preparing of Project Proposal and other Related needs for the Impl...
PA- 210-G5-Preparing of Project Proposal and other Related needs for the Impl...PA- 210-G5-Preparing of Project Proposal and other Related needs for the Impl...
PA- 210-G5-Preparing of Project Proposal and other Related needs for the Impl...
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taibur
 
Pipeline_Management_2014_06.pptx
Pipeline_Management_2014_06.pptxPipeline_Management_2014_06.pptx
Pipeline_Management_2014_06.pptx
 
GF TADs Seminar On National Project Proposals
GF TADs Seminar On National Project ProposalsGF TADs Seminar On National Project Proposals
GF TADs Seminar On National Project Proposals
 
Cn mo11 2_alt_status_and_planning_final_hessel
Cn mo11 2_alt_status_and_planning_final_hesselCn mo11 2_alt_status_and_planning_final_hessel
Cn mo11 2_alt_status_and_planning_final_hessel
 
Gfatm 081208 partnership forum arnsa pres v9
Gfatm 081208 partnership forum arnsa pres v9Gfatm 081208 partnership forum arnsa pres v9
Gfatm 081208 partnership forum arnsa pres v9
 
Findings Relevant to the GEF IW Learn Confernce
Findings Relevant to the GEF IW Learn ConfernceFindings Relevant to the GEF IW Learn Confernce
Findings Relevant to the GEF IW Learn Confernce
 
Livestock and Fish monitoring, evaluation and learning framework
Livestock and Fish monitoring, evaluation and learning frameworkLivestock and Fish monitoring, evaluation and learning framework
Livestock and Fish monitoring, evaluation and learning framework
 
Investment planning and public investment plans: Inssues and Best Practices
Investment planning and public investment plans: Inssues and Best PracticesInvestment planning and public investment plans: Inssues and Best Practices
Investment planning and public investment plans: Inssues and Best Practices
 
Presentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptxPresentation on manual PSDP in Pakistan.pptx
Presentation on manual PSDP in Pakistan.pptx
 
Concepts in Participatory Monitoring and Evaluation
Concepts in Participatory Monitoring and Evaluation Concepts in Participatory Monitoring and Evaluation
Concepts in Participatory Monitoring and Evaluation
 
Final outline plan for webinar evaluation and impact assessment mof 2004
Final outline plan for webinar evaluation and impact assessment mof 2004   Final outline plan for webinar evaluation and impact assessment mof 2004
Final outline plan for webinar evaluation and impact assessment mof 2004
 
Writing evaluation report of a project
Writing evaluation report of a projectWriting evaluation report of a project
Writing evaluation report of a project
 
Regional aid for trade 'effectiveness' and corridor approaches
Regional aid for trade 'effectiveness' and corridor approachesRegional aid for trade 'effectiveness' and corridor approaches
Regional aid for trade 'effectiveness' and corridor approaches
 
CGIAR Site Integration: Site Integration Plans – next steps
CGIAR Site Integration: Site Integration Plans – next stepsCGIAR Site Integration: Site Integration Plans – next steps
CGIAR Site Integration: Site Integration Plans – next steps
 
Improving JSR Practices at Country Level: Achievements and Gaps in Eastern an...
Improving JSR Practices at Country Level: Achievements and Gaps in Eastern an...Improving JSR Practices at Country Level: Achievements and Gaps in Eastern an...
Improving JSR Practices at Country Level: Achievements and Gaps in Eastern an...
 
Project Cycle Management WG5.ppt
Project Cycle Management WG5.pptProject Cycle Management WG5.ppt
Project Cycle Management WG5.ppt
 
2014.11.28 - NAEC Group Meeting_Lamia Kamal-Chaoui
2014.11.28 - NAEC Group Meeting_Lamia Kamal-Chaoui2014.11.28 - NAEC Group Meeting_Lamia Kamal-Chaoui
2014.11.28 - NAEC Group Meeting_Lamia Kamal-Chaoui
 

Más de Nizam Al-Hussainy

NRP_Document_Anand_24Oct16 (1)
NRP_Document_Anand_24Oct16 (1)NRP_Document_Anand_24Oct16 (1)
NRP_Document_Anand_24Oct16 (1)
Nizam Al-Hussainy
 
DRR prodoc -2 for UN women -final draft
DRR prodoc -2 for UN women -final draftDRR prodoc -2 for UN women -final draft
DRR prodoc -2 for UN women -final draft
Nizam Al-Hussainy
 
gender prospectives in differnt forms
gender prospectives in differnt formsgender prospectives in differnt forms
gender prospectives in differnt forms
Nizam Al-Hussainy
 
APEX_Short report on the Desk research
APEX_Short report  on the Desk researchAPEX_Short report  on the Desk research
APEX_Short report on the Desk research
Nizam Al-Hussainy
 
Fordham&Al-HussainyCombinedTechnicalReport
Fordham&Al-HussainyCombinedTechnicalReportFordham&Al-HussainyCombinedTechnicalReport
Fordham&Al-HussainyCombinedTechnicalReport
Nizam Al-Hussainy
 

Más de Nizam Al-Hussainy (6)

NRP_Document_Anand_24Oct16 (1)
NRP_Document_Anand_24Oct16 (1)NRP_Document_Anand_24Oct16 (1)
NRP_Document_Anand_24Oct16 (1)
 
DRR prodoc -2 for UN women -final draft
DRR prodoc -2 for UN women -final draftDRR prodoc -2 for UN women -final draft
DRR prodoc -2 for UN women -final draft
 
gender prospectives in differnt forms
gender prospectives in differnt formsgender prospectives in differnt forms
gender prospectives in differnt forms
 
APEX_Short report on the Desk research
APEX_Short report  on the Desk researchAPEX_Short report  on the Desk research
APEX_Short report on the Desk research
 
Business & Gender
Business  & GenderBusiness  & Gender
Business & Gender
 
Fordham&Al-HussainyCombinedTechnicalReport
Fordham&Al-HussainyCombinedTechnicalReportFordham&Al-HussainyCombinedTechnicalReport
Fordham&Al-HussainyCombinedTechnicalReport
 

Dhaka revpres160814

  • 1. Preliminary Findings and Conclusions of the Mid-term Project Evaluation by Christian Bugnion, Subur Consulting S.L., Team Leader Dr. Nizam Al-Husainy, National consultant www.suburconsulting.es Dhaka, 16 August 2014 AID EFFECTIVENESS PROJECT Mid-term Evaluation Preliminary Findings Implemented by the ERD, MoF With technical and financial support by UNDP and co-funded by DFID, DANIDA, Australia
  • 2. • Feedback and accountability to stakeholders: Findings, conclusions and recommendations; • Inform about programme performance: relevance, efficiency, performance, effectiveness, ownership, and sustainability; • Identify good practice and lessons, looking at the achievements to date; • Make forward-looking recommendations taking into consideration the remaining two years time-frame of the Project, but also the wider Development Effectiveness Agenda Presentation objectives
  • 3. Mix-methods but primarily qualitative analysis based on the following: • Documentary review of project documents and updates received during the in- country mission • Semi-structured individual interviews with (20) key informants from the following stakeholder groups: A. GoB (4 ERD, 1 Cabinet, 1 MP, 1 Planning Commission) B. UNDP (2 ACD, 1 CD, 1 AE specialist) C. AE Unit (1 NPM, 1 DPM, M&E specialist, ICT Specialist, Aid Specialist) and a group discussion jointly with UNDP D. Development Partners: DFID (1), DANIDA (1) E. Civil society (2), Ernst and Young (1) • One field visit to interview participants from AE awareness workshop given at district level (Moulvbazar) by a member of the evaluation team METHODOLOGY :
  • 4. • Relevance in responding to identified needs • Efficiency of the project (use of resources) • Performance of the project including design issues and implementation • Effectiveness in achieving project results • Ownership (degree to which ERD is committed to the process) • Sustainability after the end of the project EVALUATION CRITERIA:
  • 5. • Sunday 3rd August 2013 : Start review of documents for the MTE and consultations between the AE team and the national consultant and field visit • Sunday 10 August 2014: arrival of Evaluation Team leader and start of formal key informant interviews, including joint AE team and UNDP joint meetings. • Key informant interviews from 10th to 14th August 2014 • 15th August 2014: review and analysis of data and notes and preparation of the presentation • 16th August 2014: presentation to primary stakeholders of the preliminary findings, conclusions and recommendations • End August 2014: submission of draft evaluation report Evaluation Agenda
  • 6. Evaluation Preliminary Findings, Conclusions and Recommendations
  • 7. • The project addresses the issue of Aid Effectiveness, a wider unit of analysis that cannot be achieved by a limited intervention such as the AE project in its limited time-frame. However as the AE project stems from the highest level of ERD authority, it is clearly responsive to the needs of the government and in line with the current debate on what is now called Development Effectiveness. • GoB planning is based on the current 6th 5-year plan (p. 239) and AE contributes to shaping future planning and partnership processes (such as JCS 2010-2014) Relevance
  • 8. • The project has known a number of delays both linked to procurement and human resource constraints and limitations from both UNDP and GoB’s side. In addition the year prior to the election more than half a year of work was lost given political unrest and violent strikes. • The project is not particularly efficient as delivery rates varied per year and some activities had to be postponed or cancelled or changed in light of the context. Late start also means low initial delivery : 47,5% of expenditures (US$ 1.46 mio or 32.6% of initial budget and 47.5% of current funds available). BUT delivery ≠ effectiveness!! Efficiency
  • 10. Need to understand the context and environment of the Project – a number of factors led to delay – enabling factor JCS 2010-2014 • 2011 – late recruitment and start of the project delayed to 2012 • Feb. 2012: change of NPD (15 Feb. 2012) – staffing and international staffing gradually falling in place – TOR for studies/assessment - Holding of awareness raising activities at Dhaka and Division levels – support to LCG/WG - Cambodia Aid database identified as model – Development of AIMS • 213 – part of the year lost strikes and security situation - Visit to VN for aid policy, capacity assessment of ERD • 2014 – Beta version of AIMS, final E&Y report ERD capacity assessment, aid policy outline established, IMC set-up Performance
  • 11. • Reasonable performance given the constraints – could have been better, but could also have been worse • Essential characteristics: low efficiency in part cause no clear road map to guide the vision of the AE (insufficient coord. and information sharing between GoB and UNDP on modalities and incremental approach and theory of change missing in the design) by also by lack of an enabling environment (e.g. initially low awareness of the AE, purpose of AE, no clear understanding of AE, no previous preparation within ERD or GoB except for 5 YP and JCS, so AE new and not streamlined) • Better reporting on results necessary, low RBM Performance
  • 12. • Despite average performance, project rating from the key informant interviews is: 4 out of 5 (1 being lowest, 5 being highest) regarding the effectiveness = Good. • This is based on the following: A. Awareness within GoB (high-level) of the importance of the AE agenda B. Development of the AIMS Database (win/win for GoB and DPs) essential to provide quality data on aid flows C. On-going process to develop an aid policy (outline ready and objective to finalize the policy by end of 2014) D. Revitalisation of the LCG and WGs E. Participation in international events (feeds national ownership and 5YP and JCS so multiplier effect) F. Ownership trough creation of ERD AE Wing and announced co-funding from GoB (leading to sustainability) G. Inclusiveness of the consultation process (NGOs) but more can be done (Parliament, media, etc.) Effectiveness
  • 13. • Rating Grid (1 lowest to 5 highest) Effectiveness E R D 2UNDP3 UNDP4ERD5 CS6 DP7 DP8 AE9 GoB12 AE14 CS15 AVG 4 4 4 4 3,5 4 4 4 4 4,5 4 4
  • 14. • The development of an AIMS database is a key achievement. Actually not yet live on line, but potential for win/win provided GoB and DPs are committed to its use • Will contribute to aid transparency and provide credible evidence and management information regarding aid flows to all authorized stakeholders • Slow in its shaping as no clear technical specs set out from the onset (tweaking of Cambodia’s model based on cost-effectiveness considerations) RESULTS PER PROJECT COMPONENT – 1 AIMS
  • 15. • Many awareness raising activities undertaken but wider inclusiveness and participation required (civil society, NGO, Parliament, South-South Coop) • Established a capacity assessment ERD wide but will not be able to generate evidence by the end of the project: at best some recommendations will be implemented but remains too soon to affect overall ERD aid management capacity • Questionable if this is correct entry-point (ERD-wide assessment) rather than more limited but incremental approach to capacity development (e.g. selected wings and future AE Wing) • Other LM capacity development envisaged but not materialised (although CA are being foreseen over the rest of the project – TOR developed) COMPONENT 2 : ERD Aid management capacity
  • 16. • Very positive feedback on the dynamics and revitalisation of the structures and positive appraisal of its performance – of course varies from WG to WG. • Unclear follow-up of key findings and recommendations stemming from WGs • More monitoring efforts and RBM into facilitating the process, and also should be under ownership of ERD when project ends (LCG Secretariat within ERD Wing? Currently all done by AE Unit – substitution?) COMPONENT 3 : LCG/WG mechanisms
  • 17. • Slow process and back-and-forth movement to the process. Initially unclear level of commitment to developing an AP – current process now based on VN experience requires technical support (int. and nat. consultants hired) and wide consultations with civil society, parliament, private sector, etc. • Draft outline ready • Inter-ministerial committee tasked with follow-up • Again initial lack of reference or preparation for taking up the aid policy development process (hence visits and examples from other countries) • Seen as critical to demonstrate ownership and leadership from GoB and create a coherent framework for DP assistance COMPONENT 4: AID POLICY
  • 18. • Participation in international events and support of DPs fuels national ownership • ERD S and CS and other high-level officials committed to AE agenda and the development of AE/DE Wing in ERD • Ownership ≠ Leadership – GoB committed to both but technical support from DPs necessary (such as UNDP) • Long-term process that requires a WoG approach beyond the life of the project Ownership
  • 19. • Seems guaranteed through ERD AE/DE Wing creation • Considering also GoB co-funding to the Project (last SC) • Full operational AIMS (likely by end of project) • Approval and implementation of the Aid Policy (likely by end of the project) • Gradual merging of AEU into ERD AE Wing with hand-over and training Sustainability
  • 20. 1. The project has still two years to complete its objectives (June 2016) 2. Important milestones have been achieved so far (AIMS, Draft outline of AP, support to LCG/WG, develop capacity assessment). Project outputs are nonetheless an essential contribution to the outcomes, but the outcomes are yet to be appraised. 3.AE agenda (or DE agenda) cannot be accomplished over the short time-frame with a single small project. The AE project is the initial building block from which AE (or DE) efforts must be mainstreamed in GoB with the support of DP. Long- term planning and commitment from both GoB and DPs to this effect is essential (incremental approach of 15 years or more). 4. Opportunity for synergies and linkages exist within the AE agenda that are unexploited. Capacity Development should be a harmonized programme for GoB under the leadership of a DP (UNDP) and inclusive of all DP to work across sectors CONCLUSIONS
  • 21. 5. Capacity of other LM not yet started, could be envisaged outside of the project (under a Capacity Development Programme, see point 4. 6. ERD personnel capacity development needs to be given priority with adequate hand-over from AEU to new ERD wing over the next two years 7. Longer-term support requires a long-term roadmap for how and where support will be ensured from DPs over the next fifteen years as it is needed to ensure mainstreaming of leadership and ownership of AE into GoB 8. More attention needed to show results and RBM value – trainings to ERD CONCLUSIONS
  • 22. • Importance of giving sufficient time to create enabling conditions for any change process. Given that AE is a long-time process, the creation of a critical mass of knowledgeable and committed partners is a pre-condition for success (e.g. importance of awareness raising and dissemination) • AE requires a specific communication strategy to enable to engage the various partners and visualize stakeholders’ buy-in and gains. • Difficulty to report on achievements given untangible nature of some processes. Hence the importance of a robust RBM in the Project design to inform proper Monitoring and Evaluation and a proper Results Framework mindful of the hierarchy of results. • Importance of leveraging national leadership and ownership through international exposure and participation in regional initiatives (Post Busan Conference, APD, etc.) – so capacity to grasp emerging opportunities beyond the prodoc. Lessons Learnt
  • 23. 1. Continue and consolidate the project achievements, particularly: ▫ Consolidate and roll-out functional AIMS to be used by GoB and all DP including UNDP in the first phase to show commitment to the process ▫ Continue the process and provision of support to the development of the Aid Policy and ensure its finalisation ▫ Continue providing support to ERD capacity development and ensure hand- over, training and coaching of the ERD new DE Wing ▫ Continue to support participation in LCG/WG structure and participation in international events 2. Capacity development for development effectiveness is not limited to ERD or specific LM. A harmonized approach amongst DPs is required for an effective WoG capacity development programme under the aegis of the UNDP. This global and harmonized CD programme should be inclusive of all CD projects and initiatives but provide an overall framework for actual results of the CD process. RECOMMENDATIONS
  • 24. 3. The value of the inclusion of the Capacity Assessment foreseen amongst now 5 LM under the AE project is not evident for this project and should be dropped and included in the wider CD programme mentioned in the previous point to ensure no duplication of other DP efforts. 4. Develop a fifteen year road-map and strategy for achieving mainstreaming of AE/DE into WoG with commitment and support from DPs and incremental approach from ERD to WoG. 5. Plan incremental developments on the basis of achievements and synchronized with the National FYPs 6. Improve RBM knowledge and capacity through commissioning JOINT EVALUATIONS of future AE/DE interventions RECOMMENDATIONS (cont.)
  • 25. 7. Develop a monitoring mechanism for LCG/WG to ensure that key issues are being addressed (high number of issues do not appear to be followed up or no evidence of referral). Important issues raised in LCG and WG should lead to action. The ERD owned LCG Secretariat needs to be properly staffed and equipped for this function. 8. UNDP and ERD need to develop jointly a comprehensive communication strategy for AE/DE that can be used for addressing various stakeholders (media, CS, Parliament) based on a shared understanding of the AE/DE agenda, including at field level (sub-district). 9. High visibility needs to be given to achievements (when AIMS will be used and the first analytical report prepared, when the NAP will be officially adopted, etc.) to contribute to leadership and ownership. RECOMMENDATIONS (cont.)
  • 26. Questions or comments welcome Thank you very much! Christian Bugnion de Moreta, Team Leader Nizam Al-Husainy, National Consultant www.suburconsulting.es